 Ms. Siya Bharadwaj, a MBBS from AIIMS has come
back to her home town Kanpur and wants to start a
hospital at a small level of 20 bed capacity.
 For this she has come to a professional Ms.Punya
Awasthi, who has an experience in forming project
proposal and helping in implementing it.
 She has an aim to help people by taking care of
health issue and a commercial aim to get at least
15% ROI.
 Project Scope Statement :
Design, construct and equip a local hospital and
securing necessary funds for constructions of a 20
bed capacity general hospital in the city of Kanpur.
The project aims at providing an ROI of 15% and is
to be started by 25th July 2014 by completing the
project without exceeding the budget of 5.61 crores.
 Project Objectives:
• To complete the project within the time boundary
i.e. 30th September 2015.
• To ensure that the project is completed within the
given budget.
• To earn adequate return on investment.
• To ensure that the supplies are timely.
 Project sponsor :
Bharadwaj and Sons 40%
Bank 60%
 Customers:
The customer or we can say beneficiaries of the
project are the people in the region who don’t get
good and timely medical facilities.This project will
serve the men, women and children by providing
the best health care facilities.
 Summary of EconomicViability:
• Phase 1: This phase involves running of a hospital
for patients in the region. It is proposed to establish
this 24*7 facility in a 5,000 square feet space in the
region.The unit will have separate facilities for
male, female and children.The estimated land cost
is INR 70 lakh which is expected to be funded by
Bhardwaj & sons and by bank loan.
• Phase 2: This phase involves the establishment of a
20 bed hospital in about 5000 square feet of land.
The hospital will have a built up area of 5,000 square
feet.
• Phase 3: This involves the recruitment and
marketing.
• The estimated project cost is 5.61 crores.
• This whole project is a health care facility so focus
is not on profit gain. But since the sponsors are
involved so this project aims at 15% ROI.
 Preliminary Stakeholders Analysis
• Project Sponsor: Kashinath Bharadwaj, Executive
Vice President, Bhardawaj & sons
• Bank: HDFC Bank
• Project Manager: Ms. Punya Awasthi
• Key person of project: Ms. Siya Bharadwaj
Major Deliverables
Deliverables Description
Deliverable 1- System Design
Study the hospital’s requirement and needs.
Getting statutory approvals.
Deliverable 2 - Construction Procurement of land
Legal Approval
Hiring an Architect for designing
Hire a contractor for construction
Deliverable 3 – Equipment
Quotations and Contracting fromVendors for
various Equipments
Furnishing
Ambulance, stretchers etc
Deliverable 4 – staffing and marketing
Recruitment of specialists, administrative staff,
supporting staff etc.
Advertising through newspapers and local
television channels
Deliverable 5- Analysis
Analyzing at each step that the project is running
Summary budget
Cost of Project Total (in Rs.)
Land cost@ 990 per sq. feet 0.70 crores
Construction cost 1.20 crores
Machinery & equipment 1.96 crores
Furnishing 0.90 crores
Vehicles 0.22 crores
Contingencies – 5 % construction cost 0.06 crores
Funding operating losses 0.50 crores
Recruitment 0.02 crores
Advertising 0.05 crores
Total estimated project Cost 5.61 crores
Cost Break down as per different major
activities or materials involved
Material / activity involved Cost (in Rs.)
LAND @ Rs.990 / square feet 7000000
Construction:
Contract to a regional contractor (raw
material, labour etc.)
3200000
Machinery & equipment
25 Hospital bed 250000
25 Bench 2500
5 Cabinet 30000
2 Conference table 25000
2 Emergency trolley 1000000
5 Executive chair 180000
30 stool 45000
2Waste paper tub 700
5 Oxygen set 5000
2 Binocular microscope 33000
1 Glucose analyzer 32000
2Weighing scale 9800
