Manual Plastering
What is Plaster?
Plaster is a building material used for coating walls and
ceilings. Sand-cement plaster is used extensively in building
work as a decorative or protective coating for concrete and
masonry walls .
Plaster is one of the oldest building materials, the most
primitive form was mud plaster, used to hold together
structures made of branches or wood for example. Today
internal plastering is used more as a way of smoothing out
surfaces and preparing them for decoration, it also adds
strength to the wall or ceiling and helps seal together building
materials.
Materials Required
 Cement
 Sand
 Water
 Masonry Trowel
 Smoothening Trowel
 Metal Float
 Measuring Tape
 Plumb Bob
 Mud Pan
 Chicken Mesh
 Hairs
 Recron Fibre6/9/2014
Know your Materials!
6/9/2014
Cement Sand Recron Fibre
Final Mortar mix (made from
mixing Cement,sand,water and
recron fibre) present in a Mudpan
Procedure
1. After the masonry wall made of bricks or aerated blocks is ready, it is
first cleaned properly before starting the plastering wall using brushes
and trowels.
6/9/2014
Brick wall Aerated Block wall
2. The scaffold is prepared for provide the labour a platform to stand and
materials required for plastering are transported at the site of plastering.
3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For
ex-In our case the ratio specified is 1:4.So we use
1 unit volume of cement for 4 unit volume of
sand. The normal cement bag is 50 kg in mass
0.035 m3. So we prepare a container of volume
0.035 m3 and pour 4 containers of cement.
6/9/2014
Scaffolding
Container
for
measuring
sand
4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125
gm fibre for 1 bag of cement.
5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of
cement, but at site it is subjected to the workability requirements.
Note: The mortar mix should be used within it’s initial setting time = 45 min
6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at
the joint in future.
6/9/2014
Chicken Mesh Labour putting Chicken Mesh
7. Making of Level Pads : Level pads are used for maintaining the thickness of
plaster coat required.They act as a reference for checking thickness of plaster.
- First we lay a reference line using rope and nails
- We check the distance of wall from this reference line and note it(say D1)
- Now we put the mortar of wall and smoothen it. We now calculate the
distance between the reference line and level pad’s surface(say D2)
D1-D2= Thickness of coat required
- If the thickness doesn’t matches then adjust the thickness of level pad
- Now make one level pad above the first level pad and check if it’s in line
with the help of plumb bob.It might happen the wall is not exactly vertical
either inwards or outwards which can be checked with help of plumb bob
hence thickness of level pad can be adjusted accordingly.
6/9/2014
6/9/2014
Labourers checking the distance of wall from reference
line
Making of level pad
6/9/2014
Level Pad
Labourers checking distance of level pad from reference
line
6/9/2014
Plumb Bob
No gap between wall and plumb
bob, signifying that wall is straight
Gap between wall and plumb
bob indicating that wall is
“Inwards”
- After checking for vertical alignment of level pads, check for horizontal
alignment with the help of a rope( pin a rope parallel to the first level pad
also vertical with adjacent wall).Adjust the level pads in thickness if the wall
is tilted sideways.
6/9/2014
Checking for vertical alignment of pads
Horizontally laid level pads
8. After making the level pads, wet the wall with help of diluted cement water slurry
to provide better adhesion with mortar.
9. The mason then applies the mortar on the walls
with the help of trowel.
6/9/2014
Masonry Trowel
10. With the help of metal float the mason creates a smooth reference plain of
required thickness by pressing the float against two vertical level pads.The
additional mortar is scrapped of with the help of float.
6/9/2014Metal Float
Reference Plain
11. The finishing of the plaster is done with the help of finishing trowel.
6/9/2014
Removing excess material with
float
Finishing Trowel
12. After smoothening, the plaster is roughened up for providing better adhesion in
case of a second coat. A hair is used for it or sometimes labour also uses chicken
mesh only.
6/9/2014
Hair used for roughening
surface
Rough Plaster coat
Challenges in Manual Plastering
1. A proper hierarchical system is not present on site. Ideally the engineer should
teach the supervisor as in what he requires and the supervisor should convey it to
the labour.But due to lack of number and agility of supervisors the engineer has
to do that part.
2. Due to above point, the engineer is not able to perform his main task efficiently
which is Quality Checks .Two examples in this regard are:-
(a) Amount of water is not as per as standards and the labour puts water
according to his will. This in turn degrades the quality of the mix.
(b) Checking of the thickness and alignment of level pads is not proper which
leads to lack of uniformity of plaster. Plumb checking is not also proper.
3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes
used beyond 4 hours. This again degrades the quality.
4. The floor is not cleaned properly before starting plaster and sacks are not always
laid down to collect the fallen mortar. So the mortar gets mixed with the mud and
is then used again which has serious implications on the quality.
6/9/2014
5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of
loosing labour the supervisor also doesn’t say much to them as his performance is
judged by the way he handles the labourers.This leads to slow pace of work.
6/9/2014
Fallen Mortar getting mixed
with mud

