SlideShare une entreprise Scribd logo
1  sur  10
Télécharger pour lire hors ligne
Researched & Organized by:         The largest and most in-depth meeting point for         Exceptional opportunity to connect with market
                                   the offshore wind installation industry globally…
                                           back for its 3rd blockbusting year
                                                                                            “
                                                                                        participants working to make offshore wind a viable
                                                                                       industry in the UK    Gregg Egen, Managing Director,
                                      ...attracting over 450 delegates in 2011!                         ”
                                                                                             Espirito Santo Investment Bank



3rd Annual

OffshOre Wind COnstruCtiOn, installatiOn
and COmmissiOning COnferenCe
4-6 October 2011, London UK                                                                                           save
                                                                                                                      £300
                                                                                                                     register before

Overcome farshore contract and                                                                                           July 15


construction challenges to successfully start
early revenue generation from your wind farm
•	 WHAT	WORK	IS	COMING	UP?		Where is the potential for the greatest long term
   contracts? Which sites are suited to offshore wind installation R&D? Find out from the
                                                                                                   ExpErt spEakErs from
   experts themselves!
•	 CASE	STUDIES	ON	THE	“WORLD’S	LARGEST”	OFFSHORE	WIND	FARMS	London Array,
   Greater Gabbard, Ormonde and Thanet
•	 OVERVIEW	ON	THE	CABLE	CHALLENGES	ARISING	IN	OFFSHORE	WIND	FARMS	Cover all
   ranging challenges between laying telephonic communications, fibre optic and HVDC/
   HVAC cables
•	 FOUNDATION	OPTIONS,	DESIGNS	AND	INSTALLATION	TECHNIQUES	In depth discussion
   from the established players alongside the new comers on structural integrity issues –
   can grout alone be the long term solution
•	 STATE	OF	THE	ART	OFFSHORE	TURBINE	TECHNOLOGY	Get the inside track on what’s
   available for use in the Round 3 boom
•	 TRANSPORT	AND	LOGISTICS	OF	THE	MAJOR	COMPONENTS	From the factory to point of
   installation here’s what you need to consider
•	 RISK	ASSESSMENT	AND	FINANCIAL	OPTIONS	FOR	THE	OFFSHORE	WIND	INDUSTRY	
   Risk and finance go hand in hand in offshore wind projects; Hear how 65 different
   projects have been brought through the consent phase
•	 CONTRACTING	METHODS	AND	STRUCTURE	client and project bundling options laid bare



                              All New Features for 2011
  Expert Led Offshore Wind                       Larger Exhibitors Area  Increased
   Opportunities Workshop                          Networking Time
  Contact Structuring Workshop                   Keynote Presentation Day
  Operators Group Meeting                        Twice As Many Technology
                                                   Presentations

 LEAD EXHIBITORS




    Join 450 Offshore Wind Industry Colleagues For Three Business Critical Days of Analysis, Information Sharing and
                         Business Development at the Largest Industry Gathering Worldwide

                                  www.windenergyupdate.com/OWCIC
Exclusive	European	Offshore	Wind	Installation	Analysis
                       How	to	Plan	and	Execute	Successful	European	Offshore	Wind	Projects

Join 450+ industry professionals at the landmark event that will help you improve offshore
wind project installation, overcome farshore transport and logistics challenges, understand the
best methods for foundation installation and cable lay through the latest project experience,
technology innovation and information updates
Dear Colleague,                                                                     Project Managers: What’s Your Exposure?
Since the last Offshore Wind Construction, Installation and                         The cost of installation is significant and something that needs to be planned
Commissioning conference (OWCIC) in October, landmark changes                       for – and then back-up plans created! Looking at the trends in wind farm
have impacted offshore wind installation in Europe                                  project costs below can you work out your exposure? How much will
                                                                                    offshore wind installation activity cost you in the next 5 years?
In the past four to five years, several larger, second-generation projects
(including the UK’s Round 2), entered the construction phase, delivering            Figure 1 - Trends in wind farm project costs
a significant increase in operational installed capacity. Statistics point to
a rapidly growing offshore industry. The biggest increase in offshore                                                3.5
capacity occurred in 2010. European capacity increased by 883MW                                                              Drivers
                                                                                                                             • Rising commodity prices                                  Rhyl Flats
compared with 582MW added in 2009. The UK contribution to the 2010                                                   3.0     • Bottlenecks in supply chain
increase was 562MW, which included Thanet (300MW), the largest                                                               • Complexity of sites, distances, depths      Robin Rigg




                                                                                     Cost per MW installed (€m/MW)
                                                                                                                             • FX rate volatility
operational wind farm to date.                                                                                       2.5
                                                                                                                                                                                            Gunfleet
Europe is unquestionably the epicentre of the market with 2.9 GW of the                                                        North Hoyle                                                  Sands
3GW total installed wind energy capacity based in Europe and accounting                                              2.0                                                         Lynn
for 88% of 2010 new capacity. Over the next decade it is estimated by                                                                                                   Burbo
                                                                                                                                                             Kentish Flats
EWEA that by 2020, total European offshore installed capacity will be 40GW.                                          1.5
The UK’s contribution to that total is estimated at 25GW. The main centre                                                              South Sands
for offshore construction looks set to remain in northern Europe.                                                    1.0
                                                                                                                                                                        Barrow
Through a combination of the sheer volume of demand for contractor
                                                                                                                     0.5
services, coupled with potential raw material price spikes, project managers
are facing upward pressure on prices and hitting timely deadlines. It is
                                                                                                                     0.0
therefore crucial that owner/operators have a water tight strategy in place                                           2002        2003      2004      2005      2006     2007    2008       2009     2010
to deal with their installation liability. Contractors need to ensure they are
positioned to corner off a share of this multi-million pound industry with
cost effective, safe service offerings or face being left behind by their           Source: Carbon Trust/Emerging Energy Research (2009)
counterparts.
                                                                                    The OWCIC conference will equip you with all the planning information and
                                                                                    technological tools to tackle your installation liability in the most proactive,
Installing offshore wind farms is costly, technically challenging and
                                                                                    cost effective way. Don’t get caught out, start planning now by attending the
potentially hazardous both to the workforce and a company’s global image.
                                                                                    conference
If costs are to be reduced then careful planning is required and common
sense strategies must be put in place. In order to do that some of the
following challenges must be faced:                                                 Contractors: Offshore Wind Installation is on
                                                                                    the Rise
•	 Grouting	the	Transition	Piece          •	 Supply	Chain	Management
                                                                                    CAPEX costs for wind farms completed in 2009/10 have edged toward £3m
•	 Ploughing	Cable	Trenches	at	           •	 Cost	Reduction
                                                                                    / MW, some 50 -100% above costs of wind farms in the period up to 2006.
   Depth                                  •	 Farshore	Transport		Logistics
•	 Working	with	HVAC/HVDC	Cables          •	 Weather	Windows                        Considering there are still 32,200 MW of wind energy to be harnessed from
•	 EHS	Offshore                           •	 Working	with	5MW+	Turbines             the UK Round 3 zones this translates into a £96.9 million market.
•	 Project	Planning		Management
                                                                                                                     Wind Farm                            Region                        MW Capacity
                                                                                                                     Moray Firth                          Scotland                          1300
The 3rd Annual Offshore Wind Construction, Installation and
Commissioning conference will supply your business with the critical                                                 Firth of Forth                       Scotland                          3500
intelligence and tools you need to build a cost effective, time efficient                                            Dogger Bank                         North Sea                          9000
installation strategy. Delivered by the best in the industry, you’ll be able to
take away key lessons and real world action points that you can implement                                              Hornsea                           North Sea                          4000
to save millions of GBP.                                                                                             Norfolk Bank                  Southern North Sea                       7200
Now in its third year, OWCIC will be bringing together 450 offshore wind                                               Hastings                              South                           600
installation experts for three days of business critical intelligence, unrivalled
                                                                                                    West of Isle of Wight                                    South                           900
networking and stimulating discussion.
With senior level representatives from major  independent operators, lead           Bristol Channel Atlantic
                                                                                                                                                        South West                          1500
contractors, specialist service companies and the major European land                         Array
governing body – can you afford to miss out?                                                                           Irish Sea                          Irish Sea                         4200
                                                                                                                        TOTAL                                                              32200
I look forward to seeing you in London in October.
All the best,
                                                                                    Are you positioned to take advantage of this?
                                                                                    Attend OWCIC 2011 and you’ll have the opportunity to not only receive all
                                                                                    the market forecast you need to accurately set out your business plans for
Tom Evans                  Tel: +44	(0)20	7375	7247                                 2011 and beyond – but also we’ll put you in front of the top project owners.
Head of Sector,            Email: tom@windenergyupdate.com
Wind Energy Update         Wind Energy Update: www.windenergyupdate.com
                                                                                    Fill your order book in 3 days by attending this conference.



         Register	today	-	visit	www.windenergyupdate.com/OWCIC		or	phone	+44	020	7375	7575
Your	Exclusive	OWCIC	Conference	Overview:	Review	the	new	conference	format	
       and	the	information	on	offer	from	the	world’s	leading	offshore	wind	installation	experts


  Conference at a Glance
                                                  morNING                                         aftErNooN                                  EVENING

                                                                                 •	Registration  Exhibition Opens
          October 4                                                              •	Opportunities in Offshore Wind Workshop         •	Networking Drinks
         Pre-Conference             •	Exhibition Set Up
                                                                                 •	Structuring Contracts for Offshore Wind           Reception
              Day                                                                  Workshop

                                    •	Conference Opens
          October 5                 •	Market Analysis
                                                                                 •	Project Management  Planning
            Key Note                                                             •	Risk Assessment  Mitigation                    •	Networking Reception
                                    •	Cost Estimation
        Presentation Day                                                         •	Supply Chain Management
                                    •	Installation Case Studies


          October 6                 •	New	Wind	Turbine	Technology	+	             •	Cable Installation
           Multi Track                Construction Techniques                    •	Transport and Logistics of Major
       Technology Analysis          •	Foundation Installation                      Components




