The document summarizes six cost options for a new or renovated middle school in Gloucester County. Option A1 would construct a new 800-student middle school on the Walker Road site for a total estimated cost of $28.2 million. Option A2 is similar but slightly cheaper at $27.9 million. Option B would build a new school on the existing Page site for $26.7 million. Additional potential costs discussed include adding a 9th grade wing, geothermal heating/cooling, and renovating or replacing athletic facilities. A renovation of the existing Page school is estimated at $22.2 million under Option C.
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
October 27th 2011 RRMM Powerpoint
1. Joint Meeting of Gloucester County
School Board and Board of Supervisors
October 27, 2011
Page Middle School Discussion
RRMM
A R C H ITE C T S
2. Since our meeting on September 20, 2011…
Option A1 – New 800 Student Middle School on Walker Road Site (6-8)
Option A2 - New 800 Student Middle School on Walker Road Site (6-8)
Option B – New 800 Student Middle School on Page Site (6-8)
RRMM
Add-Ons
9th Grade House @ Walker Road Site
Geothermal Option
Administration and Operations Center @ Page Site
New Football Field @ Walker Road Site
New Softball Field @ Walker Road Site
Option C – 800 Student Renovation and Addition on Page Site (6-8)
Backup Data for Each Cost Model and Add-On
Basis of Cost (No Deductions Shown for Insurance Settlement)
A R C H ITE C T S
3. PAGE MIDDLE SCHOOL
COST OPTION SUMMARY
Title
Brief Description
Probable Total Project Cost
Option A1
6-8 Middle School on Walker Rd for 800
students.
$28,169,690
Option A2
6-8 Middle School on Walker Rd for 800
students.
$27,937,322
Option B
6-8 Middle School on Page Site for 800
students.
$26,703,772
Add-on 1
9th Grade House at Walker Road Site
$11,742,000
Add-on 2
Geothermal Option
Add-on 3
High School A-Wing Renovations
Add-on 4
Administration and Operations Center
@ Page
Add-on 5
New Football Field @ Walker Road
600,000
Replaces football field at Page Site. Includes lights and 25
additional parking spaces.
Add-on 6
New Softball Field @ Walker Road
185,000
Replaces softball fields at Page Site. Includes lights and 25
additional parking spaces.
Option C
6-8 Middle School Renovation/Addition
on Page Site for 800 students
RRMM
A R C H ITE C T S
Comments
Slightly better location for utilities than A1 and better
opportunity for future high school connection.
$750,000
$2,132,100
$14,220,365
$22,193,780
Includes renovation of existing auditorium, gym, lobby.
Assumes SF/student, on-site and off-site improvements
comparable to Option B.
4. Date:
Option A1
Construction Costs (Hard Costs)
Option B
New 6-8 for 800 Walker Road Site
10/27/2011
New 6-8 for 800 Page Site
Factors
Unit
Costs
Factors
Unit
Costs
Exceptional Site Costs Allowance (site demo: A- note 1; B- note 2)
1
LS
$343,600
1
LS
$154,750
Exceptional Site Costs Allowance (Bldg. demo & hazmat removal)
1
LS
$-00
1
LS
$361,073
General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.)
Exceptional Site Costs Allowance (signalization)
1
1
LS
LS
$1,953,576
$200,000
1
1
LS
LS
$1,967,218
$200,000
LS
LS
LS
$ 150.00
$505,000
$800,000
$979,840
$17,760,000
$22,542,016
1
1
1
118,400
LS
LS
LS
$ 150.00
$505,000
$-00
$135,000
$17,760,000
$21,083,041
5%
PCT
$1,127,101
$23,669,117
6%
PCT
$1,264,982
$22,348,023
7%
1
1
PCT
LS
LS
$1,577,941
$1,964,446
$137,710
$3,680,097
7%
1
1
PCT
LS
LS
$1,475,813
$1,964,446
$137,710
$3,577,969
Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.)
Exceptional Site Costs Allowance (Road Widening of TC Walker)
Exceptional Site Costs Allowance (Water and Sewer)
New Middle School Building (148 SF/P x 800 students)**
Total Construction Cost
Contingency Factor
Construction Cost Grand Total (w/ Contingency)
1
1
1
118,400
Soft Costs
Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.)
