1. C.v
NAME : OSAMA FOUAD ABD EL AZIZ
DATE OF BIRTH : 9 FEBRUARY 1976
NATIONALITY : EGYPTIAN.
EDUCATIONAL : DIPLOMA IN MAINTAINS & REPAIR OF ELECTRICAL EQ.
MARITAL STATUS : MARRIED.
BUSINESS : SUPER VISOR COMMISSIONING TECH
ADDRESS : 7 ABASE GHAZI S.T FAYSAL GIZA – EGYPT.
TEL : +201005529721, +96597297106
MAIL ADDRES : ufouad@yahoo.com
Work Experience :
From February 2012 up to now
Super visour commissioning tech
Al kharafi national co.
West dameta power station. (Egypt)
Central bank of Kuwait. (Kuwait)
Administration building. (Kuwait)
COMMISSIONING AND START UP
AND CONTINUO IN WARRANTY PERIOD
1- TEST POWER TARANCEFORMER (WINDING RESISTANCE , ISOLATE, RATIO, VECTOR
GROUP, )
2- TEST C.T & V.T ( RATIO, ISOLATE, RESISTANCE, MAGNETIZATION CURVE,)
3- TEST HVAC (TEMPERATURE, AIR FLOWE, BALANCE, VAV DIVECE )
4- TEST FIRE FIGHTING SYSTEM.
5- DIESEL GENERATOR ( CONTROL CIRCUIT, SYNC SYSTEM, )
From Dec. 2010 up to January 2012
Senior Commissioning Tech.
Al oasis co. (king sudia of Arabic)
• COMMISSIONING AND START UP FOR ELRYADH SUB STATION NO:8074 132/13.8K.V
• COMMISSIONING AND START UP FOR ELKHULAIS SUB STATION 110/33K.V
1- TEST THE CURRENT TRANSFORMER (MEGGER, POLARITY, MAGNETIZATION
CURVE, TURNS RATIO AND LOOP CHECK)
TEST THE VOLTAGE TRANSFORMER (MEGGER, POLARITY, TURNS RATIO AND
LOOP CHECK)
2- MEASURE THE TIMING OF CLOSING AND OPENING OF CIRCUIT BREAKER
3- CHECK THE MECHANICAL PROTECTION AND OPERATE THE FAN GROUPS
AND THE TAPCHANGER OF THE TRANSFORMER
4- MEASURE THE EARTH RESISTANCE
5- TEST THE POWER TRANSFORMER (MEGGER ,WINDING RESISTANCE, VECTOR
GROUP CHECK AND VOLTAGE RATIO CHECK )
2. 6- CHECK AUX. RELAY
From April 2009 up to November 2010
Team leader in
Madad group engineering
• COMMISSIONING AND START UP FOR TIBEEN POWER STATION AND PETROL
PLATFORM WITH ENPI CO.
• COMPILATION OF PAINTINGS, ELECTRIC, WITH ABB CO.
• INSTALLATION AND TESTING OF CEMENT PACKING MACHINE FOR HELWAN CEMENT
FACTORY AND ELSUZ CEMENT FACTORY.
• COMMISSIONING AND START UP FOR KURIMAT SOLAR ENERGY SUB CONTRACT
IBERDROLA CO.
From august 2007 up to march 2009
G.E.S (GLOBAL ENERGY SERVICES) (SPANISH COMPANY) ZAFARANA 85 MW
MAINTENANCE AND OPERATION TECHNICIAN FOR WIND TURBINES INCLUDING
MAINTENANCE OF THE FOLLOWING FOR 100 TURBINES:
• GENERATOR (INDAR 850 KW/H 690 V).
• GEARBOX (ECHESA).
• HYDRAULIC GROUP CONTROLLING THE MOVEMENT OF BLADES AND BRAKE SYSTEMS.
• PLC CONTROLLING THE DIRECTION AND SPEED OF THE WIND TURBINE.
