By
ZAINI ABDUL WAHAB
ENERGY AUDIT :
APPROACH & METHODOLOGY (PART 2)
1
ENERGY EFFICIENCY INFORMATION
SHARING SERIES
Outline & Content
PART 1
• Introduction to energy audit
PART 2
• Energy Audit Approach
• Steps In Energy Audit Process
PART 3
• Energy Audit Report & Presentation
2
PART 2:
Energy Audit Approach
Steps In Energy Audit Process
3
4
ENERGY AUDIT APPROACH
5
Preparation
 Finalize and agree on the terms of reference for energy
audit team
 Objectives
 Expectations from the management
 Confidentiality
 Frequency of progress reporting and meeting
 Line of communication
 Introduction of energy audit team (consultant & in-house)
 Special briefing for external auditors on production, safety,
health and environment requirements
 Briefing on energy audit activities and timeframe
6
INTERNAL
Energy manager
Engineers
Technical personnel
•Process Technicians
•Electrical Technicians
• Boilerman
EXTERNAL (Consultant)
Chief auditor
•Auditors (electrical, mechanical
& etc)
•Technicians
Processes
Operation
Maintenance
Accessibility
Data required
Measurement
Data analysis
Energy saving measures
Calculations and
verifications method
Financial analysis
ENERGY MANAGER/
CHIEF AUDITOR
Overall
Coordination
Energy
Auditing
FACTORY/BUILDING MANAGEMENT
•Commitment and Supports
Personnel
Input
Energy Audit Organization
7
Steps In Energy Audit Process
Prepare Energy Audit Report
Define and confirm audit scope
Analyze Feasibility And Viability
Prioritize Proposed Measures
Understand Processes And Requirements
Obtain Data On Energy Input & Output
Identify Existing Energy Performance
Measurements and data analysis
Identify Additional Data
Analyse Energy Balance And Energy
Performance Data
Identify Energy Saving Measures
Prepare A List of Energy Saving Measures
Calculate Energy Saving Potentials
Financial Analysis
PLANNING AND DATA COLLECTION ANALYSIS AND REPORT PREPARATION
PRESENT FINDINGS TO CONVINCE
THE TOP MANAGEMENT
FOR IMPLEMENTATION
8
9
Define Audit Scope
 Type of audit
 Boundary
 Tasks involved
 Timeframe
 Expected output
10
Understand Processes And Requirements
• Processes and the requirements to maintain production
output/services
• Discuss with the site's senior management the aims of the
energy audit and economic guidelines associated with the
recommendations of the audit
• Analyze the major energy consumption data with the relevant
personnel
• Obtain site drawings where available - building layout, steam
distribution, compressed air distribution, electricity distribution
etc
• Site investigation accompanied by
facilities/engineering/production personnel
11
Obtain Data On Energy Input & Output
Energy contracts and bills analysis
Understand the energy bills
Verify suitability of existing purchased energy (tariff, fuel prices)
Verify accuracy of the bills received
Options available for energy supply
DESKTOP ANALYSIS (DOCUMENTATION)
Electrical demand profile in kW for daily/weekly/monthly)
Plant/Process line/Equipment/Machine
Obtain actual quantity of energy using equipment in operation,
on stand-by and unused)
Prepare inventory list for:
-each space and its purposes
-energy related controls and operating hours
-each equipment and its functions and location
MEASUREMENT & SITE DATA COLLECTION
12
Tips For Data Collection
 Easy to use and provide the information to the accuracy that is needed, not the
accuracy that is technically possible
 Measurement equipment can be inexpensive (flow rates using a bucket and
stopwatch)
 The quality of the data must be such that the correct conclusions are drawn (what
grade of product is on, is the production normal etc)
 Define how frequent data collection should be to account for process variations
 Measurement exercises over abnormal workload periods (such as startup and
shutdowns)
 Design values can be taken where measurements are difficult (cooling water
through heat exchanger)
DO NOT ESTIMATE WHEN YOU CAN CALCULATE
DO NOT CALCULATE WHEN YOU CAN MEASURE
13
Identify Existing Energy Performance
Loads profile data
Control systems available
Functions and purposes
The recent measured performance data/reports
Process flow, technology related, etc
Energy consumption figures of equipment/process/unit
Production and operating schedules
Best energy efficiency practices and latest technologies, etc
As-built technical data and information
Layout drawing of the plant
Energy using equipment information
•Name, type, location
•Manufacturer, year produced and technical
conditions
•Production/Output capacity
•Rated power and efficiency
•Energy medium (fuel) and consumption
•Operational mode conditions/performance
•(full load/partial load)
•Operational times
1. Desktop Analysis
14
Identify Existing Energy Performance
2. Measurements and data analysis
 Measurement of process parameters and energy
related parameters for all energy sources/utilities
using portable instruments/plant instrumentation
 Conducting tests and trials on equipment/utilities to
assess the performance wherever applicable
 Energy and performance related data
 Data on existing meters and sub-meters
 Temperature, humidity, pressure, flow rate, speed,
efficiency level and etc.
Measurement: Power Factor Profile & Analysis
No. Landlord MSB
Average Power Factor
PF Req.
( >85% )On-Peak
(0800-2200)
Office Hour
(0800-1800)
1 MSB/L1 (Tx2) 83.0% 82.8% < 85%
2 MSB/L1 (Tx3) 76.0% 78.1% < 85%
3 MSB/L16 (Tx6) 98.0% 97.5% > 85%
4 MSB/L16 (Tx7) 79.5% 89.4% > 85%
5 *MSB/AC (Tx4) 95.0% 95.0% > 85% 15
Measurement : Electrical System Analysis & Load Profile
Parameters Lowest Highest Average
Current Range (A) 46.75 305.16 168.16
Voltage (V) 411.19 426.37 418.96
Load (kW) 25.44 185.43 100.84
Load profile for MSB L1 TX2 from 12/10/12 to 18/10/12
16
Measurement : Building Monthly Load Profile (kW) from sub-metering
17
Baseline : Building monthly load profile(kW) for AHU from sub-metering
18
Measurement & Analysis: Chiller Plant Efficiency
• Actual efficiency at about 0.98kW/RT for both chillers
• Efficient chiller should be less than 0.65kW/RT
Chilller Specs. Actual
Chiller Plant 1 Capacity(RT) 800 600
Input Power (kW) 437 475
Delta T (F) 10 8
Plant Efficiency(kW/RT) 0.65 0.97
C.O.P 6.0 4.45
Chiller plant 2 Capacity(RT) 300 205
Input Power (kW) 171 162
Delta T (F) 10 7
Plant Efficiency(kW/RT) 0.65 0.98
C.O.P 6.0 4.44
19
Measurement & Analysis: Lighting System Performance
No. Location Standard MS1525:2007 Actual (Average)
1 Main lobby 100 178
2 Cafe 200 166
3 Corridor 100 65
4 Lift lobby 100 111
5 Toilet 100 212
6 Car-park 50 130
7 Staircase 100 20
No. Location Power Density (W/m2)
Max. Power Density
(W/m2) (Standard
MS1525:2007)
1 Main lobby 6.53 20
2 Cafe 7.84 15
3 Corridor 4.03 10
4 Lift lobby 3.67-5.03 20
6 Car-park 1.03-1.41 5
Lux level
Power
density
20
21
Identify Existing Energy Performance
3.Observation of present
operating practices &
process parameters
 Review of operation and
maintenance practices
 Interaction and discussions
with heads of department,
engineers, supervisors,
operators
22
Identify Additional Data
Required And Measurements Needed
• Use of measured data in
monitoring and verification.
Don’t measure something that
we won’t use- wasting time and
resources!
• Obtain measuring equipment
23
THERMAL
MEASUREMENT
• Thermometer
• Thermocouple
• & Indicator
• Thermograph
• Data-logger
• Hygrometer
MECHANICAL
MEASUREMENTS
Flow
• Vane Anemometer
• Ultra Sonic Flow Meter
• Flow/Velocity
• Temperature
• Relative Humidity
Pressure
• Pressure Recorder
• Leaks
• Ultra Sonic Leak Checker
Speed
• Contact Tachometer
Multifunction kit
• Flow/Velocity
• Pressure
• Temperature
• Relative Humidity
• Sound
• dB Meter
• Time
Stop watch
Measuring tape
CHEMICAL
MEASUREMENT
Flue Gas Analysis
Flue Gas Analyzer
• (CO2 & O2,
• CO
• Temp
• Efficiency
ELECTRICAL
MEASUREMENT
3-Phase/
1-Phase Power Analyzer
Voltage,
Current
kVA, kW, kVAr
Power factor
Harmonics
Lighting
Lux meter
Energy Audit Equipment
24
Ultra-sonic Flow Meter
• Application : Flow
