TOWN OF HIGH RIVER



    GROWTH
 MANAGEMENT
   STRATEGY

PUBLIC OPEN HOUSE
         15 MARCH 2012
WHAT IS GROWTH MANAGEMENT?
GMS PROJECT TEAM
Project is being done in-house

Team Members:

   Khalid Mohammed
   Fazeel Elahi
   Yuli Siao
   Ian Fawcett
TOWN PLAN

   Adopted August 2009

   Sets out a vision for the future of the town

   Two components:
      1. Policies
      2. Growth strategy

   Growth Management Strategy
ANNEXATION
 Town Plan - annexation for future growth
 Town and MD – joint annexation proposal
 Approved 1st January 2012
 1769 acres N. and N.W. of boundary
 Sufficient for 30 years growth
 GMS is a plan for that area
 Also addresses areas of undeveloped
  land
MAP OF GMS AREA
GMS CONTENT
Policies for:
 - land use and development
 - roads and utility services
 - community services
 - protecting the environment

Diagrams indicating how and where

Progressively more detailed plans will follow
HIERARCHY OF PLANS

           Town Plan
              GMS
      Area Structure Plans
     Neighbourhood Plans
             Zoning
   Subdivision & Development
GMS PROGRESS
  Preliminary work started last fall
  Aim is to complete project by July 2012
  3rd Open House
  Focus of this Open House – draft policies
  Next phase is drafting the Plan




Pre-consultation   2nd Open House   3rd Open House    4th Open House
1st Open House        Key issues     Draft policies       Draft Plan
REGIONAL CONTEXT
Calgary Metropolitan Plan
   High River identified as a growth area in region
   High River pop. = 31,000 in 30 years
   Current pop.= 13,000. Growth = 18,000
   Min. 25% of future growth within urban area
    (8,000 +/- = 10,000)
   CMP - residential density = 8 - 10 upa
          - higher wherever possible
   Protect environment (river valley), scenic corridors
    (Highway 543), views (mountains)
   Must participate in regional utilities and transit
HIGH RIVER & FOOTHILLS
Inter-municipal Development Plan
 To be adopted in 2012
 Joint planning around town boundary
 Protect all land in river valley – joint study
 Plan for Highway 543/498 Avenue corridor
 Plan for CR area
 Plan for east of Highway 2
IDP LAND USE MAP
ANNEXATION
   Annexation Application
    - need for 30 years growth
    - annexed area primarily residential

   Annexation Agreement
    - assumed that approx. 1400 acres
      developable
    - 350 acres undevelopable
ANNEXATION AREA
TOWN PLAN
 Greater mix of housing types
 Neighbourhoods to be more walkable and
  to have local services
 Roads to reflect more of a grid pattern
 Review existing road standards
 Ensure future transit is taken into account
GMS STUDIES
   Environmental
   Roads and Utilities study
   MetroQuest
   Talked to service providers
   Talked to interest groups:
    - general public
    - landowners
    - youth
    - developers
PUBLIC RESPONSES – OPEN HOUSE #2

Question 1:
People often say they like the “small town feel” of High River.
What in your opinion are the defining characteristics of the “small
town feel” and how should we try to preserve and enhance those
characteristics in a plan for growth over the next 30 years?


Answer:
High River’s “small town feel” is comprised of both the tangible
(unique boutique shops of the downtown, Happy Trails and the
ample green space) and the intangible elements (such as good
social and servicing groups, respect and tolerance in the community,
and knowing your neighbours and community members).
PUBLIC RESPONSES – OPEN HOUSE #2

Question 2:
Some of the feedback we have received suggests that people would
like to see “more walkable” communities in the future.
What does this mean to you and what sort of features should we try to
provide in new communities to achieve this objective?


Answer:
Future communities of High River will feature multi-use and mixed
use developments that are walkable and integrated into active green
space with conscious continuation and expansion of the Happy
Trails pathways.
PUBLIC RESPONSES – OPEN HOUSE #2

Question 3:
Municipalities are being urged to reduce the footprint of new urban
growth and to grow more sustainably. This implies consuming less
land for major land uses (residential, recreation, commercial,
industrial, institutional) and infrastructure (roads and utilities).
How should we achieve this?

