MIN-NOVATION
Mining and Mineral Processing Waste Management Innovation Network



   Mining Waste Reduction Methods
   PhD Veiko Karu, Tallinn University of Technology,
                Department of Mining
PROJECT PARTNERSHIP


Mapa do wklejenia
STUDY TRIPS
PROJECT GOALS



   Bringing mining sector
    stakeholders together

   Promoting innovative
    approaches to mining waste
    prevention, recovery, recycling
    and re-use

   Pursuing cross-regional
    initiatives
PROJECT PILOT UNITS


                                 • ESTONIA
•   Mobil installation for recovery waste from oil shale and limestone mining

                                    • FINLAND
                •    Lab for mining and processing waste research

                                       • POLAND
            •       Installation for recovering waste from coal mining

                                 • SWEDEN
•   Mobil installation for recovering of different solid waste materials (slags,
                          alum shale residues, fly ashes)
MIN-NOVATION
Mining and Mineral Processing Waste Management Innovation Network


            PILOT INVESTMENT FOR ESTONIA

             “Waste-to-product mobile unit”
Oil shale for oil or electricity
                       Pilot unit

Oil shale waste rock



                                              Limestone for
                                              aggregate or
                                              backfilling
THE PRINCIPLE OF OPERATION
      Crushing bucket
THE PRINCIPLE OF OPERATION
      Mini wheelloader
THE PRINCIPLE OF OPERATION
        Sieving unit
Enrichment unit for oil shale
Mini beltconveyor
MIN-NOVATION
Mining and Mineral Processing Waste
 Management Innovation Network




PILOT INVESTMENT FOR POLAND
INSTALLATION PROJECT

                 1 – wastes charger
                 2 – crusher conveyor
                 3 – retaining construction
                 4 – impact crusher
                 5 – vibrating screens
                 6,7,8,9 – belt conveyors
                 10 – product containers
                 11 – de-dusting system
INSTALLATION PROJECT
                            • Wastes loaded from waste
                            stockpile by loader to charger
                            • From charger material is
                            directed to impact crusher M5
                            • After crushing material is led
                            to two-deck vibrating screens
                            • Fraction >31.5 mm is
                            redirected to impact crusher
                            • Fraction 5-31.5 mm (final
                            product) is put to product
                            container
                            • Fraction 0-5 mm („Secondary
Impact crusher M5:          waste”) is directed to second
• Capacity 1,5 tph          container
• Power 7,5 kW              • Product containers periodically
• 1000 RPM                  cleared to product stockpiles
WP 5 Pilot investment by Örebo Univ. (P4)

A mobile unit for recovery of metals from various categories of
mining waste and metal-rich process residues

(1) Crushing/milling
(2) Leaching
(3) Recovery of elements from solution
in sequence:
• A combination of a jaw crusher and another type of mill
   crushing the waste down to roughly 0.1 mm.
• A leaching apparatus designed to leach (using manipulated
   water solutions) solid waste using high pressure and
   temperature.
• A mixer-settler unit for recovery of metals by using liquid/liquid
   extraction
WP 5 Pilot investment by Örebo Univ. (P4)
MIN-NOVATION
Mining and Mineral Processing Waste
 Management Innovation Network




 FINNISH PILOT INVESTMENT
      Kainuun Etu Ltd
DISCRIPTION

          crushing
             crushinggrinding
                         grinding   screening
                                      screening    sieving
                                                    sieving   flotation
                                                                 flotation
KAJAK




                    filtering
                    filtering                fine grading
                                              fine grading
MIN-NOV




             Thermodymanic reactions,
           material optimization, chemical
             characterization, material
                   modification…
THE PRINCIPLE OF OPERATION
             - ELEMENTS AND CAPACITY

 Elements of investment (by now)

              XRF MiniPal4                 Chamber furnace
              for chemical                 for material
              characterization             modification
              of the samples

              TGA-DT, DSC
              for thermodynamic
              reactions and material
              optimization
 Capasity: so far only preliminary experiences . XRF: 20
  min / sample; TGA-DT, DSC: 3 samples / shift, furnace:
  1 heating / 1 kg / shift.
WAYS TO KEEP INFORMED ABOUT
                     MIN-NOVATION
   See Min-Novation website: www.min-novation.eu

   Sign up for Min-Novation newsletters
   Join the Min-Novation Linked-In
    group
   Min-Novation conference at the end
    of 2013 in Poland
   Contact project manager:
    ostrega@agh.edu.pl
    or communication officer:
    piotr.szmigielski@fii.org.pl
THANK YOU !

