3. Achieved results:
Support to the Ministry of Economy in developing of
the legal framework for Renewable Energy Sources
(RES)
Provision of technical support to the Hydrometeorological Institute for collection of hydrology
data, as well as two Hydrological reports to the
Ministry of Economy
Creation of a technical study “Distributed Source
connection and operation in the electric power
system of Montenegro”
4. Achieved results
ROADMAP for potential investors in RES in
Montenegro - steps from submitting application for a
concession to getting construction permit,
construction and setting in operation a small
hydropower plant
Template for the Local Energy Plan (LEP) and
prepared LEPs for three Municipalities
Development of conceptual design for the
construction of a mini hydro power plant at the main
water supply system in Andrijevica
www.res-oie.me
5. Recommendations
Ministry of Economy to allocate adequate resources
and assistance to maintain momentum of SHPP
development after the completion of the Small Hydro
Power Project.
Use the lessons learned from this Project to
accelerate development of other Renewable Energy
sources in Montenegro
The Government - to remove bottlenecks to the
development of SSHP concessions in Montenegro
6. Recommendations
Plan for private sector investment in hydrometric data
collection
Government to address its need for investment into the
upgrading of its grid network to secure the safe absorption
of power from various renewable energy sources
Improve the prospects of financing availability for Small
Hydro Power Projects
Ministry of Economy should obligate Small Hydro Power
Project concessionaires to monitor and report on
construction quality of Small Hydro Power Projects to
international standards and to perform Monitoring,
Reporting and Verification functions on power generation