1Water distiller 120000
5 Surgeons stool 5000
2 ICU bed 150000
2 ECG Monitor 740000
2 Syringe pump 15000
3 ventilator 1200000
ICU instruments 1000000
Furnishing
30 Fan 36000
1 Air conditioner 22000
2 LED 8000
Wooden furniture (table, sofa, chair etc.) 150000
Vehicles
2 Ambulance 1500000
Recruitment
Expense on advertising for recruitment + per
head interview scheduling cost
2000000
Advertisement
Newspaper n(half page inTOI) 1212750
Hoarding ( GT road) 336000
 Cash INFlow
• Expected patients per day- 10
• Average charges-
Appointment fee- 100 Rs
Special appointment- 300 Rs
Sehat Hospital Project Proposal
Summary Milestones
Milestone Description
Month
s
Start Dates
Phase 1 –
Construction
Confirm the needs and project plan 1 25th July 17, 2014
Acquisition of land, carry out site
development.
2 25th August 2014
Obtain necessary statutory approvals. 2 25th October 2014
Prepare Master Plan and building
construction plans.
8
25th November
2014
Phase 2 –
Equipment
Equipment 2 25th June 2015
Furnishing 1 25th July 2015
Phase 3 – Staffing
and Marketing
Recruitment andTraining. 2 25th July 2015
Gantt chart of the Project
 WBS For Construction of Hospitals
1. Confirm the needs and project plan
 Confirm the needs for the service of the hospital.
 Confirm the market size, quality of services and
the capacity to serve.
 Prepare cost estimates and check with the
estimated budget.
 Prepare a preliminary schedule.
 Verify the cash flow and the project feasibility
assumption.
2. Acquisition of land, carry out site development.
 Evaluate available sites and select the site.
 Negotiate the land acquisitions with the suppliers
and purchase of the land.
 Soil testing and land classifications.
 Architectural drawings.
 Approvals and permit.
 Site development.
▪ Arrange water.
▪ Arrange Electricity.
▪ Construct boundary walls and fence.
3. Obtain necessary statutory approvals.
 Receive approvals for construction of the plan.
 Receive approvals from the board of medical
sciences.
 Receive Electricity supply approvals
 Receive approvals from the water supply
authority
 Prepare Master Plan and building construction plans.
 Select and appoint architect.
▪ Prepare overall Floor-wise layout plan.
▪ Construction details for lintels, staircase, walls
windows and doors.
▪ Colour schemes.
▪ Specification for flooring, fittings and fixtures.
▪ Prepare electrical cables layouts
▪ Prepare fire escape and sprinkler layout plans.
▪ Prepare air conditioning scheme and ducting layouts.
 Carryout Construction activities at the site.
▪ Select the prime contractor.
▪ OP Block
▪ Clinical Block
▪ Clinical lab block
▪ ICU block
▪ General Ward (Male)
▪ General Ward (Female)
▪ Admin Block
▪ Doctors Block
 Equipment and Furnishing
 Equipment
▪ Vendor Quotations
▪ Contracting with vendors
▪ Medicals contracting
 Furnishing
▪ Prepare the master plan for interiors decoration.
▪ Install Reception
▪ Install Room Furniture. – Beds, saline etc.
▪ Install ICU’s
▪ Install Doctors room and others.
 Recruitment and
Marketing
 Recruitment and
Training.
▪ Doctors
▪ Nurses
▪ Clerks
▪ Accountants
▪ Human Resources
▪ Drivers
 Marketing
▪ Print media
▪ Pamphlets
▪ News papers
▪ Outdoor
advertisements
▪ Hoardings
 Assumptions Risks :
 The staff may not be professional enough to handle
the equipment with care.
 Delay in getting the necessary approval for
construction of the hospital.
 The necessary resources may not be delivered on
time.
 Time constraint while recruitment and selection
of staff.
 Mismatch between demand and supply
 The loan sanction might get delayed from the
bank.
 Prices of raw materials , interest rates might
increase in case of inflation
 Political changes.
 Constraints
 Competition from other local private health
centers.
 Government owned hospitals are cheaper
 Doctors might charge high fees.

