SlideShare une entreprise Scribd logo
1  sur  31
Télécharger pour lire hors ligne
TCEQ – PGMA Program &
Plan Performance Review

  TEXAS ALLIANCE OF GROUNDWATER DISTRICTS
         TEXAS GROUNDWATER SUMMIT
   - GROUNDWATER MANAGEMENT PRACTICES -
              AUGUST 29, 2012
OVERVIEW
Priority Groundwater Management Areas
• Old PGMAs
• New PGMAs
• Future PGMAs
Management Plans & Performance Review
• TCEQ Role
• Plan & Petition Triggers
• Process
PGMA?
Priority
Groundwater
Management
Area

An area of the state designated and
delineated by the TCEQ that is experiencing,
or expected to experience within the next 50
years, critical groundwater problems
PGMA?
What are critical groundwater problems?

• Shortages of surface or groundwater
• Land subsidence resulting from
  groundwater withdrawal
• Contamination of groundwater supplies
PGMA?
What is the purpose of designating a PGMA?

• To assure that a groundwater conservation
  district is established to manage the
  aquifer or aquifers and to conserve,
  preserve, protect, and prevent waste of
  groundwater
Old PGMAs
  1990          1997        2001
Designated    Renamed &    Mandates
as Critical   Designated   for TCEQ
  Areas       as PGMAs
Old PGMAs
   1990                   1997           2001
 Designated            Renamed &        Mandates
 as Critical           Designated       for TCEQ
   Areas               as PGMAs



 2002           2008             2011      2012
 TCEQ          1st test        PGMA       TCEQ
 rules         of TCEQ        statute      rules
adopted         rules        amended     amended
Old PGMAs
  GCD Creation Process


     Executive
 Director’s (ED)
 GCD report and
recommendation
   developed &
 filed with TCEQ

Possible
Recommendations
• create new GCD(s)
• add PGMA to GCD(s)
Old PGMAs
  GCD Creation Process

                       Contested case
     Executive
                        hearing and
 Director’s (ED)
                       State Office of
 GCD report and
                       Administrative
recommendation
                          Hearings
   developed &
                        Proposal for
 filed with TCEQ
                          Decision

Possible
Recommendations
• create new GCD(s)
• add PGMA to GCD(s)
Old PGMAs
  GCD Creation Process

                       Contested case
     Executive                            TCEQ
                        hearing and
 Director’s (ED)                         Agenda
                       State Office of
 GCD report and                          Hearing
                       Administrative
recommendation                             and
                          Hearings
   developed &                            TCEQ
                        Proposal for
 filed with TCEQ                          Order
                          Decision

Possible
Recommendations
• create new GCD(s)
• add PGMA to GCD(s)
Old PGMAs
Post-TCEQ Order
           Commissioners
              Court(s)            Temporary
New                                Directors
GCD?           appoint
             Temporary               take
              Directors             control


              GCD          Nay? – Back to
 Add to      board             TCEQ for
                           additional action
Existing     votes         within one year;
 GCD?         yeah          no additional
             or nay        hearing required
New PGMAs
Designation & GCD Creation Process
                Notice of new    Requests to
ID & initiate
                  study to         TWDB,
new studies
                stakeholders     TPWD, TDA
New PGMAs
Designation & GCD Creation Process
                 Notice of new     Requests to
ID & initiate
                   study to          TWDB,
new studies
                 stakeholders      TPWD, TDA

                   ED report &       Contested
                recommendations         case
 Agency
                     PGMA?            hearing
reports &
                                        and
info back       Create GCD(s)?        Proposal
  to ED
                 Add to existing         for
                     GCDs?            Decision
New PGMAs
Designation & GCD Creation Process
                  Notice of new      Requests to
ID & initiate
                    study to           TWDB,
new studies
                  stakeholders       TPWD, TDA

                   ED report &         Contested
                recommendations           case
 Agency
                      PGMA?             hearing
reports &
                                          and
info back        Create GCD(s)?         proposal
  to ED
                  Add to existing          for
                      GCDs?             decision

