Introduction 
• A Bridge is a structure build to span a valley, road, river, body 
of water, or any other physical obstacle. 
• Designs of Bridges will vary depending upon the function of 
the bridge and nature of the area where the bridge is to be 
constructed. 
• The first bridges were made by nature itself—as simple as a 
log fallen across a stream or stones in the river. 
• The first bridges made by humans were probably spans of cut 
wooden logs or planks and eventually stones, using a simple 
support and crossbeam arrangement. 
• Some early Americans used trees or bamboo poles to cross 
small caverns or wells to get from one place to another.
Ctd. 
• A common form of lashing sticks, logs, and 
deciduous branches together involved the use of long reeds 
or other harvested fibers woven together to form a 
connective rope capable of binding and holding together 
the materials used in early bridges. 
• Hilly region pose unique problem for bridge construction. In 
a restricted hilly area itself climatic conditions, geological 
features and hydrological parameters vary considerably. 
• Keeping in view the bridge site and various constraints, 
type of bridge and method of construction are to be 
selected carefully for safe, economical and 
successful completion of bridge construction.
Fig.1 History of Bridge Development
Challenges in Hilly Area Bridges 
Construction 
Various challenges that come across while constructing bridges 
in hilly area are: 
• Construction of bridge across deep gorges; 
• Construction of bridge on rivers with boundary beds; 
• Construction of bridges in extreme temperature zones; 
• Construction of bridges on sharp turn on highway; 
• Landslide or Debris flow.
Bridge Foundation and Substructure 
• Foundation construction for any large bridge takes time. 
• Problems encountered during construction of foundation depend upon 
type of foundation, soil strata encountered, equipment/plant deployed 
and logistic problems. Construction difficulties anticipated during the 
execution be kept in view while planning the works/ period for the job. 
• Foundation can be opened foundation, pile foundation, well foundation or 
any other types of foundation. 
• In case of well foundation, the various type of soil are encountered and it 
becomes difficult to give any clear time schedule about the sinking of 
wells unless the soil details are very clear and the anticipated profile 
matched with the actual encountered. 
• In case of boundary and clayey soil the rate of sinking schedule is likely to 
be slow when compared with the sandy soil. 
• Also there may be requirement of pneumatic sinking technique 
subsequent to open grabbing due to difficulties in sinking of well.
Superstructure 
• For particular site there are numerous structural arrangements 
possible. 
• Final proposal be made based on the greater examination of site 
condition may be technical, aesthetic and construction 
methodology. 
• Special care need to be taken in case of deep gorge where there is 
sizable difference between soffit level and bed level. This may pose 
difficulties for staging and shuttering. 
• Proposal recommended for site should be well read in advance. 
After the proposal has been finalized for particular bridge, the 
construction can be planned. 
• The quantities of each items involved and execution method be 
listed. Basically method statement should be kept ready for overall 
execution including job estimate.
Plant Management 
Requirement of equipment/plant be assessed systematically 
and accordingly action may be taken to arrange this for a 
particular job. 
• Quantum of work covering all the items with specifications; 
• Time available for work execution; 
• Details of equipment and also minimum requirement as per 
job position; 
• Rated capacity of equipment/ plant; 
• Assessed capacity; 
• Schedule of maintenance; 
• Inventory of spare parts required; 
• Repair cover to equipment/plant.
Material Management 
• Material management is a parallel activity along 
with start of the Project. 
• This cover procurement of camp material, office 
equipment, major purchased items, such as 
aggregates, sand, cement, steel, structural steel, 
shuttering consumables, electrical fittings. 
• Forecasting of quantities and cost of various 
items on monthly basis must be done at least 
three to six months in advance which should be 
regularly reviewed.
Finance Management 
• No project and implimentation or project and implimentation 
management can be meaningful without this. 
• In case of Government work the manager should get his 
budget fixed on monthly basis, on the basis of work done or 
minimum to be fed at site, on the decision of higher 
authorities. 
• Key to measure financial planning lies in taking all above 
action and taking suitable measures at appropriate times to 
ensure that individual inputs are achieved to the maximum 
and capital investment kept at the lowest level.
Types of Hilly Area Bridges 
• Beam Bridge; 
• Truss Bridge; 
• Cantilever Bridge; 
• Arch Bridge; 
• Tied-Arch Bridge; 
• Suspension Bridge; 
• Cable-Stayed Bridge.
Beam Bridge 
• Beam bridges are the simplest structural forms for bridge 
spans supported by an abutment or pier at each end. 
• No moments are transferred throughout the support, 
hence their structural type is known as simply supported. 
• The simplest beam bridge could be a stone slab or 