 Veiko Karu

 Tallinn University of Technology,
 Department of mining

 veiko.karu@ttu.ee

Contenu connexe

En vedette

Advantages of 3D vision systems over sieving for particle size measurement
Advantages of 3D vision systems over sieving for particle size measurementAdvantages of 3D vision systems over sieving for particle size measurement
Advantages of 3D vision systems over sieving for particle size measurementAdrian Krop
 
Ppt sieve analysis
Ppt sieve analysisPpt sieve analysis
Ppt sieve analysisManoj Kumar
 
Grain size analysis
Grain size analysisGrain size analysis
Grain size analysisanoopsingh93
 
Topic 3: Ore processing and metal recovery
Topic 3: Ore processing and metal recoveryTopic 3: Ore processing and metal recovery
Topic 3: Ore processing and metal recoveryLondon Mining Network
 

En vedette (6)

WTR - TZMI Conference Nov 2012
WTR - TZMI Conference Nov 2012WTR - TZMI Conference Nov 2012
WTR - TZMI Conference Nov 2012
 
Advantages of 3D vision systems over sieving for particle size measurement
Advantages of 3D vision systems over sieving for particle size measurementAdvantages of 3D vision systems over sieving for particle size measurement
Advantages of 3D vision systems over sieving for particle size measurement
 
Ppt sieve analysis
Ppt sieve analysisPpt sieve analysis
Ppt sieve analysis
 
Grain size analysis
Grain size analysisGrain size analysis
Grain size analysis
 
Understanding sieve analysis of sand
Understanding sieve analysis of sand Understanding sieve analysis of sand
Understanding sieve analysis of sand
 
Topic 3: Ore processing and metal recovery
Topic 3: Ore processing and metal recoveryTopic 3: Ore processing and metal recovery
Topic 3: Ore processing and metal recovery
 

Similaire à Mining waste reduction methods

7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in IlukaKristy Marshall
 
Nanofluids kostic
Nanofluids kosticNanofluids kostic
Nanofluids kosticStar Gold
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaMidas Engineering Group
 
Emos tech presentation to rbh
Emos tech presentation to rbhEmos tech presentation to rbh
Emos tech presentation to rbhSergei Brukovskyi
 
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...Robtec
 
The industrial minerals sector, an indispensable partner in innovation, by Jo...
The industrial minerals sector, an indispensable partner in innovation, by Jo...The industrial minerals sector, an indispensable partner in innovation, by Jo...
The industrial minerals sector, an indispensable partner in innovation, by Jo...IMA-Europe
 
Tampere Wear Center activities and research equipment 2015
Tampere Wear Center activities and research equipment 2015Tampere Wear Center activities and research equipment 2015
Tampere Wear Center activities and research equipment 2015Kati Valtonen
 
Tampere Wear Center & Research equipment 2014
Tampere Wear Center & Research equipment 2014Tampere Wear Center & Research equipment 2014
Tampere Wear Center & Research equipment 2014Kati Valtonen
 
Sputtering Many Machines
Sputtering Many MachinesSputtering Many Machines
Sputtering Many Machinesdarwin1098
 
PARDAM 2016 PRODUCTS AND SERVICES
PARDAM 2016 PRODUCTS AND SERVICESPARDAM 2016 PRODUCTS AND SERVICES
PARDAM 2016 PRODUCTS AND SERVICESJan Buk
 
Tecnalia - Foundry Unit Projects
Tecnalia - Foundry Unit ProjectsTecnalia - Foundry Unit Projects
Tecnalia - Foundry Unit ProjectsLucaOdetti
 
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...Burton Lee
 

Similaire à Mining waste reduction methods (20)

7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
 
Nanofluids kostic
Nanofluids kosticNanofluids kostic
Nanofluids kostic
 
AMIF2014 – [Plenaria] Marco Vittori Antisari, Innovazione dei materiali per i...
AMIF2014 – [Plenaria] Marco Vittori Antisari, Innovazione dei materiali per i...AMIF2014 – [Plenaria] Marco Vittori Antisari, Innovazione dei materiali per i...
AMIF2014 – [Plenaria] Marco Vittori Antisari, Innovazione dei materiali per i...
 
Removing Uranium & Thorium From Zircon
Removing Uranium & Thorium From ZirconRemoving Uranium & Thorium From Zircon
Removing Uranium & Thorium From Zircon
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
Modular Enrichment Plants
Modular Enrichment PlantsModular Enrichment Plants
Modular Enrichment Plants
 
Emos tech presentation to rbh
Emos tech presentation to rbhEmos tech presentation to rbh
Emos tech presentation to rbh
 
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
 
Managing our Most Precious Resource
Managing our Most Precious ResourceManaging our Most Precious Resource
Managing our Most Precious Resource
 
The industrial minerals sector, an indispensable partner in innovation, by Jo...
The industrial minerals sector, an indispensable partner in innovation, by Jo...The industrial minerals sector, an indispensable partner in innovation, by Jo...
The industrial minerals sector, an indispensable partner in innovation, by Jo...
 