Answer:
Through the planning process, future developments within High
River will strive towards: mixing appropriate land uses, increasing
density and variety of housing options, creating more neighbourhood
commercial options, and where appropriate, making use of existing
buildings for new uses (adaptive reuse).
PUBLIC RESPONSES – OPEN HOUSE #2

Question 4:
We know that the population in Canada is aging and also that High
River is a valued location for retirees.
What sort of housing and community facilities do you think we should
promote over the next 30 years for this sector of the population?


Answer:
Over the next 30 years, High River will offer housing development
that is suited to various income levels, close to recreation and future
transit facilities, and flexible to accommodate “aging in place”.
GMS DRAFT POLICIES
   Policies are preliminary for discussion
   For annexation area
   4 groups:
    - General
    - Environment
    - Infrastructure
    - Land use
DRAFT POLICIES - GENERAL
 Incorporate   CMP and IDP policies

 Annexation    area divided into 4 “cells”

 ASP’S   for each cell

 NOP’s   for smaller areas
MAP OF ASP AREAS
DRAFT POLICIES
ENVIRONMENT
   All river “lands” to be a joint study
   No development within 30 metres of river
   Protect access to river
   Protect views – scenic corridor
   Energy efficiency/water conservation/LID
   Arts and culture to be integrated
DRAFT POLICIES
INFRASTRUCTURE
ROADS
 Grid-based network
 Location of key access points
 Provide for future transit
 Traffic calming
 Link to adjacent areas
 Extend Happy Trails
 Reduce standards
DRAFT POLICIES
INFRASTRUCTURE

UTILITIES
 Integrate consultant recommendations for
  water, storm and sanitary
 Storm ponds to also be used for recreation
  and bio-retention
 Protect/remove existing transmission line
DRAFT POLICIES
LAND USE
RESIDENTIAL
 New areas to be compact and walkable
 Density: minimum 8 – 10 upga
 Range of housing types in all areas
 2 main zones: low/medium density & high density
 Housing preferred to be within 400m of
  neighbourhood centre
 Higher densities nearer centre
DRAFT POLICIES
LAND USE (cont)                                 neighbourhood
                                                    centre



COMMERCIAL
 Neighbourhood commercial only
 No commercial fronting Highway 543
 NC’s to provide day-to-day
  retail/personal service needs
 NC’s can also include: health,
  recreation, day care, post office, library,
  school, offices, emergency services,
  parks, community services
 Encourage mixed use, e.g. live/work
DRAFT POLICIES
LAND USE (cont)
INDUSTRIAL
   No new industrial zoning
   Existing industrial zoning to be phased out
   Existing industrial buildings (2) can remain
   Adaptive re-use to be encouraged
DRAFT POLICIES
LAND USE (cont)
OTHER
 New leisure centre
 New fire/police/ambulance facility
 New Town shop/yard
 Allow for Urban Agriculture
 112th Street “triangle” to be included in IDP joint study
 Municipal reserve land to be distributed on ASP basis
                                498
                                 A ve




               The “triangle”
                                  .




            112 St.



                                           Urban agriculture
GMS DRAFT POLICIES
EXISTING URBAN AREA
 Min. 25% of new development
 Minimum residential density 10 upga
 Higher wherever possible
 Revisit existing approved plans
LAND USE MAP
WHAT’S NEXT?
   GMS project to be completed July 2012

   Open House draft plan 16th May 2012

   Town Plan to incorporate GMS policies –
    early fall
SUMMARY

 GMS policies are DRAFT
 Need to know if we have missed any
 Need to know if any create issues
 Questionnaire: today, on-line
 Deadline 3 weeks - April 5th
Thank you
TOWN OF HIGH RIVER



    GROWTH
 MANAGEMENT
   STRATEGY

PUBLIC OPEN HOUSE
         15 MARCH 2012

Contenu connexe

Tendances

Urban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power PointUrban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power Pointmrizzit2
 
Task 7-urban renewal
Task 7-urban renewalTask 7-urban renewal
Task 7-urban renewalAzie Esa
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)MIRAL SONI
 
Alternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraAlternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraMIRAL SONI
 
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENT
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENTSOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENT
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENTRajesh Kolli
 
Making and unmaking of Chandigarh - making public spaces -
Making and unmaking of Chandigarh   - making public spaces -Making and unmaking of Chandigarh   - making public spaces -
Making and unmaking of Chandigarh - making public spaces -JIT KUMAR GUPTA
 
Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land usearpriyank
 
Urban renewal in France
Urban renewal in FranceUrban renewal in France
Urban renewal in FranceNachman Shelef
 
Proposed Garden City Zoning in Kawit, Cavite
Proposed Garden City Zoning in Kawit, CaviteProposed Garden City Zoning in Kawit, Cavite
Proposed Garden City Zoning in Kawit, CaviteShayne Galo
 
Challenges and Opportunities of China’s Urban Renewal
Challenges and Opportunities of China’s Urban RenewalChallenges and Opportunities of China’s Urban Renewal
Challenges and Opportunities of China’s Urban RenewalSTL Lab
 
Making Ludhiana Smart- Concepts, Issues and Options
Making Ludhiana  Smart- Concepts, Issues and Options Making Ludhiana  Smart- Concepts, Issues and Options
Making Ludhiana Smart- Concepts, Issues and Options JIT KUMAR GUPTA
 
2ND ANNUAL URBAN RENEWAL AUSTRALIA
2ND ANNUAL URBAN RENEWAL AUSTRALIA2ND ANNUAL URBAN RENEWAL AUSTRALIA
2ND ANNUAL URBAN RENEWAL AUSTRALIACorin Tan
 
Veterans Plaza - A Dynamic Cultural District
Veterans Plaza - A Dynamic Cultural DistrictVeterans Plaza - A Dynamic Cultural District
Veterans Plaza - A Dynamic Cultural DistrictJose Carlos Ayala
 
Urban stream study
Urban stream studyUrban stream study
Urban stream studyZhao Wei Kim
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, AhmedabadPratham Pincha
 
Chapter 5 mixed use design guidelines
Chapter 5   mixed use design guidelinesChapter 5   mixed use design guidelines
Chapter 5 mixed use design guidelinessikushina
 

Tendances (20)

Urban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power PointUrban Planning 494 Final Presentation Power Point
Urban Planning 494 Final Presentation Power Point
 
Task 7-urban renewal
Task 7-urban renewalTask 7-urban renewal
Task 7-urban renewal
 
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
BHADA (BHUJ AREA DEVELOPMENT AUTHORITY)
 
Alternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in VadodaraAlternatives to traffic congestion in Vadodara
Alternatives to traffic congestion in Vadodara
 
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENT
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENTSOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENT
SOCIO ECONOMIC DETERMINANTS IN MIXED USE DEVELOPMENT
 
Making and unmaking of Chandigarh - making public spaces -
Making and unmaking of Chandigarh   - making public spaces -Making and unmaking of Chandigarh   - making public spaces -
Making and unmaking of Chandigarh - making public spaces -
 
Assignment mixed land use
Assignment mixed land useAssignment mixed land use
Assignment mixed land use
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
 
Urban renewal in France
Urban renewal in FranceUrban renewal in France
Urban renewal in France
 
Proposed Garden City Zoning in Kawit, Cavite
Proposed Garden City Zoning in Kawit, CaviteProposed Garden City Zoning in Kawit, Cavite
Proposed Garden City Zoning in Kawit, Cavite
 
Challenges and Opportunities of China’s Urban Renewal
Challenges and Opportunities of China’s Urban RenewalChallenges and Opportunities of China’s Urban Renewal
Challenges and Opportunities of China’s Urban Renewal
 
Making Ludhiana Smart- Concepts, Issues and Options
Making Ludhiana  Smart- Concepts, Issues and Options Making Ludhiana  Smart- Concepts, Issues and Options
Making Ludhiana Smart- Concepts, Issues and Options
 
2ND ANNUAL URBAN RENEWAL AUSTRALIA
2ND ANNUAL URBAN RENEWAL AUSTRALIA2ND ANNUAL URBAN RENEWAL AUSTRALIA
2ND ANNUAL URBAN RENEWAL AUSTRALIA
 
Veterans Plaza - A Dynamic Cultural District
Veterans Plaza - A Dynamic Cultural DistrictVeterans Plaza - A Dynamic Cultural District
Veterans Plaza - A Dynamic Cultural District
 
Urban stream study
Urban stream studyUrban stream study
Urban stream study
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
Chandigarh
ChandigarhChandigarh
Chandigarh
 