Furnishings/Fixtures/Equipment and Technology Allowance
Construction Testing/Inspection, Adv./Reprod.
Miscellaneous Soft Costs Total
Total Project Cost
Total Project Cost with 3% Escalation
$27,349,214
$28,169,690
Version A2 (incl. conting., soft costs & escalation)
$27,937,322
RRMM
A R C H ITE C T S
$25,925,992
$26,703,772
5. Potential Additional Costs
9th Grade House + Core Increase to Accommodate Growth*
Sitework for 9th Grade House
Construction Contingency @ 5%
Soft Costs at app. 15%
Subtotal w/ 3% escalation
Geothermal Option
1
HS A-Wing Renovation Allowance
Soft Costs at app. 15%
Subtotal w/ 3% escalation
Administration and Operations Center Project
Exceptional Site (turn lane allowance)
Exceptional Site (Bldg. demo less gym/audit/main hall.)
Site Work
Renovate Existing Gym, Auditorium, Lobby
New Administration & Operations Bldg + Transportation
Convert Transportation Bldg to Grounds
Hazmat Removal (incl. in bldg. demo)
Construction Contingency (5%)
Soft Costs
Total Project Cost w/ 3% escalation
Replace Page Football Field @ Walker Rd. Site (w/ lights)
Replace Page Softball Field @ Walker Rd. Site (w/ lights)
*Increase incl. auditorium exp. 400 to 800 (4,450), 9th Gr. House (31,082), Admin
(600), Media Ctr Core (200), Special Programs (3,100) + efficiency factor.
**Basis for Costs - See Attachment
RRMM
50,000 $ 165.00
1
LS
1
LS
1
LS
A R C H ITE C T S
LS
30,000 $
$8,250,000
$1,250,000
$475,000
$1,425,000
$11,742,000
$750,000
60.00
LS
$1,800,000
$270,000
$2,132,100
1
LS
1
LS
1
LS
17,536 $ 50.00
67,444 $ 120.00
1
LS
1
LS
1
LS
1
LS
1
$50,000
$291,981
$1,348,880
$876,800
$8,093,280
$383,109
$-00
$558,161
$2,204,221
$14,220,625
1
1
LS
LS
$600,000
$185,000
Note 1 - Walker Road site demo primarily clearing and grubbing of timber.
Note 2 - Page site includes general clearing/demo but not the $361,073 for
demo of main building noted on the next line.
$750,000
8. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Existing George Washington Highway/TC Walker Road intersection
New traffic signal ($200,000)
Extend northbound right-turn lane to 200’ taper, 300’ storage ($50,000)
Extend southbound left-turn lane to 200’ taper, 300’ storage ($50,000)
New westbound right turn lane - 200’ taper, 200’ storage ($125,000)
RRMM
A R C H ITE C T S
9. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Existing TC Walker Road
New westbound right turn lane at the proposed main school entrance – 200’
taper, 200’ storage ($125,000)
New westbound right turn lane at the proposed bus entrance – 200’ taper, 200’
storage ($125,000)
School Zone Advance Warning Speed Limit Signage Assembly and Flashing
Beacons ($30,000)
Subtotal Turn Lane Improvements - $505,000
Widen existing 2-lane road to new 3-lane road for approximately 0.3 mile.
Widened road would include left turn lanes into two proposed site entrances.
($800,000)
RRMM
A R C H ITE C T S
10. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Water
3,000’ of new 8” or 10” fire service from site service entrance to George Washington Hwy.
($225,000)
Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000)
Tap existing 12” water main ($40,000)
Double check detector and vault ($15,000)
3” water meter and vault ($5,000)
Tap fee – County ($25,200)
Tap fee – HRSD ($59,140)
RRMM
A R C H ITE C T S
11. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Sewer
3,000’ of new 4” or 6” force main from site service entrance to George Washington Hwy.
