A look back at FY 2013 for the Valdosta-Lowndes Metropolitan Planning Organization. A full copy of the report is available on our website at www.sgrc.us/transportation
2. Annual Report Highlights
• New Census Data = Brooks County
• Freight Report Series Presented at National
Conference
• Regional DBE Conference in Valdosta
• LEP population has increased by 0.6%, +874
• New database to track project documentation
• Crashes appear to be increasing
3. Annual Report Highlights
• Jobs in Freight Intensive Industries increase by
2.4% (2010 to 2011)
• New alternative fuel stations
• 98 Miles of sidewalks in Valdosta
• Travel Times will be available for use in late
2013, from FHWA
4. Projects
Project Status
I-75, Exit 2 Ongoing
I-75, Exit 11 Ongoing
I-75, Exit 22/29 Ongoing
Jerry Jones Ongoing
Forrest St Ongoing
Oak St Ext Ongoing
Davidson Road Complete
SR 31 Bridge Under Construction
Twin Street Complete
US 84 Under Construction
Woodrow Wilson Under Construction
Tucker Road Complete
I-75, Exit 18 Ops Complete