Urban renewal
Urban renewalUrban renewal
Urban renewal
 
Chapter 5 mixed use design guidelines
Chapter 5   mixed use design guidelinesChapter 5   mixed use design guidelines
Chapter 5 mixed use design guidelines
 
3.6 urban renewal
3.6 urban renewal3.6 urban renewal
3.6 urban renewal
 

Similaire à March 15 Growth Management Strategy Open House - Presentation

Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design ReportAsadullah Malik
 
SAtIATED TOWN
SAtIATED TOWNSAtIATED TOWN
SAtIATED TOWNSMYM_13
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committeeguestb99391
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdfSkFoishalAhmed
 
Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Trailnet
 
Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Trailnet
 
Urban management of Duhok master plan
Urban management of Duhok master plan Urban management of Duhok master plan
Urban management of Duhok master plan Payman Bahjat
 
Planning documents relevant to Countryside
Planning documents relevant to CountrysidePlanning documents relevant to Countryside
Planning documents relevant to CountrysideCity of Roanoke
 
Lesson 2 town planning concepts
Lesson  2 town planning conceptsLesson  2 town planning concepts
Lesson 2 town planning conceptsVINCENT WAN PERERA
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi reportGeeva Chandana
 
Irish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanIrish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanMichael Gibbons
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning pptshradha arun
 
Growth Management Strategy - Second Public Open House
Growth Management Strategy - Second Public Open HouseGrowth Management Strategy - Second Public Open House
Growth Management Strategy - Second Public Open HouseTown of High River
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysTim Hays
 
Town planning presentation
Town planning presentationTown planning presentation
Town planning presentationVishvendu pandey
 
Carbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewCarbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewMikePierceall
 

Similaire à March 15 Growth Management Strategy Open House - Presentation (20)

Neighbourhood Design Report
Neighbourhood Design ReportNeighbourhood Design Report
Neighbourhood Design Report
 
SAtIATED TOWN
SAtIATED TOWNSAtIATED TOWN
SAtIATED TOWN
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committee
 
Wf May2208 Support Committee
Wf May2208 Support CommitteeWf May2208 Support Committee
Wf May2208 Support Committee
 
Subdivision presentation.pdf
Subdivision presentation.pdfSubdivision presentation.pdf
Subdivision presentation.pdf
 
convert_266361
convert_266361convert_266361
convert_266361
 
Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1
 
Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1Revitalizing Retail Corridors, Presentation 1
Revitalizing Retail Corridors, Presentation 1
 
Urban management of Duhok master plan
Urban management of Duhok master plan Urban management of Duhok master plan
Urban management of Duhok master plan
 
Planning documents relevant to Countryside
Planning documents relevant to CountrysidePlanning documents relevant to Countryside
Planning documents relevant to Countryside
 
Cmap bhb land use
Cmap bhb land useCmap bhb land use
Cmap bhb land use
 
Lesson 2 town planning concepts
Lesson  2 town planning conceptsLesson  2 town planning concepts
Lesson 2 town planning concepts
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Irish Hills Ranch Specific Plan
Irish Hills Ranch Specific PlanIrish Hills Ranch Specific Plan
Irish Hills Ranch Specific Plan
 
Regional planning ppt
Regional planning pptRegional planning ppt
Regional planning ppt
 
Growth Management Strategy - Second Public Open House
Growth Management Strategy - Second Public Open HouseGrowth Management Strategy - Second Public Open House
Growth Management Strategy - Second Public Open House
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
Town planning presentation
Town planning presentationTown planning presentation
Town planning presentation
 
Rmtsp
RmtspRmtsp
Rmtsp
 
Carbondale Comp Plan - Overview
Carbondale Comp Plan - OverviewCarbondale Comp Plan - Overview
Carbondale Comp Plan - Overview
 

Plus de Town of High River

Growth management-strategy open-house-4-presentation
Growth management-strategy open-house-4-presentationGrowth management-strategy open-house-4-presentation
Growth management-strategy open-house-4-presentationTown of High River
 
Upper little bow river presentation
Upper little bow river presentationUpper little bow river presentation
Upper little bow river presentationTown of High River
 
Pioneer Square Pop-up Planning
Pioneer Square Pop-up PlanningPioneer Square Pop-up Planning
Pioneer Square Pop-up PlanningTown of High River
 