measurement of Liquids
• Parameters : Velocity &
Measured discharge of
liquid flow
• Make : Panametrics, Ireland
• Range : 0.03 to 12.2 m/s
(pipe size 2” to 24”)
25
Non Contact Tachometer -
Stroboscope
• Application : Speed
Measurements
• Parameters measured :
Speed of Rotating
Element
• Make : Testo, Germany
• Range : 20 to 20000 rpm
26
Digital temperature & humidity
data logger
• Parameters measured :
Dry bulb temperature &
humidity
• Make : Gemini, USA
• Range : -15 to 150oC and
0-99 % RH
27
Non Contact Type Infrared
Temperature Indicator
• Application :
Measurement of Surface
Temperatures
• Parameters measured :
Surface Temperatures
• Make : Raytek, USA
• Range : -18 to 870oC
28
Digital Temperature & Hygrometer
• Application :
Measurement of
Temperatures & humidity
• Parameters measured :
Dry bulb temperature &
humidity
• Make : Center, Taiwan
• Range : -20 to 60oC, 0 to
100% RH
29
Flue Gas Analyzer
• Application : Measurement
of Flue Gas Parameters
• Parameters measured : O2,
CO, NO, NO2, SO2,
Humidity
• Make : TESTO, Germany
• Range : 02-0 to 21%, CO-0
to 20000 ppm,
• NO- 0 to 3000, No2-0 to 500
ppm,
• Humidity- 0 to 100%
30
3-Phase Power Analyzer
• Application: Measures all
Electrical and Harmonic
Parameters
• Parameters measured : V,
A, PF, KW, kVA, kVAr, Hz,
first 50
• Harmonics
• Make : RCC Technologies,
Canada
• Range : 600V, 1000A
31
Digital Lux Meter
• Application :
Measurement of Light
Levels
• Parameters measured :
Light level in lux and/or
foot-candles
• Make : Physics
• Range : 0 to 50000 lux
32
Prepare Energy Balance Data
And Information
• Energy supply and consumption data
• Apportioning of energy consumption by:
Type of energy – fuel, electricity
Equipment/system – production machinery, motor,
air conditioning, lighting and etc.
Applications – production facilities, offices, tenants
Load Distribution: Building
End-use Breakdown(%) Cost(RM)
Chiller 139821.00 35.08 51453.56
AHU 67740.47 16.99 24928.22
CoolingTower 10441.54 2.62 3842.44
CDWP 10321.21 2.59 3798.16
CHWP 15671.31 3.93 5766.98
Lighting 39068.12 9.80 14376.91
Others 115552.15 28.99 42522.72
Total 398615.80 100.00 146689.00
Energy
Consumption
(kWh)
Air conditioning system consumed the biggest
energy (61%)%) 33
34
Loads Distribution-Factory
35
Analyse Energy Balance And Energy
Performance Data
• Energy and material balance & energy
loss/waste analysis
• Identify areas where energy is being or
possibly wasted
Energy Input Desired Product/
Service Level
PROCESS
(Equipment/
Operation)
Energy loss (???)
Energy loss (???)
Output
36
Identify Energy Saving Measures
Conceptual ideas, develop
and refine measures
Review existing/previous ideas
– brainstorming and value analysis
Communication with
manufacturers/technology
experts for more efficient
technologies solutions
• Identification of energy saving measures to
eliminate/minimize energy wastage to improve
energy performance
Guidelines On Common Energy
Audit Checklists
37
General management items
1. Energy management
system
• Organization
• Energy conservation target and investment target
• Medium-and-long term plans
2. Measuring and recording
implementation status
• Installation and operating status of measuring
instruments
• Implementation status of measurement control
system
3. Maintenance of
equipment
• Periodic inspection and daily inspection
• Repairing of leakage (water, air and steam)
• Equipment cleaning (filters and strainers)
4. Management of energy
consumption volume
• Recording status of daily report
• Daily consumption volume and daily load curve
• Monthly consumption volume and graph for
comparison to previous year
5. Energy unit consumption
management
• Unit consumption management
6. PDCA management cycle • PDCA management status
38
Building Facilities
39
Energy Facilities of Buildings
Air conditioners
•Heat sources and
transportation of heat
•Air conditioners and
ventilating facilities
•Water supplies and water discharging facilities
•Freezers, refrigeration and kitchen facilities
•Power receiving and transforming facilities, lighting
and electrical facilities
•Elevators and building facilities
40
Air conditioning and ventilating facilities
• Air conditioning
operational
management
• Appropriate temperature and humidity settings
• Inhomogeneous temperature distributions
• Warming up operations
• Review of operations
• Termination of air conditioning for unused rooms
• Exclusion of outdoor air intrusion
• Management of air
conditioning
efficiency
• Restriction of air conditioning sections
• Utilization of outdoor air (outdoor air cooling) and night purge
ventilation
• Prevention of mixing losses
• Water spraying on rooftops and outdoor units
• Implementation of
energy
conservation
equipment
• Variable Air Volume and Variable Water Volume
• Outdoor air introduction control systems (carbon dioxide controls)
• Outdoor air cooling systems
• Installation of total heat exchangers
• Localized cooling and exhausting
• Ventilation facility
management
• Appropriate ventilating frequency
• Management of temperature (electric rooms and machine rooms)
• Termination of ventilation for unused rooms
• Ventilation controls of parking area (carbon dioxide concentration
controls)
• Speed controls of blower and ventilator (VAV and VWV)
41
Supply and discharge water, chiller,
refrigeration and kitchen facilities
• Water supply
and discharge
facilities
management
• Utilization of miscellaneous water (rain water and
well water, etc.)
• Water conservation measures (water saving top,
automatic washers, onomatopoeic device for
restrooms, water saving showers)
• Supply water flow rates and pressures.
• Reusing of discharged water
• Management
of chilling,
refrigerating
and kitchen
facilities
• Heat insulation and defrosting management
• Opening and closing management of doors
• Management of showcase
• Increasing efficiency
42
Power receiving and transforming, lighting
and electrical facilities
• Operational
management of
power receiving and
transforming
facilities
• Demand factors
• Power factor management
• Management of demand
• Transformer capacities
• Shut off for unnecessary transformers
• Implementation of
energy conservation
equipment
• Demand monitoring and control
• Low-loss transformers
• Operational
management of
lighting facilities
• Management of appropriate light intensities
• Extinguishing of light when not needed (use of
daylight)
• Light apparatus cleaning and apparatus replacement
• Installation location of lighting and division of
circuits
• Dimming and/or extinguishing with dimming control
system
• Localized lighting
43
Power receiving and transforming, lighting
and electrical facilities
4. Implementation
of energy
conservation
lighting facilities
• Adoption of highly efficient lamps
• Adoption of highly efficient apparatuses
• Inverter stabilizers
• Implementation of Task Ambient method
• Lighting switching control
• Natural lighting systems
5. Management of
OA equipment
• Reduction of standby electric power
• Shut off power when not required
• Electric power conserving-type
implementations
6. Vending machine
management
• Implementation of energy conserving-type
equipment
• Time controls
44
Manufacturing Facilities
45
Air Conditioning And Chilling Facilities
•Operational management
• Appropriate temperature & humidity settings
• Reduce air intake from outdoor
• Management of heat producing equipment
• Chilled water outlet temperature settings
• Scheduled operation
• Outdoor air shutout and ventilation status
•Energy conservation strategies
• Enhance thermal building insulation
• Waste heat recovery and utilization
• Speed controls for pumps and blowers
• Localizing cooling and exhausting
•Operational management of
cooling facilities
• Operating power of chillers
• Outlet & inlet pressure of refrigerant
• Inlet & outlet temperature control and pressure control of
chilled water
•Operational management of
auxiliary equipment
• Operating power of cooling towers
