SlideShare a Scribd company logo
1 of 7
Download to read offline
Integrated Sensor Is the Structure
                               (ISIS)




                                                                                   1
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
Integrated Sensor Is the Structure (ISIS)
   Simultaneous AMTI/GMTI Operation via Dual Band (UHF/X-Band) Aperture
                                                                                             Cruise Missile Defense
                                                  Long-range AMTI/GMTI/COMM




                                       Detect/Track Dismounts




        FOPEN GMTI

                                                                          To Scale
                                                                                         1.0 Relative Search Capability (PA)
                                                                         Global Hawk     1.0 Relative Track Capability (PA2/λ2)

                                                                                                    140
                                                                                         X
                                                                                                                     Platform carries
                                                                                         X                 1,800
                                                                        Joint STARS                                       the antenna

                                                                                         S                1,500
                                                                                         S                  3,000
                                                                          AWACS
                                                                                                                                  Platform is
Extremely High Capacity Comms                                                                                                     the antenna
                                                                                         UHF                         160,000
                                                                                         VHF
                                                                                         X                                 330,000,000
Distribution Statement “A” (Approved for Public
                                                                                       100 101 102 103 104 105 106 107 108 109
        Release, Distribution Unlimited)                                   ISIS

 Global Relocation <10 days – 600km Sensor Radius – No In-Theater Ground Support
              10+ year Operational Lifetime – 99% Availability for 1 year        2
Integrated Airship-Radar
                         Conventional                                                              ISIS New Paradigm
                                                                                                 Payload: >30% of system mass
                 Payload: 2-3% of system mass



                              MDA Airship
                               89,000kg

                                                                                                         Integrated
   Payload bay
                                                                                                          Payload

Enabling Technologies                    DARPA ISIS Accomplishments
Hull Material                            • Improved lifetime by 10x while reducing fabric mass 4x over state-of-the-art
Active-Array Antenna                     •   Performance from size, not power
                                         •   Removed heavy high power electronics, cooling
                                         •   Removed structure: Flexible panels bonded onto pressure vessel
                                         •   Low-power Transmit/Receive modules based on low-cost “cell phone” technology
Power System                             • Solar-regenerative power with fuel cells instead of batteries
                                         • Airspeed: 60 knot sustained, 100 knot sprint


                                                                                                FY10        FY11        FY12       FY13
                                                                FY08               FY09
   FY04        FY05            FY06             FY07
        System Study                                                                      Scaled Prototype System Demonstration      SDD…
                                  Technology Development


                                                                     TRL 5                                                        TRL 7
                                                                     MRL 2                                                        MRL 6
                                                                                                                                            3
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
ISIS Critical Technologies
 Addressing critical hardware technology needs                                                 Achieved
 • Low areal-density advanced hull material
          –   Areal density ≤100 g/m2                                                          90.6 g/m2
          –   Matrix glass transition temperature (TG) ≤ -90°C                                   -101°C
          –   Fiber strength-to-weight ≥ 1000 kN·m/kg                                      1274 kN-m/kg
          –   Fiber retains >85% strength at 5 years                                    >85% at 22 years




                                                                                                            Mass
 • Lightweight, low-power density AESA
          – Areal density ≤ 2 kg/m2                                                             1.8 kg/m2
          – Power consumption ≤ 5.0 W/m2 on receive                                             4.7 W/m2
          – Bonded to hull material                                                               Passed

 • Extremely low-power Transmit-Receive modules
          – FOM ≥1x104 W-2                                                                  1.1 x 104 W-2




                                                                                                            Power
          – Demonstrated TRL5 (MTTF >106 Hours)                                    MTTF >1.98x106 Hours

 • Novel power systems for stratospheric airships
          – Demonstrate 400 W-hr/kg regenerative system                                      779 W-hr/kg


                                                                                                                    4
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
Single Integrated Picture
   “High-Definition” Picture of All Moving Targets → 10x Resolution Improvement
                                                                                       Complete Air Picture
                                     LAND
      SEA                                                             AIR
                                                                                    • AWACS (70’s) and E-2 (60’s) –
    Pulse-to-Pulse aperture reconfiguration enables all missions simultaneously

                                                                                      designed for hard targets of their day
                                                                                    • ISIS is designed for                                            JLENS        225km
                                                                                      the theoretical limit
Blue Water