($225,000)
Tap existing 18” HRSD force main ($75,000)
New on-site pump station ($250,000)
Tap fee – County ($30,500)
Water and Sewer Subtotal - $979,840
Construction Cost Opinion = $2,484,840
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit
fees)
RRMM
A R C H ITE C T S
12. Onsite Costs Improvements
Preliminary Opinion of Construction Costs
Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions
Qty
Unit
24,200
30
CY
ACRE
Cost per Unit
Total
Section Total Cost
Site Demolition:
Earthwork (Cut/Fill/Dispose)
Clear & Grub
$
$
8.00
5,000.00
$
$
193,600
150,000
Total Site Demolition
$ 193,600.00
$ 150,000.00
$ 343,600.00
New Sitework:
Practice Field/Track
Practice Field
Track Running Surface/Striping
175,000
48,000
SF
SF
$
$
1.00
5.00
$
$
175,000
240,000
$
415,000
Baseball Field
Field Base Fill/Drain/Surface
Dug-Outs Bating Areas
Fencing
1
2,200
200
Field
SF
LF
$
$
$
25,000.00
3.00
35.00
$
$
$
25,000
6,600
7,000
$
38,600
Hard Surface Play Area
Base Pad/Asphalt Surfacing
10,800
SF
$
6.00
$
64,800
$
64,800
Court
Court
LF
Poles
$
$
$
$
45,000.00
3,500.00
25.00
5,500.00
$
$
$
$
90,000
7,000
11,500
22,000
$
130,500
Tennis Courts
Base/Surfacing
Striping/Posts/Netting
Fencing/Gates
Lighting
RRMM
A R C H ITE C T S
2
2
460
4
13. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Fitness Development
Soft Mulch Workout Area Pad
1,500
SF
$
10.00
$
15,000
$
15,000
3,889
SY
$
30.00
$
116,667
$
181,867
Heavy Duty Asphalt Drive Lanes
667
SY
$
30.00
$
20,000
Striping
480
LF
$
0.50
$
240
18
EA
$
95.00
$
1,710
1,700
LF
$
20.00
$
34,000
10
EA
$
125.00
$
1,250
4
EA
$
2,000.00
$
8,000
Bus Parking/Loop with Drive Lanes
Heavy Duty Asphalt Parking
Symbols/Directional Arrows
Curb & Gutters
Signage
Site Lighting
RRMM
A R C H ITE C T S
14. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Vehicular Parking with Drive Lanes
Light Duty Asphalt Parking
7,778
SY
$
25.00
$
194,444
Light Duty Asphalt Drive Lanes
3,000
SY
$
25.00
$
75,000
Striping
3,750
LF
$
0.50
$
1,875
10
EA
$
95.00
$
950
2,000
LF
$
20.00
$
40,000
Signage
15
EA
$
125.00
$
1,875
Site Lighting
10
EA
$
2,000.00
$
20,000
Heavy Duty Asphalt Drive Lanes
4,000
SY
$
30.00
$
120,000
Striping
1,000
LF
$
0.50
$
500
10
EA
$
95.00
$
950
1,300
LF
$
20.00
$
26,000
Signage
5
EA
$
125.00
$
625
Site Lighting
5
EA
$
2,000.00
$
10,000
Symbols/Directional Arrows
Curb & Gutters
$
334,144
$
158,075
Entry Drive Lanes
Symbols/Directional Arrows
Curb & Gutters
RRMM
A R C H ITE C T S
15. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Landscaping/Seeding
Large Trees
13
EA
$
350.00
$
4,550
Medium Trees
24
EA
$
245.00
$
5,880
Small Trees
10
EA
$
125.00
$
1,250
Shrubs
50
EA
$
45.00
$
2,250
Groundcover
250
EA
$
15.00
$
3,750
Mulch Beds
10
CY
$
40.00
$
400
12
EA
$
134.00
$
1,608
2
EA
$
125.00
$
250
6,500
SF
$
4.00
$
26,000
LOC
$
1,500.00
$
7,500
1,000
SF
$
5.00
$
5,000
Erosion Control
5,000
LF
$
3.00
$
15,000
Cut/Fill/Dispose
14,520
CY
$
8.00
$
116,160
7,500
CY
$
18.00
$
135,000
435,600
SF
$
0.07
$
30,492
$
18,080
$
1,858
$
38,500
$
296,652
Site Signage
Fire Lane Signs
Stop/Directional/Info Signs
Concrete Walks/Pads
Concrete Walks
HC Ramps/Walk Features
Pads
5
Earthwork
BMP w/Control Measures
