SlideShare une entreprise Scribd logo
1  sur  4
C.v
NAME : OSAMA FOUAD ABD EL AZIZ
DATE OF BIRTH : 9 FEBRUARY 1976
NATIONALITY : EGYPTIAN.
EDUCATIONAL : DIPLOMA IN MAINTAINS & REPAIR OF ELECTRICAL EQ.
MARITAL STATUS : MARRIED.
BUSINESS : SUPER VISOR COMMISSIONING TECH
ADDRESS : 7 ABASE GHAZI S.T FAYSAL GIZA – EGYPT.
TEL : +201005529721, +96597297106
MAIL ADDRES : ufouad@yahoo.com
Work Experience :
From February 2012 up to now
Super visour commissioning tech
Al kharafi national co.
West dameta power station. (Egypt)
Central bank of Kuwait. (Kuwait)
Administration building. (Kuwait)
COMMISSIONING AND START UP
AND CONTINUO IN WARRANTY PERIOD
1- TEST POWER TARANCEFORMER (WINDING RESISTANCE , ISOLATE, RATIO, VECTOR
GROUP, )
2- TEST C.T & V.T ( RATIO, ISOLATE, RESISTANCE, MAGNETIZATION CURVE,)
3- TEST HVAC (TEMPERATURE, AIR FLOWE, BALANCE, VAV DIVECE )
4- TEST FIRE FIGHTING SYSTEM.
5- DIESEL GENERATOR ( CONTROL CIRCUIT, SYNC SYSTEM, )
From Dec. 2010 up to January 2012
Senior Commissioning Tech.
Al oasis co. (king sudia of Arabic)
• COMMISSIONING AND START UP FOR ELRYADH SUB STATION NO:8074 132/13.8K.V
• COMMISSIONING AND START UP FOR ELKHULAIS SUB STATION 110/33K.V
1- TEST THE CURRENT TRANSFORMER (MEGGER, POLARITY, MAGNETIZATION
CURVE, TURNS RATIO AND LOOP CHECK)
TEST THE VOLTAGE TRANSFORMER (MEGGER, POLARITY, TURNS RATIO AND
LOOP CHECK)
2- MEASURE THE TIMING OF CLOSING AND OPENING OF CIRCUIT BREAKER
3- CHECK THE MECHANICAL PROTECTION AND OPERATE THE FAN GROUPS
AND THE TAPCHANGER OF THE TRANSFORMER
4- MEASURE THE EARTH RESISTANCE
5- TEST THE POWER TRANSFORMER (MEGGER ,WINDING RESISTANCE, VECTOR
GROUP CHECK AND VOLTAGE RATIO CHECK )
6- CHECK AUX. RELAY
From April 2009 up to November 2010
Team leader in
Madad group engineering
• COMMISSIONING AND START UP FOR TIBEEN POWER STATION AND PETROL
PLATFORM WITH ENPI CO.
• COMPILATION OF PAINTINGS, ELECTRIC, WITH ABB CO.
• INSTALLATION AND TESTING OF CEMENT PACKING MACHINE FOR HELWAN CEMENT
FACTORY AND ELSUZ CEMENT FACTORY.
• COMMISSIONING AND START UP FOR KURIMAT SOLAR ENERGY SUB CONTRACT
IBERDROLA CO.
From august 2007 up to march 2009
G.E.S (GLOBAL ENERGY SERVICES) (SPANISH COMPANY) ZAFARANA 85 MW
MAINTENANCE AND OPERATION TECHNICIAN FOR WIND TURBINES INCLUDING
MAINTENANCE OF THE FOLLOWING FOR 100 TURBINES:
• GENERATOR (INDAR 850 KW/H 690 V).
• GEARBOX (ECHESA).
• HYDRAULIC GROUP CONTROLLING THE MOVEMENT OF BLADES AND BRAKE SYSTEMS.
• PLC CONTROLLING THE DIRECTION AND SPEED OF THE WIND TURBINE.
• COMMUNICATION SYSTEM BETWEEN PLC AND CCU THROUGH OPTICAL FIBER