a wood plank laid across a stream. 
• Bridges designed for modern infrastructure will usually 
be constructed of steel or reinforced concrete, or a 
combination of both.
Fig.2 Beam Bridge
Truss Bridge 
• A truss bridge is a bridge whose load-bearing superstructure is composed 
of a truss, a structure of connected elements forming triangular units. 
• The connected elements may be stressed from tension, compression, or 
sometimes both in response to dynamic loads. 
• Truss bridges are one of the oldest types of modern bridges. 
• The basic types of truss bridges shown in this article have simple designs 
which could be easily analyzed by 19th- and early 20th-century engineers. 
• A truss bridge is economical to construct because it uses materials 
efficiently. 
Fig.3 Truss Bridge
Cantilever Bridge 
• A cantilever bridge is a bridge built using cantilevers, structures that project 
horizontally into space, supported on only one end. 
• For small footbridges, the cantilevers may be simple beams; however, large 
cantilever bridges designed to handle road or rail traffic use trusses built 
from structural steel, or box girders built from prestressed concrete. 
• The steel truss cantilever bridge was a major engineering breakthrough when 
first put into practice, as it can span distances of over 1,500 feet (460 m), and 
can be more easily constructed at difficult crossings by virtue of using little or 
no falsework. 
• A simple cantilever span is formed by two cantilever arms extending from 
opposite sides of an obstacle to be crossed, meeting at the center. 
Fig. 4 Cantilever Bridge Components 
Fig. 5
Fig. 6 Howrah Bridge
Arch Bridge 
• An arch bridge is a bridge with abutments at each end shaped 
as a curved arch. 
• Arch bridges work by transferring the weight of the bridge and 
its loads partially into a horizontal thrust restrained by the 
abutments at either side. 
• A viaduct (a long bridge) may be made from a series of arches, 
although other more economical structures are typically used 
today. 
Fig. 7 Zhijinghe River Bridge
Tied-Arch Bridges 
• A tied-arch bridge is an arch bridge in which the outward-directed 
horizontal forces of the arch, or top chord, are borne as tension by the 
bottom chord, rather than by the ground or the bridge foundations. 
• Thrusts downward on such a bridge's deck are translated, as tension, by 
vertical ties of the deck to the curved top chord, tending to flatten it and 
thereby to push its tips outward into the abutments, like other arch 
bridges. However, in a tied-arch or bowstring bridge, these movements 
are restrained not by the abutments but by the bottom chord, which ties 
these tips together, taking the thrusts as tension, rather like the string of a 
bow that is being flattened. Therefore, the design is often called 
a bowstring-arch or bowstring-girder bridge. 
Fig.8 Tied-Arch Bridge
Suspension Bridge 
• A suspension bridge is a type of bridge in which the deck (the load-bearing 
portion) is hung below suspension cables on vertical suspenders. 
• The first modern examples of this type of bridge were built in the early 
19th century. 
• Bridges without vertical suspenders have a long history in many 
mountainous parts of the world. 
• This type of bridge has cables suspended between towers, plus 
vertical suspender cables that carry the weight of the deck below, upon 
which traffic crosses. 
• This arrangement allows the deck to be level or to arc upward for 
additional clearance. 
• Like other suspension bridge types, this type often is constructed 
without falsework. 
Fig.9 Capilano Suspension Bridge
Cable-Stayed Bridge 
• A cable-stayed bridge has one or more towers (or pylons), from 
which cables support the bridge deck. 
• There are two major classes of cable-stayed bridges: harp and fan. 
• In the harp or parallel design, the cables are nearly parallel so that the 
height of their attachment to the tower is proportional to the distance 
from the tower to their mounting on the deck. 
• In the fan design, the cables all connect to or pass over the top of the 
towers. The fan design is structurally superior with minimum moment 
applied to the towers but for practical reasons the modified fan is 
preferred especially where many cables are necessary. In the modified fan 
arrangement the cables terminate near to the top of the tower but are 
spaced from each other sufficiently to allow better termination, improved 
environmental protection, and good access to individual cables for 
maintenance. 
• The cable-stayed bridge is optimal for spans longer than cantilever 
bridges, and shorter than suspension bridges.
Fig.10 Cable stayed Bridge over Cooper River
Conclusion 
• All bridges held generally the same amount of weight. The arch bridges 
held a little more than the other bridges. They were in the 1400-1500 
gram range. The other bridges were in the 1000-1200 gram range. 
• The bridges would not stand up on their own, so a support at each end 
had to be constructed. Balancing the weights on the bridges required 
patience. Clamps were used to hold the bridges during gluing. 
• The bridges supported different amounts of weights because each type 
has different construction. The arch bridges supported the most weight 
because of the great natural strength of the arch. The pier bridges 
supported the least weight because the supporting piers broke during 
construction.
Thank You