                                                                                      at the radar horizon                                                              ISIS
                                                           Foliage Penetration
                                                                                                                                                                        600km
                                                                                                                                                     AWACS
                                                                                            – Single-platform
                                     Urban                                                                                                                  375km
                                                                                              search, track, and
          Brown Water
                                                                                              fire-control
Global Relocation <10 days – 600km Sensor Radius – No In-Theater Ground Support
             10+ year Operational Lifetime – 99% Availability for 1 year

Unobscured Surface Target                                                            Wide-Area Foliage Penetration GMTI
• Joint STARS (70’s) designed for tanks in                                                 • Joint STARS precision across an
  the Fulda Gap                                                                              extremely large operational area
                                                              ISIS
• ISIS is designed for                                                 JSTARS
  dismounts across the entire
  Line-of-Sight                                                                    600km
                                                                                                                                             600km
                                                                           300km                                                     300km

        – LSRS-like resolution
        – 300km @ 3º grazing angle
        – 600km line-of-sight                                                                       Primary tropical forest
                                                                                                    Cerrado savanna                                    300km – Track
                                                                                                    Agriculture/pasture                                600km – Detect
                                                                                                                                                                               5
                                                                                                    Natural/artificial waterbodies
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)                                                                            & Locate
                                                                                                    Secondary succession forest
No Forward-Based Logistics
•    Forward-deployed aircraft-based                                               •   CONUS-deployed ISIS
     ISR                                                                               –   Unmanned
       –    Local air base                                                             –   Launched from U.S. locations
       –    Multiple aircraft for single orbit                                         –   Global deployment in 10 days
       –    Air crews                                                                  –   Regenerative fuel sources
       –    Ground crews                                                               –   Ten-year service life
       –    Fuel supplies                                                              –   Permanent CONUS ground station
       –    Maintenance facilities




         Multiply the cost delta by the number of AOI’s and multiple
             platform types (JSTARS, AWACS, P-3, E-2C, etc)
                                                                                                                            6
Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
Schedule
                                                                                                        FY10      FY11      FY12   FY13
                                                                                     FY08      FY09
                                      FY04        FY05         FY06         FY07
                                             Phase 1                    Phase 2                            Phase 3
                                                                                                        Design/Build/Demo
Phase 1: Feasibility Study
 • Objective system design                                    Conceptual Design
 • Technology requirements                                    Review (CoDR)

 • Sensor analysis

Phase 2: System Studies and
Technology Development                                                      Technology
                                                                            Readiness Review
 • Continued objective system                                               (TRR)
   design
 • Develop core technology
                                                                                                  PDR       CDR
Phase 3: Demo System Design
 • Demo system design
 • Large-scale integration
 • Hi-fidelity flight test
                                                                                                                            Demo
   simulation
 • Demonstration system build
 • Flight demonstration




                                                                                                                                          7
 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)

More Related Content

What's hot

Saab Gripen 3D Cutaway
Saab Gripen 3D CutawaySaab Gripen 3D Cutaway
Saab Gripen 3D CutawaySaab AB
 
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / RisersSUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / RisersJoão Henrique Volpini Mattos
 
Infinity II - Preliminary Aircraft Design Presentation
Infinity II - Preliminary Aircraft Design PresentationInfinity II - Preliminary Aircraft Design Presentation
Infinity II - Preliminary Aircraft Design PresentationManu Sharma
 
Cambium networks pmp_450_access_point_specification
Cambium networks pmp_450_access_point_specificationCambium networks pmp_450_access_point_specification
Cambium networks pmp_450_access_point_specificationAdvantec Distribution
 
Paz Ground Segment
Paz Ground SegmentPaz Ground Segment
Paz Ground SegmentEsri
 
B AMC Presentation (Icns 2009) V Final [13 May2009]
B AMC Presentation (Icns 2009) V Final [13 May2009]B AMC Presentation (Icns 2009) V Final [13 May2009]
B AMC Presentation (Icns 2009) V Final [13 May2009]University of Pennsylvania
 
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...grssieee
 
Revised msedcl progress report_25.06.2011
Revised msedcl progress report_25.06.2011Revised msedcl progress report_25.06.2011
Revised msedcl progress report_25.06.2011Lagamanna Saratape
 