CABLES.AND MODIFACATI ON PLC SOFTWARE
• OPERATION AND MAINTENANCE OF AIR CONDITION (MEGA-HISSOTTO)
From January 2005 to July 2007
Egyptian Electricity Transmission
Cairo Regional Control Center (CRCC)
MY JOB IS CONSTRUCTION, FOR 115 SUBSTATIONS,(66-20-11K.V)
• REPAIR AND MAINTENANCE ANY PROBLEMS SUB STATIONS WITH CRCC.
• ELECTRICAL SURVEY FOR NEW POWER SUB STATIONS EXTENSIONS (TRANSFORMERS
& FEEDERS) AND ANY SUBSTITUTE.
• DESIGN SCADA SYSTEM FOR SURVEYED SUBSTATIONS.
• CABLE TRAY CALCULATION AND INSTALLATION.
• CABLE LAYING AND TESTING.
• INSTALL ALL EQUIPMENT NEEDED FOR SCADA SYSTEM.
• PROCEEDING RTU-POINT TO POINT TEST WITH EEA.
March 2000 to December 2004
Team leader in
Tarradco .co {Sub contractor of siemens}
Responsible for:
MY JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 66KV
SUBSTATIONS; AND POWER GENERATOR IN CAIRO ZONE.
TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS,
DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE
CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT
BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG -
BBC - ABB - MERLAN GERAN - ELECTRO IMPEX- WESTING HOUSE - MITSUBISHI- EGEMAC -
RADE KONCAR -POLAND- WEST GERMANY)
December 1999 to February 2000
ICAT (Under /Ansco)
Gabal El Asfar-contract 16.
Responsible for:
OPERATOR BUMP STATION AND METERING FOR ALL EQUIPMENT
October 1996 to December2000
Kolaly Engineering {Sub contractor of Haris}
UPGRAD.of national energy connyrol center
My Responsible for:
JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 220, 500 KV SUB
STATION AND POWER GENERATOR IN ARAB REPABLIC OF EGYPT.
TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS,
DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE
CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT
BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG -
BBC - ABB - WESTING HOUSE - MITSUBISHI- RADE KONCAR -POLAND- WEST GERMANY)
July 1996 to October
Alcatal-Italy
GREATER CAIRO Line 2
RESPONSIBLE FOR:
CONNECTED FIRE ALARM. SOUND SYSTEM AND LINE TELEPHONE
NOVEMBER 1994 to June 1996
ELECTRO THARWT
ELARISH POWER Station-Greater Cairo Metro
Responsible For:
CONNECTED CONTROL PANEL AND TESTED ALL FEEDER
June 1994 to October 1994
COGELEX Alsthom
AMRIA SUB -STATION
Responsible For:
INSTLATION OF H.V ELECTRICAL TOWERS
AND MADE CABLE TRAY
NOVEMBER 1993 to March 1994
MEGLCON
CAIRO WEST POWER STATION
Responsible For:
CONNECTED CONTROL PANEL
Courses:
 COURSE SAFETY IMPARTED BY TESICNOR COMPANY IN RISK PREVENTION
AT WIND FARMS .THIS COURSE INCLUDES:

 COURSE 30 HOUR FROM [OCCUPATIONAL SAFETY &HEALTH
ADMINISTRATION (OSHA)] IN GENERAL INDUSTRIAL SAFETY STANDARDS.
US DEPARTMENT OF LABOR (CODE NO.1910).
Languages:
• ARABIC - MOTHER TONGUE.
• ENGLISH – SPOKEN AND WRITTEN (VERY GOOD).
Computer skills:
WIN XP, WORD XP, EXCEL XP, AND WINDOUS 7

Contenu connexe

Tendances

Compact High Voltage Pulser
Compact High Voltage PulserCompact High Voltage Pulser
Compact High Voltage Pulser
Michael Bethel
 
CVrev 2 B BUNGAY 2013
CVrev 2 B BUNGAY 2013CVrev 2 B BUNGAY 2013
CVrev 2 B BUNGAY 2013
davey baker
 

Tendances (13)

Operating Poles - PB Weir Substation Earthing Operating Poles High Voltage
Operating Poles - PB Weir Substation Earthing Operating Poles High VoltageOperating Poles - PB Weir Substation Earthing Operating Poles High Voltage
Operating Poles - PB Weir Substation Earthing Operating Poles High Voltage
 
Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017Balpara Electrical Engineering Projects 2017
Balpara Electrical Engineering Projects 2017
 
C 1 .V.
C 1 .V.C 1 .V.
C 1 .V.
 
Compact High Voltage Pulser
Compact High Voltage PulserCompact High Voltage Pulser
Compact High Voltage Pulser
 
CVrev 2 B BUNGAY 2013
CVrev 2 B BUNGAY 2013CVrev 2 B BUNGAY 2013
CVrev 2 B BUNGAY 2013
 
Novica_Andjelkovic CV
Novica_Andjelkovic CVNovica_Andjelkovic CV
Novica_Andjelkovic CV
 
Entrepreneurship Course -- Pitching for VC
Entrepreneurship Course -- Pitching for VCEntrepreneurship Course -- Pitching for VC
Entrepreneurship Course -- Pitching for VC
 
Inishraher Ireland Renewable Energy Study
Inishraher Ireland Renewable Energy Study Inishraher Ireland Renewable Energy Study
Inishraher Ireland Renewable Energy Study
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...Challenge Industrial Company Introduction_Instrument transformer_Current tran...
Challenge Industrial Company Introduction_Instrument transformer_Current tran...
 
2. Rail Infrastructure - December 2014
2. Rail Infrastructure - December 20142. Rail Infrastructure - December 2014
2. Rail Infrastructure - December 2014
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017
 
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV FarmsMatrix Networks (Renewables) - Muncey & Black Peak PV Farms
Matrix Networks (Renewables) - Muncey & Black Peak PV Farms
 

Similaire à Osama Fouad (Update)

Similaire à Osama Fouad (Update) (20)

lead electrical commissioning engineer
lead electrical commissioning engineerlead electrical commissioning engineer
lead electrical commissioning engineer
 
lead electrical commissioning engineer
lead electrical commissioning engineerlead electrical commissioning engineer
lead electrical commissioning engineer
 
gamal ghazy svc
gamal ghazy svcgamal ghazy svc
gamal ghazy svc
 
Mohamed A.Razaq
Mohamed A.RazaqMohamed A.Razaq
Mohamed A.Razaq
 
CV 07.12.2015
CV 07.12.2015CV 07.12.2015
CV 07.12.2015
 
Hussein CV 2015
Hussein CV 2015Hussein CV 2015
Hussein CV 2015
 
Eng Hossam Barakat C.V
Eng Hossam Barakat C.VEng Hossam Barakat C.V
Eng Hossam Barakat C.V
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
TOSH
TOSHTOSH
TOSH
 
resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986resume_2015_11_19_11_22_24_986
resume_2015_11_19_11_22_24_986
 
osama dwedar ..
osama dwedar ..osama dwedar ..
osama dwedar ..
 