Who will you meet?                                                                   TOP 4 CONFERENCE TAKE-AWAYS
Meet, hear and do business with the cutting edge players in the Offshore             We guarantee to deliver strategies that will have a real and lasting positive
Wind Installation space.                                                             impact on your business, giving you the tools to ensure the success of your
This is a high-level exclusive event – it's not just a tradeshow expo. There         decommissioning strategy.
will be a select number of key decision makers who have all paid money to
hear about this exact topic - how to install wind farms farshore on time and         1 CONNECTIONS - only theOffshorethe best will be here. Our delegates
                                                                                       are the best of the best of
                                                                                                                   best of
                                                                                                                           Wind executives!
on budget
To get the inside track on building and growing a presence in the Offshore
Wind business you need to be meeting and hearing from the very best                  2 FACTS – solid, hard hitting on progress made and the steps facts about
                                                                                       the Offshore Wind industry
                                                                                                                   presentations filled with the true
                                                                                                                                                      needed to
brains in the business, experts in the latest thinking, new technologies and              push installations forward.
evangelists on the path we need to take. Fortunately OWCIC does this for
you by bringing together the very best the Offshore Wind industry has to
offer, including key players from:
•	 Round	3	zone	project	managers         •	 Financial	analysts,	insurers,	and	
                                                                                     3 INSPIRATION – Wind fresh insightspeople onlively discussion with your
                                                                                       fellow Offshore
                                                                                                       get
                                                                                                           executives –
                                                                                                                         through
                                                                                                                                    your level, who think like
                                                                                          you
•	 Tried	and	Tested	Lead	installation	      technical experts
   contractors
                                                                                          PRACTICAL IDEAS – only at OWCIC will you will hear the best tips,
This conference is going to be a breath of fresh air to this industry,               4    strategies and practical knowledge that will directly help you in your
everywhere you turn when you get in the conference room or step into the                  day-to-day work
coffee reception area you are going to be surrounded by key decision makers
from the best of the best. The very best companies, researchers and people                       you will get conference audio, presentation slides, conference
who are going to push the offshore wind world forward.                               Plus        booklet, face to face meeting time and much more!
If this sounds good then you need to be here! CONTACT US TODAY about
this	conference,	the	latest	offshore	wind	news	and	more	-		+44	(0)207	375	
7575	tom@windenergyupdate.com


 Your chance to impress - become an OWCIC                                            Signing on with us to be a part of OWCIC is just the beginning. Sponsoring,
                                                                                     exhibiting and advertising is a platform for you to reach your sales and
 sponsor or exhibitor                                                                marketing goals.
 The Offshore Wind Construction, Installation and Commissioning                      We guarantee that our continuing efforts to help you get the most out of
 Conference is the most exciting and fresh conference in the offshore wind           your opportunity is unparalleled in the conference world - ask us for help on
 space.                                                                              how to get the most out of a presentation, how to work the exhibition floor
 Our vision of putting together a summit focused solely on how to build and          or even what copy to use in your advert. With Wind Energy Update this is
 grow offshore wind installation businesses makes for a unique and exciting          part of the service and it is an invaluable one worth its weight in gold. It's
 event.                                                                              the reason our percentage of repeat customers eclipses the conference
 If you need our delegates as partners or clients this event is a valuable           industry average.
 chance for you to meet, greet and impress them in person.
 With opportunities as low as £3500 - Sponsoring, exhibiting or advertising             This could be the chance you need to pave the way
 with us is one the best and most cost effective ways to generate interest,
                                                                                        to massive future profits - you owe it to yourself
 meet leads and make deals, build relationships and imprint your company
 name	in	the	brains	of	all	the	summit	attendees	and	all	the	20,000+	                    to at least give us a call and ask for our free
 industry leaders who we will reach with our comprehensive marketing and                sponsorship info package.
 promotional campaign.
 We only sell custom made, high value packages - Talk to us today and
                                                                                        call Tom Evans, Wind Energy Update on
 share some ideas about what we could do together to help push your                     +44 (0)20 7375 7247
 business forward. We have a range of options to suit every budget and we               or email tom@windenergyupdate.com
 tailor every deal to match your individual needs like a glove.



   Register	today	-	online	at:	www.windenergyupdate.com/OWCIC	or	phone	+44	(0)20	7375	7575
Unrivalled	Industry	Networking	at	the	OWCIC	Conference!	Join	450	offshore	
                                 wind	installation	experts	at	the	world’s	leading	gathering


Networking at the OWCIC Conference 2011
OWCIC 2011 provides outstanding                    Attend the Conference and you’ll meet...
networking opportunities for anyoneinvolved                                                        Who will be there?
                                                   Senior decision makers from the leading
in offshore wind installation. This is the         Crown Estate Round 3 winners attend             Senior level decision makers  project managers
single largest meeting point globally-             OWCIC every year to meet services               from the major and independent wind farm owner/
attracting over 450 stakeholders. If offshore      providers offering new technologies and         developers who want to discover the latest technologies
wind installation is part of your job role – you   services to help them reduce cost, hit          and services for planning and executing offshore wind
simply can’t afford to miss out.                   timelines and ensure safe projects.             construction and installation projects.

This year Wind Energy Update are                       +PLUS+
providing:
•	 Over	17	hours	of	dedicated	networking	
                                                   Suppliers / Solutions providers
                                                   •	 Construction		Installation	of	foundations
                                                                                                   Major/Independent
                                                                                                           Operators              35%
                                                                                                                                 25%
   time across the 3 days of the conference
                                              •	 Construction	of	wind	turbines                            Intergrated
•	A	brand	new	pre-conference	day	for	you	to	                                                              Contractors
  engage in more relaxed discussion           •	 Installation	of	cables
•	Fully	interactive	panel	sessions	for	you	
  to identify yourself to the entire delegate
                                              •	 Installation	of	offshore		onshore	
                                                 substations
                                                                                                       Sub Contractor
                                                                                                                              10%
                                                                                                                              10%
  audience as a topic expert                  •	 Installation	of	wind	turbines
                                                                                                    Specialist Services
•	Dedicated	workshops,	coffee	breaks,	             •	 Main	contractors	/	project	managers


                                                                                                                              10%
  lunches  evening drinks for you to target
                                                   •	 Production	of	cables
  your key clients                                                                                       Public Sector
                                                   •	 Supply	of	vessels	/	Sea	based	support


                                                                                                                              10%
You’ll have more face to face                           And Many Others…
                                                                                                       Legal, Financial
                                                                                                          Consultants




                Who You’ll Meet…
                Wind Energy Update run a series of offshore wind conferences from health and safety, supply chain, North American development and
                construction. This places us in the unique position of bringing together wind installation experts from across the globe.
                Below is a breakdown of who attends our conferences



       Offshore                                                 Tier 1                                              Tier 2
       Wind Developers                                          Lead Contractors                                    Sub-Contractors
       C-Power                                                  A2SEA                                               Dredging International
       Dong Energy                                              Ballast Nedam Offshore Energy                       Embassy Machine Services
       EDF Energy                                               Beluga Group                                        Euskal Forging
       EDP Renewables                                           DEME                                                Foundocean
       EnBW Erneuerbare Energien                                Fluor Corporation                                   Houlder
       Iberdrola Renewables                                     GeoSea                                              Jumbo Offshore
       London Array Limited                                     KBR                                                 Minelco
       Mainstream Renewable Power                               Mammoet Europe                                      Sepam
       RWE Offshore Logistics Company                           Seaway Heavy Lifting                                Vos Prodect Innovations
       Scottish Power                                           Technip
       SeaEnergy Renewables                                     Van Oord Dreging and
       Vattenfall                                               Marine Contractors




     Excellent. As a newcomer to the industry it provided in-depth information and topical discussion on the major issues facing Offshore Wind
  “
  turbine installers and developers today.
  Tata Steel International
                                                   ”
              Book	your	place	to	meet	all	the	above	today!	Turn	to	inside	back	cover	now!
OWCIC	Full	Conference	Agenda:		
               Unparalleled	expert	speaker	line-up	for	three	days	of	invaluable	information




     2011 Conference Structure
                                                                               Two workshops aimed at giving a European offshore
     The Offshore Wind Construction, Installation and Commissioning
     Conference has an all-new format for 2011 and will take place over        wind opportunities overview.
     three days. This is to ensure the best possible delegate experience
     through added benefits such as training sessions, workshops, more
     choice on agenda topics, keynote presentations, extended networking       Offshore Wind Technical Workshop
     time and larger exhibition space                                          •	Diversification	and	challenges	for	parallel	sectors	(Aerospace,	
                                                                                 automotive, composites, large item manufacture parallels)
     The conference will be structured as follows:                             •	Technological	challenges	and	RD	in	offshore	wind

                     Pre-Conference Day October 4                              •	Components,	customers	and	technological	trends:	A:	Metalworking	
                                                                                 and fabrication
     •	 Pre-Registration Open                                                   •	Components,	customers	and	technological	trends:	B:	Electrical	and	
                                                                                  cables
     •	 Exhibition Open
                                                                                •	Vessel	supply	and	demand	
     •	 Training Workshop
                                                                                •	Vessel	and	offshore	equipment	manufacture
     •	 Opportunities in Offshore Wind Workshop                                 •	Offshore	construction	management
     •	 Structuring Contracts for Offshore Wind Workshop                        BVG Associates

                                                                               Structuring Contracts for Offshore Wind Workshop
                                                                               Workshop on how to structure contracts in the offshore environment
                                                                               •	Suitability	of	FIDIC	and	others
                                                                               •	How	and	why	consortium	are	needed
                                                                               •	Best	way	to	split	risk
                                                                               TBC




                                                                                      The Offshore Wind Construction, Installation and
                                                                                  “
                                                                                  Commissioning Conference allowed our company to reach out
                                                                                  to the industry to showcase the capabilities of our services. It is
                                                                                  without a doubt an important part of our marketing plan.
                                                                                  Signal International Inc.                                         ”

                                                       Keynote Presentation Day October 5

Section One: Market Overview  Regulations
Market overview on the work approaching us in the next                      Farshore wind: collaborate or compete?
18-24 months                                                                •	 Hear	about	areas	where	industry	is	working	together	to	improve	efficiency	and	
•	 What	are	the	impacts	from	the	high	profile	industry	flaws	in	2010	on	       safety in farshore wind projects
   the opportunities for testing new methodology for installation and       •	 Gain	insight	into	the	contract	models	which	work	best	to	help	reduce	project	
   construction                                                                costs
•	 Take	away	an	up-to-date	analysis	of	recent	predictions	on	where	the	     •	 Learn	about	suitable	contracting	methods	and	structures	including	client	and	
   greatest short and long term gains for construction firms in European       project bundling options
   offshore wind
•	 Gain	insight	into	offshore	wind	risk	metrics	and	marketing	forecasting   UK policy panel: Creation of the UK offshore wind
Timo Laakso, Vice President, Wind Power, Poyry                              industry                                                                 PANEL
                                                                            Håkon Sandbekk, Legal Counsel, Statkraft (TBC)                          SESSION