Stabilization/Seeding
RRMM
A R C H ITE C T S
16. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option A1 - New 800 Student School on TC Walker Road Site
Section Descriptions
Qty
Storm System w/Structures
3,000
LF
$
60.00
$
180,000
$
180,000
500
LF
$
40.00
$
20,000
$
20,000
Sanitary Sewer System w/Structures
Unit
Cost per Unit
Total
Section Total Cost
Water System w/ Vault/Meter (in off site)
$
-
$
-
$
-
Water System w/ Vault/Meter
$
-
$
-
$
-
(incl. w/ off site work)
Fire Line System w/ Structures
500
LF
Offsite Utility Allowance (incl. in off site)
$
$
35.00
-
$
$
17,500
-
$
$
17,500
-
Gas Service
1
LS
$
8,000.00
$
8,000
$
8,000
Power Service / Transformers
1
LS
$
35,000.00
$
35,000
$
35,000
Total New Sitework
RRMM
A R C H ITE C T S
$ 1,953,576
19. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Existing George Washington Highway/TC Walker Road Intersection
New
Traffic Signal ($200,00)
New Northbound right-turn lane to 200’ taper, 300’ storage ($50,000)
Extend Southbound left-turn lane to 200’ taper, 300’ storage ($50,000)
New Westbound right-turn lane – 200’ taper, 200’ storage ($125,000)
RRMM
A R C H ITE C T S
20. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Existing TC Walker Road
Widen
existing 2-lane road to 3-lane road 500’ on either side of the easement entrance,
approximately 1,000’. Widened road would include left turn lane into proposed site entrance.
($550,000)
Assume 15,000 sf of wetlands impacts with road widening. Based on $180,000 per acre mitigation
cost (2:1 ratio), wetlands mitigation fee approximated at $62,000.
New Westbound right-turn lane at the proposed main school entrance – 200’ taper, 200’ storage
($125,000)
School Zone Advance Warning Speed Limit Signage Assembly and Flashing Beacons ($30,000)
Construction Cost Opinion = $1,317,000
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit and
impact (fees)
RRMM
A R C H ITE C T S
21. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Water
•
•
•
•
•
•
•
800’ of new 8” or 10” fire service from site service entrance to George Washington Hwy.
($60,000)
Bore and jack 80’ under George Washington Hwy. northbound lanes ($30,000)
Tap existing 12” water main ($40,000)
Double check detector and vault ($15,000)
3” water meter and vault ($5,000)
Tap fee – County ($25,200)
Tap fee – HRSD ($59,140)
RRMM
A R C H ITE C T S
22. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs – Version A2 (cont’d)
Option A2 – New 800 Student School on TC Walker Road Site (Per attached RRMM sketch)
Based on preliminary analysis, the following improvements are anticipated:
Sewer
•
800’ of new 4” or 6” force main from site service entrance to George Washington Hwy.
($60,000)
• Tap existing 18” or 24” HRSD force main ($75,000)
• New on-site pump station ($250,000)
• Tap fee – County ($30,500)
Construction Cost Opinion = $979,840
(Does not include soft costs for surveying and design fees, right-of-way acquisition, or permit fees)
Total Option A2 = $2,296,840 or $188,000 less than A1. $188,000 x 1.05 contingency = $197,400.
$197,400 + $28,200 soft costs = $225,600. $225,600 x 1.03 escalation = $232,368. Thus bottom line
of Option A2 is $28,244,391.