• COMMUNICATION SYSTEM BETWEEN PLC AND CCU THROUGH OPTICAL FIBER
CABLES.AND MODIFACATI ON PLC SOFTWARE
• OPERATION AND MAINTENANCE OF AIR CONDITION (MEGA-HISSOTTO)
From January 2005 to July 2007
Egyptian Electricity Transmission
Cairo Regional Control Center (CRCC)
MY JOB IS CONSTRUCTION, FOR 115 SUBSTATIONS,(66-20-11K.V)
• REPAIR AND MAINTENANCE ANY PROBLEMS SUB STATIONS WITH CRCC.
• ELECTRICAL SURVEY FOR NEW POWER SUB STATIONS EXTENSIONS (TRANSFORMERS
& FEEDERS) AND ANY SUBSTITUTE.
• DESIGN SCADA SYSTEM FOR SURVEYED SUBSTATIONS.
• CABLE TRAY CALCULATION AND INSTALLATION.
• CABLE LAYING AND TESTING.
• INSTALL ALL EQUIPMENT NEEDED FOR SCADA SYSTEM.
• PROCEEDING RTU-POINT TO POINT TEST WITH EEA.
3. March 2000 to December 2004
Team leader in
Tarradco .co {Sub contractor of siemens}
Responsible for:
MY JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 66KV
SUBSTATIONS; AND POWER GENERATOR IN CAIRO ZONE.
TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS,
DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE
CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT
BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG -
BBC - ABB - MERLAN GERAN - ELECTRO IMPEX- WESTING HOUSE - MITSUBISHI- EGEMAC -
RADE KONCAR -POLAND- WEST GERMANY)
December 1999 to February 2000
ICAT (Under /Ansco)
Gabal El Asfar-contract 16.
Responsible for:
OPERATOR BUMP STATION AND METERING FOR ALL EQUIPMENT
October 1996 to December2000
Kolaly Engineering {Sub contractor of Haris}
UPGRAD.of national energy connyrol center
My Responsible for:
JOB IS CONSTRUCTION, SHUT DOWN, OFF LINE, ON LINE AND START UP OF 220, 500 KV SUB
STATION AND POWER GENERATOR IN ARAB REPABLIC OF EGYPT.
TO TRANSMIT THE STATUS OF THE SUBSTATION EQUIPMENT SUCH AS CIRCUIT BREAKERS,
DISCONNECTS, EARTHLING SWITCHES, PROTECTION RELAYS AND METERING TO THE
CENTER ALSO THE PROJECT WILL FACILITATE THE SUPERVISORY CONTROL OF CIRCUIT
BREAKERS FROM THE CENTER (MAKING CLOSE AND TRIP) FOR SUBSTATION TYPE.(AEG -
BBC - ABB - WESTING HOUSE - MITSUBISHI- RADE KONCAR -POLAND- WEST GERMANY)
July 1996 to October
Alcatal-Italy
GREATER CAIRO Line 2
RESPONSIBLE FOR:
CONNECTED FIRE ALARM. SOUND SYSTEM AND LINE TELEPHONE
4. NOVEMBER 1994 to June 1996
ELECTRO THARWT
ELARISH POWER Station-Greater Cairo Metro
Responsible For:
CONNECTED CONTROL PANEL AND TESTED ALL FEEDER
June 1994 to October 1994
COGELEX Alsthom
AMRIA SUB -STATION
Responsible For:
INSTLATION OF H.V ELECTRICAL TOWERS
AND MADE CABLE TRAY
NOVEMBER 1993 to March 1994
MEGLCON
CAIRO WEST POWER STATION
Responsible For:
CONNECTED CONTROL PANEL
Courses:
COURSE SAFETY IMPARTED BY TESICNOR COMPANY IN RISK PREVENTION
AT WIND FARMS .THIS COURSE INCLUDES:
COURSE 30 HOUR FROM [OCCUPATIONAL SAFETY &HEALTH
ADMINISTRATION (OSHA)] IN GENERAL INDUSTRIAL SAFETY STANDARDS.
US DEPARTMENT OF LABOR (CODE NO.1910).
Languages:
• ARABIC - MOTHER TONGUE.
• ENGLISH – SPOKEN AND WRITTEN (VERY GOOD).
Computer skills:
WIN XP, WORD XP, EXCEL XP, AND WINDOUS 7