• Water quality management
• Pump operating power(water quantity and pump head)
•Cold temperature retention and
chilling facilities
• Management of incoming & outgoing through doors(door
opening & closing period)
• Management of temperature to increase efficiency
46
Pumps, Fans & Air Compressors
•Operational management
of pumps and fans
• Open/close status of valves
• Improvement of routing(piping &ducting)
• Consumption flow rate & operating
pressure
• Check the actual against design
performance
• Speed and unit controls
•Operational management
of air compressors
• Review types of air
compressors(screw/reciprocating)
• Matching of capacity & types
47
Boilers And Industrial Furnaces
•Combustion management
• Air ratios and exhaust gas management
• Burners, fuels and air flow systems
• Combustion control equipment
• Regenerative type combustion system
•Operational and efficiency
management
• Load factors, startup and stop status
• Quantity control
• Heat efficiency, heat balance and heat
distribution
• Water quality management and blow
management
•Thermal insulation, heat
retention and heat radiation
prevention
• Temperature on outer surface of furnace walls
and ducts
• Thermal insulation materials (heat storage losses)
• Sealing of opening and furnace pressure
•Exhaust gas temperature
management and waste heat
recovery
• Exhaust gas temperature
• Heat recovery (air preheating)
• Exhaust gas circulation
48
Steam Systems, Heat Exchangers, Waste
Heat And Waste Water, Etc.
•Operational management • Steam pressure and temperature settings
• Steam flow rates
•Leak and temperature
retention management • Piping systems and tanks, etc.
• Load facilities
•Appropriate piping systems • Routing, differential pressures and piping sizes
• Sorting unnecessary piping
• Integration of multiple steam systems
•Load leveling • Installation of accumulators
• Countermeasures on side of load
•Use of drain recovery • Steam trap management
• Drain recovery locations and recovery systems
• Flash steam utilization
49
Steam Systems, Heat Exchangers, Waste
Heat And Waste Water, Etc.
• Operational
management of
heat exchangers
• Suitability of types
• Suitability of usage and heat transfer media
• Maintenance status (soiling and pressure
losses)
• Temperatures of heat transfer media and
heated objects
• Temperature effectiveness
• Reduction of
waste heat and
waste water
• Recovery of heat from hot water
• Appropriate exhaust air duct
• Recycling of cooling water
• Management for concentrations of
impurities in water
• Excessive gas use • Use of excessive gases
50
Power Receiving And Transforming Electric
Motors, Electric Heating And Lighting Facilities
•Power receiving
facility management
• Management of load factors and power factors
• Management of demand (monitor and control)
• Electric power purchase contract details
• Utilization of electric power during night
•Transformer facility
management
• Transformer capacities, voltage and low-loss transformers
• Demand factor/supply adjustment
• Shut off for unnecessary transformers
•Management of
electric motors and
electric heating
facilities
• Facility capacity, voltage and number of units
• Rotational speed control
• Termination of operation when unloaded
•Lighting facility
management
• Adoption of highly efficiency lamps
• Adoption of automatic extinguishing and localized lighting
• Installation location of lighting and division of circuits
• Management of appropriate illuminance
• Extinguishing during unnecessary hours and use of daylight
51
52
Prepare A List of Energy Saving Measures
• Discuss and list down all energy
saving measures and opportunities
53
Calculate Energy Saving Potentials
• Calculate projected energy saving potentials in
energy unit and convert into RM!
• Use data from measurements/manufacturers’
information/data analysis to estimate potential
saving values
54
Conduct Financial Analysis
 Conduct financial analysis for each measure
 Use method adopted by the company/organization
including life cycle analysis
Item for
Investment
Operating
Cost/year
Saving/year
(in energy or other
unit)
Saving/year
(RM)
Equipment
Instrumentation
Civil works &
others
Purchasing
cost
Maintenance
& repairs
Labour
Energy
Depreciation
Electrical energy
Thermal energy
Others (disposal,
labour and etc.)
Example :Energy Cost Savings for Air Conditioning System at a Building
NO. Item
MOTOR
RUNNING
NORMAL MODE ENERGY SAVING MODE
( Rated
kW )
( Running
kW )
kWh/Year
Rate/Year
(RM)
Amount
(kWh)
Rate/Year
(RM)
SAVING
(%)
SAVING
(RM/Year)
1
CHWP 1
18.5 19.1 165,024 70,960 107,266 46,124 35% 24,836
Old Block Chiller Room
2
CHWP 2
18.5 19.0 164,160 70,589 106,704 45,883 35% 24,706
New Block Chiller Room
3
CDWP 1
15 13.3 114,912 49,412 82,737 35,577 28% 13,835
Old Block Chiller Room
4
CDWP 2
18.5 15.3 132,192 56,843 95,178 40,927 28% 15,916
New Block Chiller Room
Sub-Total 67 576,288 247,804 391,884 168,510 32% 79,294
No Item
Rated
(kW)
Actual
kW
Normal
kWh/Year
Saving Mode
kWh/Year
Saving % Saving kWh
Saving
(RM/Year)
1 Chiller – Old Blk 210 128 1,105,920 995,328 10% 427,991 47,555
2 Chiller– New Blk 210 115 993,600 914,112 8% 393,068 34,180
Sub-Total 420 243 2,099,520 1,909,440 9.1% 821,059 81,734
TOTAL HVAC SAVING 161,028
55
56
Analyze Feasibility And Viability
• The technical feasibility should address the following
issues
 Technology availability, space, skilled manpower, reliability,
service etc
 The impact of energy efficiency measure on safety, quality,
production or process
 The maintenance requirements and spares availability
• Analyze and confirm feasibility and viability of each
measure from technical and financial point of view
57
Prioritize Proposed Measures
 List proposed measures according to its priority for implementation and its
implementation plan
Easy step
 Energy management at operational management level
 No/low cost
 Measuring, operation tuning, resetting, minor repairs
 Can be carried out with ideas or ability of the operators with advice
from energy manager/engineer
 By small group activities at operational level-workers
Middle step
 Technical improvement, medium scale investment, replacement of old
equipment with higher efficiency technologies
 Can be carried out engineers, partly by small group
High step
 Improvement with large scale of investment
 New process line or new plant
 Require detailed financial assessment (payback, ROI, life-cycle analysis)
 As project, task-force level-Top management
58
Energy Saving Measures(ESMs)Summary
Table
Energy
saving
measure
Type of
option (No-
cost/low
cost/high
cost)
Saving/year
(in energy)
Saving/year
(RM) Investment
value (RM)
Payback
period
(Year)
Priority
(High/Low)
59
MEASUREMENTS &
VERIFICATION OF SAVINGS
 Propose parameters and values to be used as a
baseline for each measure
 Propose measurement, data collection method
and calculation to be used to produce baseline
value and result after the implementation.
 Get agreement on the baselines to be used for
verification of results
A TOOL TO CONFIRM THE ACTUAL RESULTS OF EACH
IMPLEMENTED ENERGY SAVING MEASURE
Example: Energy saving calculated by the difference between
a baseline year and a subsequent year from electricity bill(kWh)
60
Example: Savings calculated based on actual measurement
from sub-meters
61
Options For
Energy Baseline & Savings Calculation
Method Advantages Disadvantages
Utility billing history Low cost •Effects of weather ,
occupancy, other changes
may mask savings
•May be unreliable unless
savings are significant
compared to normal bill
variation
Data already available
Independent data
Represent all effects of
ESMs
Account for interactive
effects
System/Equipment
sub-metering
Isolate effects of ESMs
•Higher cost
•Misses interactive effects
Very accurate for
lighting measures
Results are more
predictable(low risk)
62
zainiabdulwahab@yahoo.com
019 2152700
www.goingee.blogspot.com.my
www.facebook/zaini.abdulwahab1 63
THANK YOU!