Contenu connexe

Tendances

Tendances (20)

Foundation
FoundationFoundation
Foundation
 
Plastering
PlasteringPlastering
Plastering
 
Plastering
PlasteringPlastering
Plastering
 
Plaster
PlasterPlaster
Plaster
 
Plastering ppt
Plastering pptPlastering ppt
Plastering ppt
 
Bulking of sand
Bulking of sandBulking of sand
Bulking of sand
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
 
Design and analysis of flexible pavement
Design and analysis of flexible pavementDesign and analysis of flexible pavement
Design and analysis of flexible pavement
 
Damp proofing course archna
Damp proofing course archnaDamp proofing course archna
Damp proofing course archna
 
Shallow foundation
Shallow foundationShallow foundation
Shallow foundation
 
Concrete
ConcreteConcrete
Concrete
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures Cracks in concrete and its remedial measures
Cracks in concrete and its remedial measures
 
REPORT ON PLASTERING
REPORT ON PLASTERINGREPORT ON PLASTERING
REPORT ON PLASTERING
 
Plastering by mani
Plastering by maniPlastering by mani
Plastering by mani
 
Construction Materials
Construction Materials Construction Materials
Construction Materials
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
type of aggregate
type of aggregatetype of aggregate
type of aggregate
 
Construction of flexible pavement
Construction of flexible pavementConstruction of flexible pavement
Construction of flexible pavement
 
Unit 4
Unit 4Unit 4
Unit 4
 

Similaire à Manual Plastering Guide: How to Smooth Walls with Cement Mix (39

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Chan Yifung
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersPhurba Tamang
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bmLin Hui
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIPMkh Nantu
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructureRohan chansoriya
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and strawlibnam
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plasteringbuiltify
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfAbhinavSahu45
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportSheng Zhe
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksBhagyashreeNagpure2
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Vijay Patidar
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Vijay Patidar
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01Engr. Umair Razzaq
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptxHimanshumangal12
 
house construction
house constructionhouse construction
house constructionAbhinav Saha
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxswethaasukumar
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningANURAG KASHYAP
 

Similaire à Manual Plastering Guide: How to Smooth Walls with Cement Mix (39 (20)

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
 
abcreport
abcreportabcreport
abcreport
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIP
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
 
cereamic
cereamiccereamic
cereamic
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and straw
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plastering
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdf
 
paving_.pdf
paving_.pdfpaving_.pdf
paving_.pdf
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
house construction
house constructionhouse construction
house construction
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 

Dernier

Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 

Dernier (20)

Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 

Manual Plastering Guide: How to Smooth Walls with Cement Mix (39

  • 2. What is Plaster? Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls . Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.
  • 3. Materials Required  Cement  Sand  Water  Masonry Trowel  Smoothening Trowel  Metal Float  Measuring Tape  Plumb Bob  Mud Pan  Chicken Mesh  Hairs  Recron Fibre6/9/2014
  • 4. Know your Materials! 6/9/2014 Cement Sand Recron Fibre Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan
  • 5. Procedure 1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels. 6/9/2014 Brick wall Aerated Block wall
  • 6. 2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering. 3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use 1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement. 6/9/2014 Scaffolding Container for measuring sand
  • 7. 4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement. 5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements. Note: The mortar mix should be used within it’s initial setting time = 45 min 6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at the joint in future. 6/9/2014 Chicken Mesh Labour putting Chicken Mesh
  • 8. 7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster. - First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad - Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly. 6/9/2014
  • 9. 6/9/2014 Labourers checking the distance of wall from reference line Making of level pad
  • 10. 6/9/2014 Level Pad Labourers checking distance of level pad from reference line
  • 11. 6/9/2014 Plumb Bob No gap between wall and plumb bob, signifying that wall is straight Gap between wall and plumb bob indicating that wall is “Inwards”
  • 12. - After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways. 6/9/2014 Checking for vertical alignment of pads Horizontally laid level pads
  • 13. 8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar. 9. The mason then applies the mortar on the walls with the help of trowel. 6/9/2014 Masonry Trowel
  • 14. 10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float. 6/9/2014Metal Float Reference Plain
  • 15. 11. The finishing of the plaster is done with the help of finishing trowel. 6/9/2014 Removing excess material with float Finishing Trowel
  • 16. 12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only. 6/9/2014 Hair used for roughening surface Rough Plaster coat
  • 17. Challenges in Manual Plastering 1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part. 2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:- (a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper. 3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes used beyond 4 hours. This again degrades the quality. 4. The floor is not cleaned properly before starting plaster and sacks are not always laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality. 6/9/2014
  • 18. 5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work. 6/9/2014 Fallen Mortar getting mixed with mud