QoS Cheatsheet by packetlife.net
QoS Cheatsheet by packetlife.netQoS Cheatsheet by packetlife.net
QoS Cheatsheet by packetlife.netFebrian ‎
 
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)Jeff Hunter
 
Cambium networks ptp_230_specification
Cambium networks ptp_230_specificationCambium networks ptp_230_specification
Cambium networks ptp_230_specificationAdvantec Distribution
 
Cambium networks pmp_430_access_point_(5.8_g_hz)_specification
Cambium networks pmp_430_access_point_(5.8_g_hz)_specificationCambium networks pmp_430_access_point_(5.8_g_hz)_specification
Cambium networks pmp_430_access_point_(5.8_g_hz)_specificationAdvantec Distribution
 
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationCambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationAdvantec Distribution
 
Building Efficient Networks
Building Efficient NetworksBuilding Efficient Networks
Building Efficient NetworksMichael Peeters
 
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationCambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationAdvantec Distribution
 

What's hot (19)

Saab Gripen 3D Cutaway
Saab Gripen 3D CutawaySaab Gripen 3D Cutaway
Saab Gripen 3D Cutaway
 
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / RisersSUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
SUC Brasil 2012 : Coupled Dynamic Analysis FPSO / Mooring / Risers
 
Infinity II - Preliminary Aircraft Design Presentation
Infinity II - Preliminary Aircraft Design PresentationInfinity II - Preliminary Aircraft Design Presentation
Infinity II - Preliminary Aircraft Design Presentation
 
Cambium networks pmp_450_access_point_specification
Cambium networks pmp_450_access_point_specificationCambium networks pmp_450_access_point_specification
Cambium networks pmp_450_access_point_specification
 
Paz Ground Segment
Paz Ground SegmentPaz Ground Segment
Paz Ground Segment
 
B AMC Presentation (Icns 2009) V Final [13 May2009]
B AMC Presentation (Icns 2009) V Final [13 May2009]B AMC Presentation (Icns 2009) V Final [13 May2009]
B AMC Presentation (Icns 2009) V Final [13 May2009]
 
Seminole
SeminoleSeminole
Seminole
 
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...
Nonlinear Range Cell Migration (RCM) Compensation Method for SpaceborneAirbor...
 
Revised msedcl progress report_25.06.2011
Revised msedcl progress report_25.06.2011Revised msedcl progress report_25.06.2011
Revised msedcl progress report_25.06.2011
 
Infiniti Xm
Infiniti XmInfiniti Xm
Infiniti Xm
 
FPSO Requirements
FPSO RequirementsFPSO Requirements
FPSO Requirements
 
QoS Cheatsheet by packetlife.net
QoS Cheatsheet by packetlife.netQoS Cheatsheet by packetlife.net
QoS Cheatsheet by packetlife.net
 
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)
APT IMR Workshop, Session 8 (Evolution to 4g and impacts on IMR_2011-06-14)
 
Advanced Methods for ULS and FLS
Advanced Methods for ULS and FLSAdvanced Methods for ULS and FLS
Advanced Methods for ULS and FLS
 
Cambium networks ptp_230_specification
Cambium networks ptp_230_specificationCambium networks ptp_230_specification
Cambium networks ptp_230_specification
 
Cambium networks pmp_430_access_point_(5.8_g_hz)_specification
Cambium networks pmp_430_access_point_(5.8_g_hz)_specificationCambium networks pmp_430_access_point_(5.8_g_hz)_specification
Cambium networks pmp_430_access_point_(5.8_g_hz)_specification
 
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationCambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
 
Building Efficient Networks
Building Efficient NetworksBuilding Efficient Networks
Building Efficient Networks
 
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specificationCambium networks pmp_430_access_point_(5.4_g_hz)_specification
Cambium networks pmp_430_access_point_(5.4_g_hz)_specification
 

Viewers also liked

Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPI
Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPIDensus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPI
Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPIlspiuinbdg
 
ISIS / ISIL/ IS/ ISIL/ DAESH
ISIS / ISIL/ IS/ ISIL/ DAESH ISIS / ISIL/ IS/ ISIL/ DAESH
ISIS / ISIL/ IS/ ISIL/ DAESH Aashir Khalil
 
What's the Deal with ISIS
What's the Deal with ISISWhat's the Deal with ISIS
What's the Deal with ISISOwen Wang
 