Contenu connexe

Tendances

Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Basic components and parts of bridge structures
Basic components and parts of bridge structuresBasic components and parts of bridge structures
Basic components and parts of bridge structuresMuhammad Qasim Jameel
 
Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its TypesZakaria Yahya
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringHalcrow
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineeringPooja Lonare
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating TunnelIntikhab Alam
 
LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYGhulam Yasin
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway EngineeringIrfan Nasir
 
Jetties and breakwater.pptx
Jetties and breakwater.pptxJetties and breakwater.pptx
Jetties and breakwater.pptxDEVNAIK7
 
Construction methods of Bridges and its types
Construction methods of Bridges and its typesConstruction methods of Bridges and its types
Construction methods of Bridges and its typesprathiekraj1
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge ConstructionRobin Nirwal
 
Bridge
Bridge Bridge
Bridge illpa
 

Tendances (20)

Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Introduction to bridges
Introduction to bridgesIntroduction to bridges
Introduction to bridges
 
Basic components and parts of bridge structures
Basic components and parts of bridge structuresBasic components and parts of bridge structures
Basic components and parts of bridge structures
 
Bridge Construction & Its Types
Bridge Construction & Its TypesBridge Construction & Its Types
Bridge Construction & Its Types
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Submerged Floating Tunnel
Submerged Floating TunnelSubmerged Floating Tunnel
Submerged Floating Tunnel
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
LOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAYLOW LEVEL & HIGH LEVEL CAUSEWAY
LOW LEVEL & HIGH LEVEL CAUSEWAY
 
Bridge
Bridge Bridge
Bridge
 
Bridges
BridgesBridges
Bridges
 
Defects in rails. Railway Engineering
Defects in rails. Railway EngineeringDefects in rails. Railway Engineering
Defects in rails. Railway Engineering
 
Jetties and breakwater.pptx
Jetties and breakwater.pptxJetties and breakwater.pptx
Jetties and breakwater.pptx
 
Construction methods of Bridges and its types
Construction methods of Bridges and its typesConstruction methods of Bridges and its types
Construction methods of Bridges and its types
 
Box culverts
Box culvertsBox culverts
Box culverts
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
 
Bridge,types of bridges
Bridge,types of bridgesBridge,types of bridges
Bridge,types of bridges
 
PPT On Bridge Construction
PPT On Bridge ConstructionPPT On Bridge Construction
PPT On Bridge Construction
 
Bridge
Bridge Bridge
Bridge
 

En vedette

Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge constructionsymphonyjo
 
Submerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilSubmerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilShantanu Patil
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridgemominzaki
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 
Cantilever bridge
Cantilever bridgeCantilever bridge
Cantilever bridgeWaiaupa4
 
Bridge foundation
Bridge  foundation Bridge  foundation
Bridge foundation Ghulam Yasin
 
Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Kushal Patel
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Vernacular Architecture (Case Study- H.P.)
Vernacular Architecture (Case Study- H.P.)Vernacular Architecture (Case Study- H.P.)
Vernacular Architecture (Case Study- H.P.)divya_binu
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONGLA University
 