Contenu connexe

Tendances

Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationLeonardo ENERGY
 
Solar Photovoltaic Power Plant
Solar Photovoltaic Power PlantSolar Photovoltaic Power Plant
Solar Photovoltaic Power PlantPratish Rawat
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industrySameer Kumar Rout
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
Energy management system slide 2
Energy management system slide 2Energy management system slide 2
Energy management system slide 2shaufiq boboy
 
Solar Calculation (44 slide)
 Solar Calculation (44 slide) Solar Calculation (44 slide)
Solar Calculation (44 slide)Rami Hassbini
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfPaul374728
 
efficiency of various power plants
efficiency of various power plantsefficiency of various power plants
efficiency of various power plantsRadhika Chittora
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plantRavinder Jangid
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Gensol Engineering Limited
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPMurugappa Group
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesSlideTeam
 

Tendances (20)

Basics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig GensolBasics of Solar PV O&M - Solarig Gensol
Basics of Solar PV O&M - Solarig Gensol
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
 
Solar Photovoltaic Power Plant
Solar Photovoltaic Power PlantSolar Photovoltaic Power Plant
Solar Photovoltaic Power Plant
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industry
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Energy management system slide 2
Energy management system slide 2Energy management system slide 2
Energy management system slide 2
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Energy Efficiency and Energy Audit
Energy Efficiency and Energy AuditEnergy Efficiency and Energy Audit
Energy Efficiency and Energy Audit
 
Solar Calculation (44 slide)
 Solar Calculation (44 slide) Solar Calculation (44 slide)
Solar Calculation (44 slide)
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Electrical checklist
Electrical checklistElectrical checklist
Electrical checklist
 
Energy audit
Energy auditEnergy audit
Energy audit
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
 
Design Checklist_Electrical
Design Checklist_Electrical Design Checklist_Electrical
Design Checklist_Electrical
 
efficiency of various power plants
efficiency of various power plantsefficiency of various power plants
efficiency of various power plants
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plant
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
SOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOPSOLAR SITE SURVEY ROOFTOP
SOLAR SITE SURVEY ROOFTOP
 
Energy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation SlidesEnergy Management PowerPoint Presentation Slides
Energy Management PowerPoint Presentation Slides
 

En vedette

Training and development Program
Training and development ProgramTraining and development Program
Training and development ProgramZAINI ABDUL WAHAB
 
Laporan dan perancangan program PIBG SMA Nilai 2014 2016
Laporan dan perancangan program PIBG SMA Nilai 2014 2016Laporan dan perancangan program PIBG SMA Nilai 2014 2016
Laporan dan perancangan program PIBG SMA Nilai 2014 2016ZAINI ABDUL WAHAB
 
MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013ZAINI ABDUL WAHAB
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students ZAINI ABDUL WAHAB
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008ZAINI ABDUL WAHAB
 
Introduction to energy audit part 3
Introduction to energy audit part 3Introduction to energy audit part 3
Introduction to energy audit part 3ZAINI ABDUL WAHAB
 
Key Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationKey Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationZAINI ABDUL WAHAB
 
Professional Appearance & Etiquette - Basic guides on body language
Professional Appearance & Etiquette - Basic guides on body languageProfessional Appearance & Etiquette - Basic guides on body language
Professional Appearance & Etiquette - Basic guides on body languageZAINI ABDUL WAHAB
 
Energy Efficiency Implementation in Japan
Energy Efficiency Implementation  in JapanEnergy Efficiency Implementation  in Japan
Energy Efficiency Implementation in JapanZAINI ABDUL WAHAB
 
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspective
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspectiveIIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspective
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspectiveZAINI ABDUL WAHAB
 
UNEP training for climate change mitigation - lighting
UNEP training for climate change mitigation - lightingUNEP training for climate change mitigation - lighting
UNEP training for climate change mitigation - lightingZAINI ABDUL WAHAB
 
Panduan ringkas amalan kecekapan tenaga di rumah
Panduan ringkas amalan kecekapan tenaga di rumahPanduan ringkas amalan kecekapan tenaga di rumah
Panduan ringkas amalan kecekapan tenaga di rumahZAINI ABDUL WAHAB
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardZAINI ABDUL WAHAB
 
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga Ele...
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga  Ele...Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga  Ele...
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga Ele...ZAINI ABDUL WAHAB
 
Workshop on tips for public speaking school students
Workshop on tips for public speaking school studentsWorkshop on tips for public speaking school students
Workshop on tips for public speaking school studentsZAINI ABDUL WAHAB
 
Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...ZAINI ABDUL WAHAB
 
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy Efficiency
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy EfficiencyMAESCO 14th AGFM 2015-Key Updates and Visions in Energy Efficiency
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy EfficiencyZAINI ABDUL WAHAB
 
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIA
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIAPROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIA
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIAZAINI ABDUL WAHAB
 
Tips to public speaking-how to entertain the audience from the stage
Tips to public speaking-how to entertain the audience from the stageTips to public speaking-how to entertain the audience from the stage
Tips to public speaking-how to entertain the audience from the stageZAINI ABDUL WAHAB
 
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
Career Talk for Undergraduates:Energy efficiency industry  and career potenti...Career Talk for Undergraduates:Energy efficiency industry  and career potenti...
Career Talk for Undergraduates:Energy efficiency industry and career potenti...ZAINI ABDUL WAHAB
 

En vedette (20)

Training and development Program
Training and development ProgramTraining and development Program
Training and development Program
 
Laporan dan perancangan program PIBG SMA Nilai 2014 2016
Laporan dan perancangan program PIBG SMA Nilai 2014 2016Laporan dan perancangan program PIBG SMA Nilai 2014 2016
Laporan dan perancangan program PIBG SMA Nilai 2014 2016
 
MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013MIDA networking session on clean technologies-21.2.2013
MIDA networking session on clean technologies-21.2.2013
 
Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students Introduction to energy efficiency industry to Malaysian universities students
Introduction to energy efficiency industry to Malaysian universities students
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008
 
Introduction to energy audit part 3
Introduction to energy audit part 3Introduction to energy audit part 3
Introduction to energy audit part 3
 
Key Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC ImplementationKey Steps and Success Factors in EPC Implementation
Key Steps and Success Factors in EPC Implementation
 
Professional Appearance & Etiquette - Basic guides on body language
Professional Appearance & Etiquette - Basic guides on body languageProfessional Appearance & Etiquette - Basic guides on body language
Professional Appearance & Etiquette - Basic guides on body language
 
Energy Efficiency Implementation in Japan
Energy Efficiency Implementation  in JapanEnergy Efficiency Implementation  in Japan
Energy Efficiency Implementation in Japan
 
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspective
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspectiveIIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspective
IIEC ELECTRICAL CONFERENCE 2013:EE implementation-player's perspective
 
UNEP training for climate change mitigation - lighting
UNEP training for climate change mitigation - lightingUNEP training for climate change mitigation - lighting
UNEP training for climate change mitigation - lighting
 
Panduan ringkas amalan kecekapan tenaga di rumah
Panduan ringkas amalan kecekapan tenaga di rumahPanduan ringkas amalan kecekapan tenaga di rumah
Panduan ringkas amalan kecekapan tenaga di rumah
 
Energy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forwardEnergy Efficiency for Malaysia-the way forward
Energy Efficiency for Malaysia-the way forward
 
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga Ele...
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga  Ele...Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga  Ele...
Pengenalan Kepada Sektor Tenaga, Polisi Dan Perundangan Kecekapan Tenaga Ele...
 
Workshop on tips for public speaking school students
Workshop on tips for public speaking school studentsWorkshop on tips for public speaking school students
Workshop on tips for public speaking school students
 
Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...Energy costs reduction through Energy Performance Contracting projects implem...
Energy costs reduction through Energy Performance Contracting projects implem...
 
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy Efficiency
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy EfficiencyMAESCO 14th AGFM 2015-Key Updates and Visions in Energy Efficiency
MAESCO 14th AGFM 2015-Key Updates and Visions in Energy Efficiency
 
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIA
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIAPROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIA
PROPOSED CONTENTS FOR PUBLIC EE PORTAL FOR MALAYSIA
 
Tips to public speaking-how to entertain the audience from the stage
Tips to public speaking-how to entertain the audience from the stageTips to public speaking-how to entertain the audience from the stage
Tips to public speaking-how to entertain the audience from the stage
 
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
Career Talk for Undergraduates:Energy efficiency industry  and career potenti...Career Talk for Undergraduates:Energy efficiency industry  and career potenti...
Career Talk for Undergraduates:Energy efficiency industry and career potenti...
 

