1. YEO TEEN INN
A Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY
Background which provide the ABILITY to MANAGE and IMPROVE the Supplier
within SHORT Time to PUSH AHEAD the COST Improvement Activities
WORK EXPERIENCE
Sourcing
Purchasing
Part Quality
Assurance
Production
Operation
Sub-Con
Management
Equipment
Maintenance
1991 1993
MAGNETIC Head
ASSEMBLY
Production
(SINGAPORE)
8mm CAMCORDER
MAGNETIC Head
ASSEMBLY
Production
(SINGAPORE)
MAGNETIC Head
ASSEMBLY
Production
(THAILAND)
1996
MAGNETIC Head
ASSEMBLY
Production
(SINGAPORE)
MAGNETIC Head
ASSEMBLY
Production
(THAILAND)
OPERATION
EXPENSE
Control and
COST DOWN
1999
MAGNETIC Head
ASSEMBLY
(BATAM)
OPERATION
CONTROL
2001
VHS CAMCORDER
2003
MAGNETIC Head
ASSEMBLY
(BATAM)
OPERATION
CONTROL
DVC CAMCORDER
MAGNETIC Head
ASSEMBLY
(BATAM)
OPERATION
CONTROL
MAGNETIC Tip
PROCESSING
Production
(SINGAPORE)
2005
Blu-Ray PLAYER
MAGNETIC Tip
PROCESSING
Production
(SINGAPORE)
Blu-Ray PRISM
PROCESSING
Production
(SINGAPORE)
2008
ASST Engineer
Senior
ASST Engineer
Engineer Senior Engineer ASST Manager
Production
Manager
8mm PLAYER
2. Sourcing
Purchasing
Part Quality
Assurance
Production
Operation
Sub-Con
Management
Equipment
Maintenance
PLP ASEAN Supplier SOURCING
MATERIAL VA and Process CD
(PROCUREMENT)
NEW Model Part
FA Certification
(PROCUREMENT)
YEO TEEN INN
A Multi-Discipline PPROCUREMENT Manager with PRODUCTION and QUALITY
Background which provide the ABILITY to MANAGE and IMPROVE the Supplier
within SHORT Time to PUSH AHEAD the COST Improvement Activities
WORK EXPERIENCE
2003 2005 2008 2011 2012 2013 2015
MAGNETIC Head
ASSEMBLY
(BATAM)
OPERATION
CONTROL
MAGNETIC Tip
PROCESSING
Production
(SINGAPORE)
MAGNETIC Tip
PROCESSING
Production
(SINGAPORE)
Blu-Ray PRISM
PROCESSING
Production
(SINGAPORE)
DVC CAMCORDER
Blu-Ray PLAYER
CISCO SERVER
Power Supply Unit
NEW Model Part
SOURCING
(PROCUREMENT)
Product
EOL
Supplier QUALITY
IMPROVEMENT
(PROCUREMENT)
PART QUALITY CONTROL
REVAMP IQC
(PROCUREMENT)
SONY BRAVIA TV
Power Supply Board
2009
PART Purchasing
SETUP NAIJI System
(PROCUREMENT)
PART Purchasing
SETUP ORACLE MRP
(PROCUREMENT)
2010
Business
TERMINATE
3. ACHIEVEMENT ▲MAGNETIC HEAD REVIVAL UP MARKET SHARE
8mm VIDEO HEAD
Production TRANSFER
from JAPAN to Sub-
Contractor in
Indonesia-BATAM
Market SHARE UP SALES “ONE Coin” PROJECT SELL-Price
DVC VIDEO HEAD
Production TRANSFER
from JAPAN to Sub-
Contractor in
Indonesia-BATAM
4. ACHIEVEMENT ▲TURN-AROUND TIP OPERATION BREAKEVEN P/L
Use CE Diagram to determine IMPACT Material Cost REDUCTION – YIELD-UP REDUCE Labour Cost – LINE Balancing✚
5. ACHIEVEMENT ▲BLU-RAY PRISM SMOOTH SETUP EXPAND CAPACITY
[ UTILIZE Tip-Processing Experience to SPEED-UP Performance ]
➀Capacity UP 30% within 3 Months ➁Cost Down Target to improve P/L Production INNOVATION Activities✚
6. ACHIEVEMENT ▲RE-VITALIZE PROCUREMENT – VALUE ADDED
SOURCE ASEAN Supplier
[Show ASEAN Price BETTER CHINA]
VA/CD Activities by Supplier
COLLOBRATION
FIRST Article Certification
FUNCTION Transfer
“NAIJI” for DEMAND UP
with MIN INVENTORY
ⒶⒶⒶⒶ PURCHASING ⒷⒷⒷⒷ SOURCING ⒸⒸⒸⒸ PART QA
7. ACHIEVEMENT ▲SMOOTH TERMINATION of BUSINESS CONTINUITY
➀Hand-Over SOURCING
Function to HQ
➁SETUP NEW Purchasing
ROUTE for SONY IPO
➂SETUP MRP Software for
BATAM Production
Making MASTER Plan with
ALL Related Party
8. SKILL
Production Procurement
“COST DOWN”
Project
Engineering
/ Quality
Implement
/ ENFORCE
5S
ShopFloor
Management
Implement /
ENFORCE TPM
Environment
Committee
Safety
Committee
Implement /
ENFORCE ISO
Usage of SPC
Tool
LEAN
Production
4M Change
Management
Improvement
PDCA Cycle
6-SIGMA
Implement
Use 5-Why
Approach
Determine
OQC Sampling
SETUP /
RUN MRP
Supplier
AUDIT
INTERPRETE
Drawing
SUMMARIZE
Data CRUNCH