Charles Clark Park Medical Facility
Charles Clark Park Medical FacilityCharles Clark Park Medical Facility
Charles Clark Park Medical FacilityTown of High River
 

Plus de Town of High River (8)

Growth management-strategy open-house-4-presentation
Growth management-strategy open-house-4-presentationGrowth management-strategy open-house-4-presentation
Growth management-strategy open-house-4-presentation
 
Upper little bow river presentation
Upper little bow river presentationUpper little bow river presentation
Upper little bow river presentation
 
Growth Management Strategy
Growth Management StrategyGrowth Management Strategy
Growth Management Strategy
 
Pioneer Square Pop-up Planning
Pioneer Square Pop-up PlanningPioneer Square Pop-up Planning
Pioneer Square Pop-up Planning
 
Tornado safety awareness
Tornado safety awarenessTornado safety awareness
Tornado safety awareness
 
Parent link web
Parent link webParent link web
Parent link web
 
Metroquest game results
Metroquest game resultsMetroquest game results
Metroquest game results
 
Charles Clark Park Medical Facility
Charles Clark Park Medical FacilityCharles Clark Park Medical Facility
Charles Clark Park Medical Facility
 

March 15 Growth Management Strategy Open House - Presentation

  • 1. TOWN OF HIGH RIVER GROWTH MANAGEMENT STRATEGY PUBLIC OPEN HOUSE 15 MARCH 2012
  • 2. WHAT IS GROWTH MANAGEMENT?
  • 3. GMS PROJECT TEAM Project is being done in-house Team Members:  Khalid Mohammed  Fazeel Elahi  Yuli Siao  Ian Fawcett
  • 4. TOWN PLAN  Adopted August 2009  Sets out a vision for the future of the town  Two components: 1. Policies 2. Growth strategy  Growth Management Strategy
  • 5. ANNEXATION  Town Plan - annexation for future growth  Town and MD – joint annexation proposal  Approved 1st January 2012  1769 acres N. and N.W. of boundary  Sufficient for 30 years growth  GMS is a plan for that area  Also addresses areas of undeveloped land
  • 6. MAP OF GMS AREA
  • 7. GMS CONTENT Policies for: - land use and development - roads and utility services - community services - protecting the environment Diagrams indicating how and where Progressively more detailed plans will follow
  • 8. HIERARCHY OF PLANS Town Plan GMS Area Structure Plans Neighbourhood Plans Zoning Subdivision & Development
  • 9. GMS PROGRESS  Preliminary work started last fall  Aim is to complete project by July 2012  3rd Open House  Focus of this Open House – draft policies  Next phase is drafting the Plan Pre-consultation 2nd Open House 3rd Open House 4th Open House 1st Open House Key issues Draft policies Draft Plan
  • 10. REGIONAL CONTEXT Calgary Metropolitan Plan  High River identified as a growth area in region  High River pop. = 31,000 in 30 years  Current pop.= 13,000. Growth = 18,000  Min. 25% of future growth within urban area (8,000 +/- = 10,000)  CMP - residential density = 8 - 10 upa - higher wherever possible  Protect environment (river valley), scenic corridors (Highway 543), views (mountains)  Must participate in regional utilities and transit
  • 11. HIGH RIVER & FOOTHILLS Inter-municipal Development Plan  To be adopted in 2012  Joint planning around town boundary  Protect all land in river valley – joint study  Plan for Highway 543/498 Avenue corridor  Plan for CR area  Plan for east of Highway 2
  • 13. ANNEXATION  Annexation Application - need for 30 years growth - annexed area primarily residential  Annexation Agreement - assumed that approx. 1400 acres developable - 350 acres undevelopable
  • 15. TOWN PLAN  Greater mix of housing types  Neighbourhoods to be more walkable and to have local services  Roads to reflect more of a grid pattern  Review existing road standards  Ensure future transit is taken into account
  • 16. GMS STUDIES  Environmental  Roads and Utilities study  MetroQuest  Talked to service providers  Talked to interest groups: - general public - landowners - youth - developers
  • 17. PUBLIC RESPONSES – OPEN HOUSE #2 Question 1: People often say they like the “small town feel” of High River. What in your opinion are the defining characteristics of the “small town feel” and how should we try to preserve and enhance those characteristics in a plan for growth over the next 30 years? Answer: High River’s “small town feel” is comprised of both the tangible (unique boutique shops of the downtown, Happy Trails and the ample green space) and the intangible elements (such as good social and servicing groups, respect and tolerance in the community, and knowing your neighbours and community members).