Resume Superintendent Head Electrical
Resume Superintendent Head ElectricalResume Superintendent Head Electrical
Resume Superintendent Head Electrical
 
M.Ibrahim_Adv
M.Ibrahim_AdvM.Ibrahim_Adv
M.Ibrahim_Adv
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015 Essam Afifi CV 19-10-015
Essam Afifi CV 19-10-015
 
PM Ahmed Abdelhady CV
PM Ahmed Abdelhady CVPM Ahmed Abdelhady CV
PM Ahmed Abdelhady CV
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
Moh cv
Moh cvMoh cv
Moh cv
 
SHORT BIOGRAPHY
SHORT BIOGRAPHYSHORT BIOGRAPHY
SHORT BIOGRAPHY
 

Osama Fouad (Update)

  • 1. C.v NAME : OSAMA FOUAD ABD EL AZIZ DATE OF BIRTH : 9 FEBRUARY 1976 NATIONALITY : EGYPTIAN. EDUCATIONAL : DIPLOMA IN MAINTAINS & REPAIR OF ELECTRICAL EQ. MARITAL STATUS : MARRIED. BUSINESS : SUPER VISOR COMMISSIONING TECH ADDRESS : 7 ABASE GHAZI S.T FAYSAL GIZA – EGYPT. TEL : +201005529721, +96597297106 MAIL ADDRES : ufouad@yahoo.com Work Experience : From February 2012 up to now Super visour commissioning tech Al kharafi national co. West dameta power station. (Egypt) Central bank of Kuwait. (Kuwait) Administration building. (Kuwait) COMMISSIONING AND START UP AND CONTINUO IN WARRANTY PERIOD 1- TEST POWER TARANCEFORMER (WINDING RESISTANCE , ISOLATE, RATIO, VECTOR GROUP, ) 2- TEST C.T & V.T ( RATIO, ISOLATE, RESISTANCE, MAGNETIZATION CURVE,) 3- TEST HVAC (TEMPERATURE, AIR FLOWE, BALANCE, VAV DIVECE ) 4- TEST FIRE FIGHTING SYSTEM. 5- DIESEL GENERATOR ( CONTROL CIRCUIT, SYNC SYSTEM, ) From Dec. 2010 up to January 2012 Senior Commissioning Tech. Al oasis co. (king sudia of Arabic) • COMMISSIONING AND START UP FOR ELRYADH SUB STATION NO:8074 132/13.8K.V • COMMISSIONING AND START UP FOR ELKHULAIS SUB STATION 110/33K.V 1- TEST THE CURRENT TRANSFORMER (MEGGER, POLARITY, MAGNETIZATION CURVE, TURNS RATIO AND LOOP CHECK) TEST THE VOLTAGE TRANSFORMER (MEGGER, POLARITY, TURNS RATIO AND LOOP CHECK) 2- MEASURE THE TIMING OF CLOSING AND OPENING OF CIRCUIT BREAKER 3- CHECK THE MECHANICAL PROTECTION AND OPERATE THE FAN GROUPS AND THE TAPCHANGER OF THE TRANSFORMER 4- MEASURE THE EARTH RESISTANCE 5- TEST THE POWER TRANSFORMER (MEGGER ,WINDING RESISTANCE, VECTOR GROUP CHECK AND VOLTAGE RATIO CHECK )
  • 2. 6- CHECK AUX. RELAY From April 2009 up to November 2010 Team leader in Madad group engineering • COMMISSIONING AND START UP FOR TIBEEN POWER STATION AND PETROL PLATFORM WITH ENPI CO. • COMPILATION OF PAINTINGS, ELECTRIC, WITH ABB CO. • INSTALLATION AND TESTING OF CEMENT PACKING MACHINE FOR HELWAN CEMENT FACTORY AND ELSUZ CEMENT FACTORY. • COMMISSIONING AND START UP FOR KURIMAT SOLAR ENERGY SUB CONTRACT IBERDROLA CO. From august 2007 up to march 2009 G.E.S (GLOBAL ENERGY SERVICES) (SPANISH COMPANY) ZAFARANA 85 MW MAINTENANCE AND OPERATION TECHNICIAN FOR WIND TURBINES INCLUDING MAINTENANCE OF THE FOLLOWING FOR 100 TURBINES: • GENERATOR (INDAR 