The Long Road Ahead Solutions for Power Sector Problems in India
The Situation India has the fifth largest power generation capacity in the world, generating some 4% of all power. The per capita consumption is about 704kWh, which is fairly low.  Transmission and Distribution losses of electricity in India stands at almost 33%- a shocking figure much higher than global benchmarks. The current transmission capacity is only a measly 13 percent of the total installed generation capacity and stands at about 20,750 MW.
The Goals By the year 2012, the power sector is poised to handle a 1000 kWh per capita consumption, as outlined by the 11th Plan. This means a need-based capacity addition of about 10,000 MW by such time. The domination of Centre and State Utilities in the Power Sector is being sidelined by privatization of various capacities through outright privatization or franchisee routes.  The Ministry of Power plans to establish an integrated National Power Grid by 2012 that will have a generation capacity of 200,000 MW and an inter-region power transfer capacity of 37,700 MW.
Target Areas and Past Measures There is a need for improvement in metering, billing and collection efficiency.  Greater regard for Private Ventures in the field of Power Generation, Transmission and Distribution, by way of liberalizing related government policies.  The unbundling of SEBs and the Electricity Act, 2003 have been pivotal turning points. Accelerated and Power Development Reforms Program to help distribution and granting permission for trading of power.
Challenges faced There are several challenges faced by new, private entrants in the power industry. Some of them are  project execution- problems arising due to unpreparedness for the projects, shortage of equipment especially by BHEL, delay in financial closure. Geological surprises, delay in clearance from ministry of environment and forestry and natural calamities are causes for hampering hydroelectric power.  fuel security power equipment capacities infrastructure constraints- for instance, coal being a mainstay of the energy production in the country requires increased coal transportation by the Railways- where we face capacity shortage.
Plans vs. Plants: Building Castles in the air?
Suggestions There is a need for sound project management principles in a well-structured framework.  Stakeholder Identification and Communication Planning in the project’s early stage. This has a major impact on project schedule and budget.  A detailed procurement level planning primarily addressing fuel availability and equipment shortage. Schedule integration- The preparation of a master schedule interlinking various planned projects to avoid gaps and mismatches.  Enhanced manpower training, higher salaries and addressing changing employee aspirations to attract well-trained and skilled human resources.
Solutions for power sector

Contenu connexe

Tendances

Renewable Energy Presentation - Joanne Howard
Renewable Energy Presentation - Joanne HowardRenewable Energy Presentation - Joanne Howard
Renewable Energy Presentation - Joanne Howard
uktila
 

Tendances (20)

Bhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power AssessmentBhutan - Utility Scale Solar Power Assessment
Bhutan - Utility Scale Solar Power Assessment
 
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of CooperationAchieving Sustainable Energy for All in South Asia: Modalities of Cooperation
Achieving Sustainable Energy for All in South Asia: Modalities of Cooperation
 
How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...How JICA mobilizes private sector finance and investments for affordable and ...
How JICA mobilizes private sector finance and investments for affordable and ...
 
Building Electricity Supplies in Africa
Building Electricity Supplies in AfricaBuilding Electricity Supplies in Africa
Building Electricity Supplies in Africa
 
Power Scenario of Bhutan and Nepal
Power Scenario of  Bhutan and NepalPower Scenario of  Bhutan and Nepal
Power Scenario of Bhutan and Nepal
 
Use of renewable energy for developing country
Use of renewable energy for developing countryUse of renewable energy for developing country
Use of renewable energy for developing country
 
Sasaenia Paul Oluwabunmi (submitted to the World Bank ffd MOOC)
Sasaenia Paul Oluwabunmi (submitted to the World Bank ffd MOOC)Sasaenia Paul Oluwabunmi (submitted to the World Bank ffd MOOC)
Sasaenia Paul Oluwabunmi (submitted to the World Bank ffd MOOC)
 
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech LtdSWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
SWOT of Green Deal and the delivery model proposed - Shaun Taylor, Solartech Ltd
 