        TCEQ Agenda Hearing and TCEQ Order
New PGMAs
  Post-TCEQ Order
                           < 2 years – landowners may
                            create new or join existing
                           GCDs through legislative or
                New             petition processes
                GCD?
                           > 120 day < 2 years - TCEQ
  TAES*                      shall create one or more
Educational                          new GCDs
 Outreach
                 Add to        < 120 days – GCD board
                existing       votes yeah or nay. If nay,
                 GCD?         back to TCEQ for additional
                                action within one year

TAES = Texas AgriLife Extension Service
Future PGMAs
Data
• Gray / Blue / White Areas
• Modeled Available Groundwater
• 2011 Regional Water Plans/2012 State Water Plan
  • Unique 2011-2012 data snapshot

Timing & Schedule
• FY 2013 – identify & prioritize likely areas
• FY 2014 – Start new studies
  • 45-day stakeholder comment period
  • 180-days for TWDB & TPWD studies/reports
  • 90-days for ED-TCEQ report & recs.
GCD Management Plans
TCEQ Role

  Respond if GCD management plans are
  not adopted and/or readopted on time

  Respond if GCD is not operational as
  determined by the State Auditor’s Office

  Respond to Petitions for Inquiry
GCD Management Plans
Triggers – For Executive Director to initiate
TCEQ Performance Review

   GCD does not adopt initial plan by the 3 year
statutory deadline
   GCD does not readopt plan by the 5 year
statutory deadline
   EA-TWDB* does not approve plan or readopted
plan and GCD does not resolve within 180 days
   EA-TWDB does not approve plan or readopted
plan and all GCD appeals to TWDB final
  SAO finds GCD not operational

* EA-TWDB = Executive Administrator of the TWDB
GCD Management Plans
Triggers – Petition for TCEQ Inquiry

GCD does not:
1.   submit plan to EA-TWDB
2.   participate in joint planning
3.   adopt rules
4.   adopt DFC by resolution
5.   update plan within 2 years of new DFCs
6.   update rules within 1 year of new plan (#5)
7.   adopt rules designed to achieve the DFCs
8.   adequately protect groundwater by its rules
9.   adequately protect groundwater by enforcing
     substantial compliance with its rules
GCD Management Plans
Performance Review – Initiated by ED
        ED                       ED submits
                  ED notifies
  investigates                   compliance
                   GCD and
 the facts and                   agreement
                  attempts to
circumstances                      (CA) to
                    resolve
   of violation                     GCD
GCD Management Plans
Performance Review – Initiated by ED
        ED                            ED submits
                    ED notifies
  investigates                        compliance
                     GCD and
 the facts and                        agreement
                    attempts to
circumstances                           (CA) to
                      resolve
   of violation                          GCD

Compliance Agreement

• Identifies the violation
• Outlines GCD actions
• Provides schedule for compliance
• GCD – 30 days to amend / 60 days to enter
• Terms met? ED notifies GCD İNo Mas! TCEQ
GCD Management Plans
Performance Review – Petition for Inquiry


                  Petitioner
                 files copies        GCDs
  Affected
                  of Petition       provided
 Person files
                 with GCDs        opportunity
   Petition
                    in and           to file
 with TCEQ
                 adjacent to       responses
                     GMA
GCD Management Plans
Performance Review – Petition for Inquiry
              Dismiss?
 TCEQ            or            Review Panel
Petition                        Report and
Review      Appoint Five-    Recommendations
              Member
90 days       Review             120 days
               Panel?



