LONDON OLYMPIC STADIUM 2012
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN 
Bachelor of Science (Honours) in Architecture 
BUILDING CONSTRUCTION 2 [ARC 2513] 
Project 2: Understanding Forces in Solid Structure and Surface Structure 
Tutor: Mr Bruce Lee Xia Sheng 
GROUP MEMBERS: TAN WEI HOW (0310707) 
YONG CHANG THENG (0310925) 
LEE YUAN JUNE (0311128) 
WONG PEAKKY (1101A13474) 
CHUAH WEI HONG (0310900) 
CHEONG SIEW LEONG (0310845)
CONTENT 
1 INTRODUCTION 
2 DRAWINGS 
3 CONSTRUCTION 
4 STRUCTURAL SYSTEM 
5 MODELLING PROCESS 
6 CONCLUSION
INTRODUCTION 
In this project, we are to do research and 
choose a building with at least 2 different 
types of structural system and study the 
various structural systems that are used in 
that building. In a group of 6 persons, we 
need to build a structural model with 
suitable scale and materials to understand 
the construction of the building. 
Our chosen building is the Olympic Stadium, 
which is located on a 40-hectare, diamond-shaped 
island in the Queen Elizabeth 
Olympic Park, Stratford, London. It was 
constructed to serve as the host stadium for 
the 2012 Summer Olympics and 
Paralympics. It was designed by Populous, 
specialists in the design of sports venues. It 
is the lightest Olympic Stadium ever built 
and it stands as a testament to steel’s 
speed of construction and its flexibility.
DRAWINGS 
PLAN SECTION 
ELEVATION
CONSTRUCTION OF 
DIFFERENT PARTS 
Populous’s architects, the designers of the 
stadium, created a Lego-like modular structure 
wherein the roof, outer bowl, inner bowl and 
auxiliary support pieces are all independent of 
each other. Steelwork has played an important 
role during the construction programme and 
112 steel rakers were installed to support the 
two tiers of seating. Circling the stadium at 
high level, a steel roof compression truss, 
made from 28 individual steel sections, each 
one 15m high by 30 m long and weighing 85 
tonnes, supports a cable net roof and 14 
lighting towers. During the Olympic games, the 
stadium was able to hold 80,000 spectators. 
That is why the structure of the foundation is 
very important to support the whole building. 
There are 5,000 piles reaching up to 20 metres 
deep in the foundation of the base level which 
are cast in situ piles, continuous flight auger 
piles, and vibro concrete columns.
STRUCTURAL SYSTEM 
Skeletal structure system 
The stadium is designed using steel skeletal structure system, which transfers all load gravity, 
uplift, and lateral loads to the foundation. Besides that, there are precast concrete, which are 
heavy, solid, can hold weight on the upper tier seats and lower tier seats. 
Rigid concrete frame with reinforcement 
Concrete is weak in tension but strong in compression. Therefore, reinforcement is needed is 
needed to resist the tensile stresses resulting from the loads. The rigid structures made of linear 
elements, beams and columns that are connected that do not allow rotations. Structures are built 
at the site, which may or may not be poured monolithically. When concrete column and beams are 
cast in one piece. 
Prefabrication of concrete 
The concrete elements of the building are manufactured in factory and then transported to the site. 
All the process involved in concrete construction are done at the factory. This speeds up 
construction and thus, saves cost. The concrete prefabricated parts will be erected and jointed on 
site.
External Bracing 
It is not only for structural use but it also offers aesthetics to the building. The advantage of steel is 
to stabilize the frame against strong winds. Lateral forces are resisted by axial actions of bracing 