Contenu connexe

Tendances

Hm 2012 session-iii planning & developing a hospital
Hm 2012 session-iii planning & developing a hospitalHm 2012 session-iii planning & developing a hospital
Hm 2012 session-iii planning & developing a hospitaldrbhutto
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare constructionMmedsc Hahm
 
Planning and organizing: Hospital, unit and ancillary services
Planning and organizing: Hospital, unit and ancillary servicesPlanning and organizing: Hospital, unit and ancillary services
Planning and organizing: Hospital, unit and ancillary servicesShweta Sharma
 
New Hospital Presentation
New Hospital PresentationNew Hospital Presentation
New Hospital PresentationTina Gilson
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New HospitalNc Das
 
Dr. B. Krishnamurthy medicall 2011 fms
Dr. B. Krishnamurthy medicall 2011 fmsDr. B. Krishnamurthy medicall 2011 fms
Dr. B. Krishnamurthy medicall 2011 fmsSatishkumar Durairajan
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout pptSandeep Singh
 
In patient department
In patient departmentIn patient department
In patient departmentVISHAL THAKUR
 
Mh0052 hospital organization, operations and planning
Mh0052   hospital organization, operations and planningMh0052   hospital organization, operations and planning
Mh0052 hospital organization, operations and planningsmumbahelp
 
Out patient services
Out patient servicesOut patient services
Out patient servicesNc Das
 

Tendances (20)

Rainbow Hospitals
Rainbow HospitalsRainbow Hospitals
Rainbow Hospitals
 
Hm 2012 session-iii planning & developing a hospital
Hm 2012 session-iii planning & developing a hospitalHm 2012 session-iii planning & developing a hospital
Hm 2012 session-iii planning & developing a hospital
 
HOSPITAL PLANNING .ppt
HOSPITAL PLANNING .pptHOSPITAL PLANNING .ppt
HOSPITAL PLANNING .ppt
 
Ward management
Ward managementWard management
Ward management
 
8.healthcare construction
8.healthcare construction8.healthcare construction
8.healthcare construction
 
Planning and organizing: Hospital, unit and ancillary services
Planning and organizing: Hospital, unit and ancillary servicesPlanning and organizing: Hospital, unit and ancillary services
Planning and organizing: Hospital, unit and ancillary services
 
Opd design and process
Opd design and processOpd design and process
Opd design and process
 
New Hospital Presentation
New Hospital PresentationNew Hospital Presentation
New Hospital Presentation
 
Super speciality
Super specialitySuper speciality
Super speciality
 
Department of cardiology
Department of cardiologyDepartment of cardiology
Department of cardiology
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New Hospital
 
SHANTI MEMORIAL HOSPITAL - VISION & MISSION
SHANTI MEMORIAL HOSPITAL - VISION & MISSIONSHANTI MEMORIAL HOSPITAL - VISION & MISSION
SHANTI MEMORIAL HOSPITAL - VISION & MISSION
 
Dr. B. Krishnamurthy medicall 2011 fms
Dr. B. Krishnamurthy medicall 2011 fmsDr. B. Krishnamurthy medicall 2011 fms
Dr. B. Krishnamurthy medicall 2011 fms
 
Final hospital planning and layout ppt
Final hospital planning and layout pptFinal hospital planning and layout ppt
Final hospital planning and layout ppt
 
Outpatient Department (OPD)
Outpatient Department (OPD)Outpatient Department (OPD)
Outpatient Department (OPD)
 
In patient department
In patient departmentIn patient department
In patient department
 
Mh0052 hospital organization, operations and planning
Mh0052   hospital organization, operations and planningMh0052   hospital organization, operations and planning
Mh0052 hospital organization, operations and planning
 
Hospital planning
Hospital planningHospital planning
Hospital planning
 
Out patient services
Out patient servicesOut patient services
Out patient services
 

Similaire à Sehat hospital final

Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Redsun Communication
 
project management hospital construction.docx
project management hospital construction.docxproject management hospital construction.docx
project management hospital construction.docxmohamedwesam3544
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxShashidharaTV2
 
Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Ted Herbosa
 
Pre Construction Stages Work(procurement and tendering) Binod Patro
Pre Construction Stages Work(procurement and tendering)  Binod PatroPre Construction Stages Work(procurement and tendering)  Binod Patro
Pre Construction Stages Work(procurement and tendering) Binod PatroBBinodKumarPatro
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...meiroc
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...meiroc
 
A Guide to Grant Writing
A Guide to Grant Writing  A Guide to Grant Writing
A Guide to Grant Writing ticoscu
 
How to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasHow to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasVISHESH VYAS
 
case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEDiraviam Jayaraj
 
hospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxhospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxShashidharaTV2
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974Manideep Yellanki
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptxBimsaraRotaract
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxtodd581
 
Improve patient satisfaction 2.docx
Improve patient satisfaction 2.docxImprove patient satisfaction 2.docx
Improve patient satisfaction 2.docx4934bk
 

Similaire à Sehat hospital final (20)

Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
project management hospital construction.docx
project management hospital construction.docxproject management hospital construction.docx
project management hospital construction.docx
 
PMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptxPMS CASE STUDY - 02 .....1-2.pptx
PMS CASE STUDY - 02 .....1-2.pptx
 
Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)Final mpoc presentation roadshow (23 nov2012)
Final mpoc presentation roadshow (23 nov2012)
 
Mata ppt
Mata pptMata ppt
Mata ppt
 
Pre Construction Stages Work(procurement and tendering) Binod Patro
Pre Construction Stages Work(procurement and tendering)  Binod PatroPre Construction Stages Work(procurement and tendering)  Binod Patro
Pre Construction Stages Work(procurement and tendering) Binod Patro
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...Challenges faced during the development of new high demand public hospitals w...
Challenges faced during the development of new high demand public hospitals w...
 
site selections
site selectionssite selections
site selections
 
A Guide to Grant Writing
A Guide to Grant Writing  A Guide to Grant Writing
A Guide to Grant Writing
 
How to Write a Project Proposal
How to Write a Project ProposalHow to Write a Project Proposal
How to Write a Project Proposal
 
How to start a Old Hospital with New ideas
How to start a Old Hospital with New ideasHow to start a Old Hospital with New ideas
How to start a Old Hospital with New ideas
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEMEAGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
 
hospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptxhospitalplanning-130528040750-phpapp02 (2).pptx
hospitalplanning-130528040750-phpapp02 (2).pptx
 
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_100419743761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
3761 db7415 -_manideep_yellanki_assesment_2_55705_10041974
 
Hospital Planning
Hospital PlanningHospital Planning
Hospital Planning
 
00. Presentation QS0005.pptx
00. Presentation QS0005.pptx00. Presentation QS0005.pptx
00. Presentation QS0005.pptx
 
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docxRunning head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
Running head PROJECT SCOPE AND CHARTER1PROJECT SCOPE AND CH.docx
 
Improve patient satisfaction 2.docx
Improve patient satisfaction 2.docxImprove patient satisfaction 2.docx
Improve patient satisfaction 2.docx
 

Dernier

THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...漢銘 謝
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEMCharmi13
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...Henrik Hanke
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...marjmae69
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxnoorehahmad
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxaryanv1753
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGYpruthirajnayak525
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSebastiano Panichella
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.KathleenAnnCordero2
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationNathan Young
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this periodSaraIsabelJimenez
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxJohnree4
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRRsarwankumar4524
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comsaastr
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptxogubuikealex
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxCarrieButtitta
 

Dernier (20)

THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
THE COUNTRY WHO SOLVED THE WORLD_HOW CHINA LAUNCHED THE CIVILIZATION REVOLUTI...
 
Quality by design.. ppt for RA (1ST SEM
Quality by design.. ppt for  RA (1ST SEMQuality by design.. ppt for  RA (1ST SEM
Quality by design.. ppt for RA (1ST SEM
 
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
DGT @ CTAC 2024 Valencia: Most crucial invest to digitalisation_Sven Zoelle_v...
 
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
Gaps, Issues and Challenges in the Implementation of Mother Tongue Based-Mult...
 
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptxAnne Frank A Beacon of Hope amidst darkness ppt.pptx
Anne Frank A Beacon of Hope amidst darkness ppt.pptx
 
Event 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptxEvent 4 Introduction to Open Source.pptx
Event 4 Introduction to Open Source.pptx
 
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC  - NANOTECHNOLOGYPHYSICS PROJECT BY MSC  - NANOTECHNOLOGY
PHYSICS PROJECT BY MSC - NANOTECHNOLOGY
 
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with AerialistSimulation-based Testing of Unmanned Aerial Vehicles with Aerialist
Simulation-based Testing of Unmanned Aerial Vehicles with Aerialist
 
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
PAG-UNLAD NG EKONOMIYA na dapat isaalang alang sa pag-aaral.
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
The Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism PresentationThe Ten Facts About People With Autism Presentation
The Ten Facts About People With Autism Presentation
 
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular PlasticsDutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
Dutch Power - 26 maart 2024 - Henk Kras - Circular Plastics
 
Early Modern Spain. All about this period
Early Modern Spain. All about this periodEarly Modern Spain. All about this period
Early Modern Spain. All about this period
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
Genshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptxGenshin Impact PPT Template by EaTemp.pptx
Genshin Impact PPT Template by EaTemp.pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRRINDIAN GCP GUIDELINE. for Regulatory  affair 1st sem CRR
INDIAN GCP GUIDELINE. for Regulatory affair 1st sem CRR
 