                                  TCEQ
                                  Action
                                  45 days
GCD Management Plans
TCEQ Enforcement Action

Required When:
 • GCD is unable to resolve violation
 • Review Panel makes recommendation

Authorized TCEQ Actions:
 • Order GCD to take or refrain from certain actions
 • Dissolve the board
 • Request Attorney General bring suit for
   appointment of receiver
 • Dissolve the district
 • Recommend action to Legislature
Summary
Old PGMAs
• FY 2013 until done – work to establish GCDs
• Comal & Travis, Midland & Upton, Briscoe

New PGMAs
• FY 2013 – review data, identify areas & prioritize
• FY 2014 – start new studies

Performance Review
• Management plan adoption, readoption & SAO
• Petition for TCEQ Inquiry → review panel
Kelly Mills, P.G.
Texas Commission on
Environmental Quality

Telephone:
(512) 239-4512

FAX:
(512) 239-4450

E-mail:
Kelly.Mills@tceq.texas.gov

Contenu connexe

Similaire à PGMA Process and TCEQ's Role in Groundwater, Kelly Mills

Carbon credit basics
Carbon credit basicsCarbon credit basics
Carbon credit basicskonvictangio
 
Issues and Challenges of Power Projects.pptx
Issues and Challenges of Power Projects.pptxIssues and Challenges of Power Projects.pptx
Issues and Challenges of Power Projects.pptxSudhirArya5
 
Environmental assessment methods
Environmental assessment methodsEnvironmental assessment methods
Environmental assessment methodsemmak781
 
Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...CDSB
 
Bb06 srihari six_sigma project
Bb06 srihari six_sigma projectBb06 srihari six_sigma project
Bb06 srihari six_sigma projectSrihari Chodagiri
 
PMI-ACP Case Study
PMI-ACP Case StudyPMI-ACP Case Study
PMI-ACP Case StudyThanh Nguyen
 
LEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeLEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeGuidon Performance Solutions
 
International Project Management.- Mercedes Benz- Demo
International Project Management.- Mercedes   Benz- DemoInternational Project Management.- Mercedes   Benz- Demo
International Project Management.- Mercedes Benz- Demodaverashesh
 
Pride Procurement Lean
Pride Procurement LeanPride Procurement Lean
Pride Procurement LeanElm Valle
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010Ngy Ea
 
ZA IWA Valencia Spain presentation
ZA IWA Valencia Spain presentationZA IWA Valencia Spain presentation
ZA IWA Valencia Spain presentationZillay A. Nawab
 
Proposal Development Process
Proposal Development ProcessProposal Development Process
Proposal Development ProcessCIAT
 

Similaire à PGMA Process and TCEQ's Role in Groundwater, Kelly Mills (20)

Carbon credit basics
Carbon credit basicsCarbon credit basics
Carbon credit basics
 
Groundwater Management Update
Groundwater Management UpdateGroundwater Management Update
Groundwater Management Update
 
TAGD's TWCA Presentation
TAGD's TWCA PresentationTAGD's TWCA Presentation
TAGD's TWCA Presentation
 
May 2018 TCEQ Update
May 2018 TCEQ UpdateMay 2018 TCEQ Update
May 2018 TCEQ Update
 
GCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma DanielsonGCD's - Joint and Regional Planning_Velma Danielson
GCD's - Joint and Regional Planning_Velma Danielson
 
Issues and Challenges of Power Projects.pptx
Issues and Challenges of Power Projects.pptxIssues and Challenges of Power Projects.pptx
Issues and Challenges of Power Projects.pptx
 
TCEQ Update - Abiy Berehe
TCEQ Update - Abiy BereheTCEQ Update - Abiy Berehe
TCEQ Update - Abiy Berehe
 
TCEQ GCD District Performance Review
TCEQ GCD District Performance ReviewTCEQ GCD District Performance Review
TCEQ GCD District Performance Review
 
Environmental assessment methods
Environmental assessment methodsEnvironmental assessment methods
Environmental assessment methods
 
Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...
 