Similaire à Introduction to energy audit part 2

Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)ravindradatar
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industriesravindradatar
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsCETN
 
Energy audit &amp; conservation studies for commercial premises
Energy audit &amp; conservation studies for commercial premisesEnergy audit &amp; conservation studies for commercial premises
Energy audit &amp; conservation studies for commercial premisesravindradatar
 
Small Embedded Data Center Pilot Program Webinar
Small Embedded Data Center Pilot Program WebinarSmall Embedded Data Center Pilot Program Webinar
Small Embedded Data Center Pilot Program WebinarLester Shen
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptxZaidMasoodKhan
 
Energy audit in Industry.pptx
Energy audit in Industry.pptxEnergy audit in Industry.pptx
Energy audit in Industry.pptxAyush51240
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...Rajeswaran Muthu Venkatachalam
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programZondits
 
Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overviewNidec Corporation
 
Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 DoLegend Power
 

Similaire à Introduction to energy audit part 2 (20)

Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy audit & conservation studies for industries
Energy audit & conservation studies for industriesEnergy audit & conservation studies for industries
Energy audit & conservation studies for industries
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Energy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicatorsEnergy auditing and energy efficiency indicators
Energy auditing and energy efficiency indicators
 
Energy audit &amp; conservation studies for commercial premises
Energy audit &amp; conservation studies for commercial premisesEnergy audit &amp; conservation studies for commercial premises
Energy audit &amp; conservation studies for commercial premises
 
Small Embedded Data Center Pilot
Small Embedded Data Center PilotSmall Embedded Data Center Pilot
Small Embedded Data Center Pilot
 
Small Embedded Data Center Pilot Program Webinar
Small Embedded Data Center Pilot Program WebinarSmall Embedded Data Center Pilot Program Webinar
Small Embedded Data Center Pilot Program Webinar
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
05 - IEC 61400-15 Update, Jason Fields (NREL).pptx
 
Submission#19614_Final
Submission#19614_FinalSubmission#19614_Final
Submission#19614_Final
 
Presentation_Energy Audit_2.1
Presentation_Energy Audit_2.1Presentation_Energy Audit_2.1
Presentation_Energy Audit_2.1
 
Energy audit in Industry.pptx
Energy audit in Industry.pptxEnergy audit in Industry.pptx
Energy audit in Industry.pptx
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...
 
Qeraton Intro- Energy Audits
Qeraton Intro- Energy AuditsQeraton Intro- Energy Audits
Qeraton Intro- Energy Audits
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
 
Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overview
 
Reasdfg
ReasdfgReasdfg
Reasdfg
 
Legend Power Overview 97 2003 120410 1256 Do
Legend Power   Overview 97 2003 120410 1256 DoLegend Power   Overview 97 2003 120410 1256 Do
Legend Power Overview 97 2003 120410 1256 Do
 

Plus de ZAINI ABDUL WAHAB

INTRODUCTION TO ENERGY SERVICES
INTRODUCTION TO ENERGY SERVICESINTRODUCTION TO ENERGY SERVICES
INTRODUCTION TO ENERGY SERVICESZAINI ABDUL WAHAB
 
Adopting Energy Management System Standards to Achieve Business and Sustainab...
Adopting Energy Management System Standards to Achieve Business and Sustainab...Adopting Energy Management System Standards to Achieve Business and Sustainab...
Adopting Energy Management System Standards to Achieve Business and Sustainab...ZAINI ABDUL WAHAB
 
OVERVIEW OF ENERGY EFFICIENT LOGISTICS
OVERVIEW OF ENERGY EFFICIENT LOGISTICSOVERVIEW OF ENERGY EFFICIENT LOGISTICS
OVERVIEW OF ENERGY EFFICIENT LOGISTICSZAINI ABDUL WAHAB
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIAZAINI ABDUL WAHAB
 
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKPENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKZAINI ABDUL WAHAB
 
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATION
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATIONROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATION
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATIONZAINI ABDUL WAHAB
 
Introduction to basic communications for secondary school students
Introduction to basic communications for secondary school studentsIntroduction to basic communications for secondary school students
Introduction to basic communications for secondary school studentsZAINI ABDUL WAHAB
 
SPM and challenges in the current and future career markets
SPM and challenges in the current and future career marketsSPM and challenges in the current and future career markets
SPM and challenges in the current and future career marketsZAINI ABDUL WAHAB
 
Basic tips on project marketing for fund raising for undergraduates
Basic tips on project marketing for fund raising for undergraduatesBasic tips on project marketing for fund raising for undergraduates
Basic tips on project marketing for fund raising for undergraduatesZAINI ABDUL WAHAB
 
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...ZAINI ABDUL WAHAB
 
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY ZAINI ABDUL WAHAB
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry ZAINI ABDUL WAHAB
 
Effective report writing and presentation slides for school students
Effective report writing and presentation slides for school students Effective report writing and presentation slides for school students
Effective report writing and presentation slides for school students ZAINI ABDUL WAHAB
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansZAINI ABDUL WAHAB
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaZAINI ABDUL WAHAB
 
Train the trainer program introductory slides
Train the trainer program introductory slidesTrain the trainer program introductory slides
Train the trainer program introductory slidesZAINI ABDUL WAHAB
 
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALS
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALSTIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALS
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALSZAINI ABDUL WAHAB
 
Proposed energy efficiency program at melaka malaysia by MAESCO
Proposed energy efficiency program at melaka malaysia by MAESCOProposed energy efficiency program at melaka malaysia by MAESCO
Proposed energy efficiency program at melaka malaysia by MAESCOZAINI ABDUL WAHAB
 
Energy management awareness program for decision makers
Energy management awareness program for decision makersEnergy management awareness program for decision makers
Energy management awareness program for decision makersZAINI ABDUL WAHAB
 
Workshop on early career planning for secondary school students
Workshop on early career planning  for secondary school studentsWorkshop on early career planning  for secondary school students
Workshop on early career planning for secondary school studentsZAINI ABDUL WAHAB
 

Plus de ZAINI ABDUL WAHAB (20)

INTRODUCTION TO ENERGY SERVICES
INTRODUCTION TO ENERGY SERVICESINTRODUCTION TO ENERGY SERVICES
INTRODUCTION TO ENERGY SERVICES
 
Adopting Energy Management System Standards to Achieve Business and Sustainab...
Adopting Energy Management System Standards to Achieve Business and Sustainab...Adopting Energy Management System Standards to Achieve Business and Sustainab...
Adopting Energy Management System Standards to Achieve Business and Sustainab...
 
OVERVIEW OF ENERGY EFFICIENT LOGISTICS
OVERVIEW OF ENERGY EFFICIENT LOGISTICSOVERVIEW OF ENERGY EFFICIENT LOGISTICS
OVERVIEW OF ENERGY EFFICIENT LOGISTICS
 
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
OVERVIEW OF  NET ENERGY METERING  IN MALAYSIAOVERVIEW OF  NET ENERGY METERING  IN MALAYSIA
OVERVIEW OF NET ENERGY METERING IN MALAYSIA
 
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKPENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
 
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATION
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATIONROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATION
ROLES OF ENERGY MANAGERS IN SUSTAINABLE ENERGY MANAGEMENT IMPLEMENTATION
 
Introduction to basic communications for secondary school students
Introduction to basic communications for secondary school studentsIntroduction to basic communications for secondary school students
Introduction to basic communications for secondary school students
 
SPM and challenges in the current and future career markets
SPM and challenges in the current and future career marketsSPM and challenges in the current and future career markets
SPM and challenges in the current and future career markets
 
Basic tips on project marketing for fund raising for undergraduates
Basic tips on project marketing for fund raising for undergraduatesBasic tips on project marketing for fund raising for undergraduates
Basic tips on project marketing for fund raising for undergraduates
 
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...
EE INDUSTRY-HOW GLOBAL BUSINESS SERVICES VENDORS CAN PLAY A PART TO ENHANCE I...
 