Tampere Wear Center activities and research equipment 2015
Tampere Wear Center activities and research equipment 2015Tampere Wear Center activities and research equipment 2015
Tampere Wear Center activities and research equipment 2015
 
Tampere Wear Center & Research equipment 2014
Tampere Wear Center & Research equipment 2014Tampere Wear Center & Research equipment 2014
Tampere Wear Center & Research equipment 2014
 
Oerlikon Solar
Oerlikon SolarOerlikon Solar
Oerlikon Solar
 
Sputtering Many Machines
Sputtering Many MachinesSputtering Many Machines
Sputtering Many Machines
 
Services Brochure 260416
Services Brochure 260416Services Brochure 260416
Services Brochure 260416
 
PARDAM 2016 PRODUCTS AND SERVICES
PARDAM 2016 PRODUCTS AND SERVICESPARDAM 2016 PRODUCTS AND SERVICES
PARDAM 2016 PRODUCTS AND SERVICES
 
Tecnalia - Foundry Unit Projects
Tecnalia - Foundry Unit ProjectsTecnalia - Foundry Unit Projects
Tecnalia - Foundry Unit Projects
 
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
Crystalsol Overview - Developing Next Generation Photovoltaics - Thomas Badeg...
 
MOCVD Brochure.PDF
MOCVD Brochure.PDFMOCVD Brochure.PDF
MOCVD Brochure.PDF
 
ARS AUTOMAT 1
ARS AUTOMAT 1ARS AUTOMAT 1
ARS AUTOMAT 1
 

Plus de Veiko Karu

TalTech Intro slides Denure position Mining Professor
TalTech Intro slides Denure position Mining ProfessorTalTech Intro slides Denure position Mining Professor
TalTech Intro slides Denure position Mining ProfessorVeiko Karu
 
Veiko karu green_mining
Veiko karu green_miningVeiko karu green_mining
Veiko karu green_miningVeiko Karu
 
KAEVANDAMINE JA KESKKOND
KAEVANDAMINE JA KESKKONDKAEVANDAMINE JA KESKKOND
KAEVANDAMINE JA KESKKONDVeiko Karu
 
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsist
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsistEesti Noorte Teadlaste Akadeemia doktoriõppe analüüsist
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsistVeiko Karu
 
Mine water in Estonia - Veiko Karu
Mine water in Estonia - Veiko KaruMine water in Estonia - Veiko Karu
Mine water in Estonia - Veiko KaruVeiko Karu
 
Eesti maavarad veiko_karu
Eesti maavarad veiko_karuEesti maavarad veiko_karu
Eesti maavarad veiko_karuVeiko Karu
 
Maavrade kaevandamise tulevik
Maavrade kaevandamise tulevikMaavrade kaevandamise tulevik
Maavrade kaevandamise tulevikVeiko Karu
 
Keskkond Inseneriteadus
Keskkond InseneriteadusKeskkond Inseneriteadus
Keskkond InseneriteadusVeiko Karu
 
Eesti Maavarad
Eesti MaavaradEesti Maavarad
Eesti MaavaradVeiko Karu
 

Plus de Veiko Karu (9)

TalTech Intro slides Denure position Mining Professor
TalTech Intro slides Denure position Mining ProfessorTalTech Intro slides Denure position Mining Professor
TalTech Intro slides Denure position Mining Professor
 
Veiko karu green_mining
Veiko karu green_miningVeiko karu green_mining
Veiko karu green_mining
 
KAEVANDAMINE JA KESKKOND
KAEVANDAMINE JA KESKKONDKAEVANDAMINE JA KESKKOND
KAEVANDAMINE JA KESKKOND
 
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsist
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsistEesti Noorte Teadlaste Akadeemia doktoriõppe analüüsist
Eesti Noorte Teadlaste Akadeemia doktoriõppe analüüsist
 
Mine water in Estonia - Veiko Karu
Mine water in Estonia - Veiko KaruMine water in Estonia - Veiko Karu
Mine water in Estonia - Veiko Karu
 
Eesti maavarad veiko_karu
Eesti maavarad veiko_karuEesti maavarad veiko_karu
Eesti maavarad veiko_karu
 