Substructure of Bridges
Substructure of BridgesSubstructure of Bridges
Substructure of Bridgesdanmssnr
 

En vedette (16)

Basics of bridge construction
Basics of bridge constructionBasics of bridge construction
Basics of bridge construction
 
Submerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu PatilSubmerged Floating Tunnel by Shantanu Patil
Submerged Floating Tunnel by Shantanu Patil
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Types of bridges.pptx 1
Types of bridges.pptx 1Types of bridges.pptx 1
Types of bridges.pptx 1
 
Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
CHENAB BRIDGE
CHENAB BRIDGECHENAB BRIDGE
CHENAB BRIDGE
 
Cantilever bridge
Cantilever bridgeCantilever bridge
Cantilever bridge
 
flyover and bridge problems and its solutions
flyover and bridge problems and its solutionsflyover and bridge problems and its solutions
flyover and bridge problems and its solutions
 
Bridge foundation
Bridge  foundation Bridge  foundation
Bridge foundation
 
Bridge foundation
Bridge foundationBridge foundation
Bridge foundation
 
Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Types of bridge(theory.explanation)
Types of bridge(theory.explanation)
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Vernacular Architecture (Case Study- H.P.)
Vernacular Architecture (Case Study- H.P.)Vernacular Architecture (Case Study- H.P.)
Vernacular Architecture (Case Study- H.P.)
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
Substructure of Bridges
Substructure of BridgesSubstructure of Bridges
Substructure of Bridges
 

Similaire à Bridges in Hilly areas seminar

1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,bMani Das
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
Bridge and Railway Engineering.pptx
Bridge and Railway Engineering.pptxBridge and Railway Engineering.pptx
Bridge and Railway Engineering.pptxmayuray
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Mohamed Yassin
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningChinnuNinan
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civilAssad ULlah
 
Balanced Cantilever metro bridge.pptx
Balanced Cantilever metro bridge.pptxBalanced Cantilever metro bridge.pptx
Balanced Cantilever metro bridge.pptxLalitIngole1
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptxSauravShahane
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge constructionKundan Sanap
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls Manvinder Kingra
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever BridgeJeelkumar Patel
 
CHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design engCHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design engabdi beder
 

Similaire à Bridges in Hilly areas seminar (20)

1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
Bridge and Railway Engineering.pptx
Bridge and Railway Engineering.pptxBridge and Railway Engineering.pptx
Bridge and Railway Engineering.pptx
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)Bridge construction (RC girder bridges)
Bridge construction (RC girder bridges)
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioning
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
 
Balanced Cantilever metro bridge.pptx
Balanced Cantilever metro bridge.pptxBalanced Cantilever metro bridge.pptx
Balanced Cantilever metro bridge.pptx
 
CULVERTS.pdf
CULVERTS.pdfCULVERTS.pdf
CULVERTS.pdf
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
 
Bridge introduction
Bridge introductionBridge introduction
Bridge introduction
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
 
Bridge intr.ppt
Bridge intr.pptBridge intr.ppt
Bridge intr.ppt
 
CHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design engCHapter 1 introduction to bridge design eng
CHapter 1 introduction to bridge design eng
 
Bridge Engg1.ppt
Bridge Engg1.pptBridge Engg1.ppt
Bridge Engg1.ppt
 

Dernier

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Dernier (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Bridges in Hilly areas seminar