850 KW/H 690 V). • GEARBOX (ECHESA). • HYDRAULIC GROUP CONTROLLING THE MOVEMENT OF BLADES AND BRAKE SYSTEMS. • PLC CONTROLLING THE DIRECTION AND SPEED OF THE WIND TURBINE. • COMMUNICATION SYSTEM BETWEEN PLC AND CCU THROUGH OPTICAL FIBER CABLES.AND MODIFACATI ON PLC SOFTWARE • OPERATION AND MAINTENANCE OF AIR CONDITION (MEGA-HISSOTTO) From January 2005 to July 2007 Egyptian Electricity Transmission Cairo Regional Control Center (CRCC) MY JOB IS CONSTRUCTION, FOR 115 SUBSTATIONS,(66-20-11K.V) • REPAIR AND MAINTENANCE ANY PROBLEMS SUB STATIONS WITH CRCC. • ELECTRICAL SURVEY FOR NEW POWER SUB STATIONS EXTENSIONS (TRANSFORMERS & FEEDERS) AND ANY SUBSTITUTE. • DESIGN SCADA SYSTEM FOR SURVEYED SUBSTATIONS. • CABLE TRAY CALCULATION AND INSTALLATION. • CABLE LAYING AND TESTING. • INSTALL ALL EQUIPMENT NEEDED FOR SCADA SYSTEM. • PROCEEDING RTU-POINT TO POINT TEST WITH EEA.
  • 3. March 2000 to December 2004 Team leader in Tarradco .co {Sub contractor of siemens} Responsible for: MY JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 66KV SUBSTATIONS; AND POWER GENERATOR IN CAIRO ZONE. TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS, DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG - BBC - ABB - MERLAN GERAN - ELECTRO IMPEX- WESTING HOUSE - MITSUBISHI- EGEMAC - RADE KONCAR -POLAND- WEST GERMANY) December 1999 to February 2000 ICAT (Under /Ansco) Gabal El Asfar-contract 16. Responsible for: OPERATOR BUMP STATION AND METERING FOR ALL EQUIPMENT October 1996 to December2000 Kolaly Engineering {Sub contractor of Haris} UPGRAD.of national energy connyrol center My Responsible for: JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 220, 500 KV SUB STATION AND POWER GENERATOR IN ARAB REPABLIC OF EGYPT. TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS, DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG - BBC - ABB - WESTING HOUSE - MITSUBISHI- RADE KONCAR -POLAND- WEST GERMANY) July 1996 to October Alcatal-Italy GREATER CAIRO Line 2 RESPONSIBLE FOR: CONNECTED FIRE ALARM. SOUND SYSTEM AND LINE TELEPHONE
  • 4. NOVEMBER 1994 to June 1996 ELECTRO THARWT ELARISH POWER Station-Greater Cairo Metro Responsible For: CONNECTED CONTROL PANEL AND TESTED ALL FEEDER June 1994 to October 1994 COGELEX Alsthom AMRIA SUB -STATION Responsible For: INSTLATION OF H.V ELECTRICAL TOWERS AND MADE CABLE TRAY NOVEMBER 1993 to March 1994 MEGLCON CAIRO WEST POWER STATION Responsible For: CONNECTED CONTROL PANEL Courses:  COURSE SAFETY IMPARTED BY TESICNOR COMPANY IN RISK PREVENTION AT WIND FARMS .THIS COURSE INCLUDES:   COURSE 30 HOUR FROM [OCCUPATIONAL SAFETY &HEALTH ADMINISTRATION (OSHA)] IN GENERAL INDUSTRIAL SAFETY STANDARDS. US DEPARTMENT OF LABOR (CODE NO.1910). Languages: • ARABIC - MOTHER TONGUE. • ENGLISH – SPOKEN AND WRITTEN (VERY GOOD). Computer skills: WIN XP, WORD XP, EXCEL XP, AND WINDOUS 7