and columns. It is more efficient than rigid frame. 
The arrows on the image show the external bracing Structural detail of bolted joints 
made of steels
JOINTS 
The London Olympic Stadium’s temporary structure will be dismantled after the event. To allow for 
best flexibility, the roof structure is isolated from the terrace structure. The most efficient way to do 
so while also saving cost is to employ precast technology and bolted joints for the construction of 
concrete and steel structure. The V-shaped steel supports act as bracing for the steel truss 
structure that forms a compression ring. Specially designed cable construction holds the 
lightweight PVC roof membranes together. For the terrace structure, the precast concrete terrace 
module is bolted onto the raking lattice girders spanning the whole stadium. As for the permanent 
structure, precast concrete joints are used. 
Photo shown is the concrete terrace module 
bolted onto the large raking lattice girder 
Photo shown is the typical precast 
concrete joint
LOAD DISTRIBUTION 
ROOF LOAD 
UPPER TIER LOAD 
LOWER TIER 
LOAD 
Load Transfer Pathway 
Roof load: Light tower > Roof & 
Steel cable > Roof truss > V 
shaped column 
Upper Tier load: Precast seating 
module > Raking lattice girder > 
Column 
Lower Tier load: Floor slab > 
Beam > Column
14 light towers 
Located over the inner ring. Each weighs 
34 tonnes and has a power of 70,000 watts. 
532 floodlights are used in the 14 towers. 
The roof structure 
Made from recycled materials like meltdown 
scrap and others from an abandoned gas 
pipeline project. It is light- weighted and 
completely eco-friendly. 
The Wrap Banners 
Fabric wrap made from polyester and 
polyethylene 
Upper tier seats 
Precast concrete upper bowl has a capacity 
of 55,000 seats. 
STRUCTURAL DETAILS 
Lower tier seats 
Sunken elliptical bowl that is made up of 
40% less embodied carbon precast 
concrete. It has a capacity of 25,000 seats. 
STRUCTURE AND MATERIALS 
112 steel sections 
Provide support to the upper bowl. 126,000 
bolts were used to fix the temporary black 
section in place. 
PTeremmapnoernatr ys tructure
CONCLUSION 
By completing this project, we get to understand more about different structures and 
its relevant structural components. We can learn about construction and building 
structures by doing research and demonstrate our understanding through modelling. 
As designers, it is very important to understand when and where each of the different 
type of structural system is used. Furthermore, teamwork is also very important in 
order to complete a project. This project has brought 6 of us closer together to work 
as a team. Finally, we want to thank our lecturer, Mr Bruce Lee for guiding us during 
tutorial classes in order to choose a suitable building and complete this project.
REFERENCES 
1. London 2012 - Olympic Stadium, 2012, Detail architecture-topics. 
[online] Available at: 
http://www.detail-online.com/architecture/topics/london-2012-olympic-stadium-019389.html 
2. Olympic Stadium, London, 2012, Structural Steel Design Awards, Steel Construction. 
[online] Available at: 
http://www.steelconstruction.info/Olympic_Stadium,_London 
3. How to Construct the Lightest, Most Open Olympic Stadium Ever built, 2012, Popular 
Science. 
[online] Available at: http://www.popsci.com/technology/article/2012-07/how-construct-lightest- 
most-open-olympic-stadium-ever-built 
4. London 2012 Olympic Stadium, 2014, Designing Buildings Wiki. 
[online] Available at: 
http://www.designingbuildings.co.uk/wiki/London_2012_Olympic_Stadium#Engineering_for_t 
he_Seating_Bowl