                                                                            Ed Wilson, Head of Renewable Energy, Project Finance,
                                                                            Lloyds Bank Corporate Markets
                                                                            David Curran, Department of Energy  Climate Change (DECC)
                                                                            Michelle Thomas, Partner, Head of Clean Energy and Sustainability,
                                                                            Eversheds LLP




  Register	today	-	visit	www.windenergyupdate.com/OWCIC	or	phone	+44	(0)20	7375	7575
Overcome	farshore	contract	and	construction	challenges	to	successfully	
          start	early	revenue	generation	from	your	wind	farm	
                                                         Keynote Presentation Day October 5

Section Two: The World’s Largest                          Section Three: Offshore Wind                         Section Four: Addressing skills in
Offshore Wind Farms                                       Farm Finance, Contracting and                        the offshore wind sector
Overview of the potential challenges and criteria         Risk Mitigation
involved when selecting contractors for the Walney                                                             Skills specific to offshore wind: what
wind farm                                                 Risk reduction specific to offshore                  the UK is doing now to secure offshore
•	 Hear	how	experiences	in	DONG	Energy’s	previous	        wind designed for both the owner                     wind jobs
   UK and Danish offshore wind farm work led the          and contractor                                       •	 Get	the	inside	track	from	the	UK	skills	market	
   thinking on Walney from the start                                                                              to understand what processes are now in place
                                                          •	 Understand	how	construction	liability	can	
•	 Get	the	inside	track	on	how	the	contracts	were	           be reduced or even eliminated from an                to drive the growth of offshore wind
   split up among the respective contractors and how         operator’s balance                                •	 Assess	the	direction	your	business	needs	to	
   DONG went about project managing the work                                                                      take to enjoy the maximum benefit from these
                                                          •	 Eliminate	catastrophic	costs	related	to	
•	 Discover	how	the	contactors	were	chosen	and	              contractor insolvency  other perils through a       skills initiatives
   what criteria they are working to and for what            new model designed specifically for farshore      •	 Learn	what	the	proven	routes	of	acquiring	and	
   rewards                                                   wind                                                 retaining credible workforce labour are for the
Jens Hansen, Project Manager,                             •	 Mitigate	risk	of	increased	costs	tied	to	            offshore wind construction industry
Dong Energy (invited)                                        sudden market fluctuations                        Bob Granger, Head of Renewables,
                                                          Jatin Sharma, Head of Offshore, GCube                National Skills Academy for Power
Discover the challenges and benefits of                   Underwriting Limited
turnkey installation of a sole vs. multiple                                                                    Military skills on offer to the offshore
contractors to the supplier and contractor                Analysing the risks in offshore wind,                wind industry
•	 Understand	the	complexities	of	constructing	with	      the various models used to date                      •	 Hear	from	the	UK’s	leading	marine	military	
   fixed and floating offshore structures and vessels     in Europe (project finance bill and                     personal employer about the skill set matches
   further	than	70km	from	the	shore                       refinancing)                                            that the Royal Navy has with the offshore wind
•	 Discover	the	challenges	and	benefits	of	turnkey	                                                               construction industry needs
                                                          •	 Discover	the	fundamental	differences	
   installation with a sole main contractor                  between UK and European projects and why          •	 Benefit	from	hundreds	and	thousands	of	
•	 What	are	contractor	capabilities	for	farshore	wind	       lenders approach the two from very different         hours of higher level education training suited
   farms and will all parts of the extended supply           angles                                               specifically to working in harsh offshore
   chain be ready?                                                                                                conditions with state of the art engineering
                                                          •	 Get	the	latest	insight	from	the	most	                technology
Graham Mason, Project Development Director, Fluor            experienced global leader in the field to drive
Corporation                                                  forward success in your business from up to       •	 Discover	the	volume	and	likelihood	of	personal	
                                                             date facts                                           from military background available to the
                                                                                                                  private sector in the next 12-18 months and
Discover the importance of stakeholder                    •	 See	how	to	work	with	the	system	from	the	            how you should best look to recruit
management in planning and how this                          beginning to best ensure long term financial
can delay a project if neglected                             securing and headache free days when              Karen Carroll, Career Transition Partnership,
                                                             projects are delayed                              Royal Navy
•	 Get	a	virtual	tour	of	the	work	London	Array	has	
   accomplished to date                                   Christos Kolliatsas, Project Manager, Mott
                                                          MacDonald
•	 Hear	the	decision	makers	first-hand	describe	                                                                how your input will lead to
   the concepts that they used to enable buy into
   potentially one of Britain’s most polarising energy
                                                          Legal insight – contract changes                      Offshore Wind Construction change
   station new builds in the last 50 years                necessary to ensuring offshore wind                   Buy a ticket and attend the Offshore
•	 Understand	the	best	and	worst	case	scenarios	for	
                                                          market reaching potential                             Wind Construction, Installation and
   an offshore wind project through best and poor         •	 Assess	the	impact	that	NDAs	have	on	               Commissioning Conference!
   stakeholder engagement                                    both long term and day to day business
                                                             operations
Joanne Haddon, Stakeholder and Media Manager,
                                                          •	 Get	the	inside	track	on	what	is	actually	          Speak up and get your points across at the
London Array
                                                             considered business critical to you and your       Working Group Discussions
Understand how to prepare for farshore                       partners and what is purely legal red tape
                                                             hindering your project’s success
wind construction including the                                                                                 Your moderator will take notes summarizing
management of resources, equipment,                       •	 Learn	how	to	silo	up	certain	parts	of	the	
                                                                                                                the groups input
                                                             construction packages so that mini-EPC
cross-contractor communication and                           units can be formed to work in a more
mitigating uncertainties                                     manageable way
•	 Understand	the	strategic	planning	considerations	                                                            Panel discussion featuring all the group
                                                          Peter Scurlock, Eversheds LLP                         moderators presenting the discussions
   for construction activities in the North Sea and
   their implications on project timelines and costs                                                            findings
•	 Discover	the	importance	of	stakeholder	
   management when planning projects and how this
                                                                                                                Working together, you, the panel and the
   can delay a project if it is neglected
                                                                                                                rest of the audience will work together to
•	 Find	out	what	a	detailed	reasonable	working	hours	
                                                                                                                define the Action Points!
   assessment consists of how this can significantly
   mitigate the risk posed to lost man hours by
   adverse weather conditions
                                                                                                                After the conference you can track the
Ole Bigum Nielsen, Head of UK Offshore Projects,                                                                Action Points progress through Wind Energy
Vattenfall                                                                                                      Update’s news, reports and web services



  Register	today	-	visit	www.windenergyupdate.com/OWCIC	or	phone	+44	(0)20	7375	7575
Overcome	farshore	contract	and	construction	challenges	to	successfully	
          start	early	revenue	generation	from	your	wind	farm		
                                                           October 6 Technical Split Track Day

Section Five: New Wind Farm                           Piling operations in deep water and                     Alternative methods for cable installation
Technology, Construction and                          farshore offshore wind farm sites                       •	 Can	J-tubes	be	regarded	as	the	industry	standard	
Maintenance Techniques                                                                                           for inter connection?
                                                      •	 Discover	what	efficiencies	have	evolved	in	the	
A look at the state of the art turbine                   last few months that not only speed installation     •	 Get	a	comprehensive	case	study	of	Thanet’s	many	
technology available for release                         but also increase work place HSE                        connections  learn how costs were successfully
                                                                                                                 reduced
•	 Understand	the	benefits	that	new	technology	 •	 Learn	the	impact	weather	used	to	have	on	
   can offer projects for not just energy            projects and how this has been significantly         •	 See	what	value	subsea	connection	can	add		and	
   production but also for ease of construction,     reduced through better technology and                   how much simpler the cable lay procedure can
   installation and OM                              methodology                                             become
•	 Does	larger	always	mean	better	-	What	are	     •	 Get	the	latest	insight	direct	from	the	vessel	decks	 Olivier Angoulevant, Subsea Cabling, Nexans
   the changes in turbine design that will really    on how to minimise time on site through a solid,
   make a difference?                                continued supply chain of piling components          Export cable installation: working with
•	 Gain	an	analysis	of	the	benefit	associated	        Ivan Ostvik, VP Business and Project Development,       HVAC and HVDC cables in the Baltic Sea
   employing a test area within your project to       NorWind                                                 to maximise effectiveness of project time
   trial the latest turbine technology alongside                                                              and capital
   proven tech                                        Foundation structural integrity issues –
Karl John, Business Development Director,             Successful methodology laid bare                        •	 Full	session	information	to	be	provided	after	
                                                                                                                 company signoff
AREVA                                                 •	 See	how	the	history	of	offshore	wind	installation	
                                                         certification has led to the methods used today      Head of Installation team, Norddeutsche
Operation and Maintenance of                          •	 Benefit	from	a	collection	of	case	study	
                                                                                                              Seekabelwerke
farshore wind turbine generators:                        experience gained in the current installation        Why traditional cable lay methodology
access requirements, methodology                         projects to determine what factors to be aware of
                                                                                                              isn’t working
and technology                                           in your project
                                                                                                              •	 Looking	in	depth	at	ploughing,	survey,	laying	
•	 With	strategy,	access	and	time	all	at	a	           •	 Gain	a	clear	analysis	of	the	future	equipment	
                                                                                                                 methodology, subsea interconnection and cable
   premium for offshore work hear how one                developments that will aid foundation and
                                                                                                                 tensile issues
   company is planning for maintenance of its            transition piece connection
   WTGs                                                                                                       •	 Understand	why	a	“lazy	S”	isn’t	a	suitable	way	of	
                                                      Jim Bell, Managing Director, Foundocean
                                                                                                                 laying down excess slack
•	 Learn	the	varying	levels	of	errors	and	
   maintenance checks that explain whether an         Innovative foundation                                   •	 The	worry	the	amount	of	responsibility	a	ships’	
   onsite engineer is necessary or if the error can   installation                                 PANEL         captain has in cable lay regarding his guesswork as
   be checked as part of scheduled maintenance                                                    SESSION        to where the cable sits in relationship to the vessels
                                                  Kaj Lindvig, CSO, A2SEA                                        drivetrain
•	 Discover	which	parts	of	the	turbine	are	high,	
   medium and low risk and which require round Paul Gibson, Chairman, MPI-Offshore                            Steven Wilson, CTC Marine
   the clock monitoring vs. an annual check up Per Volund, Head of Wind Power, Grontmij
                                                                                                              Inter Array cable connections in the
Richard Luijendijk, Director of Service, Siemens
Wind Power
                                                      Inge Lotsberg, DNV Wind Energy
                                                                                                              Thanet Wind farm
                                                      Case study of the installation at                       •	 Benefit	from	leading	expert	knowledge	on	the	
The Development of Maintenance                        Ormonde                                                    many connections made on Thanet to improve the
Strategies for Farshore HVDC Grid                                                                                chance of right first time success on your project
                                                      •	 Understand	fully	the	logistics	and	planning	
Assets Based on Experience in the                        for transporting the turbines and lifting the
                                                                                                              •	 Hear	how	the	cables	connections	were	split	onto	
German Market                                            components in place
                                                                                                                 batches so that knowledge gained from one batch
                                                                                                                 could be improved upon and then utilised in the next
•	 Full	session	information	to	be	provided	after	     •	 Get	the	inside	track	on	how	the	sea	conditions	
   company signoff                                                                                            •	 Discover	the	innovate	connection	methodology	that	
                                                         were overcome
                                                                                                                 was used that allowed minimal delays from this part
Richard Cooke, Renewables, Petrofac                   •	 Learn	how	the	rate	of	installation	was	kept	high	       of the job to impact on others
                                                         throughout the project
Section Six: Foundation                                                                                       Ian Bonnon, Head of Offshore, GL Garrad Hassan
                                                      COO, A2SEA
Installation                                                                                                  Section Eight: Transport and Logistics
Jackets, Monopiles, Gravity bases –                   Section Seven: Cable Installation                       of Major Components
pros and cons to your project                         Overview on the cable challenges arising Transport and logistics of the major
•	 Receive	an	introduction	to	the	options	            in offshore wind farms                            components from factory to point of
   available now  how each can be used in            •	 Challenges	between	telephonic	communications,	 installation
   shallow and deep waters for installation of          fibre optic and HVDC/HVAC                             •	 Learn	about	the	different	methods	that	have	been	
   offshore turbines
                                                      •	 How	multiple	connections	can	cause	huge	                used in offshore wind installation and hear first-
•	 Discover	through	a	comparison	of	cost,	               project time delays                                     hand about the ones that worked well
   transport and environment implications the
                                                      •	 The	current	state	of	knowledge	from	vessel	          •	 Discover	the	importance	of	correct	planning	and	
   benefits of one over another
                                                         captains and how cross industry experience can          having strong alternatives to compensate for the
•	 Understand	the	implications	of	public	                cause more harm than good                               tough and ever changing working conditions of the
   restrictions passed re: noise and how this                                                                    North Sea
   impacts hammer size and hence monopole             Ralph Steinberg, Manager Offshore Cable Systems,
                                                      NKT Cables                                              •	 Utilise	exclusive	industry	case	studies	to	plan	work	
   use
                                                                                                                 around the European working hour restrictions
Seaway Heavy Lifting
                                                                                                              Andrew Davies, BDM, Sarens
                                                                                                              TBC