RRMM
A R C H ITE C T S
24. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:
Proposed George Washington Highway/TC Walker Road bus entrance
New traffic signal ($200,000)
New northbound left-turn lane – 200’ taper, 300’ storage ($150,000)
New southbound right-turn lane – 200’ taper, 300’ storage ($150,000)
Existing George Washington Highway/Page MS entrance
Extend northbound left-turn lane to 200’ taper, 200’ storage ($50,000)
New south bound right-turn lane – 200’ taper, 200’ storage ($125,000)
RRMM
A R C H ITE C T S
25. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:
Existing George Washington Highway
Replace Existing School Zone Advance Warning Speed Limit Signage Assembly
and Flashing Beacons ($30,000)
Subtotal Turn Lane Improvements – ($505,000)
Water
New 8” fire service required for new school’s sprinkler system ($60,000)
Assume existing domestic water service is adequate
RRMM
A R C H ITE C T S
26. Offsite Transportation & Utility Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B – New 800 Student School on Existing Page MS Site (Per attached RRMM Sketch)
Based on preliminary analysis, the following improvements are anticipated:
Sewer
Assume existing pump station requires upgrading ($50,000)
Assume existing force main is requires relocation on site ($25,000)
Water and Sewer Subtotal – ($135,000)
Construction Cost Opinion = $840,000
(Does not include soft costs for surveying and design fees, right-of-way
acquisition, or permit and impact fees)
RRMM
A R C H ITE C T S
27. Onsite Costs Improvements
Preliminary Opinion of Construction Costs
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Site Demolition:
Existing Tennis Courts
2
EA
$
1,200.00
$
2,400
$
2,400
Existing Roadway Pavement
10
Loads
$
500.00
$
5,000
$
5,000
Existing Parking Pavement
20
Loads
$
500.00
$
10,000
$
10,000
CY
$
6.00
$
72,600
$
117,600
2,500.00
$
45,000
Earthwork (Cut/Fill/Dispose)
12,100
Clear & Grub
18
ACRE
$
Signage
-
EA
$
-
$
-
$
-
Misc. Existing Building Pads and Structures-Heavy Equipment Removal-Disposal
Other Pads and Structures
Loads
$
500.00
$
5,000
Fencing
1
Loads
$
500.00
$
500
Bleachers
1
Loads
$
500.00
$
500
Tanks/Vaults
RRMM
10
1
Loads
$
500.00
$
500
A R C H ITE C T S
$
6,500
28. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Unforeseen Underground Services
Qty
1
Unit
LS
Utility Removal (Disposal Costs)
Cost per Unit
$
Total
Section Total Cost
5,000.00
$
5,000
$
5,000
$
3,500
`
Storm
5
Load
$
500.00
$
2,500
Sanitary
1
Load
$
500.00
$
500
Water
1
Load
$
500.00
$
500
Site Lighting
18
Pole
$
250.00
$
4,500
$
4,500
Landscaping
1
LS
$
250.00
$
250
$
250
Total Site Demolition $ 154,750.00
Main School Structure Demo (incl. Hazmat)
RRMM
A R C H ITE C T S
91643 $
3.94
$
361,073
$
361,073
29. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
New Sitework:
Practice Field/Track
Practice Field
175,000
SF
$
1.00
$
175,000
$
415,000
Track Running Surface/Striping
48,000
SF
$
5.00
$
240,000
Field
$
25,000.00
$
25,000
$
38,600
2,200
SF
$
3.00
$
6,600
200
LF
$
35.00
$
7,000
10,800
SF
$
6.00
$
64,800
$
64,800
$
130,500
Baseball Field
Field Base Fill/Drain/Surface
Dug-Outs Bating Areas
Fencing
1
Hard Surface Play Area
Base Pad/Asphalt Surfacing
Tennis Courts
Base/Surfacing
2
Court
$
45,000.00
$
90,000
Striping/Posts/Netting
2
Court
$
3,500.00
$
7,000
LF