Contenu connexe

Tendances

KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...Anurag Mathur
 
STADIUM STUDY - SHARON SHERANI DANIEL.pdf
STADIUM STUDY - SHARON SHERANI DANIEL.pdfSTADIUM STUDY - SHARON SHERANI DANIEL.pdf
STADIUM STUDY - SHARON SHERANI DANIEL.pdfSheraniDaniel
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid ArchitectsDhanveersinh Chavda
 
RETRACTABLE STRUCTURES
RETRACTABLE STRUCTURESRETRACTABLE STRUCTURES
RETRACTABLE STRUCTURESasif anwar
 
Heydar Aliyev Centre
Heydar Aliyev CentreHeydar Aliyev Centre
Heydar Aliyev CentreNADEEM AKHTAR
 
Khan shatyr entertainment center
Khan shatyr entertainment centerKhan shatyr entertainment center
Khan shatyr entertainment centerRuchita Dhami
 
Zaha hadid london aquatics centre
Zaha hadid  london aquatics centreZaha hadid  london aquatics centre
Zaha hadid london aquatics centreAthira Suresh
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building ConstructionAsz My
 
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdf
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdfSTADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdf
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdfSheraniDaniel
 
Slab & Vault
Slab & VaultSlab & Vault
Slab & Vaultwinner
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptxPrituJadhav1
 
Denver Art Museum
Denver Art MuseumDenver Art Museum
Denver Art MuseumNour Salo
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.rajitk97
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreTanisha Agarwal
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgnAshfaq Ahmed. A
 

Tendances (20)

KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
STADIUM STUDY - SHARON SHERANI DANIEL.pdf
STADIUM STUDY - SHARON SHERANI DANIEL.pdfSTADIUM STUDY - SHARON SHERANI DANIEL.pdf
STADIUM STUDY - SHARON SHERANI DANIEL.pdf
 
Wembley stadium
Wembley stadiumWembley stadium
Wembley stadium
 
London Aquatics Center – Zaha Hadid Architects
 London Aquatics Center – Zaha Hadid Architects London Aquatics Center – Zaha Hadid Architects
London Aquatics Center – Zaha Hadid Architects
 
RETRACTABLE STRUCTURES
RETRACTABLE STRUCTURESRETRACTABLE STRUCTURES
RETRACTABLE STRUCTURES
 
Heydar Aliyev Centre
Heydar Aliyev CentreHeydar Aliyev Centre
Heydar Aliyev Centre
 
Khan shatyr entertainment center
Khan shatyr entertainment centerKhan shatyr entertainment center
Khan shatyr entertainment center
 
Zaha hadid london aquatics centre
Zaha hadid  london aquatics centreZaha hadid  london aquatics centre
Zaha hadid london aquatics centre
 
Long Span Building Construction
Long Span Building ConstructionLong Span Building Construction
Long Span Building Construction
 
London Olympic Stadium
London Olympic Stadium London Olympic Stadium
London Olympic Stadium
 
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdf
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdfSTADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdf
STADIUM DESIGN PROGRAM - SHARON SHERANI DANIEL.pdf
 
Slab & Vault
Slab & VaultSlab & Vault
Slab & Vault
 
Long span structures case study.pptx
Long span structures case study.pptxLong span structures case study.pptx
Long span structures case study.pptx
 
Structural System
Structural SystemStructural System
Structural System
 
Tensile structures
Tensile structures Tensile structures
Tensile structures
 
Denver Art Museum
Denver Art MuseumDenver Art Museum
Denver Art Museum
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Case study milwaukee art museum.
Case study  milwaukee art museum.Case study  milwaukee art museum.
Case study milwaukee art museum.
 
Heydar Aliyev Cultural Centre
Heydar Aliyev Cultural CentreHeydar Aliyev Cultural Centre
Heydar Aliyev Cultural Centre
 
Kinematics & dynamics assgn
Kinematics & dynamics assgnKinematics & dynamics assgn
Kinematics & dynamics assgn
 

En vedette

Understanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyUnderstanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyAbhimanyu Singhal
 
TENSEGRITY - Smart Structures - G@T
TENSEGRITY - Smart Structures -  G@TTENSEGRITY - Smart Structures -  G@T
TENSEGRITY - Smart Structures - G@TTheerumalai Ga
 
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Ltd
 
TENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARTENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARAshita Choudhry
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edThomas Britto
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Bookleteileen_0692
 
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMEHaya Haroon
 
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelBRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelTheerumalai Ga
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013Franco Bontempi
 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29carodriguez21
 
Spanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang SchuellerSpanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang SchuellerWolfgang Schueller
 
Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)Waseem Akbar
 

En vedette (20)

Understanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case StudyUnderstanding Gridshell Structures - Mannheim Multihalle Case Study
Understanding Gridshell Structures - Mannheim Multihalle Case Study
 
TENSEGRITY - Smart Structures - G@T
TENSEGRITY - Smart Structures -  G@TTENSEGRITY - Smart Structures -  G@T
TENSEGRITY - Smart Structures - G@T
 
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric visionBase Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
Base Structures Tensile Fabric Webinar 2: Realising your tensile fabric vision
 
TENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINARTENSILE / FABRIC ARCHITECTURE SEMINAR
TENSILE / FABRIC ARCHITECTURE SEMINAR
 
Steel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_edSteel structures practical_design_studies_mac_ginley_2nd_ed
Steel structures practical_design_studies_mac_ginley_2nd_ed
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
 
Structure as Architecture
Structure as ArchitectureStructure as Architecture
Structure as Architecture
 
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOMESTUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
STUDY OF FAILED PROJECT ---- THE MILLENNIUM DOME
 
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvelBRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
BRIHADEESWARAR TEMPLE - An Ancient Architectural marvel
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
 
Millennium dome %28 pp%29
Millennium dome %28 pp%29Millennium dome %28 pp%29
Millennium dome %28 pp%29
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
 
Tensile Fabric Structures
Tensile Fabric StructuresTensile Fabric Structures
Tensile Fabric Structures
 
Spanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang SchuellerSpanning Space, Horizontal-span Building Structures, Wolfgang Schueller
Spanning Space, Horizontal-span Building Structures, Wolfgang Schueller
 
Long span structures
Long span structures  Long span structures
Long span structures
 
Tensile structures
Tensile structuresTensile structures
Tensile structures
 
Long span cable
Long span cableLong span cable
Long span cable
 
Roof
RoofRoof
Roof
 
Cable strucutres(presentation)
Cable strucutres(presentation)Cable strucutres(presentation)
Cable strucutres(presentation)
 
Roof
RoofRoof
Roof
 

Similaire à Building Construction 2 Project 2 Report

Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxLHiuNgha2
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)ong93
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1Yen Min Khor
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTJoyeeLee0131
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Ow Cong
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
Building construction 02
Building construction 02Building construction 02
Building construction 02Sarah Esa
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)Lek Yuen
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Reportdouglasloon
 
Steel design.pdf
Steel design.pdfSteel design.pdf
Steel design.pdfLathi Raj
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyAnupama Krishnan
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdfPrakashM970621
 
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET Journal
 
Extension report b
Extension report bExtension report b
Extension report bBaddy Peigun
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1Bolin Loong
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down methodDarshan Parakhiya
 

Similaire à Building Construction 2 Project 2 Report (20)

Beijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptxBeijing national stadium -The Bird's nest - Presentation group.pptx
Beijing national stadium -The Bird's nest - Presentation group.pptx
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)BTECHN PROJECT 2 Final report (GROUP)
BTECHN PROJECT 2 Final report (GROUP)
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1
 
BUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORTBUILDING TECHNOLOGY PROJECT 2 REPORT
BUILDING TECHNOLOGY PROJECT 2 REPORT
 
Bcon
BconBcon
Bcon
 
Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1Bcon bus shelter skeletal construction P1
Bcon bus shelter skeletal construction P1
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Building construction 02
Building construction 02Building construction 02
Building construction 02
 
Building Construction 02 (Project1)
Building Construction 02 (Project1)Building Construction 02 (Project1)
Building Construction 02 (Project1)
 
Building Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions ReportBuilding Technology 1 Construction Solutions Report
Building Technology 1 Construction Solutions Report
 
Steel design.pdf
Steel design.pdfSteel design.pdf
Steel design.pdf
 
A long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karolyA long span structure in Romania Full paper balint karoly
A long span structure in Romania Full paper balint karoly
 
compositestructure31-38.pdf
compositestructure31-38.pdfcompositestructure31-38.pdf
compositestructure31-38.pdf
 
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic StadiumIRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
IRJET- Case Study on Beijing National Stadium : Bird Nest Olympic Stadium
 
Extension report b
Extension report bExtension report b
Extension report b
 
Building Construction II - Project 1
Building Construction II - Project 1Building Construction II - Project 1
Building Construction II - Project 1
 
the kajima cut and take down method
the kajima cut and take down methodthe kajima cut and take down method
the kajima cut and take down method
 
Long Span Structures
Long Span StructuresLong Span Structures
Long Span Structures
 
Shell structure
Shell structureShell structure
Shell structure
 

Plus de Wilden How

Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 ReportWilden How
 
Esd project2 final
Esd project2 finalEsd project2 final
Esd project2 finalWilden How
 