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
 
Kyrgyzstan
KyrgyzstanKyrgyzstan
Kyrgyzstan
 
Renewable Energy Presentation - Joanne Howard
Renewable Energy Presentation - Joanne HowardRenewable Energy Presentation - Joanne Howard
Renewable Energy Presentation - Joanne Howard
 
Vietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investingVietnam, a hidden gem in power development & investing
Vietnam, a hidden gem in power development & investing
 
OECD-ENV Vietnam questionnaire key points
OECD-ENV Vietnam questionnaire key pointsOECD-ENV Vietnam questionnaire key points
OECD-ENV Vietnam questionnaire key points
 
What is the plan of your country to have a 100% green energy supply and is th...
What is the plan of your country to have a 100% green energy supply and is th...What is the plan of your country to have a 100% green energy supply and is th...
What is the plan of your country to have a 100% green energy supply and is th...
 
PPT Cecilia Tam- OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Cecilia Tam- OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...PPT Cecilia Tam- OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
PPT Cecilia Tam- OECD Stakeholder Dialogue on Mobilising Clean Energy Finance...
 
Nepal Energy Scenario
Nepal Energy ScenarioNepal Energy Scenario
Nepal Energy Scenario
 
Hevrat hashmal eng 2012
Hevrat hashmal eng 2012Hevrat hashmal eng 2012
Hevrat hashmal eng 2012
 
[Task 1 2] Final energy consumption and reduction scenarios for lao's mecon h...
[Task 1 2] Final energy consumption and reduction scenarios for lao's mecon h...[Task 1 2] Final energy consumption and reduction scenarios for lao's mecon h...
[Task 1 2] Final energy consumption and reduction scenarios for lao's mecon h...
 
Role of Hydropower Electricity in Economic Development of Nepal
Role of Hydropower Electricity in Economic Development of NepalRole of Hydropower Electricity in Economic Development of Nepal
Role of Hydropower Electricity in Economic Development of Nepal
 
Albania[1]
Albania[1]Albania[1]
Albania[1]
 

Similaire à Solutions for power sector

Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
A.S.M. Abdul Hye
 
2010 – 11 mtef strategic plan(91p)
2010 – 11 mtef strategic plan(91p)2010 – 11 mtef strategic plan(91p)
2010 – 11 mtef strategic plan(91p)
shangrok shin
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
Anuradha Goswami
 

Similaire à Solutions for power sector (20)

Hydro power presentation
Hydro power presentationHydro power presentation
Hydro power presentation
 
Sustainable Energy development bangladesh
Sustainable Energy development bangladeshSustainable Energy development bangladesh
Sustainable Energy development bangladesh
 
9-Energy
9-Energy9-Energy
9-Energy
 
Hydro policies of india
Hydro policies of indiaHydro policies of india
Hydro policies of india
 
Renewable Energy Sector Funding
Renewable Energy Sector FundingRenewable Energy Sector Funding
Renewable Energy Sector Funding
 
Energy demand forecasting of remote areas using linear regression and inverse...
Energy demand forecasting of remote areas using linear regression and inverse...Energy demand forecasting of remote areas using linear regression and inverse...
Energy demand forecasting of remote areas using linear regression and inverse...
 
Class 3 the power sector in india
Class 3   the power sector in indiaClass 3   the power sector in india
Class 3 the power sector in india
 
Hydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrowHydropower in-india-key-enablers-for-better-tomorrow
Hydropower in-india-key-enablers-for-better-tomorrow
 
Electricity generation in liberia
Electricity generation in liberiaElectricity generation in liberia
Electricity generation in liberia
 
THE CHALLENGES AND OPPORTUNITIES FOR LOCAL AREA ENERGY SYSTEMS IN THE UK ENER...
THE CHALLENGES AND OPPORTUNITIES FOR LOCAL AREA ENERGY SYSTEMS IN THE UK ENER...THE CHALLENGES AND OPPORTUNITIES FOR LOCAL AREA ENERGY SYSTEMS IN THE UK ENER...
THE CHALLENGES AND OPPORTUNITIES FOR LOCAL AREA ENERGY SYSTEMS IN THE UK ENER...
 
