ITEMS DE PERFORACION Y VOLADURA
EQUIPO DE PERFORACION

JUMBO

SECCION DE LABOR

4.00

X

DESMONTE

2.9
Metros
Metros
Metros

TIPO DE ROCA

M

DURA

TIPO DE MATERIAL Y DENSIDAD
LONGITUD DE BARRA

4.27

LONGITUD DE PERFORACION

3.96

EFICIENCIA DE VOLADURA

3.69

TALADROS PERFORADOS

MINERAL

TALADROS RIMADOS

3.8

14

Pies

13

Pies

93

43

%

Unidades / frente
Unidades / frente

4
4

TALADROS DISPARADOS

Unidades / frente

35

TALADROS DE ALIVIO

Unidades / frente

VOLUMEN CALCULADO (m3)

DESMONTE

58.96

MINERAL

58.96

TONELAJE ROTO (TON.)

DESMONTE

170.99

MINERAL

224.05

FACTOR DE CARGA - EMULSION Y ANFO
FACTOR DE CARGA Kg/ M3

KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION)
133.53
Kilos
107.37 U$D
Kilos
0.00 U$D
EMULSION 1 x 8"
Kilos
0.00 U$D
EMULSION 1 1/8 x 12"
Kilos
0.00 U$D
EMULSION 1 1/4 x 12"
15.96
Kilos
26.18 U$D
EMULSION 1 1/2 x 12"
Kilos
0.00 U$D
KILOS TOTAL DE EXPLOSIVOS
149.494
Kilos
133.55 U$D
COSTOS DE ACCESORIOS (U$D)
EXANEL 3.00 m
Und
0 U$D
EXANEL 4.20 m
35
Und
42 U$D
CORDON DETONANTE - Metro
25
m
4 U$D
FULMINANTE - Unidad
2
Und
0.22 U$D
MECHA LENTA - Metro
6
m
1.62 U$D
COSTO DE ACCESORIOS
47.84
U$D / DISPARO
COSTO TOTAL - EMULSION Y ANFO
181.39
U$D / DISPARO
ANFO

4.00

DINAMITA 7/8 x 7"

DESMONTE

2.54

MINERAL

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.87

MINERAL

0.67

49.22

MINERAL

49.22

2.54
DINAMITA 7/8 x 7"

1.06

MINERAL

0.81

EMULSION 1 x 8"

KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION

EMULSION 1 1/8 x 12"

FACTOR DE CARGA - EMULSION
FACTOR DE CARGA Kg/ M3

EMULSION 1 1/4 x 12"

DESMONTE

1.90

MINERAL

1.90

EMULSION 1 1/2 x 12"

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.65

MINERAL

0.50

KILOS TOTAL DE EXPLOSIVOS

60.96

MINERAL

65.55

COSTO DE ACCESORIOS

1.41

MINERAL

1.08

COSTO TOTAL - EMULSION

22.92
89.06
111.98
47.84
241.55

Kilos
Kilos
Kilos
Kilos
Kilos
Kilos

0.00
0.00
0.00
37.59
156.12
193.71
U$D / DISPARO
U$D / DISPARO

DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DURA
CANTIDAD DE TALADROS
ARRANQUE
1RA. AYUDA
2DA. AYUDA
AY. CUADRADOR
CUADRADOR
AY. CORONA
CORONA
ARRASTRE
CUNETA
TAL. RIMADOS
TAL. ALIVIOS

TOTAL

3
4
4
4
6
3
5
5
1
4
4

43

CARTUCHOS DE
EMULSION / TALADROS
1 1/2 x 12"
1 1/4 x 12"
12
0
11
0
10
0
9
0
8
0
8
0
0
6
0
10
0
8
0
0
0
0

228

88

TOTAL EN
KILOS
14.08
17.20
15.64
14.08
18.77
9.38
7.80
13.00
2.08
0.00
0.00

112.03

CEBO EMULSION Y COLUMNA DE ANFO
EMULSION
COLUMNA
KILOS EXPLOSIVOS
1 1/4 x 12"
ANFO (m)
EMULSION
ANFO
3
3.00
0.80
16.11
4
3.00
1.06
21.48
4
2.40
1.06
17.18
4
2.40
1.06
17.18
6
2.40
1.60
25.78
3
2.00
0.80
10.74
30
0.00
7.98
0.00
5
2.40
1.33
21.48
1
2.00
0.27
3.58
0
0.00
0.00
0.00
0
0.00
0.00
0.00