Planning performance agreements - a developer perspective
Planning performance agreements - a developer perspectivePlanning performance agreements - a developer perspective
Planning performance agreements - a developer perspective
 
Bb06 srihari six_sigma project
Bb06 srihari six_sigma projectBb06 srihari six_sigma project
Bb06 srihari six_sigma project
 
PMI-ACP Case Study
PMI-ACP Case StudyPMI-ACP Case Study
PMI-ACP Case Study
 
LEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a TimeLEAN Ohio: Transforming State Government One Process at a Time
LEAN Ohio: Transforming State Government One Process at a Time
 
International Project Management.- Mercedes Benz- Demo
International Project Management.- Mercedes   Benz- DemoInternational Project Management.- Mercedes   Benz- Demo
International Project Management.- Mercedes Benz- Demo
 
Pride Procurement Lean
Pride Procurement LeanPride Procurement Lean
Pride Procurement Lean
 
TCEQ Updates - Abiy Berehe
TCEQ Updates - Abiy BereheTCEQ Updates - Abiy Berehe
TCEQ Updates - Abiy Berehe
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
ZA IWA Valencia Spain presentation
ZA IWA Valencia Spain presentationZA IWA Valencia Spain presentation
ZA IWA Valencia Spain presentation
 
Proposal Development Process
Proposal Development ProcessProposal Development Process
Proposal Development Process
 

Plus de TXGroundwaterSummit

Drought: Looking Back and Planning Ahead, Todd Votteler
Drought: Looking Back and Planning Ahead, Todd VottelerDrought: Looking Back and Planning Ahead, Todd Votteler
Drought: Looking Back and Planning Ahead, Todd VottelerTXGroundwaterSummit
 
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterHydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterTXGroundwaterSummit
 
Weather Modification, Todd Flanagan
Weather Modification, Todd FlanaganWeather Modification, Todd Flanagan
Weather Modification, Todd FlanaganTXGroundwaterSummit
 
Groundwater Interests Panel - Producers, Ronald Gertson
Groundwater Interests Panel - Producers, Ronald GertsonGroundwater Interests Panel - Producers, Ronald Gertson
Groundwater Interests Panel - Producers, Ronald GertsonTXGroundwaterSummit
 
Current State of Groundwater Management, Larry French
Current State of Groundwater Management, Larry FrenchCurrent State of Groundwater Management, Larry French
Current State of Groundwater Management, Larry FrenchTXGroundwaterSummit
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavageTXGroundwaterSummit
 
GCD Panel - Drought Response, Kirk Holland
GCD Panel - Drought Response, Kirk HollandGCD Panel - Drought Response, Kirk Holland
GCD Panel - Drought Response, Kirk HollandTXGroundwaterSummit
 
Aquifer Storage and Recovery, Kelley Neumann
Aquifer Storage and Recovery, Kelley NeumannAquifer Storage and Recovery, Kelley Neumann
Aquifer Storage and Recovery, Kelley NeumannTXGroundwaterSummit
 
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner Jones
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner JonesGCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner Jones
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner JonesTXGroundwaterSummit
 
A Desalination Success Story, Ed Archuleta
A Desalination Success Story, Ed ArchuletaA Desalination Success Story, Ed Archuleta
A Desalination Success Story, Ed ArchuletaTXGroundwaterSummit
 
Public Perceptions and Hydraulic Fracturing, Drew Nelson
Public Perceptions and Hydraulic Fracturing, Drew NelsonPublic Perceptions and Hydraulic Fracturing, Drew Nelson
Public Perceptions and Hydraulic Fracturing, Drew NelsonTXGroundwaterSummit
 
Groundwater Science, James Beach
Groundwater Science, James BeachGroundwater Science, James Beach
Groundwater Science, James BeachTXGroundwaterSummit
 
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...TXGroundwaterSummit
 
Interim Charges and 2013 Legislative Outlook, Brian Sledge
Interim Charges and 2013 Legislative Outlook, Brian SledgeInterim Charges and 2013 Legislative Outlook, Brian Sledge
Interim Charges and 2013 Legislative Outlook, Brian SledgeTXGroundwaterSummit
 
300 Years of Groundwater Management, Charles Porter
300 Years of Groundwater Management, Charles Porter300 Years of Groundwater Management, Charles Porter
300 Years of Groundwater Management, Charles PorterTXGroundwaterSummit
 