Renewable Energy Hydrosector India
Renewable Energy Hydrosector IndiaRenewable Energy Hydrosector India
Renewable Energy Hydrosector India
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
CCXG March 2019 Veronica Gundu Jakarasi Challenges and Opportunities for Impl...
 
2010 – 11 mtef strategic plan(91p)
2010 – 11 mtef strategic plan(91p)2010 – 11 mtef strategic plan(91p)
2010 – 11 mtef strategic plan(91p)
 
23PESGM4066.pptx
23PESGM4066.pptx23PESGM4066.pptx
23PESGM4066.pptx
 
Energy Transition and Net Zero initiative
Energy Transition and Net Zero initiativeEnergy Transition and Net Zero initiative
Energy Transition and Net Zero initiative
 
Geeta power industry
Geeta power industryGeeta power industry
Geeta power industry
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Report on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal PradeshReport on Power Scenario in Arunachal Pradesh
Report on Power Scenario in Arunachal Pradesh
 

Plus de Tejaswi Subramanian (6)

Matrix million dollar pitch channel project baby blue
Matrix million dollar pitch channel project baby blueMatrix million dollar pitch channel project baby blue
Matrix million dollar pitch channel project baby blue
 
Foreign exchange markets
Foreign exchange marketsForeign exchange markets
Foreign exchange markets
 
Millennium Development Goals, Targets and Indicators
Millennium Development Goals, Targets and IndicatorsMillennium Development Goals, Targets and Indicators
Millennium Development Goals, Targets and Indicators
 
Energy
EnergyEnergy
Energy
 
Rural electrification
Rural electrificationRural electrification
Rural electrification
 
Liberty march
Liberty marchLiberty march
Liberty march
 

Solutions for power sector

  • 1. The Long Road Ahead Solutions for Power Sector Problems in India
  • 2. The Situation India has the fifth largest power generation capacity in the world, generating some 4% of all power. The per capita consumption is about 704kWh, which is fairly low. Transmission and Distribution losses of electricity in India stands at almost 33%- a shocking figure much higher than global benchmarks. The current transmission capacity is only a measly 13 percent of the total installed generation capacity and stands at about 20,750 MW.
  • 3. The Goals By the year 2012, the power sector is poised to handle a 1000 kWh per capita consumption, as outlined by the 11th Plan. This means a need-based capacity addition of about 10,000 MW by such time. The domination of Centre and State Utilities in the Power Sector is being sidelined by privatization of various capacities through outright privatization or franchisee routes. The Ministry of Power plans to establish an integrated National Power Grid by 2012 that will have a generation capacity of 200,000 MW and an inter-region power transfer capacity of 37,700 MW.
  • 4. Target Areas and Past Measures There is a need for improvement in metering, billing and collection efficiency. Greater regard for Private Ventures in the field of Power Generation, Transmission and Distribution, by way of liberalizing related government policies. The unbundling of SEBs and the Electricity Act, 2003 have been pivotal turning points. Accelerated and Power Development Reforms Program to help distribution and granting permission for trading of power.
  • 5. Challenges faced There are several challenges faced by new, private entrants in the power industry. Some of them are project execution- problems arising due to unpreparedness for the projects, shortage of equipment especially by BHEL, delay in financial closure. Geological surprises, delay in clearance from ministry of environment and forestry and natural calamities are causes for hampering hydroelectric power. fuel security power equipment capacities infrastructure constraints- for instance, coal being a mainstay of the energy production in the country requires increased coal transportation by the Railways- where we face capacity shortage.
  • 6. Plans vs. Plants: Building Castles in the air?
  • 7. Suggestions There is a need for sound project management principles in a well-structured framework. Stakeholder Identification and Communication Planning in the project’s early stage. This has a major impact on project schedule and budget. A detailed procurement level planning primarily addressing fuel availability and equipment shortage. Schedule integration- The preparation of a master schedule interlinking various planned projects to avoid gaps and mismatches. Enhanced manpower training, higher salaries and addressing changing employee aspirations to attract well-trained and skilled human resources.