Esd final report
Esd final reportEsd final report
Esd final reportWilden How
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and ProcessWilden How
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Gropius House Analysis Essay
Gropius House Analysis EssayGropius House Analysis Essay
Gropius House Analysis EssayWilden How
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive ReportWilden How
 
business presentation
business presentationbusiness presentation
business presentationWilden How
 
Research report
Research reportResearch report
Research reportWilden How
 
EPC Individual Essay
EPC Individual EssayEPC Individual Essay
EPC Individual EssayWilden How
 

Plus de Wilden How (14)

Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Esd project2 final
Esd project2 finalEsd project2 final
Esd project2 final
 
Esd final report
Esd final reportEsd final report
Esd final report
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Gropius House Analysis Essay
Gropius House Analysis EssayGropius House Analysis Essay
Gropius House Analysis Essay
 
The Colosseum
The ColosseumThe Colosseum
The Colosseum
 
Charity Drive Report
Charity Drive ReportCharity Drive Report
Charity Drive Report
 
business presentation
business presentationbusiness presentation
business presentation
 
Research report
Research reportResearch report
Research report
 
Debate
DebateDebate
Debate
 
Musical movie
Musical movieMusical movie
Musical movie
 
The vegetable
The vegetableThe vegetable
The vegetable
 
EPC Individual Essay
EPC Individual EssayEPC Individual Essay
EPC Individual Essay
 

Dernier

Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsRommel Regala
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 

Dernier (20)

Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
The Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World PoliticsThe Contemporary World: The Globalization of World Politics
The Contemporary World: The Globalization of World Politics
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 

