1. MGMT404 Week 5 iLab Resource Workloads
PLEASE DOWNLOAD HERE
Project Monitoring and Control & Managing Project Teams - iLab
iLab 5 of 7: Resource Workloads
General Comments about the Microsoft Project Exercises
A project schedule cannot be confirmed until all resource variations and
overallocations are managed. To do this we will:
View resource workloads. Locate resource conflicts. Use automatic leveling to
resolve resource overallocations. Manually resolve resource overallocations.
Guidelines
Complete Lesson 5. Print the Gantt Chart View. (Include only those columns up
to and including the Finish Date column and the Gantt chart. Print this item on two
pages wide.) Print the Project Summary Report. Print the TaskUsage Report.
Deliverables
All of the following deliverables are required (in a zip file) to receive full credit:
Completed MyLab5_XXX.mpp Completed Review Questions
Printouts/screenshots contained in Week_5_Printouts_XXX.docx
When submitting required printouts (if you are not bringing them to class), take a
screenshot (in Windows <ALT><PrtScr>) of the report from the Print Preview
page and paste the screenshot to an MS Word document. Make sure to crop the
screen to show only the report. After cropping, resize the image appropriately. If
the printout is on more than one page, paste each page individually.
Save the Word document containing printouts as Week_5_Printouts_XXX.docx,
and submit this file to the Week 5 iLabDropbox in a zip file along with the
MyLab5_XXX.mpp file and the completed Review Questions at the end of Lesson
5. Remember to replace "XXX" in all the file names with your initials, and ensure
that all of your files are clearly labeled.
iLAB STEPS
2. STEP 1: Download iLab Instructions
Click the links below to access this week's iLab instructions. You may also
download both lessons from the MS Project Exercises category in Doc Sharing.
MS Project Lesson5.docx(Review Questions to be completed and submitted for
Lesson 5 are located at the end of this document.)
STEP 2: Complete the iLab Assignment
Complete the iLab assignment for Week 5 based on the Guidelines section and
Lesson document above.
STEP 3: Submit iLab Deliverables
Create a folder called MGMT404_YourLastName_Lab5.nm