     Register	today	-	visit	www.windenergyupdate.com/OWCIC	or	phone	+44	(0)20	7375	7575
Wind Energy Update are a global business intelligence and conference company,
                                                                     part of the FC Business Intelligence group. It's our people that make us the market
                                                                     leader we are today. We are passionate about the industry, and look to keep
                                                                     building on the strengths we've developed

 CONFERENCES – Our conferences focus on the four pillars             NEWS – Wind Energy Update                    REPORTS – Wind Energy Update
 of wind energy success:                                             produce free weekly e-news briefs            produce in depth market reports to
 •	 Operations		Maintenance				•	Turbine	Supply	Chain               which we send straight to your inbox.        give you the detailed analysis that your
 •	Health	and	Safety																		•	Offshore	Wind	Installation   These e-briefs include all the latest        organisation needs to make the right
 This gives us the unique ability to be able to call on expertise    news, analysis, executive insights and       business decisions, including unique
 from around the world when bringing you the very latest in          more to ensure you have the latest           economic forecasts, the latest regulatory
 decommissioning best practice and lessons learnt.                   industry information at your fingertips.     updates and technological developments




   Wind energy update free newsletter                                sign uP
                                                                                     Offshore Wind installation                             AvAilAb
                                                                                                                                                      le
   Free news, analysis and business intelligence                     todAY!          Construction report                                      With th
                                                                                                                                                       e
                                                                                                                                           intellig
   for the offshore decommissioning community…                        fRee                                                                          enCe
                                                                                                                                          PAss At
                                                                                                                                                   A 20%
   •	Industry	Insight        •	News	Round	UP                                                                                              disCoun
                                                                                     How to install and construct farshore,                        t off
   •	Executive	Analysis	     •	Interviews	with	Leading	Experts                       deepwater wind farms on time and cost                   the RRP
                                                                                                                                                     !
                                                                                     efficiently
                                  All this emailed completely free
                                                                                     Real case studies on current offshore wind
                                   straight to your inbox twice a                    construction projects including Ormonde, Bard 1, Thornton Bank and
                                               month.                                Greater Gabbard

                                           Sign up free at                           This ground breaking business intelligence report is now available for
                                                                                     order and will be sent direct to you within one working day of placing
                                 www.windenergyupdate.com                            your order!
                                                                                     Get unique case studies giving a detailed account on how the most
                                                                                     pressing offshore wind construction and installation challenges are
                                                                                     being tackled in four of the most daring offshore wind projects.
  Wind energy update forward schedule of
  events                                                                             Five Reasons to Buy
                                                                                     1. Find out how innovative foundations solutions such as
   3rd Annual Global Wind Turbine Supply Chain                                          gravity based foundations, jackets and floating turbines are
   Conference                                                                           being used in the latest far-shore, deep water projects

   Hamburg	Germany,	September	7-8	2011                                               2. Learn how to cut both cost and time by using the pre-piling
                                                                                        method to install jacket foundations
   www.windenergyupdate.com/supply-chain                                             3. Discover the successes - and challenges - in using gravity
                                                                                        based foundations
   US Health and Safety Conference                                                   4. Understand how monopile foundations are being pushed to
   Dallas TX, September 8-9 2011                                                        its structural limits

   www.windeenergyupdate.com/health-safety-usa                                       5. Assess the challenges of operating in hostile, farshore,
                                                                                        deepwater environments and how you can best deal with
                                                                                        them
   4rd Annual Wind OM Summit (onshore and
   offshore)                                                                         6. Learn how the industry is coping with the shortage of
                                                                                        vessels required for cable installation
   London UK, November 22-23 2011
                                                                                      Visit www.windenergyupdate.com/offshorereport
   www.windenergyupdate.com/operations-maintenance
                                                                                               to download your free summary now!


Scan this smart tag with your phone now
to access exclusive Report information




 Register	today	-	visit	www.windenergyupdate.com/OWCIC	or	phone	+44	(0)20	7375	7575
save
                                                                     “excellent event, quality presentations and relevant discussions.”
                                                                             Stephen Kerr, Project Manager, SeaEnergy Renewables


  OffshOre Wind COnstruCtiOn, installatiOn                                                                                                                                                                          £300
                                                                                                                                                                                                                   register before
  and COmmissiOning COnferenCe                                                                                                                                                                                         July 15

 4-6 October 2011, London UK

 This is your unique code ThaT saves you £50*
 Just enter it online, quote it when booking over the phone or in your email
                                                                                                                                                                         Code:        DIGITAL PDF
 *Note: Code only applies to Intelligence, Business and Basic passes but can be used in conjunction with all early booking offers listed below

        %
   E 20
SAV his                    intelligence Pass                                                                     Business Pass                                                                       Basic Pass
 on t
       Rt
  RePo                                                                                      •	 Access to all presentations and exhibition                                     •	 Access to all presentations and Workshops
              All the benefits of the Business pass plus:
       The Offshore Wind and Construction and                                               •	 Networking evening drinks reception on day                                     •	 Networking evening drinks reception
       Installation Report from Wind Energy Update                                             one                                                                               on day one
       (worth £1,395)                                                                       •	 Lunch and refreshments                                                         •	 Lunch and refreshments,
       This report provides vital information on how                                        •	 Access to presentation slides after the
       leading developers are cutting installation costs                                       conference
       and times                                                                             + Access to online delegate list and meeting
      •	 Learn from pioneering offshore wind farm                                              planner
         developers and their experiences in time, cost                                      + Access to audio recordings from every
         and logistics                                                                         session (worth £395)
      •	 Examine the pros and cons of existing
         methods of construction being used on
         offshore wind farms including cabling and
         vessels
      •	 Learn about upcoming offshore technologies
         which will revolutionise the offshore wind
         industry
      •	 Get full information on the report from
         www.windenergyupdate.com/offshorereport

   Super Early Bird (expires 15 Jul 2011)                   £2025                         Super Early Bird (expires 15 Jul 2011)                         £895                                                  £795
                                                                                                                                                                            Super Early Bird (expires 15 Jul 2011)
   Early Bird (expires 12 Aug 2011)                         £2125                         Early Bird (expires 12 Aug 2011)                               £995               Early Bird (expires 12 Aug 2011)   £895
   Last Chance (expires 9 Sept 2011)                        £2225                         Last Chance (expires 9 Sept 2011)                             £1095               Last Chance (expires 9 Sept 2011)  £995
   Full price                                               £2325                         Full price                                                    £1195               Full price                        £1095

     Post Conference materials                                                                                                     Group Discounts, Play it Smart - Bring Your Team
                                                                                                                                   With multiple conference tracts, workshops, an enlarged exhibition space
   •	 Access to presentation slides after the conference                                                                           and increased networking time – you need more people on site to benefit
                                                                                                                                   from all the conference has to offer.
   •	 Access to audio recordings from every conference session £395
                                                                                                                                   Take advantage of our group booking discount. Contact us on
                                                                                                                                   info@windenergyupdate.com to find out how much you could save.