The ISIS awareness: calling out for international attention
The ISIS awareness: calling out for international attentionThe ISIS awareness: calling out for international attention
The ISIS awareness: calling out for international attentionMina Woo
 
Pembinaan Narapidana Terorisme
Pembinaan Narapidana TerorismePembinaan Narapidana Terorisme
Pembinaan Narapidana TerorismeFreelancer
 
Isis and its impact
Isis and its impactIsis and its impact
Isis and its impactbhanchandra
 
terrorism in Pakistan
terrorism in Pakistanterrorism in Pakistan
terrorism in PakistanKhalid Khan
 
Peta Gerakan Radikal di Indonesia
Peta Gerakan Radikal di IndonesiaPeta Gerakan Radikal di Indonesia
Peta Gerakan Radikal di IndonesiaKen Setiawan
 
ISIS A Global Threat
ISIS A Global ThreatISIS A Global Threat
ISIS A Global Threatdeesha joshi
 
SURVEI SMRC: ISIS Musuh Rakyat Indonesia
SURVEI SMRC: ISIS Musuh Rakyat IndonesiaSURVEI SMRC: ISIS Musuh Rakyat Indonesia
SURVEI SMRC: ISIS Musuh Rakyat IndonesiaSaidiman Ahmad
 
Islamic State of Iraq and Syria (ISIS)
Islamic State of Iraq and Syria (ISIS)Islamic State of Iraq and Syria (ISIS)
Islamic State of Iraq and Syria (ISIS)Nitin Sharma
 
geographical location of pakistan
geographical location of pakistangeographical location of pakistan
geographical location of pakistanwaqasar
 
Terrorism in Pakistan (Data collection)
Terrorism in Pakistan (Data collection)Terrorism in Pakistan (Data collection)
Terrorism in Pakistan (Data collection)Yasir Dil
 
Li-Fi Technology (Perfect slides)
Li-Fi Technology (Perfect slides)Li-Fi Technology (Perfect slides)
Li-Fi Technology (Perfect slides)UzmaRuhy
 
Vipin solanki- terrorism in pakistan
Vipin solanki- terrorism in pakistanVipin solanki- terrorism in pakistan
Vipin solanki- terrorism in pakistanVipin Solanki
 

Viewers also liked (20)

Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPI
Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPIDensus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPI
Densus 88, Pahlawan atau Teroris? - Dauroh Islamiyah LSPI
 
ISIS / ISIL/ IS/ ISIL/ DAESH
ISIS / ISIL/ IS/ ISIL/ DAESH ISIS / ISIL/ IS/ ISIL/ DAESH
ISIS / ISIL/ IS/ ISIL/ DAESH
 
What's the Deal with ISIS
What's the Deal with ISISWhat's the Deal with ISIS
What's the Deal with ISIS
 
The ISIS awareness: calling out for international attention
The ISIS awareness: calling out for international attentionThe ISIS awareness: calling out for international attention
The ISIS awareness: calling out for international attention
 
Badan intelijen negara
Badan intelijen negaraBadan intelijen negara
Badan intelijen negara
 
Islamic state
Islamic stateIslamic state
Islamic state
 
Pembinaan Narapidana Terorisme
Pembinaan Narapidana TerorismePembinaan Narapidana Terorisme
Pembinaan Narapidana Terorisme
 
Materi terorisme internasional
Materi terorisme internasionalMateri terorisme internasional
Materi terorisme internasional
 
Isis and its impact
Isis and its impactIsis and its impact
Isis and its impact
 
terrorism in Pakistan
terrorism in Pakistanterrorism in Pakistan
terrorism in Pakistan
 
Isis
IsisIsis
Isis
 
Peta Gerakan Radikal di Indonesia
Peta Gerakan Radikal di IndonesiaPeta Gerakan Radikal di Indonesia
Peta Gerakan Radikal di Indonesia
 
ISIS A Global Threat
ISIS A Global ThreatISIS A Global Threat
ISIS A Global Threat
 
SURVEI SMRC: ISIS Musuh Rakyat Indonesia
SURVEI SMRC: ISIS Musuh Rakyat IndonesiaSURVEI SMRC: ISIS Musuh Rakyat Indonesia
SURVEI SMRC: ISIS Musuh Rakyat Indonesia
 