60

74.60

15.96

133.53

TOTAL EN
KILOS
16.91
22.54
18.25
18.25
27.37
11.54
7.98
22.81
3.85
0.00
0.00

149.49

U$D
U$D
U$D
U$D
U$D
U$D
PRECIOS DE EXPLOSIVOS Y ACCESORIOS
Explosivo
UN
3.00 m

CART

EXANEL U$D - Unidad

PESOS (Kg) Costo Unid us$/Kg
1.13 4.20 m
1.2

0.16
0.11
0.12
0.27

CORDON DETONANTE - Metro
FULMINANTE N° 8 - Unidad

MECHA - Metro
MECHA RAPIDA - Metro
CORDON DETONANTE PENTACORD 3P

M

1,800

0.014

DINAMITA SEMEXSA 45% DE 7/8 X 7

CJ

316

0.079

NITRATO DE AMONIO TECNICO, * GRADO ANFO-

KG

25

1.000

EMULSION EMULEX 65 1 1/8X12"

UN

104

0.240

EMULEX 65% 1 1/2 X 12"
EMULEX 65% 1 1/4 X 12"

UN

64

0.391

UN

96

0.260

EMULSION 1 x 8"

UN

0.16
0.18
0.80
0.44
0.68
0.43

11.80
2.31
0.80
1.85
1.75
1.64
ITEMS DE PERFORACION Y VOLADURA
EQUIPO DE PERFORACION

JUMBO

SECCION DE LABOR

4.00

X

TIPO DE ROCA

4.00

M

SEMI DURA

TIPO DE MATERIAL Y DENSIDAD

DESMONTE
4.27

LONGITUD DE BARRA

2.9
Metros
Metros
Metros

MINERAL

3.8

14

Pies

12

Pies

90

%

LONGITUD DE PERFORACION

3.66

EFICIENCIA DE VOLADURA

3.29

TALADROS PERFORADOS

42

Unidades / frente

TALADROS RIMADOS

4

Unidades / frente

TALADROS DE ALIVIO

4

Unidades / frente

34

Unidades / frente

TALADROS DISPARADOS
VOLUMEN CALCULADO (m3)

DESMONTE

52.67

MINERAL

52.67

TONELAJE ROTO (TON.)

DESMONTE

152.74

MINERAL

200.14

FACTOR DE CARGA - EMULSION Y ANFO
FACTOR DE CARGA Kg/ M3

DESMONTE

2.68

MINERAL

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.93

MINERAL

2.68
0.71

52.68

MINERAL

52.68

1.14

MINERAL

0.87

1.96

FACTOR DE CARGA - EMULSION
FACTOR DE CARGA Kg/ M3

DESMONTE

1.96

MINERAL

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.67

MINERAL

0.51

61.41

MINERAL

68.23

1.47

MINERAL

1.12

DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DU
CANTIDAD DE TALADROS
ARRANQUE
1RA. AYUDA
2DA. AYUDA
AY. CUADRADOR
CUADRADOR
AY. CORONA
CORONA
ARRASTRE
CUNETA
TAL. RIMADOS
TAL. ALIVIOS

TOTAL

3
4
4
4
6
2
5
5
1
4
4

42

CARTUCHOS DE
EMULSION / TALADROS
1 1/2 x 12"
1 1/4 x 12"
11
0
10
0
9
0
8
0
8
0
8
0
0
6
0
10
0
8
0
0
0
0

205

88

TOTAL EN
KILOS
12.90
15.64
14.08
12.51
18.77
6.26
7.80
13.00
2.08
0.00
0.00

103.04
KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION)
125.66
Kilos
101.04 U$D
DINAMITA 7/8 x 7"
Kilos
0.00 U$D
EMULSION 1 x 8"
Kilos
0.00 U$D
EMULSION 1 1/8 x 12"
Kilos
0.00 U$D
EMULSION 1 1/4 x 12"
15.69
Kilos
25.74 U$D
EMULSION 1 1/2 x 12"
Kilos
0.00 U$D
KILOS TOTAL DE EXPLOSIVOS
141.352
Kilos
126.78 U$D
COSTOS DE ACCESORIOS (U$D)
EXANEL 3.00 m
Und
0 U$D
EXANEL 4.20 m
34
Und
40.8 U$D
CORDON DETONANTE - Metro
25
m
4 U$D
FULMINANTE - Unidad
2
Und
0.22 U$D
MECHA LENTA - Metro
6
m
1.62 U$D
COSTO DE ACCESORIOS
46.64
U$D / DISPARO
COSTO TOTAL - EMULSION Y ANFO
173.42
U$D / DISPARO
ANFO

KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION
DINAMITA 7/8 x 7"
EMULSION 1 x 8"
EMULSION 1 1/8 x 12"
EMULSION 1 1/4 x 12"
EMULSION 1 1/2 x 12"
KILOS TOTAL DE EXPLOSIVOS
COSTO DE ACCESORIOS
COSTO TOTAL - EMULSION

22.92
80.08
102.99
46.64
224.60

Kilos
Kilos
Kilos
Kilos
Kilos
Kilos

0.00
0.00
0.00
37.59
140.37
177.96
U$D / DISPARO
U$D / DISPARO

EMULSION Y ANFO) - ROCA DURA
CEBO EMULSION Y COLUMNA DE ANFO
COLUMNA
KILOS EXPLOSIVOS
EMULSION
1 1/4 x 12"
ANFO (m)
EMULSION
ANFO
3
3.00
0.80
16.11
4
3.00
1.06
21.48
4
2.40
1.06
17.18
4
2.40
1.06
17.18
6
2.00
1.60
21.48
2
2.00
0.53
7.16
30
0.00
7.98
0.00
5
2.40
1.33
21.48
1
2.00
0.27
3.58
0.00
0.00
0
0.00
0.00
0.00
0
0.00

59

70.20

15.69

125.66

TOTAL EN
KILOS
16.91
22.54
18.25
18.25
23.08
7.69
7.98
22.81
3.85
0.00
0.00

141.35

U$D
U$D
U$D
U$D
U$D
U$D
PRECIOS DE EXPLOSIVOS Y ACCESORIOS
Explosivo
UN
EXANEL U$D - Unidad
3.00 m

CART

PESOS (Kg) Costo Unid
1.13 4.20 m
1.2

0.16
0.11
0.12
0.27

CORDON DETONANTE - Metro
FULMINANTE N° 8 - Unidad

MECHA - Metro
MECHA RAPIDA - Metro
CORDON DETONANTE PENTACORD 3P

M

1,800

0.014

DINAMITA SEMEXSA 45% DE 7/8 X 7

CJ

316

0.079

NITRATO DE AMONIO TECNICO, * GRADO ANFO-

KG

25

1.000

EMULSION EMULEX 65 1 1/8X12"

UN

104

0.240

EMULEX 65% 1 1/2 X 12"
EMULEX 65% 1 1/4 X 12"

UN

64

0.391

UN

96

0.260

EMULSION 1 x 8"

UN

0.16
0.18
0.80
0.44
0.68
0.43
us$/Kg

11.80
2.31
0.80
1.85
1.75
1.64
ITEMS DE PERFORACION Y VOLADURA
EQUIPO DE PERFORACION

JUMBO

SECCION DE LABOR

4.00

X

TIPO DE ROCA

4.00

M

SUAVE

TIPO DE MATERIAL Y DENSIDAD

DESMONTE
4.27

LONGITUD DE BARRA

2.9
Metros
Metros
Metros

MINERAL

3.8

14

Pies

10

Pies

90

%

LONGITUD DE PERFORACION

3.05

EFICIENCIA DE VOLADURA

2.74

TALADROS PERFORADOS

39

Unidades / frente

TALADROS RIMADOS

4

Unidades / frente

TALADROS DE ALIVIO

5

Unidades / frente

30

Unidades / frente

TALADROS DISPARADOS
VOLUMEN CALCULADO (m3)

DESMONTE

43.89

MINERAL

43.89

TONELAJE ROTO (TON.)

DESMONTE

127.28

MINERAL

166.79

FACTOR DE CARGA - EMULSION Y ANFO
FACTOR DE CARGA Kg/ M3

DESMONTE

2.60

MINERAL

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.90

MINERAL

2.60
0.69

52.15

MINERAL

52.15

1.12

MINERAL

0.86

1.81

FACTOR DE CARGA - EMULSION
FACTOR DE CARGA Kg/ M3

DESMONTE

1.81

MINERAL

FACTOR DE POTENCIA Kg / TM
DESMONTE
COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE
COSTO POR TONELADAS (U$D / TM)
DESMONTE