    Enter Attendee details
  Mr/Mrs/Ms/Dr:                              First name:                                                                        Last name:
  Company:                                                                                                                      Position/Title:
  Telephone:                                                         Fax:                                                       Email:
  Address:                                                                                                                      Postcode:                                                     Country:



     Payment Options
        I enclose a cheque/draft for:                                                                                                    Credit card number:
        (Payable to First Conferences Ltd)                                                                                               Expiry date:                                       Security number:
        Please invoice my company:                                                                                                       Name on card:
        Purchase Order Number:                                                                                                           Signature:
        Please charge my credit card:                      Amex               Visa                 Mastercard



                                                                                                                            MORE
    FAX THIS FORM BACK TO                                                                                                   WAYS TO
                                                                                                                                                               CALL    CALL +44 (0) 20 7375 7247
                                                                                                                                                               EMAIL: info@windenergyupdate.com
    +44 (0) 207 375 7576                                                                                                    REGISTER                           ONLINE: www.windenergyupdate.com/OWCIC

 Terms  Conditions: If you have to cancel - It is possible to transfer your place to a colleague/client if you are unable to     obliged to charge the full fee. The organizers (Wind Energy Update) reserve the right to make changes to the program
 attend, but you must inform Wind Energy Update of this in writing of this change prior to the event. You will incur 25%          without notice. We will send you an e-mail to confirm that we have received your registration.
 cancellation fee on or before 4th September 2011. For all cancellations received after 4th September 2011 we will be
Researched  Organized by:         The largest and most in-depth meeting point for          Exceptional opportunity to connect with market
                                    the offshore wind installation industry globally…
                                            back for its 3rd blockbusting year
                                                                                            “
                                                                                          participants working to make offshore wind a viable
                                                                                         industry in the UK    Gregg Egen, Managing Director,
                                       ...attracting over 450 delegates in 2011!                          ”
                                                                                               Espirito Santo Investment Bank



3rd Annual

OffshOre Wind COnstruCtiOn, installatiOn
and COmmissiOning COnferenCe
4-6 October 2011, London UK                                                                                             save
                                                                                                                        £300
                                                                                                                       register before

Overcome farshore contract and                                                                                             July 15


construction challenges to successfully start
early revenue generation from your wind farm
•	 WHAT	WORK	IS	COMING	UP?		Where is the potential for the greatest long term
   contracts? Which sites are suited to offshore wind installation RD? Find out from the
                                                                                                    ExpErt spEakErs from
   experts themselves!
•	 CASE	STUDIES	ON	THE	“WORLD’S	LARGEST”	OFFSHORE	WIND	FARMS	London Array,
   Greater Gabbard, Ormonde and Thanet
•	 OVERVIEW	ON	THE	CABLE	CHALLENGES	ARISING	IN	OFFSHORE	WIND	FARMS	Cover all
   ranging challenges between laying telephonic communications, fibre optic and HVDC/
   HVAC cables
•	 FOUNDATION	OPTIONS,	DESIGNS	AND	INSTALLATION	TECHNIQUES	In depth discussion
   from the established players alongside the new comers on structural integrity issues –
   can grout alone be the long term solution
•	 STATE	OF	THE	ART	OFFSHORE	TURBINE	TECHNOLOGY	Get the inside track on what’s
   available for use in the Round 3 boom
•	 TRANSPORT	AND	LOGISTICS	OF	THE	MAJOR	COMPONENTS	From the factory to point of
   installation here’s what you need to consider
•	 RISK	ASSESSMENT	AND	FINANCIAL	OPTIONS	FOR	THE	OFFSHORE	WIND	INDUSTRY	
   Risk and finance go hand in hand in offshore wind projects; Hear how 65 different
   projects have been brought through the consent phase
•	 CONTRACTING	METHODS	AND	STRUCTURE	client and project bundling options laid bare



                               All New Features for 2011
  Expert Led Offshore Wind                        Larger Exhibitors Area  Increased
   Opportunities Workshop                           Networking Time
  Contact Structuring Workshop                    Keynote Presentation Day
  Operators Group Meeting                         Twice As Many Technology
                                                    Presentations

 LEAD EXHIBITORS




   Join 450 Offshore Wind Industry Colleagues For Three Business Critical Days of Analysis, Information Sharing and
                        Business Development at the Largest Industry Gathering Worldwide

                                    www.windenergyupdate.com/OWCIC

Contenu connexe

Similaire à Connect with 450+ at Europe's largest offshore wind conference

Offshore Wind Energy In Europe Conference
Offshore Wind Energy In Europe ConferenceOffshore Wind Energy In Europe Conference
Offshore Wind Energy In Europe ConferenceTom
 
5 C Newsletter July 2010 1
5 C Newsletter July 2010 15 C Newsletter July 2010 1
5 C Newsletter July 2010 1Summer Maldives
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpoDamian Connon
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentationewanbaird
 
Science Vale UK energy event - fusion technology and industry
Science Vale UK energy event - fusion technology and industryScience Vale UK energy event - fusion technology and industry
Science Vale UK energy event - fusion technology and industryScience Vale UK
 
Offshore Wind Power Logistics - Like a journey to the moon
Offshore Wind Power Logistics - Like a journey to the moonOffshore Wind Power Logistics - Like a journey to the moon
Offshore Wind Power Logistics - Like a journey to the moonMarkus Bereiter
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505BVG Associates
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification StephenGeoMills
 
Prysmian financials
Prysmian financialsPrysmian financials
Prysmian financialsPankaj Baid
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentGlenn Klith Andersen
 
Iberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind
 
AREVA, First Half 2009 Results And Outlook
AREVA, First Half 2009 Results And OutlookAREVA, First Half 2009 Results And Outlook
AREVA, First Half 2009 Results And OutlookAREVA
 
2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industrysmarter2011
 

Similaire à Connect with 450+ at Europe's largest offshore wind conference (20)

Offshore Wind Energy In Europe Conference
Offshore Wind Energy In Europe ConferenceOffshore Wind Energy In Europe Conference
Offshore Wind Energy In Europe Conference
 
5 C Newsletter July 2010 1
5 C Newsletter July 2010 15 C Newsletter July 2010 1
5 C Newsletter July 2010 1
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpo
 
4th Year Project Proposal Presentation
4th Year Project Proposal Presentation4th Year Project Proposal Presentation
4th Year Project Proposal Presentation
 
Barrow offshore
Barrow offshoreBarrow offshore
Barrow offshore
 
Offshore Renewables
Offshore RenewablesOffshore Renewables
Offshore Renewables
 
Offshore Wind Energy Supply Chain For Construction
Offshore Wind Energy Supply Chain For ConstructionOffshore Wind Energy Supply Chain For Construction
Offshore Wind Energy Supply Chain For Construction
 
Science Vale UK energy event - fusion technology and industry
Science Vale UK energy event - fusion technology and industryScience Vale UK energy event - fusion technology and industry
Science Vale UK energy event - fusion technology and industry
 
Offshore Wind Power Logistics - Like a journey to the moon
Offshore Wind Power Logistics - Like a journey to the moonOffshore Wind Power Logistics - Like a journey to the moon
Offshore Wind Power Logistics - Like a journey to the moon
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification
 
Aoil wind power ppt 2015
Aoil wind power ppt 2015Aoil wind power ppt 2015
Aoil wind power ppt 2015
 
Open Hydro
Open HydroOpen Hydro
Open Hydro
 
Prysmian financials
Prysmian financialsPrysmian financials
Prysmian financials
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
 
Iberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, EuropeIberwind best emerging renewable energy company, Europe
Iberwind best emerging renewable energy company, Europe
 
AREVA, First Half 2009 Results And Outlook
AREVA, First Half 2009 Results And OutlookAREVA, First Half 2009 Results And Outlook
AREVA, First Half 2009 Results And Outlook
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
RINA_Paper
RINA_PaperRINA_Paper
RINA_Paper
 
2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry2011 deep research report on eu and china offshore wind power industry
2011 deep research report on eu and china offshore wind power industry
 