DFCs Demystified and GMA Status Update, Bill Hutchison
DFCs Demystified and GMA Status Update, Bill HutchisonDFCs Demystified and GMA Status Update, Bill Hutchison
DFCs Demystified and GMA Status Update, Bill HutchisonTXGroundwaterSummit
 
GCD Panel - Outreach and Education, Adeline Fox
GCD Panel - Outreach and Education, Adeline FoxGCD Panel - Outreach and Education, Adeline Fox
GCD Panel - Outreach and Education, Adeline FoxTXGroundwaterSummit
 
Private Ownership of Groundwater, Billy Howe
Private Ownership of Groundwater, Billy HowePrivate Ownership of Groundwater, Billy Howe
Private Ownership of Groundwater, Billy HoweTXGroundwaterSummit
 

Plus de TXGroundwaterSummit (18)

Drought: Looking Back and Planning Ahead, Todd Votteler
Drought: Looking Back and Planning Ahead, Todd VottelerDrought: Looking Back and Planning Ahead, Todd Votteler
Drought: Looking Back and Planning Ahead, Todd Votteler
 
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve JesterHydraulic Fracturing - Oil and Gas Perspective, Steve Jester
Hydraulic Fracturing - Oil and Gas Perspective, Steve Jester
 
Weather Modification, Todd Flanagan
Weather Modification, Todd FlanaganWeather Modification, Todd Flanagan
Weather Modification, Todd Flanagan
 
Groundwater Interests Panel - Producers, Ronald Gertson
Groundwater Interests Panel - Producers, Ronald GertsonGroundwater Interests Panel - Producers, Ronald Gertson
Groundwater Interests Panel - Producers, Ronald Gertson
 
Current State of Groundwater Management, Larry French
Current State of Groundwater Management, Larry FrenchCurrent State of Groundwater Management, Larry French
Current State of Groundwater Management, Larry French
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie Savage
 
GCD Panel - Drought Response, Kirk Holland
GCD Panel - Drought Response, Kirk HollandGCD Panel - Drought Response, Kirk Holland
GCD Panel - Drought Response, Kirk Holland
 
Aquifer Storage and Recovery, Kelley Neumann
Aquifer Storage and Recovery, Kelley NeumannAquifer Storage and Recovery, Kelley Neumann
Aquifer Storage and Recovery, Kelley Neumann
 
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner Jones
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner JonesGCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner Jones
GCD Panel - Water Conservation/Management in Urban Areas, Kathy Turner Jones
 
A Desalination Success Story, Ed Archuleta
A Desalination Success Story, Ed ArchuletaA Desalination Success Story, Ed Archuleta
A Desalination Success Story, Ed Archuleta
 
Public Perceptions and Hydraulic Fracturing, Drew Nelson
Public Perceptions and Hydraulic Fracturing, Drew NelsonPublic Perceptions and Hydraulic Fracturing, Drew Nelson
Public Perceptions and Hydraulic Fracturing, Drew Nelson
 
Groundwater Science, James Beach
Groundwater Science, James BeachGroundwater Science, James Beach
Groundwater Science, James Beach
 
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...
State Water Plan and RWPG Updates from the Groundwater Perspective, Carolyn B...
 
Interim Charges and 2013 Legislative Outlook, Brian Sledge
Interim Charges and 2013 Legislative Outlook, Brian SledgeInterim Charges and 2013 Legislative Outlook, Brian Sledge
Interim Charges and 2013 Legislative Outlook, Brian Sledge
 
300 Years of Groundwater Management, Charles Porter
300 Years of Groundwater Management, Charles Porter300 Years of Groundwater Management, Charles Porter
300 Years of Groundwater Management, Charles Porter
 
DFCs Demystified and GMA Status Update, Bill Hutchison
DFCs Demystified and GMA Status Update, Bill HutchisonDFCs Demystified and GMA Status Update, Bill Hutchison
DFCs Demystified and GMA Status Update, Bill Hutchison
 