0.62

MINERAL

0.48

58.75

MINERAL

65.28

1.41

MINERAL

1.07

DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DU
CANTIDAD DE TALADROS
ARRANQUE
1RA. AYUDA
2DA. AYUDA
AY. CUADRADOR
CUADRADOR
AY. CORONA
CORONA
ARRASTRE
CUNETA
TAL. RIMADOS
TAL. ALIVIOS

TOTAL

3
4
4
0
6
3
4
5
1
4
5

39

CARTUCHOS DE
EMULSION / TALADROS
1 1/2 x 12"
1 1/4 x 12"
9
0
9
0
8
0
0
0
7
0
7
0
0
4
0
9
0
7
0
0
0
0

158

68

TOTAL EN
KILOS
10.56
14.08
12.51
0.00
16.42
8.21
4.16
11.70
1.82
0.00
0.00

79.46
KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION)
103.10
Kilos
82.90 U$D
DINAMITA 7/8 x 7"
Kilos
0.00 U$D
EMULSION 1 x 8"
Kilos
0.00 U$D
EMULSION 1 1/8 x 12"
Kilos
0.00 U$D
EMULSION 1 1/4 x 12"
11.17
Kilos
18.32 U$D
EMULSION 1 1/2 x 12"
Kilos
0.00 U$D
KILOS TOTAL DE EXPLOSIVOS
114.276
Kilos
101.23 U$D
COSTOS DE ACCESORIOS (U$D)
EXANEL 3.00 m
Und
0 U$D
EXANEL 4.20 m
30
Und
36 U$D
CORDON DETONANTE - Metro
25
m
4 U$D
FULMINANTE - Unidad
2
Und
0.22 U$D
MECHA LENTA - Metro
6
m
1.62 U$D
COSTO DE ACCESORIOS
41.84
U$D / DISPARO
COSTO TOTAL - EMULSION Y ANFO
143.07
U$D / DISPARO
ANFO

KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION
DINAMITA 7/8 x 7"
EMULSION 1 x 8"
EMULSION 1 1/8 x 12"
EMULSION 1 1/4 x 12"
EMULSION 1 1/2 x 12"
KILOS TOTAL DE EXPLOSIVOS
COSTO DE ACCESORIOS
COSTO TOTAL - EMULSION

17.71
61.72
79.43
41.84
179.07

Kilos
Kilos
Kilos
Kilos
Kilos
Kilos

0.00
0.00
0.00
29.04
108.19
137.23
U$D / DISPARO
U$D / DISPARO

EMULSION Y ANFO) - ROCA DURA
CEBO EMULSION Y COLUMNA DE ANFO
COLUMNA
KILOS EXPLOSIVOS
EMULSION
1 1/4 x 12"
ANFO (m)
EMULSION
ANFO
3
2.80
0.80
15.04
4
2.80
1.06
20.05
4
2.50
1.06
17.90
0
2.00
0.00
0.00
6
1.80
1.60
19.33
3
1.80
0.80
9.67
16
0.00
4.26
0.00
5
2.00
1.33
17.90
1
1.80
0.27
3.22
0.00
0.00
0
0.00
0.00
0.00
0
0.00

42

57.60

11.17

103.10

TOTAL EN
KILOS
15.83
21.11
18.96
0.00
20.93
10.46
4.26
19.23
3.49
0.00
0.00

114.28

U$D
U$D
U$D
U$D
U$D
U$D
PRECIOS DE EXPLOSIVOS Y ACCESORIOS
Explosivo
UN
EXANEL U$D - Unidad
3.00 m

CART

PESOS (Kg) Costo Unid
1.13 4.20 m
1.2

0.16
0.11
0.12
0.27

CORDON DETONANTE - Metro
FULMINANTE N° 8 - Unidad

MECHA - Metro
MECHA RAPIDA - Metro
CORDON DETONANTE PENTACORD 3P

M

1,800

0.014

DINAMITA SEMEXSA 45% DE 7/8 X 7

CJ

316

0.079

NITRATO DE AMONIO TECNICO, * GRADO ANFO-

KG

25

1.000

EMULSION EMULEX 65 1 1/8X12"

UN

104

0.240

EMULEX 65% 1 1/2 X 12"
EMULEX 65% 1 1/4 X 12"

UN

64

0.391

UN

96

0.260

EMULSION 1 x 8"

UN

0.16
0.18
0.80
0.44
0.68
0.43
us$/Kg

11.80
2.31
0.80
1.85
1.75
1.64

Contenu connexe

Tendances

4 perforacion voladura_y_ventilacion
4 perforacion voladura_y_ventilacion4 perforacion voladura_y_ventilacion
4 perforacion voladura_y_ventilacionWilmer Taco
 