Dernier

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 

Dernier (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 

Connect with 450+ at Europe's largest offshore wind conference

  • 1. Researched & Organized by: The largest and most in-depth meeting point for Exceptional opportunity to connect with market the offshore wind installation industry globally… back for its 3rd blockbusting year “ participants working to make offshore wind a viable industry in the UK Gregg Egen, Managing Director, ...attracting over 450 delegates in 2011! ” Espirito Santo Investment Bank 3rd Annual OffshOre Wind COnstruCtiOn, installatiOn and COmmissiOning COnferenCe 4-6 October 2011, London UK save £300 register before Overcome farshore contract and July 15 construction challenges to successfully start early revenue generation from your wind farm • WHAT WORK IS COMING UP? Where is the potential for the greatest long term contracts? Which sites are suited to offshore wind installation R&D? Find out from the ExpErt spEakErs from experts themselves! • CASE STUDIES ON THE “WORLD’S LARGEST” OFFSHORE WIND FARMS London Array, Greater Gabbard, Ormonde and Thanet • OVERVIEW ON THE CABLE CHALLENGES ARISING IN OFFSHORE WIND FARMS Cover all ranging challenges between laying telephonic communications, fibre optic and HVDC/ HVAC cables • FOUNDATION OPTIONS, DESIGNS AND INSTALLATION TECHNIQUES In depth discussion from the established players alongside the new comers on structural integrity issues – can grout alone be the long term solution • STATE OF THE ART OFFSHORE TURBINE TECHNOLOGY Get the inside track on what’s available for use in the Round 3 boom • TRANSPORT AND LOGISTICS OF THE MAJOR COMPONENTS From the factory to point of installation here’s what you need to consider • RISK ASSESSMENT AND FINANCIAL OPTIONS FOR THE OFFSHORE WIND INDUSTRY Risk and finance go hand in hand in offshore wind projects; Hear how 65 different projects have been brought through the consent phase • CONTRACTING METHODS AND STRUCTURE client and project bundling options laid bare All New Features for 2011 Expert Led Offshore Wind Larger Exhibitors Area Increased Opportunities Workshop Networking Time Contact Structuring Workshop Keynote Presentation Day Operators Group Meeting Twice As Many Technology Presentations LEAD EXHIBITORS Join 450 Offshore Wind Industry Colleagues For Three Business Critical Days of Analysis, Information Sharing and Business Development at the Largest Industry Gathering Worldwide www.windenergyupdate.com/OWCIC
  • 2. Exclusive European Offshore Wind Installation Analysis How to Plan and Execute Successful European Offshore Wind Projects Join 450+ industry professionals at the landmark event that will help you improve offshore wind project installation, overcome farshore transport and logistics challenges, understand the best methods for foundation installation and cable lay through the latest project experience, technology innovation and information updates Dear Colleague, Project Managers: What’s Your Exposure? Since the last Offshore Wind Construction, Installation and The cost of installation is significant and something that needs to be planned Commissioning conference (OWCIC) in October, landmark changes for – and then back-up plans created! Looking at the trends in wind farm have impacted offshore wind installation in Europe project costs below can you work out your exposure? How much will offshore wind installation activity cost you in the next 5 years? In the past four to five years, several larger, second-generation projects (including the UK’s Round 2), entered the construction phase, delivering Figure 1 - Trends in wind farm project costs a significant increase in operational installed capacity. Statistics point to a rapidly growing offshore industry. The biggest increase in offshore 3.5 capacity occurred in 2010. European capacity increased by 883MW Drivers • Rising commodity prices Rhyl Flats compared with 582MW added in 2009. The UK contribution to the 2010 3.0 • Bottlenecks in supply chain increase was 562MW, which included Thanet (300MW), the largest • Complexity of sites, distances, depths Robin Rigg Cost per MW installed (€m/MW) • FX rate volatility operational wind farm to date. 2.5 Gunfleet Europe is unquestionably the epicentre of the market with 2.9 GW of the North Hoyle Sands 3GW total installed wind energy capacity based in Europe and accounting 2.0 Lynn for 88% of 2010 new capacity. Over the next decade it is estimated by Burbo Kentish Flats EWEA that by 2020, total European offshore installed capacity will be 40GW. 1.5 The UK’s contribution to that total is estimated at 25GW. The main centre South Sands for offshore construction looks set to remain in northern Europe. 1.0 Barrow Through a combination of the sheer volume of demand for contractor 0.5 services, coupled with potential raw material price spikes, project managers are facing upward pressure on prices and hitting timely deadlines. It is 0.0 therefore crucial that owner/operators have a water tight strategy in place 2002 2003 2004 2005 2006 2007 2008 2009 2010 to deal with their installation liability. Contractors need to ensure they are positioned to corner off a share of this multi-million pound industry with cost effective, safe service offerings or face being left behind by their Source: Carbon Trust/Emerging Energy Research (2009) counterparts. The OWCIC conference will equip you with all the planning information and technological tools to tackle your installation liability in the most proactive, Installing offshore wind farms is costly, technically challenging and cost effective way. Don’t get caught out, start planning now by attending the potentially hazardous both to the workforce and a company’s global image. conference If costs are to be reduced then careful planning is required and common sense strategies must be put in place. In order to do that some of the following challenges must be faced: Contractors: Offshore Wind Installation is on the Rise • Grouting the Transition Piece • Supply Chain Management CAPEX costs for wind farms completed in 2009/10 have edged toward £3m • Ploughing Cable Trenches at • Cost Reduction / MW, some 50 -100% above costs of wind farms in the period up to 2006. Depth • Farshore Transport Logistics • Working with HVAC/HVDC Cables • Weather Windows Considering there are still 32,200 MW of wind energy to be harnessed from • EHS Offshore • Working with 5MW+ Turbines the UK Round 3 zones this translates into a £96.9 million market. • Project Planning Management Wind Farm Region MW Capacity Moray Firth Scotland 1300 The 3rd Annual Offshore Wind Construction, Installation and Commissioning conference will supply your business with the critical Firth of Forth Scotland 3500 intelligence and tools you need to build a cost effective, time efficient Dogger Bank North Sea 9000 installation strategy. Delivered by the best in the industry, you’ll be able to take away key lessons and real world action points that you can implement Hornsea North Sea 4000 to save millions of GBP. Norfolk Bank Southern North Sea 7200 Now in its third year, OWCIC will be bringing together 450 offshore wind Hastings South 600 installation experts for three days of business critical intelligence, unrivalled West of Isle of Wight South 900 networking and stimulating discussion. With senior level representatives from major independent operators, lead Bristol Channel Atlantic South West 1500 contractors, specialist service companies and the major European land Array governing body – can you afford to miss out? Irish Sea Irish Sea 4200 TOTAL 32200 I look forward to seeing you in London in October. All the best, Are you positioned to take advantage of this? Attend OWCIC 2011 and you’ll have the opportunity to not only receive all the market forecast you need to accurately set out your business plans for Tom Evans Tel: +44 (0)20 7375 7247 2011 and beyond – but also we’ll put you in front of the top project owners. Head of Sector, Email: tom@windenergyupdate.com Wind Energy Update Wind Energy Update: www.windenergyupdate.com Fill your order book in 3 days by attending this conference. Register today - visit www.windenergyupdate.com/OWCIC or phone +44 020 7375 7575
  • 3. Your Exclusive OWCIC Conference Overview: Review the new conference format and the information on offer from the world’s leading offshore wind installation experts Conference at a Glance morNING aftErNooN EVENING • Registration Exhibition Opens October 4 • Opportunities in Offshore Wind Workshop • Networking Drinks Pre-Conference • Exhibition Set Up • Structuring Contracts for Offshore Wind Reception Day Workshop • Conference Opens October 5 • Market Analysis • Project Management Planning Key Note • Risk Assessment Mitigation • Networking Reception • Cost Estimation Presentation Day • Supply Chain Management • Installation Case Studies October 6 • New Wind Turbine Technology + • Cable Installation Multi Track Construction Techniques • Transport and Logistics of Major Technology Analysis • Foundation Installation Components Who will you meet? TOP 4 CONFERENCE TAKE-AWAYS Meet, hear and do business with the cutting edge players in the Offshore We guarantee to deliver strategies that will have a real and lasting positive Wind Installation space. impact on your business, giving you the tools to ensure the success of your This is a high-level exclusive event – it's not just a tradeshow expo. There decommissioning strategy. will be a select number of key decision makers who have all paid money to hear about this exact topic - how to install wind farms farshore on time and 1 CONNECTIONS - only theOffshorethe best will be here. Our delegates are the best of the best of best of Wind executives! on budget To get the inside track on building and growing a presence in the Offshore Wind business you need to be meeting and hearing from the very best 2 FACTS – solid, hard hitting on progress made and the steps facts about the Offshore Wind industry presentations filled with the true needed to brains in the business, experts in the latest thinking, new technologies and push installations forward. evangelists on the path we need to take. Fortunately OWCIC does this for you by bringing together the very best the Offshore Wind industry has to offer, including key players from: • Round 3 zone project managers • Financial analysts, insurers, and 3 INSPIRATION – Wind fresh insightspeople onlively discussion with your fellow Offshore get executives – through your level, who think like you • Tried and Tested Lead installation technical experts contractors PRACTICAL IDEAS – only at OWCIC will you will hear the best tips, This conference is going to be a breath of fresh air to this industry, 4 strategies and practical knowledge that will directly help you in your everywhere you turn when you get in the conference room or step into the day-to-day work coffee reception area you are going to be surrounded by key decision makers from the best of the best. The very best companies, researchers and people you will get conference audio, presentation slides, conference who are going to push the offshore wind world forward. Plus booklet, face to face meeting time and much more! If this sounds good then you need to be here! CONTACT US TODAY about this conference, the latest offshore wind news and more - +44 (0)207 375 7575 tom@windenergyupdate.com Your chance to impress - become an OWCIC Signing on with us to be a part of OWCIC is just the beginning. Sponsoring, exhibiting and advertising is a platform for you to reach your sales and sponsor or exhibitor marketing goals. The Offshore Wind Construction, Installation and Commissioning We guarantee that our continuing efforts to help you get the most out of Conference is the most exciting and fresh conference in the offshore wind your opportunity is unparalleled in the conference world - ask us for help on space. how to get the most out of a presentation, how to work the exhibition floor Our vision of putting together a summit focused solely on how to build and or even what copy to use in your advert. With Wind Energy Update this is grow offshore wind installation businesses makes for a unique and exciting part of the service and it is an invaluable one worth its weight in gold. It's event. the reason our percentage of repeat customers eclipses the conference If you need our delegates as partners or clients this event is a valuable industry average. chance for you to meet, greet and impress them in person. With opportunities as low as £3500 - Sponsoring, exhibiting or advertising This could be the chance you need to pave the way with us is one the best and most cost effective ways to generate interest, to massive future profits - you owe it to yourself meet leads and make deals, build relationships and imprint your company name in the brains of all the summit attendees and all the 20,000+ to at least give us a call and ask for our free industry leaders who we will reach with our comprehensive marketing and sponsorship info package. promotional campaign. We only sell custom made, high value packages - Talk to us today and call Tom Evans, Wind Energy Update on share some ideas about what we could do together to help push your +44 (0)20 7375 7247 business forward. We have a range of options to suit every budget and we or email tom@windenergyupdate.com tailor every deal to match your individual needs like a glove. Register today - online at: www.windenergyupdate.com/OWCIC or phone +44 (0)20 7375 7575