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY
IMPLEMENTATION OF ENERGY MANAGEMENT SYSTEM TO IMPROVE ENERGY EFFICIENCY
 
Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry Investment and business potentials in energy efficiency industry
Investment and business potentials in energy efficiency industry
 
Effective report writing and presentation slides for school students
Effective report writing and presentation slides for school students Effective report writing and presentation slides for school students
Effective report writing and presentation slides for school students
 
Introduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for MalaysiansIntroduction to Energy Efficiency Industry for Malaysians
Introduction to Energy Efficiency Industry for Malaysians
 
Energy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in MalaysiaEnergy efficiency implementation program for state level in Malaysia
Energy efficiency implementation program for state level in Malaysia
 
Train the trainer program introductory slides
Train the trainer program introductory slidesTrain the trainer program introductory slides
Train the trainer program introductory slides
 
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALS
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALSTIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALS
TIPS FOR ON STAGE PRESENTATION FOR EXECUTIVES AND PROFESSIONALS
 
Proposed energy efficiency program at melaka malaysia by MAESCO
Proposed energy efficiency program at melaka malaysia by MAESCOProposed energy efficiency program at melaka malaysia by MAESCO
Proposed energy efficiency program at melaka malaysia by MAESCO
 
Energy management awareness program for decision makers
Energy management awareness program for decision makersEnergy management awareness program for decision makers
Energy management awareness program for decision makers
 
Workshop on early career planning for secondary school students
Workshop on early career planning  for secondary school studentsWorkshop on early career planning  for secondary school students
Workshop on early career planning for secondary school students
 

Dernier

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 

Dernier (20)

Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 

Introduction to energy audit part 2

  • 1. By ZAINI ABDUL WAHAB ENERGY AUDIT : APPROACH & METHODOLOGY (PART 2) 1 ENERGY EFFICIENCY INFORMATION SHARING SERIES
  • 2. Outline & Content PART 1 • Introduction to energy audit PART 2 • Energy Audit Approach • Steps In Energy Audit Process PART 3 • Energy Audit Report & Presentation 2
  • 3. PART 2: Energy Audit Approach Steps In Energy Audit Process 3
  • 5. 5 Preparation  Finalize and agree on the terms of reference for energy audit team  Objectives  Expectations from the management  Confidentiality  Frequency of progress reporting and meeting  Line of communication  Introduction of energy audit team (consultant & in-house)  Special briefing for external auditors on production, safety, health and environment requirements  Briefing on energy audit activities and timeframe
  • 6. 6 INTERNAL Energy manager Engineers Technical personnel •Process Technicians •Electrical Technicians • Boilerman EXTERNAL (Consultant) Chief auditor •Auditors (electrical, mechanical & etc) •Technicians Processes Operation Maintenance Accessibility Data required Measurement Data analysis Energy saving measures Calculations and verifications method Financial analysis ENERGY MANAGER/ CHIEF AUDITOR Overall Coordination Energy Auditing FACTORY/BUILDING MANAGEMENT •Commitment and Supports Personnel Input Energy Audit Organization
  • 7. 7 Steps In Energy Audit Process
  • 8. Prepare Energy Audit Report Define and confirm audit scope Analyze Feasibility And Viability Prioritize Proposed Measures Understand Processes And Requirements Obtain Data On Energy Input & Output Identify Existing Energy Performance Measurements and data analysis Identify Additional Data Analyse Energy Balance And Energy Performance Data Identify Energy Saving Measures Prepare A List of Energy Saving Measures Calculate Energy Saving Potentials Financial Analysis PLANNING AND DATA COLLECTION ANALYSIS AND REPORT PREPARATION PRESENT FINDINGS TO CONVINCE THE TOP MANAGEMENT FOR IMPLEMENTATION 8
  • 9. 9 Define Audit Scope  Type of audit  Boundary  Tasks involved  Timeframe  Expected output
  • 10. 10 Understand Processes And Requirements • Processes and the requirements to maintain production output/services • Discuss with the site's senior management the aims of the energy audit and economic guidelines associated with the recommendations of the audit • Analyze the major energy consumption data with the relevant personnel • Obtain site drawings where available - building layout, steam distribution, compressed air distribution, electricity distribution etc • Site investigation accompanied by facilities/engineering/production personnel
  • 11. 11 Obtain Data On Energy Input & Output Energy contracts and bills analysis Understand the energy bills Verify suitability of existing purchased energy (tariff, fuel prices) Verify accuracy of the bills received Options available for energy supply DESKTOP ANALYSIS (DOCUMENTATION) Electrical demand profile in kW for daily/weekly/monthly) Plant/Process line/Equipment/Machine Obtain actual quantity of energy using equipment in operation, on stand-by and unused) Prepare inventory list for: -each space and its purposes -energy related controls and operating hours -each equipment and its functions and location MEASUREMENT & SITE DATA COLLECTION
  • 12. 12 Tips For Data Collection  Easy to use and provide the information to the accuracy that is needed, not the accuracy that is technically possible  Measurement equipment can be inexpensive (flow rates using a bucket and stopwatch)  The quality of the data must be such that the correct conclusions are drawn (what grade of product is on, is the production normal etc)  Define how frequent data collection should be to account for process variations  Measurement exercises over abnormal workload periods (such as startup and shutdowns)  Design values can be taken where measurements are difficult (cooling water through heat exchanger) DO NOT ESTIMATE WHEN YOU CAN CALCULATE DO NOT CALCULATE WHEN YOU CAN MEASURE
  • 13. 13 Identify Existing Energy Performance Loads profile data Control systems available Functions and purposes The recent measured performance data/reports Process flow, technology related, etc Energy consumption figures of equipment/process/unit Production and operating schedules Best energy efficiency practices and latest technologies, etc As-built technical data and information Layout drawing of the plant Energy using equipment information •Name, type, location •Manufacturer, year produced and technical conditions •Production/Output capacity •Rated power and efficiency •Energy medium (fuel) and consumption •Operational mode conditions/performance •(full load/partial load) •Operational times 1. Desktop Analysis
  • 14. 14 Identify Existing Energy Performance 2. Measurements and data analysis  Measurement of process parameters and energy related parameters for all energy sources/utilities using portable instruments/plant instrumentation  Conducting tests and trials on equipment/utilities to assess the performance wherever applicable  Energy and performance related data  Data on existing meters and sub-meters  Temperature, humidity, pressure, flow rate, speed, efficiency level and etc.
  • 15. Measurement: Power Factor Profile & Analysis No. Landlord MSB Average Power Factor PF Req. ( >85% )On-Peak (0800-2200) Office Hour (0800-1800) 1 MSB/L1 (Tx2) 83.0% 82.8% < 85% 2 MSB/L1 (Tx3) 76.0% 78.1% < 85% 3 MSB/L16 (Tx6) 98.0% 97.5% > 85% 4 MSB/L16 (Tx7) 79.5% 89.4% > 85% 5 *MSB/AC (Tx4) 95.0% 95.0% > 85% 15
  • 16. Measurement : Electrical System Analysis & Load Profile Parameters Lowest Highest Average Current Range (A) 46.75 305.16 168.16 Voltage (V) 411.19 426.37 418.96 Load (kW) 25.44 185.43 100.84 Load profile for MSB L1 TX2 from 12/10/12 to 18/10/12 16
  • 17. Measurement : Building Monthly Load Profile (kW) from sub-metering 17
  • 18. Baseline : Building monthly load profile(kW) for AHU from sub-metering 18
  • 19. Measurement & Analysis: Chiller Plant Efficiency • Actual efficiency at about 0.98kW/RT for both chillers • Efficient chiller should be less than 0.65kW/RT Chilller Specs. Actual Chiller Plant 1 Capacity(RT) 800 600 Input Power (kW) 437 475 Delta T (F) 10 8 Plant Efficiency(kW/RT) 0.65 0.97 C.O.P 6.0 4.45 Chiller plant 2 Capacity(RT) 300 205 Input Power (kW) 171 162 Delta T (F) 10 7 Plant Efficiency(kW/RT) 0.65 0.98 C.O.P 6.0 4.44 19
  • 20. Measurement & Analysis: Lighting System Performance No. Location Standard MS1525:2007 Actual (Average) 1 Main lobby 100 178 2 Cafe 200 166 3 Corridor 100 65 4 Lift lobby 100 111 5 Toilet 100 212 6 Car-park 50 130 7 Staircase 100 20 No. Location Power Density (W/m2) Max. Power Density (W/m2) (Standard MS1525:2007) 1 Main lobby 6.53 20 2 Cafe 7.84 15 3 Corridor 4.03 10 4 Lift lobby 3.67-5.03 20 6 Car-park 1.03-1.41 5 Lux level Power density 20
  • 21. 21 Identify Existing Energy Performance 3.Observation of present operating practices & process parameters  Review of operation and maintenance practices  Interaction and discussions with heads of department, engineers, supervisors, operators
  • 22. 22 Identify Additional Data Required And Measurements Needed • Use of measured data in monitoring and verification. Don’t measure something that we won’t use- wasting time and resources! • Obtain measuring equipment
  • 23. 23 THERMAL MEASUREMENT • Thermometer • Thermocouple • & Indicator • Thermograph • Data-logger • Hygrometer MECHANICAL MEASUREMENTS Flow • Vane Anemometer • Ultra Sonic Flow Meter • Flow/Velocity • Temperature • Relative Humidity Pressure • Pressure Recorder • Leaks • Ultra Sonic Leak Checker Speed • Contact Tachometer Multifunction kit • Flow/Velocity • Pressure • Temperature • Relative Humidity • Sound • dB Meter • Time Stop watch Measuring tape CHEMICAL MEASUREMENT Flue Gas Analysis Flue Gas Analyzer • (CO2 & O2, • CO • Temp • Efficiency ELECTRICAL MEASUREMENT 3-Phase/ 1-Phase Power Analyzer Voltage, Current kVA, kW, kVAr Power factor Harmonics Lighting Lux meter Energy Audit Equipment
  • 24. 24 Ultra-sonic Flow Meter • Application : Flow measurement of Liquids • Parameters : Velocity & Measured discharge of liquid flow • Make : Panametrics, Ireland • Range : 0.03 to 12.2 m/s (pipe size 2” to 24”)
  • 25. 25 Non Contact Tachometer - Stroboscope • Application : Speed Measurements • Parameters measured : Speed of Rotating Element • Make : Testo, Germany • Range : 20 to 20000 rpm
  • 26. 26 Digital temperature & humidity data logger • Parameters measured : Dry bulb temperature & humidity • Make : Gemini, USA • Range : -15 to 150oC and 0-99 % RH
  • 27. 27 Non Contact Type Infrared Temperature Indicator • Application : Measurement of Surface Temperatures • Parameters measured : Surface Temperatures • Make : Raytek, USA • Range : -18 to 870oC
  • 28. 28 Digital Temperature & Hygrometer • Application : Measurement of Temperatures & humidity • Parameters measured : Dry bulb temperature & humidity • Make : Center, Taiwan • Range : -20 to 60oC, 0 to 100% RH
  • 29. 29 Flue Gas Analyzer • Application : Measurement of Flue Gas Parameters • Parameters measured : O2, CO, NO, NO2, SO2, Humidity • Make : TESTO, Germany • Range : 02-0 to 21%, CO-0 to 20000 ppm, • NO- 0 to 3000, No2-0 to 500 ppm, • Humidity- 0 to 100%
  • 30. 30 3-Phase Power Analyzer • Application: Measures all Electrical and Harmonic Parameters • Parameters measured : V, A, PF, KW, kVA, kVAr, Hz, first 50 • Harmonics • Make : RCC Technologies, Canada • Range : 600V, 1000A
  • 31. 31 Digital Lux Meter • Application : Measurement of Light Levels • Parameters measured : Light level in lux and/or foot-candles • Make : Physics • Range : 0 to 50000 lux
  • 32. 32 Prepare Energy Balance Data And Information • Energy supply and consumption data • Apportioning of energy consumption by: Type of energy – fuel, electricity Equipment/system – production machinery, motor, air conditioning, lighting and etc. Applications – production facilities, offices, tenants
  • 33. Load Distribution: Building End-use Breakdown(%) Cost(RM) Chiller 139821.00 35.08 51453.56 AHU 67740.47 16.99 24928.22 CoolingTower 10441.54 2.62 3842.44 CDWP 10321.21 2.59 3798.16 CHWP 15671.31 3.93 5766.98 Lighting 39068.12 9.80 14376.91 Others 115552.15 28.99 42522.72 Total 398615.80 100.00 146689.00 Energy Consumption (kWh) Air conditioning system consumed the biggest energy (61%)%) 33
  • 35. 35 Analyse Energy Balance And Energy Performance Data • Energy and material balance & energy loss/waste analysis • Identify areas where energy is being or possibly wasted Energy Input Desired Product/ Service Level PROCESS (Equipment/ Operation) Energy loss (???) Energy loss (???) Output
  • 36. 36 Identify Energy Saving Measures Conceptual ideas, develop and refine measures Review existing/previous ideas – brainstorming and value analysis Communication with manufacturers/technology experts for more efficient technologies solutions • Identification of energy saving measures to eliminate/minimize energy wastage to improve energy performance
  • 37. Guidelines On Common Energy Audit Checklists 37
  • 38. General management items 1. Energy management system • Organization • Energy conservation target and investment target • Medium-and-long term plans 2. Measuring and recording implementation status • Installation and operating status of measuring instruments • Implementation status of measurement control system 3. Maintenance of equipment • Periodic inspection and daily inspection • Repairing of leakage (water, air and steam) • Equipment cleaning (filters and strainers) 4. Management of energy consumption volume • Recording status of daily report • Daily consumption volume and daily load curve • Monthly consumption volume and graph for comparison to previous year 5. Energy unit consumption management • Unit consumption management 6. PDCA management cycle • PDCA management status 38