ISIS
ISISISIS
ISIS
 
Islamic State of Iraq and Syria (ISIS)
Islamic State of Iraq and Syria (ISIS)Islamic State of Iraq and Syria (ISIS)
Islamic State of Iraq and Syria (ISIS)
 
geographical location of pakistan
geographical location of pakistangeographical location of pakistan
geographical location of pakistan
 
Terrorism in Pakistan (Data collection)
Terrorism in Pakistan (Data collection)Terrorism in Pakistan (Data collection)
Terrorism in Pakistan (Data collection)
 
Li-Fi Technology (Perfect slides)
Li-Fi Technology (Perfect slides)Li-Fi Technology (Perfect slides)
Li-Fi Technology (Perfect slides)
 
Vipin solanki- terrorism in pakistan
Vipin solanki- terrorism in pakistanVipin solanki- terrorism in pakistan
Vipin solanki- terrorism in pakistan
 

Similar to Isis

Meeting the challenges posed by ISR
Meeting the challenges posed by ISRMeeting the challenges posed by ISR
Meeting the challenges posed by ISRNewtec
 
LTA: Lighter-Than-Air M1400 Overview
LTA: Lighter-Than-Air M1400 OverviewLTA: Lighter-Than-Air M1400 Overview
LTA: Lighter-Than-Air M1400 Overview1st_TSG_Airborne
 
M1400 lighter than air aircraft
M1400 lighter than air aircraftM1400 lighter than air aircraft
M1400 lighter than air aircraftICSA, LLC
 
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...Cisco Russia
 
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy ILOAHawaii
 
Apc series product overview may 2012
Apc series product overview may 2012Apc series product overview may 2012
Apc series product overview may 2012pacificnet
 
Apc series product overview may 2012
Apc series product overview may 2012Apc series product overview may 2012
Apc series product overview may 2012jdlizarraga
 
Green Telecom & IT Workshop: Ee routing and networking thierry klein
Green Telecom & IT Workshop: Ee routing and networking   thierry kleinGreen Telecom & IT Workshop: Ee routing and networking   thierry klein
Green Telecom & IT Workshop: Ee routing and networking thierry kleinBellLabs
 
Tranzeo TR – FDD Series (quantumwimax.com)
Tranzeo TR – FDD Series (quantumwimax.com)Tranzeo TR – FDD Series (quantumwimax.com)
Tranzeo TR – FDD Series (quantumwimax.com)Ari Zoldan
 
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...Gruppo TIM
 
Technical Proposal - IPTV - Solution Design
Technical Proposal - IPTV - Solution DesignTechnical Proposal - IPTV - Solution Design
Technical Proposal - IPTV - Solution Designwolfthrone
 
Military Communications Systems
Military Communications SystemsMilitary Communications Systems
Military Communications SystemsSpontane_IT
 
Multi-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor TestbedMulti-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor Testbedpwynns
 
Air max sector_antennas_ds
Air max sector_antennas_dsAir max sector_antennas_ds
Air max sector_antennas_dspattala01
 

Similar to Isis (20)

Meeting the challenges posed by ISR
Meeting the challenges posed by ISRMeeting the challenges posed by ISR
Meeting the challenges posed by ISR
 
LTA: Lighter-Than-Air M1400 Overview
LTA: Lighter-Than-Air M1400 OverviewLTA: Lighter-Than-Air M1400 Overview
LTA: Lighter-Than-Air M1400 Overview
 
M1400 lighter than air aircraft
M1400 lighter than air aircraftM1400 lighter than air aircraft
M1400 lighter than air aircraft
 
Tr5 Amp
Tr5 AmpTr5 Amp
Tr5 Amp
 
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...
Инновации в архитектуре маршрутизатора ASR9K. Технология сетевой витруализаци...
 
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy
Galaxy Forum India 2010: Professor UR Rao: Excitement in astronomy
 
Apc series product overview may 2012
Apc series product overview may 2012Apc series product overview may 2012
Apc series product overview may 2012
 
Apc series product overview may 2012
Apc series product overview may 2012Apc series product overview may 2012
Apc series product overview may 2012
 
Green Telecom & IT Workshop: Ee routing and networking thierry klein
Green Telecom & IT Workshop: Ee routing and networking   thierry kleinGreen Telecom & IT Workshop: Ee routing and networking   thierry klein
Green Telecom & IT Workshop: Ee routing and networking thierry klein
 
Tranzeo TR – FDD Series (quantumwimax.com)
Tranzeo TR – FDD Series (quantumwimax.com)Tranzeo TR – FDD Series (quantumwimax.com)
Tranzeo TR – FDD Series (quantumwimax.com)
 
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
Strategic Outlook - 2009 Results and the 2010-2012 Strategic Plan Update (Cic...
 