  • 4. Unrivalled Industry Networking at the OWCIC Conference! Join 450 offshore wind installation experts at the world’s leading gathering Networking at the OWCIC Conference 2011 OWCIC 2011 provides outstanding Attend the Conference and you’ll meet... networking opportunities for anyoneinvolved Who will be there? Senior decision makers from the leading in offshore wind installation. This is the Crown Estate Round 3 winners attend Senior level decision makers project managers single largest meeting point globally- OWCIC every year to meet services from the major and independent wind farm owner/ attracting over 450 stakeholders. If offshore providers offering new technologies and developers who want to discover the latest technologies wind installation is part of your job role – you services to help them reduce cost, hit and services for planning and executing offshore wind simply can’t afford to miss out. timelines and ensure safe projects. construction and installation projects. This year Wind Energy Update are +PLUS+ providing: • Over 17 hours of dedicated networking Suppliers / Solutions providers • Construction Installation of foundations Major/Independent Operators 35% 25% time across the 3 days of the conference • Construction of wind turbines Intergrated • A brand new pre-conference day for you to Contractors engage in more relaxed discussion • Installation of cables • Fully interactive panel sessions for you to identify yourself to the entire delegate • Installation of offshore onshore substations Sub Contractor 10% 10% audience as a topic expert • Installation of wind turbines Specialist Services • Dedicated workshops, coffee breaks, • Main contractors / project managers 10% lunches evening drinks for you to target • Production of cables your key clients Public Sector • Supply of vessels / Sea based support 10% You’ll have more face to face And Many Others… Legal, Financial Consultants Who You’ll Meet… Wind Energy Update run a series of offshore wind conferences from health and safety, supply chain, North American development and construction. This places us in the unique position of bringing together wind installation experts from across the globe. Below is a breakdown of who attends our conferences Offshore Tier 1 Tier 2 Wind Developers Lead Contractors Sub-Contractors C-Power A2SEA Dredging International Dong Energy Ballast Nedam Offshore Energy Embassy Machine Services EDF Energy Beluga Group Euskal Forging EDP Renewables DEME Foundocean EnBW Erneuerbare Energien Fluor Corporation Houlder Iberdrola Renewables GeoSea Jumbo Offshore London Array Limited KBR Minelco Mainstream Renewable Power Mammoet Europe Sepam RWE Offshore Logistics Company Seaway Heavy Lifting Vos Prodect Innovations Scottish Power Technip SeaEnergy Renewables Van Oord Dreging and Vattenfall Marine Contractors Excellent. As a newcomer to the industry it provided in-depth information and topical discussion on the major issues facing Offshore Wind “ turbine installers and developers today. Tata Steel International ” Book your place to meet all the above today! Turn to inside back cover now!
  • 5. OWCIC Full Conference Agenda: Unparalleled expert speaker line-up for three days of invaluable information 2011 Conference Structure Two workshops aimed at giving a European offshore The Offshore Wind Construction, Installation and Commissioning Conference has an all-new format for 2011 and will take place over wind opportunities overview. three days. This is to ensure the best possible delegate experience through added benefits such as training sessions, workshops, more choice on agenda topics, keynote presentations, extended networking Offshore Wind Technical Workshop time and larger exhibition space • Diversification and challenges for parallel sectors (Aerospace, automotive, composites, large item manufacture parallels) The conference will be structured as follows: • Technological challenges and RD in offshore wind Pre-Conference Day October 4 • Components, customers and technological trends: A: Metalworking and fabrication • Pre-Registration Open • Components, customers and technological trends: B: Electrical and cables • Exhibition Open • Vessel supply and demand • Training Workshop • Vessel and offshore equipment manufacture • Opportunities in Offshore Wind Workshop • Offshore construction management • Structuring Contracts for Offshore Wind Workshop BVG Associates Structuring Contracts for Offshore Wind Workshop Workshop on how to structure contracts in the offshore environment • Suitability of FIDIC and others • How and why consortium are needed • Best way to split risk TBC The Offshore Wind Construction, Installation and “ Commissioning Conference allowed our company to reach out to the industry to showcase the capabilities of our services. It is without a doubt an important part of our marketing plan. Signal International Inc. ” Keynote Presentation Day October 5 Section One: Market Overview Regulations Market overview on the work approaching us in the next Farshore wind: collaborate or compete? 18-24 months • Hear about areas where industry is working together to improve efficiency and • What are the impacts from the high profile industry flaws in 2010 on safety in farshore wind projects the opportunities for testing new methodology for installation and • Gain insight into the contract models which work best to help reduce project construction costs • Take away an up-to-date analysis of recent predictions on where the • Learn about suitable contracting methods and structures including client and greatest short and long term gains for construction firms in European project bundling options offshore wind • Gain insight into offshore wind risk metrics and marketing forecasting UK policy panel: Creation of the UK offshore wind Timo Laakso, Vice President, Wind Power, Poyry industry PANEL Håkon Sandbekk, Legal Counsel, Statkraft (TBC) SESSION Ed Wilson, Head of Renewable Energy, Project Finance, Lloyds Bank Corporate Markets David Curran, Department of Energy Climate Change (DECC) Michelle Thomas, Partner, Head of Clean Energy and Sustainability, Eversheds LLP Register today - visit www.windenergyupdate.com/OWCIC or phone +44 (0)20 7375 7575
  • 6. Overcome farshore contract and construction challenges to successfully start early revenue generation from your wind farm Keynote Presentation Day October 5 Section Two: The World’s Largest Section Three: Offshore Wind Section Four: Addressing skills in Offshore Wind Farms Farm Finance, Contracting and the offshore wind sector Overview of the potential challenges and criteria Risk Mitigation involved when selecting contractors for the Walney Skills specific to offshore wind: what wind farm Risk reduction specific to offshore the UK is doing now to secure offshore • Hear how experiences in DONG Energy’s previous wind designed for both the owner wind jobs UK and Danish offshore wind farm work led the and contractor • Get the inside track from the UK skills market thinking on Walney from the start to understand what processes are now in place • Understand how construction liability can • Get the inside track on how the contracts were be reduced or even eliminated from an to drive the growth of offshore wind split up among the respective contractors and how operator’s balance • Assess the direction your business needs to DONG went about project managing the work take to enjoy the maximum benefit from these • Eliminate catastrophic costs related to • Discover how the contactors were chosen and contractor insolvency other perils through a skills initiatives what criteria they are working to and for what new model designed specifically for farshore • Learn what the proven routes of acquiring and rewards wind retaining credible workforce labour are for the Jens Hansen, Project Manager, • Mitigate risk of increased costs tied to offshore wind construction industry Dong Energy (invited) sudden market fluctuations Bob Granger, Head of Renewables, Jatin Sharma, Head of Offshore, GCube National Skills Academy for Power Discover the challenges and benefits of Underwriting Limited turnkey installation of a sole vs. multiple Military skills on offer to the offshore contractors to the supplier and contractor Analysing the risks in offshore wind, wind industry • Understand the complexities of constructing with the various models used to date • Hear from the UK’s leading marine military fixed and floating offshore structures and vessels in Europe (project finance bill and personal employer about the skill set matches further than 70km from the shore refinancing) that the Royal Navy has with the offshore wind • Discover the challenges and benefits of turnkey construction industry needs • Discover the fundamental differences installation with a sole main contractor between UK and European projects and why • Benefit from hundreds and thousands of • What are contractor capabilities for farshore wind lenders approach the two from very different hours of higher level education training suited farms and will all parts of the extended supply angles specifically to working in harsh offshore chain be ready? conditions with state of the art engineering • Get the latest insight from the most technology Graham Mason, Project Development Director, Fluor experienced global leader in the field to drive Corporation forward success in your business from up to • Discover the volume and likelihood of personal date facts from military background available to the private sector in the next 12-18 months and Discover the importance of stakeholder • See how to work with the system from the how you should best look to recruit management in planning and how this beginning to best ensure long term financial can delay a project if neglected securing and headache free days when Karen Carroll, Career Transition Partnership, projects are delayed Royal Navy • Get a virtual tour of the work London Array has accomplished to date Christos Kolliatsas, Project Manager, Mott MacDonald • Hear the decision makers first-hand describe how your input will lead to the concepts that they used to enable buy into potentially one of Britain’s most polarising energy Legal insight – contract changes Offshore Wind Construction change station new builds in the last 50 years necessary to ensuring offshore wind Buy a ticket and attend the Offshore • Understand the best and worst case scenarios for market reaching potential Wind Construction, Installation and an offshore wind project through best and poor • Assess the impact that NDAs have on Commissioning Conference! stakeholder engagement both long term and day to day business operations Joanne Haddon, Stakeholder and Media Manager, • Get the inside track on what is actually Speak up and get your points across at the London Array considered business critical to you and your Working Group Discussions Understand how to prepare for farshore partners and what is purely legal red tape hindering your project’s success wind construction including the Your moderator will take notes summarizing management of resources, equipment, • Learn how to silo up certain parts of the the groups input construction packages so that mini-EPC cross-contractor communication and units can be formed to work in a more mitigating uncertainties manageable way • Understand the strategic planning considerations Panel discussion featuring all the group Peter Scurlock, Eversheds LLP moderators presenting the discussions for construction activities in the North Sea and their implications on project timelines and costs findings • Discover the importance of stakeholder management when planning projects and how this Working together, you, the panel and the can delay a project if it is neglected rest of the audience will work together to • Find out what a detailed reasonable working hours define the Action Points! assessment consists of how this can significantly mitigate the risk posed to lost man hours by adverse weather conditions After the conference you can track the Ole Bigum Nielsen, Head of UK Offshore Projects, Action Points progress through Wind Energy Vattenfall Update’s news, reports and web services Register today - visit www.windenergyupdate.com/OWCIC or phone +44 (0)20 7375 7575