  • 18. PUBLIC RESPONSES – OPEN HOUSE #2 Question 2: Some of the feedback we have received suggests that people would like to see “more walkable” communities in the future. What does this mean to you and what sort of features should we try to provide in new communities to achieve this objective? Answer: Future communities of High River will feature multi-use and mixed use developments that are walkable and integrated into active green space with conscious continuation and expansion of the Happy Trails pathways.
  • 19. PUBLIC RESPONSES – OPEN HOUSE #2 Question 3: Municipalities are being urged to reduce the footprint of new urban growth and to grow more sustainably. This implies consuming less land for major land uses (residential, recreation, commercial, industrial, institutional) and infrastructure (roads and utilities). How should we achieve this? Answer: Through the planning process, future developments within High River will strive towards: mixing appropriate land uses, increasing density and variety of housing options, creating more neighbourhood commercial options, and where appropriate, making use of existing buildings for new uses (adaptive reuse).
  • 20. PUBLIC RESPONSES – OPEN HOUSE #2 Question 4: We know that the population in Canada is aging and also that High River is a valued location for retirees. What sort of housing and community facilities do you think we should promote over the next 30 years for this sector of the population? Answer: Over the next 30 years, High River will offer housing development that is suited to various income levels, close to recreation and future transit facilities, and flexible to accommodate “aging in place”.
  • 21. GMS DRAFT POLICIES  Policies are preliminary for discussion  For annexation area  4 groups: - General - Environment - Infrastructure - Land use
  • 22. DRAFT POLICIES - GENERAL  Incorporate CMP and IDP policies  Annexation area divided into 4 “cells”  ASP’S for each cell  NOP’s for smaller areas
  • 23. MAP OF ASP AREAS
  • 24. DRAFT POLICIES ENVIRONMENT  All river “lands” to be a joint study  No development within 30 metres of river  Protect access to river  Protect views – scenic corridor  Energy efficiency/water conservation/LID  Arts and culture to be integrated
  • 25. DRAFT POLICIES INFRASTRUCTURE ROADS  Grid-based network  Location of key access points  Provide for future transit  Traffic calming  Link to adjacent areas  Extend Happy Trails  Reduce standards
  • 26. DRAFT POLICIES INFRASTRUCTURE UTILITIES  Integrate consultant recommendations for water, storm and sanitary  Storm ponds to also be used for recreation and bio-retention  Protect/remove existing transmission line
  • 27. DRAFT POLICIES LAND USE RESIDENTIAL  New areas to be compact and walkable  Density: minimum 8 – 10 upga  Range of housing types in all areas  2 main zones: low/medium density & high density  Housing preferred to be within 400m of neighbourhood centre  Higher densities nearer centre
  • 28. DRAFT POLICIES LAND USE (cont) neighbourhood centre COMMERCIAL  Neighbourhood commercial only  No commercial fronting Highway 543  NC’s to provide day-to-day retail/personal service needs  NC’s can also include: health, recreation, day care, post office, library, school, offices, emergency services, parks, community services  Encourage mixed use, e.g. live/work
  • 29. DRAFT POLICIES LAND USE (cont) INDUSTRIAL  No new industrial zoning  Existing industrial zoning to be phased out  Existing industrial buildings (2) can remain  Adaptive re-use to be encouraged
  • 30. DRAFT POLICIES LAND USE (cont) OTHER  New leisure centre  New fire/police/ambulance facility  New Town shop/yard  Allow for Urban Agriculture  112th Street “triangle” to be included in IDP joint study  Municipal reserve land to be distributed on ASP basis 498 A ve The “triangle” . 112 St. Urban agriculture
  • 31. GMS DRAFT POLICIES EXISTING URBAN AREA  Min. 25% of new development  Minimum residential density 10 upga  Higher wherever possible  Revisit existing approved plans
  • 33. WHAT’S NEXT?  GMS project to be completed July 2012  Open House draft plan 16th May 2012  Town Plan to incorporate GMS policies – early fall