3A3
FWH
Turbine Floor
WallWall
Boilermakers weld lifting lugs to
old shell. The lugs are designed to
match the connection style of the
new heater shell lugs.
Prepared By
Steven Cooper
3A3
FWH
Boilermakers weld temporary
attachments to heater shell in 4
locations over the cut line (If
required). Supports are designed to
allow the cutting head to travel
through the support.
Turbine Floor
WallWall
The crane is released while Tri-Tool
installs the cutter and performs the
entire cut to the shell. The shell is
supported by the walls (temporary
supports if required) saving 72
hours of crane time through
removal and installation of the new
shell.
The Boilermakers rig the lifting
device to the crane. The lifting
device is then set on the heater
room walls and attached to the
new lugs previously welded to the
heater shell.
Tri-Tool removes cutting
equipment and the crane is re-
attached to the lifting device and
the heater shell.
Prepared By
Steven Cooper
3A3
FWH
Attachments are cut by torch at
the top of the attachment before
the heater shell is lifted out by the
crane. Bottom welds will be
removed by grinding after the lift.
The crane then lifts the old heater
shell out of the room to be set on
cribbing on the turbine deck or
truck bay.
Turbine Floor
WallWall
Prepared By
Steven Cooper
The lifting device is detached from
the heater shell and carried to a
staging location. The heater shell
can then be rigged with nylon
slings and laid horizontal in the Sea
/ Land.
3A3
FWH
Turbine Floor
WallWall
3A3
FWH
Prepared By
Steven Cooper

Contenu connexe

En vedette

Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsTorben Haagh
 
letter of rec from Christian
letter of rec from Christianletter of rec from Christian
letter of rec from ChristianSean Fowler
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...John Downs
 
NewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerNewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerWorldwatch Institute
 
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesExperimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesSociety of Women Engineers
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and BearingsNavneet Roy
 
Wind Turbine Report Final
Wind Turbine Report FinalWind Turbine Report Final
Wind Turbine Report FinalJames Goddings
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Mohamed _el_shora
 
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Oleg Bosyi
 

En vedette (11)

Wind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of DrivetrainsWind Drivetrain: Reliability and Serviceability of Drivetrains
Wind Drivetrain: Reliability and Serviceability of Drivetrains
 
letter of rec from Christian
letter of rec from Christianletter of rec from Christian
letter of rec from Christian
 
JAM_RESUME
JAM_RESUMEJAM_RESUME
JAM_RESUME
 
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
SPE 90376 presentation slides - Turbine drilling with imgregnated diamond bit...
 
NewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear PowerNewNuclear? Global Trends in Renewable and Nuclear Power
NewNuclear? Global Trends in Renewable and Nuclear Power
 
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel TemperaturesExperimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
Experimental Study of Gas Turbine Combustion with Elevated Fuel Temperatures
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
Latest Research On Gears and Bearings
Latest Research On Gears and BearingsLatest Research On Gears and Bearings
Latest Research On Gears and Bearings
 
Wind Turbine Report Final
Wind Turbine Report FinalWind Turbine Report Final
Wind Turbine Report Final
 
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016Operation and Well Setting GTI SEG-SUSC 08-10-2016
Operation and Well Setting GTI SEG-SUSC 08-10-2016
 
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
Simulation of a Gas Turbine Combustor Test Rig using a Reactor Network Approa...
 

#3 Heater Rigging concept Rev 2

  • 1. 3A3 FWH Turbine Floor WallWall Boilermakers weld lifting lugs to old shell. The lugs are designed to match the connection style of the new heater shell lugs. Prepared By Steven Cooper
  • 2. 3A3 FWH Boilermakers weld temporary attachments to heater shell in 4 locations over the cut line (If required). Supports are designed to allow the cutting head to travel through the support. Turbine Floor WallWall The crane is released while Tri-Tool installs the cutter and performs the entire cut to the shell. The shell is supported by the walls (temporary supports if required) saving 72 hours of crane time through removal and installation of the new shell. The Boilermakers rig the lifting device to the crane. The lifting device is then set on the heater room walls and attached to the new lugs previously welded to the heater shell. Tri-Tool removes cutting equipment and the crane is re- attached to the lifting device and the heater shell. Prepared By Steven Cooper
  • 3. 3A3 FWH Attachments are cut by torch at the top of the attachment before the heater shell is lifted out by the crane. Bottom welds will be removed by grinding after the lift. The crane then lifts the old heater shell out of the room to be set on cribbing on the turbine deck or truck bay. Turbine Floor WallWall Prepared By Steven Cooper
  • 4. The lifting device is detached from the heater shell and carried to a staging location. The heater shell can then be rigged with nylon slings and laid horizontal in the Sea / Land. 3A3 FWH Turbine Floor WallWall 3A3 FWH Prepared By Steven Cooper