GCD Panel - Outreach and Education, Adeline Fox
GCD Panel - Outreach and Education, Adeline FoxGCD Panel - Outreach and Education, Adeline Fox
GCD Panel - Outreach and Education, Adeline Fox
 
Private Ownership of Groundwater, Billy Howe
Private Ownership of Groundwater, Billy HowePrivate Ownership of Groundwater, Billy Howe
Private Ownership of Groundwater, Billy Howe
 

Dernier

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 

Dernier (20)

SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 

PGMA Process and TCEQ's Role in Groundwater, Kelly Mills

  • 1. TCEQ – PGMA Program & Plan Performance Review TEXAS ALLIANCE OF GROUNDWATER DISTRICTS TEXAS GROUNDWATER SUMMIT - GROUNDWATER MANAGEMENT PRACTICES - AUGUST 29, 2012
  • 2. OVERVIEW Priority Groundwater Management Areas • Old PGMAs • New PGMAs • Future PGMAs Management Plans & Performance Review • TCEQ Role • Plan & Petition Triggers • Process
  • 3. PGMA? Priority Groundwater Management Area An area of the state designated and delineated by the TCEQ that is experiencing, or expected to experience within the next 50 years, critical groundwater problems
  • 4. PGMA? What are critical groundwater problems? • Shortages of surface or groundwater • Land subsidence resulting from groundwater withdrawal • Contamination of groundwater supplies
  • 5. PGMA? What is the purpose of designating a PGMA? • To assure that a groundwater conservation district is established to manage the aquifer or aquifers and to conserve, preserve, protect, and prevent waste of groundwater
  • 6. Old PGMAs 1990 1997 2001 Designated Renamed & Mandates as Critical Designated for TCEQ Areas as PGMAs
  • 7. Old PGMAs 1990 1997 2001 Designated Renamed & Mandates as Critical Designated for TCEQ Areas as PGMAs 2002 2008 2011 2012 TCEQ 1st test PGMA TCEQ rules of TCEQ statute rules adopted rules amended amended
  • 8. Old PGMAs GCD Creation Process Executive Director’s (ED) GCD report and recommendation developed & filed with TCEQ Possible Recommendations • create new GCD(s) • add PGMA to GCD(s)
  • 9. Old PGMAs GCD Creation Process Contested case Executive hearing and Director’s (ED) State Office of GCD report and Administrative recommendation Hearings developed & Proposal for filed with TCEQ Decision Possible Recommendations • create new GCD(s) • add PGMA to GCD(s)
  • 10. Old PGMAs GCD Creation Process Contested case Executive TCEQ hearing and Director’s (ED) Agenda State Office of GCD report and Hearing Administrative recommendation and Hearings developed & TCEQ Proposal for filed with TCEQ Order Decision Possible Recommendations • create new GCD(s) • add PGMA to GCD(s)
  • 11. Old PGMAs Post-TCEQ Order Commissioners Court(s) Temporary New Directors GCD? appoint Temporary take Directors control GCD Nay? – Back to Add to board TCEQ for additional action Existing votes within one year; GCD? yeah no additional or nay hearing required
  • 12. New PGMAs Designation & GCD Creation Process Notice of new Requests to ID & initiate study to TWDB, new studies stakeholders TPWD, TDA
  • 13. New PGMAs Designation & GCD Creation Process Notice of new Requests to ID & initiate study to TWDB, new studies stakeholders TPWD, TDA ED report & Contested recommendations case Agency PGMA? hearing reports & and info back Create GCD(s)? Proposal to ED Add to existing for GCDs? Decision
  • 14. New PGMAs Designation & GCD Creation Process Notice of new Requests to ID & initiate study to TWDB, new studies stakeholders TPWD, TDA ED report & Contested recommendations case Agency PGMA? hearing reports & and info back Create GCD(s)? proposal to ED Add to existing for GCDs? decision TCEQ Agenda Hearing and TCEQ Order