$
25.00
$
11,500
Poles
$
5,500.00
$
22,000
Fencing/Gates
Lighting
RRMM
A R C H ITE C T S
460
4
30. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Fitness Development
Soft Mulch Workout Pad Area
1,500
SF
$
10.00
$
15,000
$
15,000
3,889
SY
$
30.00
$
116,667
$
181,867
Heavy Duty Asphalt Drive Lanes
667
SY
$
30.00
$
20,000
Striping
480
LF
$
0.50
$
240
18
EA
$
95.00
$
1,710
1,700
LF
$
20.00
$
34,000
Signage
10
EA
$
125.00
$
1,250
Site Lighting
4
EA
$
2,000.00
$
8,000
Lite Duty Asphalt Parking
7,778
SY
$
25.00
$
194,444
$
334,144
Lite Duty Asphalt Drive Lanes
3,000
SY
$
25.00
$
75,000
Striping
3,750
LF
$
0.50
$
1,875
10
EA
$
95.00
$
950
2,000
LF
$
20.00
$
40,000
Signage
15
EA
$
125.00
$
1,875
Site Lighting
10
EA
$
2,000.00
$
20,000
Bus Parking/Loop with Drive Lanes
Heavy Duty Asphalt Parking
Symbols/Directional Arrows
Curb & Gutters
Vehicular Parking with Drive Lanes
Symbols/Directional Arrows
Curb & Gutters
RRMM
A R C H ITE C T S
31. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Qty
Unit
Cost per Unit
Total
Section Total Cost
Entry Drive Lanes
Heavy Duty Asphalt Drive Lanes
4,000
SY
$
30.00
$
120,000
Striping
1,000
LF
$
0.50
$
500
10
EA
$
95.00
$
950
1,300
LF
$
20.00
$
26,000
Signage
5
EA
$
125.00
$
625
Site Lighting
5
EA
$
2,000.00
$
10,000
13,333
SY
$
5.00
$
66,667
2,800
LF
$
0.50
$
1,400
10
EA
$
95.00
$
950
800
LF
$
20.00
$
16,000
5
EA
$
125.00
$
625
Symbols/Directional Arrows
Curb & Gutters
$
158,075
$
85,642
Grounds/Transportation Pavement Rework/Addition
Heavy Duty Asphalt Drive Overlay
Striping
Symbols/Directional Arrows
Curb & Gutters
Signage
RRMM
A R C H ITE C T S
32. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Landscaping/Seeding
Large Trees
Medium Trees
Small Trees
Shrubs
Groundcover
Mulch Beds
13
24
10
50
250
10
EA
EA
EA
EA
EA
CY
$
$
$
$
$
$
350.00
245.00
125.00
45.00
15.00
40.00
$
$
$
$
$
$
4,550
5,880
1,250
2,250
3,750
400
$
18,080
Site Signage
Fire Lane Signs
Stop/Directional/Info Signs
12
2
EA
EA
$
$
134.00
125.00
$
$
1,608
250
$
1,858
Concrete Walks/Pads
Concrete Walks
HC Ramps/Walk Features
Pads
6,500
5
1,000
SF
LOC
SF
$
$
$
4.00
1,500.00
5.00
$
$
$
26,000
7,500
5,000
$
38,500
Earthwork
Erosion Control
Cut/Fill/Dispose
BMP w/Control Measures
Stabilization/Seeding
RRMM
Qty
5,000
14,520
7,500
435,600
LF
CY
CY
SF
$
$
$
$
3.00
8.00
18.00
0.07
$
$
$
$
15,000
116,160
135,000
30,492
$
296,652
A R C H ITE C T S
Unit
Cost per Unit
Total
Section Total Cost
33. Onsite Costs Improvements
Preliminary Opinion of Construction Costs (cont’d)
Option B - New 800 Student School on Existing Page MS Site
Section Descriptions
Storm System w/Structures
Sanitary Sewer System w/Structures
Qty
Unit
Cost per Unit
Total
Section Total Cost
1,800
LF
$
60.00
$
108,000
$
108,000
500
LF
$
40.00
$
20,000
$
20,000
Water System w/ Vault/Meter
$
-
$
-
$
-
(incl. w/ off site work)
Fire Line System w/ Structures
500
LF
$
35.00
$
17,500
$
17,500
Gas Service
1
LS
$
8,000.00
$
8,000
$
8,000
Power Service / Transformers
1
LS
$
35,000.00
$
35,000
$
35,000
Total New Sitework $ 1,967,218
RRMM
A R C H ITE C T S
34. Option C
New 6-8 for 800 Page Site
Construction Costs (Hard Costs)
Exceptional Site Costs Allowance (site demo)*
Exceptional Site Costs Allowance (Bldg. demo & hazmat removal)**
General Site Costs (Pkg, pav'g, walks, baseball, track, tennis, etc.)