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.comSaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
SaaStr Workshop Wednesday w/ Kyle Norton, Owner.com
 
Chizaram's Women Tech Makers Deck. .pptx
Chizaram's Women Tech Makers Deck.  .pptxChizaram's Women Tech Makers Deck.  .pptx
Chizaram's Women Tech Makers Deck. .pptx
 
miladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptxmiladyskindiseases-200705210221 2.!!pptx
miladyskindiseases-200705210221 2.!!pptx
 

Sehat hospital final

  • 1. By Group 7 – ASHISH JHA - 20 ISHANI DAS - 37 POOJATIWARI - 53 RAMYA RAVIKUMAR - 61 SHIVAM NIGAM - 72 ABHISHEKTIWARI - 84 VINAY PILLAI - 86 Hospital – SEHAT Customer name – Dr Siya Bharadwaj Project Co-ordinator - Ms.Punya Awasthi
  • 2.  Ms. Siya Bharadwaj, a MBBS from AIIMS has come back to her home town Kanpur and wants to start a hospital at a small level of 20 bed capacity.  For this she has come to a professional Ms.Punya Awasthi, who has an experience in forming project proposal and helping in implementing it.  She has an aim to help people by taking care of health issue and a commercial aim to get at least 15% ROI.
  • 3.  Project Scope Statement : Design, construct and equip a local hospital and securing necessary funds for constructions of a 20 bed capacity general hospital in the city of Kanpur. The project aims at providing an ROI of 15% and is to be started by 25th July 2014 by completing the project without exceeding the budget of 5.61 crores.
  • 4.  Project Objectives: • To complete the project within the time boundary i.e. 30th September 2015. • To ensure that the project is completed within the given budget. • To earn adequate return on investment. • To ensure that the supplies are timely.
  • 5.  Project sponsor : Bharadwaj and Sons 40% Bank 60%
  • 6.  Customers: The customer or we can say beneficiaries of the project are the people in the region who don’t get good and timely medical facilities.This project will serve the men, women and children by providing the best health care facilities.
  • 7.  Summary of EconomicViability: • Phase 1: This phase involves running of a hospital for patients in the region. It is proposed to establish this 24*7 facility in a 5,000 square feet space in the region.The unit will have separate facilities for male, female and children.The estimated land cost is INR 70 lakh which is expected to be funded by Bhardwaj & sons and by bank loan.
  • 8. • Phase 2: This phase involves the establishment of a 20 bed hospital in about 5000 square feet of land. The hospital will have a built up area of 5,000 square feet. • Phase 3: This involves the recruitment and marketing. • The estimated project cost is 5.61 crores. • This whole project is a health care facility so focus is not on profit gain. But since the sponsors are involved so this project aims at 15% ROI.
  • 9.  Preliminary Stakeholders Analysis • Project Sponsor: Kashinath Bharadwaj, Executive Vice President, Bhardawaj & sons • Bank: HDFC Bank • Project Manager: Ms. Punya Awasthi • Key person of project: Ms. Siya Bharadwaj
  • 11. Deliverables Description Deliverable 1- System Design Study the hospital’s requirement and needs. Getting statutory approvals. Deliverable 2 - Construction Procurement of land Legal Approval Hiring an Architect for designing Hire a contractor for construction Deliverable 3 – Equipment Quotations and Contracting fromVendors for various Equipments Furnishing Ambulance, stretchers etc Deliverable 4 – staffing and marketing Recruitment of specialists, administrative staff, supporting staff etc. Advertising through newspapers and local television channels Deliverable 5- Analysis Analyzing at each step that the project is running
  • 13. Cost of Project Total (in Rs.) Land cost@ 990 per sq. feet 0.70 crores Construction cost 1.20 crores Machinery & equipment 1.96 crores Furnishing 0.90 crores Vehicles 0.22 crores Contingencies – 5 % construction cost 0.06 crores Funding operating losses 0.50 crores Recruitment 0.02 crores Advertising 0.05 crores Total estimated project Cost 5.61 crores
  • 14. Cost Break down as per different major activities or materials involved