Building Construction 2 Project 2 Report

  • 2. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Bachelor of Science (Honours) in Architecture BUILDING CONSTRUCTION 2 [ARC 2513] Project 2: Understanding Forces in Solid Structure and Surface Structure Tutor: Mr Bruce Lee Xia Sheng GROUP MEMBERS: TAN WEI HOW (0310707) YONG CHANG THENG (0310925) LEE YUAN JUNE (0311128) WONG PEAKKY (1101A13474) CHUAH WEI HONG (0310900) CHEONG SIEW LEONG (0310845)
  • 3. CONTENT 1 INTRODUCTION 2 DRAWINGS 3 CONSTRUCTION 4 STRUCTURAL SYSTEM 5 MODELLING PROCESS 6 CONCLUSION
  • 4. INTRODUCTION In this project, we are to do research and choose a building with at least 2 different types of structural system and study the various structural systems that are used in that building. In a group of 6 persons, we need to build a structural model with suitable scale and materials to understand the construction of the building. Our chosen building is the Olympic Stadium, which is located on a 40-hectare, diamond-shaped island in the Queen Elizabeth Olympic Park, Stratford, London. It was constructed to serve as the host stadium for the 2012 Summer Olympics and Paralympics. It was designed by Populous, specialists in the design of sports venues. It is the lightest Olympic Stadium ever built and it stands as a testament to steel’s speed of construction and its flexibility.
  • 6. CONSTRUCTION OF DIFFERENT PARTS Populous’s architects, the designers of the stadium, created a Lego-like modular structure wherein the roof, outer bowl, inner bowl and auxiliary support pieces are all independent of each other. Steelwork has played an important role during the construction programme and 112 steel rakers were installed to support the two tiers of seating. Circling the stadium at high level, a steel roof compression truss, made from 28 individual steel sections, each one 15m high by 30 m long and weighing 85 tonnes, supports a cable net roof and 14 lighting towers. During the Olympic games, the stadium was able to hold 80,000 spectators. That is why the structure of the foundation is very important to support the whole building. There are 5,000 piles reaching up to 20 metres deep in the foundation of the base level which are cast in situ piles, continuous flight auger piles, and vibro concrete columns.
  • 7. STRUCTURAL SYSTEM Skeletal structure system The stadium is designed using steel skeletal structure system, which transfers all load gravity, uplift, and lateral loads to the foundation. Besides that, there are precast concrete, which are heavy, solid, can hold weight on the upper tier seats and lower tier seats. Rigid concrete frame with reinforcement Concrete is weak in tension but strong in compression. Therefore, reinforcement is needed is needed to resist the tensile stresses resulting from the loads. The rigid structures made of linear elements, beams and columns that are connected that do not allow rotations. Structures are built at the site, which may or may not be poured monolithically. When concrete column and beams are cast in one piece. Prefabrication of concrete The concrete elements of the building are manufactured in factory and then transported to the site. All the process involved in concrete construction are done at the factory. This speeds up construction and thus, saves cost. The concrete prefabricated parts will be erected and jointed on site.
  • 8. External Bracing It is not only for structural use but it also offers aesthetics to the building. The advantage of steel is to stabilize the frame against strong winds. Lateral forces are resisted by axial actions of bracing and columns. It is more efficient than rigid frame. The arrows on the image show the external bracing Structural detail of bolted joints made of steels
  • 9. JOINTS The London Olympic Stadium’s temporary structure will be dismantled after the event. To allow for best flexibility, the roof structure is isolated from the terrace structure. The most efficient way to do so while also saving cost is to employ precast technology and bolted joints for the construction of concrete and steel structure. The V-shaped steel supports act as bracing for the steel truss structure that forms a compression ring. Specially designed cable construction holds the lightweight PVC roof membranes together. For the terrace structure, the precast concrete terrace module is bolted onto the raking lattice girders spanning the whole stadium. As for the permanent structure, precast concrete joints are used. Photo shown is the concrete terrace module bolted onto the large raking lattice girder Photo shown is the typical precast concrete joint
  • 10. LOAD DISTRIBUTION ROOF LOAD UPPER TIER LOAD LOWER TIER LOAD Load Transfer Pathway Roof load: Light tower > Roof & Steel cable > Roof truss > V shaped column Upper Tier load: Precast seating module > Raking lattice girder > Column Lower Tier load: Floor slab > Beam > Column
  • 11. 14 light towers Located over the inner ring. Each weighs 34 tonnes and has a power of 70,000 watts. 532 floodlights are used in the 14 towers. The roof structure Made from recycled materials like meltdown scrap and others from an abandoned gas pipeline project. It is light- weighted and completely eco-friendly. The Wrap Banners Fabric wrap made from polyester and polyethylene Upper tier seats Precast concrete upper bowl has a capacity of 55,000 seats. STRUCTURAL DETAILS Lower tier seats Sunken elliptical bowl that is made up of 40% less embodied carbon precast concrete. It has a capacity of 25,000 seats. STRUCTURE AND MATERIALS 112 steel sections Provide support to the upper bowl. 126,000 bolts were used to fix the temporary black section in place. PTeremmapnoernatr ys tructure
  • 12.
  • 13.
  • 14. CONCLUSION By completing this project, we get to understand more about different structures and its relevant structural components. We can learn about construction and building structures by doing research and demonstrate our understanding through modelling. As designers, it is very important to understand when and where each of the different type of structural system is used. Furthermore, teamwork is also very important in order to complete a project. This project has brought 6 of us closer together to work as a team. Finally, we want to thank our lecturer, Mr Bruce Lee for guiding us during tutorial classes in order to choose a suitable building and complete this project.
  • 15. REFERENCES 1. London 2012 - Olympic Stadium, 2012, Detail architecture-topics. [online] Available at: http://www.detail-online.com/architecture/topics/london-2012-olympic-stadium-019389.html 2. Olympic Stadium, London, 2012, Structural Steel Design Awards, Steel Construction. [online] Available at: http://www.steelconstruction.info/Olympic_Stadium,_London 3. How to Construct the Lightest, Most Open Olympic Stadium Ever built, 2012, Popular Science. [online] Available at: http://www.popsci.com/technology/article/2012-07/how-construct-lightest- most-open-olympic-stadium-ever-built 4. London 2012 Olympic Stadium, 2014, Designing Buildings Wiki. [online] Available at: http://www.designingbuildings.co.uk/wiki/London_2012_Olympic_Stadium#Engineering_for_t he_Seating_Bowl