  • 1. Traffic Analysis of Gomti Nagar with respect to Pedestrian Facilities SRMGPC LUCKNOW [INDIA] Seminar Topic- Bridges In Hilly Challenges By Abhinav [1112200004] Under Guidance of- Mr. Gangesh Kr. Kasaudhan Asstt. Professor Department of Civil Engineering
  • 2. Introduction • A Bridge is a structure build to span a valley, road, river, body of water, or any other physical obstacle. • Designs of Bridges will vary depending upon the function of the bridge and nature of the area where the bridge is to be constructed. • The first bridges were made by nature itself—as simple as a log fallen across a stream or stones in the river. • The first bridges made by humans were probably spans of cut wooden logs or planks and eventually stones, using a simple support and crossbeam arrangement. • Some early Americans used trees or bamboo poles to cross small caverns or wells to get from one place to another.
  • 3. Ctd. • A common form of lashing sticks, logs, and deciduous branches together involved the use of long reeds or other harvested fibers woven together to form a connective rope capable of binding and holding together the materials used in early bridges. • Hilly region pose unique problem for bridge construction. In a restricted hilly area itself climatic conditions, geological features and hydrological parameters vary considerably. • Keeping in view the bridge site and various constraints, type of bridge and method of construction are to be selected carefully for safe, economical and successful completion of bridge construction.
  • 4. Fig.1 History of Bridge Development
  • 5. Challenges in Hilly Area Bridges Construction Various challenges that come across while constructing bridges in hilly area are: • Construction of bridge across deep gorges; • Construction of bridge on rivers with boundary beds; • Construction of bridges in extreme temperature zones; • Construction of bridges on sharp turn on highway; • Landslide or Debris flow.
  • 6. Bridge Foundation and Substructure • Foundation construction for any large bridge takes time. • Problems encountered during construction of foundation depend upon type of foundation, soil strata encountered, equipment/plant deployed and logistic problems. Construction difficulties anticipated during the execution be kept in view while planning the works/ period for the job. • Foundation can be opened foundation, pile foundation, well foundation or any other types of foundation. • In case of well foundation, the various type of soil are encountered and it becomes difficult to give any clear time schedule about the sinking of wells unless the soil details are very clear and the anticipated profile matched with the actual encountered. • In case of boundary and clayey soil the rate of sinking schedule is likely to be slow when compared with the sandy soil. • Also there may be requirement of pneumatic sinking technique subsequent to open grabbing due to difficulties in sinking of well.
  • 7. Superstructure • For particular site there are numerous structural arrangements possible. • Final proposal be made based on the greater examination of site condition may be technical, aesthetic and construction methodology. • Special care need to be taken in case of deep gorge where there is sizable difference between soffit level and bed level. This may pose difficulties for staging and shuttering. • Proposal recommended for site should be well read in advance. After the proposal has been finalized for particular bridge, the construction can be planned. • The quantities of each items involved and execution method be listed. Basically method statement should be kept ready for overall execution including job estimate.
  • 8. Plant Management Requirement of equipment/plant be assessed systematically and accordingly action may be taken to arrange this for a particular job. • Quantum of work covering all the items with specifications; • Time available for work execution; • Details of equipment and also minimum requirement as per job position; • Rated capacity of equipment/ plant; • Assessed capacity; • Schedule of maintenance; • Inventory of spare parts required; • Repair cover to equipment/plant.
  • 9. Material Management • Material management is a parallel activity along with start of the Project. • This cover procurement of camp material, office equipment, major purchased items, such as aggregates, sand, cement, steel, structural steel, shuttering consumables, electrical fittings. • Forecasting of quantities and cost of various items on monthly basis must be done at least three to six months in advance which should be regularly reviewed.
  • 10. Finance Management • No project and implimentation or project and implimentation management can be meaningful without this. • In case of Government work the manager should get his budget fixed on monthly basis, on the basis of work done or minimum to be fed at site, on the decision of higher authorities. • Key to measure financial planning lies in taking all above action and taking suitable measures at appropriate times to ensure that individual inputs are achieved to the maximum and capital investment kept at the lowest level.
  • 11. Types of Hilly Area Bridges • Beam Bridge; • Truss Bridge; • Cantilever Bridge; • Arch Bridge; • Tied-Arch Bridge; • Suspension Bridge; • Cable-Stayed Bridge.