  • 15. Material / activity involved Cost (in Rs.) LAND @ Rs.990 / square feet 7000000 Construction: Contract to a regional contractor (raw material, labour etc.) 3200000 Machinery & equipment 25 Hospital bed 250000 25 Bench 2500 5 Cabinet 30000 2 Conference table 25000
  • 16. 2 Emergency trolley 1000000 5 Executive chair 180000 30 stool 45000 2Waste paper tub 700 5 Oxygen set 5000 2 Binocular microscope 33000 1 Glucose analyzer 32000 2Weighing scale 9800 1Water distiller 120000 5 Surgeons stool 5000 2 ICU bed 150000 2 ECG Monitor 740000 2 Syringe pump 15000 3 ventilator 1200000
  • 17. ICU instruments 1000000 Furnishing 30 Fan 36000 1 Air conditioner 22000 2 LED 8000 Wooden furniture (table, sofa, chair etc.) 150000 Vehicles 2 Ambulance 1500000 Recruitment Expense on advertising for recruitment + per head interview scheduling cost 2000000 Advertisement Newspaper n(half page inTOI) 1212750 Hoarding ( GT road) 336000
  • 18.  Cash INFlow • Expected patients per day- 10 • Average charges- Appointment fee- 100 Rs Special appointment- 300 Rs Sehat Hospital Project Proposal
  • 20. Milestone Description Month s Start Dates Phase 1 – Construction Confirm the needs and project plan 1 25th July 17, 2014 Acquisition of land, carry out site development. 2 25th August 2014 Obtain necessary statutory approvals. 2 25th October 2014 Prepare Master Plan and building construction plans. 8 25th November 2014 Phase 2 – Equipment Equipment 2 25th June 2015 Furnishing 1 25th July 2015 Phase 3 – Staffing and Marketing Recruitment andTraining. 2 25th July 2015
  • 21. Gantt chart of the Project
  • 22.  WBS For Construction of Hospitals 1. Confirm the needs and project plan  Confirm the needs for the service of the hospital.  Confirm the market size, quality of services and the capacity to serve.  Prepare cost estimates and check with the estimated budget.  Prepare a preliminary schedule.  Verify the cash flow and the project feasibility assumption.
  • 23. 2. Acquisition of land, carry out site development.  Evaluate available sites and select the site.  Negotiate the land acquisitions with the suppliers and purchase of the land.  Soil testing and land classifications.  Architectural drawings.  Approvals and permit.  Site development. ▪ Arrange water. ▪ Arrange Electricity. ▪ Construct boundary walls and fence.
  • 24. 3. Obtain necessary statutory approvals.  Receive approvals for construction of the plan.  Receive approvals from the board of medical sciences.  Receive Electricity supply approvals  Receive approvals from the water supply authority
  • 25.  Prepare Master Plan and building construction plans.  Select and appoint architect. ▪ Prepare overall Floor-wise layout plan. ▪ Construction details for lintels, staircase, walls windows and doors. ▪ Colour schemes. ▪ Specification for flooring, fittings and fixtures. ▪ Prepare electrical cables layouts ▪ Prepare fire escape and sprinkler layout plans. ▪ Prepare air conditioning scheme and ducting layouts.
  • 26.  Carryout Construction activities at the site. ▪ Select the prime contractor. ▪ OP Block ▪ Clinical Block ▪ Clinical lab block ▪ ICU block ▪ General Ward (Male) ▪ General Ward (Female) ▪ Admin Block ▪ Doctors Block
  • 27.  Equipment and Furnishing  Equipment ▪ Vendor Quotations ▪ Contracting with vendors ▪ Medicals contracting  Furnishing ▪ Prepare the master plan for interiors decoration. ▪ Install Reception ▪ Install Room Furniture. – Beds, saline etc. ▪ Install ICU’s ▪ Install Doctors room and others.
  • 28.  Recruitment and Marketing  Recruitment and Training. ▪ Doctors ▪ Nurses ▪ Clerks ▪ Accountants ▪ Human Resources ▪ Drivers  Marketing ▪ Print media ▪ Pamphlets ▪ News papers ▪ Outdoor advertisements ▪ Hoardings
  • 29.  Assumptions Risks :  The staff may not be professional enough to handle the equipment with care.  Delay in getting the necessary approval for construction of the hospital.  The necessary resources may not be delivered on time.
  • 30.  Time constraint while recruitment and selection of staff.  Mismatch between demand and supply  The loan sanction might get delayed from the bank.  Prices of raw materials , interest rates might increase in case of inflation  Political changes.
  • 31.  Constraints  Competition from other local private health centers.  Government owned hospitals are cheaper  Doctors might charge high fees.