  • 7. Overcome farshore contract and construction challenges to successfully start early revenue generation from your wind farm October 6 Technical Split Track Day Section Five: New Wind Farm Piling operations in deep water and Alternative methods for cable installation Technology, Construction and farshore offshore wind farm sites • Can J-tubes be regarded as the industry standard Maintenance Techniques for inter connection? • Discover what efficiencies have evolved in the A look at the state of the art turbine last few months that not only speed installation • Get a comprehensive case study of Thanet’s many technology available for release but also increase work place HSE connections learn how costs were successfully reduced • Understand the benefits that new technology • Learn the impact weather used to have on can offer projects for not just energy projects and how this has been significantly • See what value subsea connection can add and production but also for ease of construction, reduced through better technology and how much simpler the cable lay procedure can installation and OM methodology become • Does larger always mean better - What are • Get the latest insight direct from the vessel decks Olivier Angoulevant, Subsea Cabling, Nexans the changes in turbine design that will really on how to minimise time on site through a solid, make a difference? continued supply chain of piling components Export cable installation: working with • Gain an analysis of the benefit associated Ivan Ostvik, VP Business and Project Development, HVAC and HVDC cables in the Baltic Sea employing a test area within your project to NorWind to maximise effectiveness of project time trial the latest turbine technology alongside and capital proven tech Foundation structural integrity issues – Karl John, Business Development Director, Successful methodology laid bare • Full session information to be provided after company signoff AREVA • See how the history of offshore wind installation certification has led to the methods used today Head of Installation team, Norddeutsche Operation and Maintenance of • Benefit from a collection of case study Seekabelwerke farshore wind turbine generators: experience gained in the current installation Why traditional cable lay methodology access requirements, methodology projects to determine what factors to be aware of isn’t working and technology in your project • Looking in depth at ploughing, survey, laying • With strategy, access and time all at a • Gain a clear analysis of the future equipment methodology, subsea interconnection and cable premium for offshore work hear how one developments that will aid foundation and tensile issues company is planning for maintenance of its transition piece connection WTGs • Understand why a “lazy S” isn’t a suitable way of Jim Bell, Managing Director, Foundocean laying down excess slack • Learn the varying levels of errors and maintenance checks that explain whether an Innovative foundation • The worry the amount of responsibility a ships’ onsite engineer is necessary or if the error can installation PANEL captain has in cable lay regarding his guesswork as be checked as part of scheduled maintenance SESSION to where the cable sits in relationship to the vessels Kaj Lindvig, CSO, A2SEA drivetrain • Discover which parts of the turbine are high, medium and low risk and which require round Paul Gibson, Chairman, MPI-Offshore Steven Wilson, CTC Marine the clock monitoring vs. an annual check up Per Volund, Head of Wind Power, Grontmij Inter Array cable connections in the Richard Luijendijk, Director of Service, Siemens Wind Power Inge Lotsberg, DNV Wind Energy Thanet Wind farm Case study of the installation at • Benefit from leading expert knowledge on the The Development of Maintenance Ormonde many connections made on Thanet to improve the Strategies for Farshore HVDC Grid chance of right first time success on your project • Understand fully the logistics and planning Assets Based on Experience in the for transporting the turbines and lifting the • Hear how the cables connections were split onto German Market components in place batches so that knowledge gained from one batch could be improved upon and then utilised in the next • Full session information to be provided after • Get the inside track on how the sea conditions company signoff • Discover the innovate connection methodology that were overcome was used that allowed minimal delays from this part Richard Cooke, Renewables, Petrofac • Learn how the rate of installation was kept high of the job to impact on others throughout the project Section Six: Foundation Ian Bonnon, Head of Offshore, GL Garrad Hassan COO, A2SEA Installation Section Eight: Transport and Logistics Jackets, Monopiles, Gravity bases – Section Seven: Cable Installation of Major Components pros and cons to your project Overview on the cable challenges arising Transport and logistics of the major • Receive an introduction to the options in offshore wind farms components from factory to point of available now how each can be used in • Challenges between telephonic communications, installation shallow and deep waters for installation of fibre optic and HVDC/HVAC • Learn about the different methods that have been offshore turbines • How multiple connections can cause huge used in offshore wind installation and hear first- • Discover through a comparison of cost, project time delays hand about the ones that worked well transport and environment implications the • The current state of knowledge from vessel • Discover the importance of correct planning and benefits of one over another captains and how cross industry experience can having strong alternatives to compensate for the • Understand the implications of public cause more harm than good tough and ever changing working conditions of the restrictions passed re: noise and how this North Sea impacts hammer size and hence monopole Ralph Steinberg, Manager Offshore Cable Systems, NKT Cables • Utilise exclusive industry case studies to plan work use around the European working hour restrictions Seaway Heavy Lifting Andrew Davies, BDM, Sarens TBC Register today - visit www.windenergyupdate.com/OWCIC or phone +44 (0)20 7375 7575
  • 8. Wind Energy Update are a global business intelligence and conference company, part of the FC Business Intelligence group. It's our people that make us the market leader we are today. We are passionate about the industry, and look to keep building on the strengths we've developed CONFERENCES – Our conferences focus on the four pillars NEWS – Wind Energy Update REPORTS – Wind Energy Update of wind energy success: produce free weekly e-news briefs produce in depth market reports to • Operations Maintenance • Turbine Supply Chain which we send straight to your inbox. give you the detailed analysis that your • Health and Safety • Offshore Wind Installation These e-briefs include all the latest organisation needs to make the right This gives us the unique ability to be able to call on expertise news, analysis, executive insights and business decisions, including unique from around the world when bringing you the very latest in more to ensure you have the latest economic forecasts, the latest regulatory decommissioning best practice and lessons learnt. industry information at your fingertips. updates and technological developments Wind energy update free newsletter sign uP Offshore Wind installation AvAilAb le Free news, analysis and business intelligence todAY! Construction report With th e intellig for the offshore decommissioning community… fRee enCe PAss At A 20% • Industry Insight • News Round UP disCoun How to install and construct farshore, t off • Executive Analysis • Interviews with Leading Experts deepwater wind farms on time and cost the RRP ! efficiently All this emailed completely free Real case studies on current offshore wind straight to your inbox twice a construction projects including Ormonde, Bard 1, Thornton Bank and month. Greater Gabbard Sign up free at This ground breaking business intelligence report is now available for order and will be sent direct to you within one working day of placing www.windenergyupdate.com your order! Get unique case studies giving a detailed account on how the most pressing offshore wind construction and installation challenges are being tackled in four of the most daring offshore wind projects. Wind energy update forward schedule of events Five Reasons to Buy 1. Find out how innovative foundations solutions such as 3rd Annual Global Wind Turbine Supply Chain gravity based foundations, jackets and floating turbines are Conference being used in the latest far-shore, deep water projects Hamburg Germany, September 7-8 2011 2. Learn how to cut both cost and time by using the pre-piling method to install jacket foundations www.windenergyupdate.com/supply-chain 3. Discover the successes - and challenges - in using gravity based foundations US Health and Safety Conference 4. Understand how monopile foundations are being pushed to Dallas TX, September 8-9 2011 its structural limits www.windeenergyupdate.com/health-safety-usa 5. Assess the challenges of operating in hostile, farshore, deepwater environments and how you can best deal with them 4rd Annual Wind OM Summit (onshore and offshore) 6. Learn how the industry is coping with the shortage of vessels required for cable installation London UK, November 22-23 2011 Visit www.windenergyupdate.com/offshorereport www.windenergyupdate.com/operations-maintenance to download your free summary now! Scan this smart tag with your phone now to access exclusive Report information Register today - visit www.windenergyupdate.com/OWCIC or phone +44 (0)20 7375 7575
  • 9. save “excellent event, quality presentations and relevant discussions.” Stephen Kerr, Project Manager, SeaEnergy Renewables OffshOre Wind COnstruCtiOn, installatiOn £300 register before and COmmissiOning COnferenCe July 15 4-6 October 2011, London UK This is your unique code ThaT saves you £50* Just enter it online, quote it when booking over the phone or in your email Code: DIGITAL PDF *Note: Code only applies to Intelligence, Business and Basic passes but can be used in conjunction with all early booking offers listed below % E 20 SAV his intelligence Pass Business Pass Basic Pass on t Rt RePo • Access to all presentations and exhibition • Access to all presentations and Workshops All the benefits of the Business pass plus: The Offshore Wind and Construction and • Networking evening drinks reception on day • Networking evening drinks reception Installation Report from Wind Energy Update one on day one (worth £1,395) • Lunch and refreshments • Lunch and refreshments, This report provides vital information on how • Access to presentation slides after the leading developers are cutting installation costs conference and times + Access to online delegate list and meeting • Learn from pioneering offshore wind farm planner developers and their experiences in time, cost + Access to audio recordings from every and logistics session (worth £395) • Examine the pros and cons of existing methods of construction being used on offshore wind farms including cabling and vessels • Learn about upcoming offshore technologies which will revolutionise the offshore wind industry • Get full information on the report from www.windenergyupdate.com/offshorereport Super Early Bird (expires 15 Jul 2011) £2025 Super Early Bird (expires 15 Jul 2011) £895 £795 Super Early Bird (expires 15 Jul 2011) Early Bird (expires 12 Aug 2011) £2125 Early Bird (expires 12 Aug 2011) £995 Early Bird (expires 12 Aug 2011) £895 Last Chance (expires 9 Sept 2011) £2225 Last Chance (expires 9 Sept 2011) £1095 Last Chance (expires 9 Sept 2011) £995 Full price £2325 Full price £1195 Full price £1095 Post Conference materials Group Discounts, Play it Smart - Bring Your Team With multiple conference tracts, workshops, an enlarged exhibition space • Access to presentation slides after the conference and increased networking time – you need more people on site to benefit from all the conference has to offer. • Access to audio recordings from every conference session £395 Take advantage of our group booking discount. Contact us on info@windenergyupdate.com to find out how much you could save. Enter Attendee details Mr/Mrs/Ms/Dr: First name: Last name: Company: Position/Title: Telephone: Fax: Email: Address: Postcode: Country: Payment Options I enclose a cheque/draft for: Credit card number: (Payable to First Conferences Ltd) Expiry date: Security number: Please invoice my company: Name on card: Purchase Order Number: Signature: Please charge my credit card: Amex Visa Mastercard MORE FAX THIS FORM BACK TO WAYS TO CALL CALL +44 (0) 20 7375 7247 EMAIL: info@windenergyupdate.com +44 (0) 207 375 7576 REGISTER ONLINE: www.windenergyupdate.com/OWCIC Terms Conditions: If you have to cancel - It is possible to transfer your place to a colleague/client if you are unable to obliged to charge the full fee. The organizers (Wind Energy Update) reserve the right to make changes to the program attend, but you must inform Wind Energy Update of this in writing of this change prior to the event. You will incur 25% without notice. We will send you an e-mail to confirm that we have received your registration. cancellation fee on or before 4th September 2011. For all cancellations received after 4th September 2011 we will be
  • 10. Researched Organized by: The largest and most in-depth meeting point for Exceptional opportunity to connect with market the offshore wind installation industry globally… back for its 3rd blockbusting year “ participants working to make offshore wind a viable industry in the UK Gregg Egen, Managing Director, ...attracting over 450 delegates in 2011! ” Espirito Santo Investment Bank 3rd Annual OffshOre Wind COnstruCtiOn, installatiOn and COmmissiOning COnferenCe 4-6 October 2011, London UK save £300 register before Overcome farshore contract and July 15 construction challenges to successfully start early revenue generation from your wind farm • WHAT WORK IS COMING UP? Where is the potential for the greatest long term contracts? Which sites are suited to offshore wind installation RD? Find out from the ExpErt spEakErs from experts themselves! • CASE STUDIES ON THE “WORLD’S LARGEST” OFFSHORE WIND FARMS London Array, Greater Gabbard, Ormonde and Thanet • OVERVIEW ON THE CABLE CHALLENGES ARISING IN OFFSHORE WIND FARMS Cover all ranging challenges between laying telephonic communications, fibre optic and HVDC/ HVAC cables • FOUNDATION OPTIONS, DESIGNS AND INSTALLATION TECHNIQUES In depth discussion from the established players alongside the new comers on structural integrity issues – can grout alone be the long term solution • STATE OF THE ART OFFSHORE TURBINE TECHNOLOGY Get the inside track on what’s available for use in the Round 3 boom • TRANSPORT AND LOGISTICS OF THE MAJOR COMPONENTS From the factory to point of installation here’s what you need to consider • RISK ASSESSMENT AND FINANCIAL OPTIONS FOR THE OFFSHORE WIND INDUSTRY Risk and finance go hand in hand in offshore wind projects; Hear how 65 different projects have been brought through the consent phase • CONTRACTING METHODS AND STRUCTURE client and project bundling options laid bare All New Features for 2011 Expert Led Offshore Wind Larger Exhibitors Area Increased Opportunities Workshop Networking Time Contact Structuring Workshop Keynote Presentation Day Operators Group Meeting Twice As Many Technology Presentations LEAD EXHIBITORS Join 450 Offshore Wind Industry Colleagues For Three Business Critical Days of Analysis, Information Sharing and Business Development at the Largest Industry Gathering Worldwide www.windenergyupdate.com/OWCIC