  • 40. Energy Facilities of Buildings Air conditioners •Heat sources and transportation of heat •Air conditioners and ventilating facilities •Water supplies and water discharging facilities •Freezers, refrigeration and kitchen facilities •Power receiving and transforming facilities, lighting and electrical facilities •Elevators and building facilities 40
  • 41. Air conditioning and ventilating facilities • Air conditioning operational management • Appropriate temperature and humidity settings • Inhomogeneous temperature distributions • Warming up operations • Review of operations • Termination of air conditioning for unused rooms • Exclusion of outdoor air intrusion • Management of air conditioning efficiency • Restriction of air conditioning sections • Utilization of outdoor air (outdoor air cooling) and night purge ventilation • Prevention of mixing losses • Water spraying on rooftops and outdoor units • Implementation of energy conservation equipment • Variable Air Volume and Variable Water Volume • Outdoor air introduction control systems (carbon dioxide controls) • Outdoor air cooling systems • Installation of total heat exchangers • Localized cooling and exhausting • Ventilation facility management • Appropriate ventilating frequency • Management of temperature (electric rooms and machine rooms) • Termination of ventilation for unused rooms • Ventilation controls of parking area (carbon dioxide concentration controls) • Speed controls of blower and ventilator (VAV and VWV) 41
  • 42. Supply and discharge water, chiller, refrigeration and kitchen facilities • Water supply and discharge facilities management • Utilization of miscellaneous water (rain water and well water, etc.) • Water conservation measures (water saving top, automatic washers, onomatopoeic device for restrooms, water saving showers) • Supply water flow rates and pressures. • Reusing of discharged water • Management of chilling, refrigerating and kitchen facilities • Heat insulation and defrosting management • Opening and closing management of doors • Management of showcase • Increasing efficiency 42
  • 43. Power receiving and transforming, lighting and electrical facilities • Operational management of power receiving and transforming facilities • Demand factors • Power factor management • Management of demand • Transformer capacities • Shut off for unnecessary transformers • Implementation of energy conservation equipment • Demand monitoring and control • Low-loss transformers • Operational management of lighting facilities • Management of appropriate light intensities • Extinguishing of light when not needed (use of daylight) • Light apparatus cleaning and apparatus replacement • Installation location of lighting and division of circuits • Dimming and/or extinguishing with dimming control system • Localized lighting 43
  • 44. Power receiving and transforming, lighting and electrical facilities 4. Implementation of energy conservation lighting facilities • Adoption of highly efficient lamps • Adoption of highly efficient apparatuses • Inverter stabilizers • Implementation of Task Ambient method • Lighting switching control • Natural lighting systems 5. Management of OA equipment • Reduction of standby electric power • Shut off power when not required • Electric power conserving-type implementations 6. Vending machine management • Implementation of energy conserving-type equipment • Time controls 44
  • 46. Air Conditioning And Chilling Facilities •Operational management • Appropriate temperature & humidity settings • Reduce air intake from outdoor • Management of heat producing equipment • Chilled water outlet temperature settings • Scheduled operation • Outdoor air shutout and ventilation status •Energy conservation strategies • Enhance thermal building insulation • Waste heat recovery and utilization • Speed controls for pumps and blowers • Localizing cooling and exhausting •Operational management of cooling facilities • Operating power of chillers • Outlet & inlet pressure of refrigerant • Inlet & outlet temperature control and pressure control of chilled water •Operational management of auxiliary equipment • Operating power of cooling towers • Water quality management • Pump operating power(water quantity and pump head) •Cold temperature retention and chilling facilities • Management of incoming & outgoing through doors(door opening & closing period) • Management of temperature to increase efficiency 46
  • 47. Pumps, Fans & Air Compressors •Operational management of pumps and fans • Open/close status of valves • Improvement of routing(piping &ducting) • Consumption flow rate & operating pressure • Check the actual against design performance • Speed and unit controls •Operational management of air compressors • Review types of air compressors(screw/reciprocating) • Matching of capacity & types 47
  • 48. Boilers And Industrial Furnaces •Combustion management • Air ratios and exhaust gas management • Burners, fuels and air flow systems • Combustion control equipment • Regenerative type combustion system •Operational and efficiency management • Load factors, startup and stop status • Quantity control • Heat efficiency, heat balance and heat distribution • Water quality management and blow management •Thermal insulation, heat retention and heat radiation prevention • Temperature on outer surface of furnace walls and ducts • Thermal insulation materials (heat storage losses) • Sealing of opening and furnace pressure •Exhaust gas temperature management and waste heat recovery • Exhaust gas temperature • Heat recovery (air preheating) • Exhaust gas circulation 48
  • 49. Steam Systems, Heat Exchangers, Waste Heat And Waste Water, Etc. •Operational management • Steam pressure and temperature settings • Steam flow rates •Leak and temperature retention management • Piping systems and tanks, etc. • Load facilities •Appropriate piping systems • Routing, differential pressures and piping sizes • Sorting unnecessary piping • Integration of multiple steam systems •Load leveling • Installation of accumulators • Countermeasures on side of load •Use of drain recovery • Steam trap management • Drain recovery locations and recovery systems • Flash steam utilization 49
  • 50. Steam Systems, Heat Exchangers, Waste Heat And Waste Water, Etc. • Operational management of heat exchangers • Suitability of types • Suitability of usage and heat transfer media • Maintenance status (soiling and pressure losses) • Temperatures of heat transfer media and heated objects • Temperature effectiveness • Reduction of waste heat and waste water • Recovery of heat from hot water • Appropriate exhaust air duct • Recycling of cooling water • Management for concentrations of impurities in water • Excessive gas use • Use of excessive gases 50
  • 51. Power Receiving And Transforming Electric Motors, Electric Heating And Lighting Facilities •Power receiving facility management • Management of load factors and power factors • Management of demand (monitor and control) • Electric power purchase contract details • Utilization of electric power during night •Transformer facility management • Transformer capacities, voltage and low-loss transformers • Demand factor/supply adjustment • Shut off for unnecessary transformers •Management of electric motors and electric heating facilities • Facility capacity, voltage and number of units • Rotational speed control • Termination of operation when unloaded •Lighting facility management • Adoption of highly efficiency lamps • Adoption of automatic extinguishing and localized lighting • Installation location of lighting and division of circuits • Management of appropriate illuminance • Extinguishing during unnecessary hours and use of daylight 51
  • 52. 52 Prepare A List of Energy Saving Measures • Discuss and list down all energy saving measures and opportunities
  • 53. 53 Calculate Energy Saving Potentials • Calculate projected energy saving potentials in energy unit and convert into RM! • Use data from measurements/manufacturers’ information/data analysis to estimate potential saving values
  • 54. 54 Conduct Financial Analysis  Conduct financial analysis for each measure  Use method adopted by the company/organization including life cycle analysis Item for Investment Operating Cost/year Saving/year (in energy or other unit) Saving/year (RM) Equipment Instrumentation Civil works & others Purchasing cost Maintenance & repairs Labour Energy Depreciation Electrical energy Thermal energy Others (disposal, labour and etc.)
  • 55. Example :Energy Cost Savings for Air Conditioning System at a Building NO. Item MOTOR RUNNING NORMAL MODE ENERGY SAVING MODE ( Rated kW ) ( Running kW ) kWh/Year Rate/Year (RM) Amount (kWh) Rate/Year (RM) SAVING (%) SAVING (RM/Year) 1 CHWP 1 18.5 19.1 165,024 70,960 107,266 46,124 35% 24,836 Old Block Chiller Room 2 CHWP 2 18.5 19.0 164,160 70,589 106,704 45,883 35% 24,706 New Block Chiller Room 3 CDWP 1 15 13.3 114,912 49,412 82,737 35,577 28% 13,835 Old Block Chiller Room 4 CDWP 2 18.5 15.3 132,192 56,843 95,178 40,927 28% 15,916 New Block Chiller Room Sub-Total 67 576,288 247,804 391,884 168,510 32% 79,294 No Item Rated (kW) Actual kW Normal kWh/Year Saving Mode kWh/Year Saving % Saving kWh Saving (RM/Year) 1 Chiller – Old Blk 210 128 1,105,920 995,328 10% 427,991 47,555 2 Chiller– New Blk 210 115 993,600 914,112 8% 393,068 34,180 Sub-Total 420 243 2,099,520 1,909,440 9.1% 821,059 81,734 TOTAL HVAC SAVING 161,028 55
  • 56. 56 Analyze Feasibility And Viability • The technical feasibility should address the following issues  Technology availability, space, skilled manpower, reliability, service etc  The impact of energy efficiency measure on safety, quality, production or process  The maintenance requirements and spares availability • Analyze and confirm feasibility and viability of each measure from technical and financial point of view
  • 57. 57 Prioritize Proposed Measures  List proposed measures according to its priority for implementation and its implementation plan Easy step  Energy management at operational management level  No/low cost  Measuring, operation tuning, resetting, minor repairs  Can be carried out with ideas or ability of the operators with advice from energy manager/engineer  By small group activities at operational level-workers Middle step  Technical improvement, medium scale investment, replacement of old equipment with higher efficiency technologies  Can be carried out engineers, partly by small group High step  Improvement with large scale of investment  New process line or new plant  Require detailed financial assessment (payback, ROI, life-cycle analysis)  As project, task-force level-Top management
  • 58. 58 Energy Saving Measures(ESMs)Summary Table Energy saving measure Type of option (No- cost/low cost/high cost) Saving/year (in energy) Saving/year (RM) Investment value (RM) Payback period (Year) Priority (High/Low)
  • 59. 59 MEASUREMENTS & VERIFICATION OF SAVINGS  Propose parameters and values to be used as a baseline for each measure  Propose measurement, data collection method and calculation to be used to produce baseline value and result after the implementation.  Get agreement on the baselines to be used for verification of results A TOOL TO CONFIRM THE ACTUAL RESULTS OF EACH IMPLEMENTED ENERGY SAVING MEASURE
  • 60. Example: Energy saving calculated by the difference between a baseline year and a subsequent year from electricity bill(kWh) 60
  • 61. Example: Savings calculated based on actual measurement from sub-meters 61
  • 62. Options For Energy Baseline & Savings Calculation Method Advantages Disadvantages Utility billing history Low cost •Effects of weather , occupancy, other changes may mask savings •May be unreliable unless savings are significant compared to normal bill variation Data already available Independent data Represent all effects of ESMs Account for interactive effects System/Equipment sub-metering Isolate effects of ESMs •Higher cost •Misses interactive effects Very accurate for lighting measures Results are more predictable(low risk) 62