Exceptional Site Costs Allowance (signalization)
Exceptional Site Costs Allowance (Turn lanes & off-site imp., etc.)
Exceptional Site Costs Allowance (Water and Sewer)
Renovation of Existing Page (hazmat removal in portion to remain)
Renovation of Existing Page
New Middle School Building (148 SF/P x 800 students)***
Total Construction Cost
Contingency Factor
Construction Cost Grand Total (w/ Contingency)
Soft Costs
Prof. Services (A/E, Commissioning, Surveys, Borings, LEED, etc.)
Furnishings/Fixtures/Equipment and Technology Allowance
Construction Testing/Inspection, Adv./Reprod.
Miscellaneous Soft Costs Total
Factors
1
1
1
1
1
1
52,569
52,569
65,831
Unit
LS
LS
LS
LS
LS
LS
$
1.95
$ 70.00
$ 150.00
Costs
$154,750
$153,951
$1,982,218
$200,000
$505,000
$135,000
$102,510
$3,679,830
$9,874,650
$16,787,909
6%
PCT
$1,007,275
$17,795,183
10%
1
1
PCT
LS
LS
$1,678,791
$1,964,446
$108,940
$3,752,176
Total Project Cost
Total Project Cost with 3% Escalation
Geothermal Option
1
*Page Site includes clearing and demo but not the $153,951 for demo of tornado damaged area.
**Based on actual bid + monitoring of 39,074 sf being demo'd. Does not include front bldg. portion.
***Square footage based on 118,400 sf (800 x 148 sf/student) less existing52,569 sf of renovation. Thus,
new addition of est. 65,831 sf.
RRMM
$21,547,359
$22,193,780
A R C H ITE C T S
LS
$750,000
35. Middle Schools and High Schools – Oct. 2011
Basis of Costs – Costs included below are construction costs (Bid Costs) and
do not include soft costs, construction contingencies, FFE and the like. Bid
prices vary depending on site conditions, required site work, complexity,
quality, size, schedule and many other factors but most importantly the market
activity at the time of bid. Costs shown are averages and tempered by current
market conditions.
Costs are also preliminary and are averages from across the state within
varying economic zones, schedule constraints, quality standards and many
other factors. See attached Dept. of Education cost data used as a resource.
RRMM
A R C H ITE C T S
36. Middle School
09-10 avg. – $142.17.
6 year avg. costs = $171.91
2011 to date – no projects.
Budget Recommendation –
$175 ($150 building, $25 site) + escalation to bid date (3%)
6 year average SF/Student =148 Recommend 148 sf/student
High School
Office Building
09-10 avg. – $0. No High Schools built.
08-09 avg. - $209.05
5 year avg. costs = $186.16
2011 to date – $210.39
Budget Recommendation - $195 ($165 building, $30 site)
6 year average SF/Student = 152
2011 average SF/Student = 164
Recommend 160 sf/student
RRMM
A R C H ITE C T S
Recommend $140/sf.
(RS Means Construction Cost Data)
38. Football and Softball Field Cost Breakdown
Football Field:
Football Field = $150,000
Football Field Lights at 10 LOC/$5,000 EA = $50,000
Bleachers at 2000 Seats = $ 220,000
Parking Spaces at 25 @ $2,000/EA = $50,000
Fencing 8' High at 4,000 LF = $60,000
Total = $530,000
$530,000 x 1.1 for design/contingency = $583,000
$583,000 x 1.03 for escalation = $600,490
App. $600,000
RRMM
A R C H ITE C T S
39. Football and Softball Field Cost Breakdown (cont’d)
Softball Field:
Softball Field = $25,000
Softball Field Lights at 8 LOC/$5,000 EA = $40,000
Bleachers at 300 Seats = $ 33,000
Parking Spaces at 25 @ $2,000/EA = $50,000
Fencing 8' High at 1,000 LF = $15,000
Total = $163,000
$163,000 x 1.1 for design/contingency = $179,300
$179,300 x 1.03 for escalation = $184,679
App. $185,000
RRMM
A R C H ITE C T S
40. Joint Meeting of Gloucester County
School Board and Board of Supervisors
October 27, 2011
Page Middle School Discussion