Tr5 Plus
Tr5 PlusTr5 Plus
Tr5 Plus
 
Cmm4 cambium 111611
Cmm4 cambium 111611Cmm4 cambium 111611
Cmm4 cambium 111611
 
Cmm4 cambium 111611
Cmm4 cambium 111611Cmm4 cambium 111611
Cmm4 cambium 111611
 
Technical Proposal - IPTV - Solution Design
Technical Proposal - IPTV - Solution DesignTechnical Proposal - IPTV - Solution Design
Technical Proposal - IPTV - Solution Design
 
Optiscan
OptiscanOptiscan
Optiscan
 
Cambium networks ugps_specification
Cambium networks ugps_specificationCambium networks ugps_specification
Cambium networks ugps_specification
 
Military Communications Systems
Military Communications SystemsMilitary Communications Systems
Military Communications Systems
 
Multi-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor TestbedMulti-Mission Advanced Sensor Testbed
Multi-Mission Advanced Sensor Testbed
 
Air max sector_antennas_ds
Air max sector_antennas_dsAir max sector_antennas_ds
Air max sector_antennas_ds
 

More from Stephen Trimble

Director, office of test and evaluation, 2013 report on Lockheed Martin F-35
Director, office of test and evaluation, 2013 report on Lockheed Martin F-35 Director, office of test and evaluation, 2013 report on Lockheed Martin F-35
Director, office of test and evaluation, 2013 report on Lockheed Martin F-35 Stephen Trimble
 
Silent Eagle Media Brief.Doc
Silent Eagle Media Brief.DocSilent Eagle Media Brief.Doc
Silent Eagle Media Brief.DocStephen Trimble
 

More from Stephen Trimble (8)

Kolly787battery pres
Kolly787battery presKolly787battery pres
Kolly787battery pres
 
Director, office of test and evaluation, 2013 report on Lockheed Martin F-35
Director, office of test and evaluation, 2013 report on Lockheed Martin F-35 Director, office of test and evaluation, 2013 report on Lockheed Martin F-35
Director, office of test and evaluation, 2013 report on Lockheed Martin F-35
 
Senado federal
Senado federalSenado federal
Senado federal
 
Dahm chicago keynote
Dahm chicago keynoteDahm chicago keynote
Dahm chicago keynote
 
Lebanon's Huey bomber
Lebanon's Huey bomberLebanon's Huey bomber
Lebanon's Huey bomber
 
F-35 Multi-Role
F-35 Multi-RoleF-35 Multi-Role
F-35 Multi-Role
 
Ash Presentation
Ash PresentationAsh Presentation
Ash Presentation
 
Silent Eagle Media Brief.Doc
Silent Eagle Media Brief.DocSilent Eagle Media Brief.Doc
Silent Eagle Media Brief.Doc
 

Recently uploaded

Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 

Recently uploaded (20)

Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 

Isis

  • 1. Integrated Sensor Is the Structure (ISIS) 1 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
  • 2. Integrated Sensor Is the Structure (ISIS) Simultaneous AMTI/GMTI Operation via Dual Band (UHF/X-Band) Aperture Cruise Missile Defense Long-range AMTI/GMTI/COMM Detect/Track Dismounts FOPEN GMTI To Scale 1.0 Relative Search Capability (PA) Global Hawk 1.0 Relative Track Capability (PA2/λ2) 140 X Platform carries X 1,800 Joint STARS the antenna S 1,500 S 3,000 AWACS Platform is Extremely High Capacity Comms the antenna UHF 160,000 VHF X 330,000,000 Distribution Statement “A” (Approved for Public 100 101 102 103 104 105 106 107 108 109 Release, Distribution Unlimited) ISIS Global Relocation <10 days – 600km Sensor Radius – No In-Theater Ground Support 10+ year Operational Lifetime – 99% Availability for 1 year 2
  • 3. Integrated Airship-Radar Conventional ISIS New Paradigm Payload: >30% of system mass Payload: 2-3% of system mass MDA Airship 89,000kg Integrated Payload bay Payload Enabling Technologies DARPA ISIS Accomplishments Hull Material • Improved lifetime by 10x while reducing fabric mass 4x over state-of-the-art Active-Array Antenna • Performance from size, not power • Removed heavy high power electronics, cooling • Removed structure: Flexible panels bonded onto pressure vessel • Low-power Transmit/Receive modules based on low-cost “cell phone” technology Power System • Solar-regenerative power with fuel cells instead of batteries • Airspeed: 60 knot sustained, 100 knot sprint FY10 FY11 FY12 FY13 FY08 FY09 FY04 FY05 FY06 FY07 System Study Scaled Prototype System Demonstration SDD… Technology Development TRL 5 TRL 7 MRL 2 MRL 6 3 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
  • 4. ISIS Critical Technologies Addressing critical hardware technology needs Achieved • Low areal-density advanced hull material – Areal density ≤100 g/m2 90.6 g/m2 – Matrix glass transition temperature (TG) ≤ -90°C -101°C – Fiber strength-to-weight ≥ 1000 kN·m/kg 1274 kN-m/kg – Fiber retains >85% strength at 5 years >85% at 22 years Mass • Lightweight, low-power density AESA – Areal density ≤ 2 kg/m2 1.8 kg/m2 – Power consumption ≤ 5.0 W/m2 on receive 4.7 W/m2 – Bonded to hull material Passed • Extremely low-power Transmit-Receive modules – FOM ≥1x104 W-2 1.1 x 104 W-2 Power – Demonstrated TRL5 (MTTF >106 Hours) MTTF >1.98x106 Hours • Novel power systems for stratospheric airships – Demonstrate 400 W-hr/kg regenerative system 779 W-hr/kg 4 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
  • 5. Single Integrated Picture “High-Definition” Picture of All Moving Targets → 10x Resolution Improvement Complete Air Picture LAND SEA AIR • AWACS (70’s) and E-2 (60’s) – Pulse-to-Pulse aperture reconfiguration enables all missions simultaneously designed for hard targets of their day • ISIS is designed for JLENS 225km the theoretical limit Blue Water at the radar horizon ISIS Foliage Penetration 600km AWACS – Single-platform Urban 375km search, track, and Brown Water fire-control Global Relocation <10 days – 600km Sensor Radius – No In-Theater Ground Support 10+ year Operational Lifetime – 99% Availability for 1 year Unobscured Surface Target Wide-Area Foliage Penetration GMTI • Joint STARS (70’s) designed for tanks in • Joint STARS precision across an the Fulda Gap extremely large operational area ISIS • ISIS is designed for JSTARS dismounts across the entire Line-of-Sight 600km 600km 300km 300km – LSRS-like resolution – 300km @ 3º grazing angle – 600km line-of-sight Primary tropical forest Cerrado savanna 300km – Track Agriculture/pasture 600km – Detect 5 Natural/artificial waterbodies Distribution Statement “A” (Approved for Public Release, Distribution Unlimited) & Locate Secondary succession forest
  • 6. No Forward-Based Logistics • Forward-deployed aircraft-based • CONUS-deployed ISIS ISR – Unmanned – Local air base – Launched from U.S. locations – Multiple aircraft for single orbit – Global deployment in 10 days – Air crews – Regenerative fuel sources – Ground crews – Ten-year service life – Fuel supplies – Permanent CONUS ground station – Maintenance facilities Multiply the cost delta by the number of AOI’s and multiple platform types (JSTARS, AWACS, P-3, E-2C, etc) 6 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)
  • 7. Schedule FY10 FY11 FY12 FY13 FY08 FY09 FY04 FY05 FY06 FY07 Phase 1 Phase 2 Phase 3 Design/Build/Demo Phase 1: Feasibility Study • Objective system design Conceptual Design • Technology requirements Review (CoDR) • Sensor analysis Phase 2: System Studies and Technology Development Technology Readiness Review • Continued objective system (TRR) design • Develop core technology PDR CDR Phase 3: Demo System Design • Demo system design • Large-scale integration • Hi-fidelity flight test Demo simulation • Demonstration system build • Flight demonstration 7 Distribution Statement “A” (Approved for Public Release, Distribution Unlimited)