  • 12. Beam Bridge • Beam bridges are the simplest structural forms for bridge spans supported by an abutment or pier at each end. • No moments are transferred throughout the support, hence their structural type is known as simply supported. • The simplest beam bridge could be a stone slab or a wood plank laid across a stream. • Bridges designed for modern infrastructure will usually be constructed of steel or reinforced concrete, or a combination of both.
  • 14. Truss Bridge • A truss bridge is a bridge whose load-bearing superstructure is composed of a truss, a structure of connected elements forming triangular units. • The connected elements may be stressed from tension, compression, or sometimes both in response to dynamic loads. • Truss bridges are one of the oldest types of modern bridges. • The basic types of truss bridges shown in this article have simple designs which could be easily analyzed by 19th- and early 20th-century engineers. • A truss bridge is economical to construct because it uses materials efficiently. Fig.3 Truss Bridge
  • 15. Cantilever Bridge • A cantilever bridge is a bridge built using cantilevers, structures that project horizontally into space, supported on only one end. • For small footbridges, the cantilevers may be simple beams; however, large cantilever bridges designed to handle road or rail traffic use trusses built from structural steel, or box girders built from prestressed concrete. • The steel truss cantilever bridge was a major engineering breakthrough when first put into practice, as it can span distances of over 1,500 feet (460 m), and can be more easily constructed at difficult crossings by virtue of using little or no falsework. • A simple cantilever span is formed by two cantilever arms extending from opposite sides of an obstacle to be crossed, meeting at the center. Fig. 4 Cantilever Bridge Components Fig. 5
  • 16. Fig. 6 Howrah Bridge
  • 17. Arch Bridge • An arch bridge is a bridge with abutments at each end shaped as a curved arch. • Arch bridges work by transferring the weight of the bridge and its loads partially into a horizontal thrust restrained by the abutments at either side. • A viaduct (a long bridge) may be made from a series of arches, although other more economical structures are typically used today. Fig. 7 Zhijinghe River Bridge
  • 18. Tied-Arch Bridges • A tied-arch bridge is an arch bridge in which the outward-directed horizontal forces of the arch, or top chord, are borne as tension by the bottom chord, rather than by the ground or the bridge foundations. • Thrusts downward on such a bridge's deck are translated, as tension, by vertical ties of the deck to the curved top chord, tending to flatten it and thereby to push its tips outward into the abutments, like other arch bridges. However, in a tied-arch or bowstring bridge, these movements are restrained not by the abutments but by the bottom chord, which ties these tips together, taking the thrusts as tension, rather like the string of a bow that is being flattened. Therefore, the design is often called a bowstring-arch or bowstring-girder bridge. Fig.8 Tied-Arch Bridge
  • 19. Suspension Bridge • A suspension bridge is a type of bridge in which the deck (the load-bearing portion) is hung below suspension cables on vertical suspenders. • The first modern examples of this type of bridge were built in the early 19th century. • Bridges without vertical suspenders have a long history in many mountainous parts of the world. • This type of bridge has cables suspended between towers, plus vertical suspender cables that carry the weight of the deck below, upon which traffic crosses. • This arrangement allows the deck to be level or to arc upward for additional clearance. • Like other suspension bridge types, this type often is constructed without falsework. Fig.9 Capilano Suspension Bridge
  • 20. Cable-Stayed Bridge • A cable-stayed bridge has one or more towers (or pylons), from which cables support the bridge deck. • There are two major classes of cable-stayed bridges: harp and fan. • In the harp or parallel design, the cables are nearly parallel so that the height of their attachment to the tower is proportional to the distance from the tower to their mounting on the deck. • In the fan design, the cables all connect to or pass over the top of the towers. The fan design is structurally superior with minimum moment applied to the towers but for practical reasons the modified fan is preferred especially where many cables are necessary. In the modified fan arrangement the cables terminate near to the top of the tower but are spaced from each other sufficiently to allow better termination, improved environmental protection, and good access to individual cables for maintenance. • The cable-stayed bridge is optimal for spans longer than cantilever bridges, and shorter than suspension bridges.
  • 21. Fig.10 Cable stayed Bridge over Cooper River
  • 22. Conclusion • All bridges held generally the same amount of weight. The arch bridges held a little more than the other bridges. They were in the 1400-1500 gram range. The other bridges were in the 1000-1200 gram range. • The bridges would not stand up on their own, so a support at each end had to be constructed. Balancing the weights on the bridges required patience. Clamps were used to hold the bridges during gluing. • The bridges supported different amounts of weights because each type has different construction. The arch bridges supported the most weight because of the great natural strength of the arch. The pier bridges supported the least weight because the supporting piers broke during construction.