  • 15. New PGMAs Post-TCEQ Order < 2 years – landowners may create new or join existing GCDs through legislative or New petition processes GCD? > 120 day < 2 years - TCEQ TAES* shall create one or more Educational new GCDs Outreach Add to < 120 days – GCD board existing votes yeah or nay. If nay, GCD? back to TCEQ for additional action within one year TAES = Texas AgriLife Extension Service
  • 16. Future PGMAs Data • Gray / Blue / White Areas • Modeled Available Groundwater • 2011 Regional Water Plans/2012 State Water Plan • Unique 2011-2012 data snapshot Timing & Schedule • FY 2013 – identify & prioritize likely areas • FY 2014 – Start new studies • 45-day stakeholder comment period • 180-days for TWDB & TPWD studies/reports • 90-days for ED-TCEQ report & recs.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22. GCD Management Plans TCEQ Role Respond if GCD management plans are not adopted and/or readopted on time Respond if GCD is not operational as determined by the State Auditor’s Office Respond to Petitions for Inquiry
  • 23. GCD Management Plans Triggers – For Executive Director to initiate TCEQ Performance Review GCD does not adopt initial plan by the 3 year statutory deadline GCD does not readopt plan by the 5 year statutory deadline EA-TWDB* does not approve plan or readopted plan and GCD does not resolve within 180 days EA-TWDB does not approve plan or readopted plan and all GCD appeals to TWDB final SAO finds GCD not operational * EA-TWDB = Executive Administrator of the TWDB
  • 24. GCD Management Plans Triggers – Petition for TCEQ Inquiry GCD does not: 1. submit plan to EA-TWDB 2. participate in joint planning 3. adopt rules 4. adopt DFC by resolution 5. update plan within 2 years of new DFCs 6. update rules within 1 year of new plan (#5) 7. adopt rules designed to achieve the DFCs 8. adequately protect groundwater by its rules 9. adequately protect groundwater by enforcing substantial compliance with its rules
  • 25. GCD Management Plans Performance Review – Initiated by ED ED ED submits ED notifies investigates compliance GCD and the facts and agreement attempts to circumstances (CA) to resolve of violation GCD
  • 26. GCD Management Plans Performance Review – Initiated by ED ED ED submits ED notifies investigates compliance GCD and the facts and agreement attempts to circumstances (CA) to resolve of violation GCD Compliance Agreement • Identifies the violation • Outlines GCD actions • Provides schedule for compliance • GCD – 30 days to amend / 60 days to enter • Terms met? ED notifies GCD İNo Mas! TCEQ
  • 27. GCD Management Plans Performance Review – Petition for Inquiry Petitioner files copies GCDs Affected of Petition provided Person files with GCDs opportunity Petition in and to file with TCEQ adjacent to responses GMA
  • 28. GCD Management Plans Performance Review – Petition for Inquiry Dismiss? TCEQ or Review Panel Petition Report and Review Appoint Five- Recommendations Member 90 days Review 120 days Panel? TCEQ Action 45 days
  • 29. GCD Management Plans TCEQ Enforcement Action Required When: • GCD is unable to resolve violation • Review Panel makes recommendation Authorized TCEQ Actions: • Order GCD to take or refrain from certain actions • Dissolve the board • Request Attorney General bring suit for appointment of receiver • Dissolve the district • Recommend action to Legislature
  • 30. Summary Old PGMAs • FY 2013 until done – work to establish GCDs • Comal & Travis, Midland & Upton, Briscoe New PGMAs • FY 2013 – review data, identify areas & prioritize • FY 2014 – start new studies Performance Review • Management plan adoption, readoption & SAO • Petition for TCEQ Inquiry → review panel
  • 31. Kelly Mills, P.G. Texas Commission on Environmental Quality Telephone: (512) 239-4512 FAX: (512) 239-4450 E-mail: Kelly.Mills@tceq.texas.gov