Maavrade kaevandamise tulevik
Maavrade kaevandamise tulevikMaavrade kaevandamise tulevik
Maavrade kaevandamise tulevik
 
Keskkond Inseneriteadus
Keskkond InseneriteadusKeskkond Inseneriteadus
Keskkond Inseneriteadus
 
Eesti Maavarad
Eesti MaavaradEesti Maavarad
Eesti Maavarad
 

Mining waste reduction methods

  • 1. MIN-NOVATION Mining and Mineral Processing Waste Management Innovation Network Mining Waste Reduction Methods PhD Veiko Karu, Tallinn University of Technology, Department of Mining
  • 4. PROJECT GOALS  Bringing mining sector stakeholders together  Promoting innovative approaches to mining waste prevention, recovery, recycling and re-use  Pursuing cross-regional initiatives
  • 5. PROJECT PILOT UNITS • ESTONIA • Mobil installation for recovery waste from oil shale and limestone mining • FINLAND • Lab for mining and processing waste research • POLAND • Installation for recovering waste from coal mining • SWEDEN • Mobil installation for recovering of different solid waste materials (slags, alum shale residues, fly ashes)
  • 6. MIN-NOVATION Mining and Mineral Processing Waste Management Innovation Network PILOT INVESTMENT FOR ESTONIA “Waste-to-product mobile unit”
  • 7. Oil shale for oil or electricity Pilot unit Oil shale waste rock Limestone for aggregate or backfilling
  • 8. THE PRINCIPLE OF OPERATION Crushing bucket
  • 9. THE PRINCIPLE OF OPERATION Mini wheelloader
  • 10. THE PRINCIPLE OF OPERATION Sieving unit
  • 11. Enrichment unit for oil shale
  • 13. MIN-NOVATION Mining and Mineral Processing Waste Management Innovation Network PILOT INVESTMENT FOR POLAND
  • 14.
  • 15. INSTALLATION PROJECT 1 – wastes charger 2 – crusher conveyor 3 – retaining construction 4 – impact crusher 5 – vibrating screens 6,7,8,9 – belt conveyors 10 – product containers 11 – de-dusting system
  • 16. INSTALLATION PROJECT • Wastes loaded from waste stockpile by loader to charger • From charger material is directed to impact crusher M5 • After crushing material is led to two-deck vibrating screens • Fraction >31.5 mm is redirected to impact crusher • Fraction 5-31.5 mm (final product) is put to product container • Fraction 0-5 mm („Secondary Impact crusher M5: waste”) is directed to second • Capacity 1,5 tph container • Power 7,5 kW • Product containers periodically • 1000 RPM cleared to product stockpiles
  • 17. WP 5 Pilot investment by Örebo Univ. (P4) A mobile unit for recovery of metals from various categories of mining waste and metal-rich process residues (1) Crushing/milling (2) Leaching (3) Recovery of elements from solution in sequence: • A combination of a jaw crusher and another type of mill crushing the waste down to roughly 0.1 mm. • A leaching apparatus designed to leach (using manipulated water solutions) solid waste using high pressure and temperature. • A mixer-settler unit for recovery of metals by using liquid/liquid extraction
  • 18. WP 5 Pilot investment by Örebo Univ. (P4)
  • 19. MIN-NOVATION Mining and Mineral Processing Waste Management Innovation Network FINNISH PILOT INVESTMENT Kainuun Etu Ltd
  • 20. DISCRIPTION crushing crushinggrinding grinding screening screening sieving sieving flotation flotation KAJAK filtering filtering fine grading fine grading MIN-NOV Thermodymanic reactions, material optimization, chemical characterization, material modification…
  • 21. THE PRINCIPLE OF OPERATION - ELEMENTS AND CAPACITY  Elements of investment (by now) XRF MiniPal4 Chamber furnace for chemical for material characterization modification of the samples TGA-DT, DSC for thermodynamic reactions and material optimization  Capasity: so far only preliminary experiences . XRF: 20 min / sample; TGA-DT, DSC: 3 samples / shift, furnace: 1 heating / 1 kg / shift.
  • 22. WAYS TO KEEP INFORMED ABOUT MIN-NOVATION  See Min-Novation website: www.min-novation.eu  Sign up for Min-Novation newsletters  Join the Min-Novation Linked-In group  Min-Novation conference at the end of 2013 in Poland  Contact project manager: ostrega@agh.edu.pl or communication officer: piotr.szmigielski@fii.org.pl
  • 23. THANK YOU ! Veiko Karu Tallinn University of Technology, Department of mining veiko.karu@ttu.ee