Equipos de perforación y voladura en minería subterránea
Equipos de perforación y voladura en minería subterráneaEquipos de perforación y voladura en minería subterránea
Equipos de perforación y voladura en minería subterráneaRicardoAndresToledoQ
 
04 diseño y trazo de voladura subterranea parte 2
04 diseño y trazo de voladura subterranea parte 204 diseño y trazo de voladura subterranea parte 2
04 diseño y trazo de voladura subterranea parte 2Jhonfernando00
 
Formulas perforacion y voladura mineria subterranea
Formulas perforacion y voladura mineria subterraneaFormulas perforacion y voladura mineria subterranea
Formulas perforacion y voladura mineria subterraneaEdison Jesús Rosas Quispe
 
03 la sarta de perforación
03 la sarta de perforación03 la sarta de perforación
03 la sarta de perforaciónMagnusMG
 
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-272419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2ادريان ادريان ادريان
 
Perforación con jack leg. ingeniero
Perforación con jack leg. ingenieroPerforación con jack leg. ingeniero
Perforación con jack leg. ingenierojhonyyvladimir
 
Diseño de barrenos 2010
Diseño de barrenos 2010Diseño de barrenos 2010
Diseño de barrenos 2010Luis Guerra
 
Parametros perforación jme may 13
Parametros perforación jme may 13Parametros perforación jme may 13
Parametros perforación jme may 13Roselio
 
5. perforacion y voladura
5. perforacion y voladura5. perforacion y voladura
5. perforacion y voladuraRoGer Bautista
 
06 sistema de izaje
06 sistema de izaje06 sistema de izaje
06 sistema de izajebelubel83
 
14 diseño de sartas de perforación y bha
14 diseño de sartas de perforación y bha14 diseño de sartas de perforación y bha
14 diseño de sartas de perforación y bhaMagnusMG
 
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946Ivo Fritzler
 

Tendances (20)

Malla de perforeacion
Malla de perforeacionMalla de perforeacion
Malla de perforeacion
 
4 perforacion voladura_y_ventilacion
4 perforacion voladura_y_ventilacion4 perforacion voladura_y_ventilacion
4 perforacion voladura_y_ventilacion
 
Room and pillar
Room and pillarRoom and pillar
Room and pillar
 
Dilución en minería subterranea
Dilución en minería subterraneaDilución en minería subterranea
Dilución en minería subterranea
 
Equipos de perforación y voladura en minería subterránea
Equipos de perforación y voladura en minería subterráneaEquipos de perforación y voladura en minería subterránea
Equipos de perforación y voladura en minería subterránea
 
04 diseño y trazo de voladura subterranea parte 2
04 diseño y trazo de voladura subterranea parte 204 diseño y trazo de voladura subterranea parte 2
04 diseño y trazo de voladura subterranea parte 2
 
Formulas perforacion y voladura mineria subterranea
Formulas perforacion y voladura mineria subterraneaFormulas perforacion y voladura mineria subterranea
Formulas perforacion y voladura mineria subterranea
 
03 la sarta de perforación
03 la sarta de perforación03 la sarta de perforación
03 la sarta de perforación
 
22 voladuras tuneles
22 voladuras tuneles22 voladuras tuneles
22 voladuras tuneles
 
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-272419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2
72419841 diseno-de-una-malla-de-perforacion-en-mineria-subterranea-parte-2
 
Perforación con jack leg. ingeniero
Perforación con jack leg. ingenieroPerforación con jack leg. ingeniero
Perforación con jack leg. ingeniero
 
Diseño de barrenos 2010
Diseño de barrenos 2010Diseño de barrenos 2010
Diseño de barrenos 2010
 
Parametros perforación jme may 13
Parametros perforación jme may 13Parametros perforación jme may 13
Parametros perforación jme may 13
 
Tronadura de precorte
Tronadura de precorteTronadura de precorte
Tronadura de precorte
 
Diseño de Malla de Perforación
Diseño de Malla de PerforaciónDiseño de Malla de Perforación
Diseño de Malla de Perforación
 
5. perforacion y voladura
5. perforacion y voladura5. perforacion y voladura
5. perforacion y voladura
 
06 sistema de izaje
06 sistema de izaje06 sistema de izaje
06 sistema de izaje
 
Cut and fill
Cut and fillCut and fill
Cut and fill
 
14 diseño de sartas de perforación y bha
14 diseño de sartas de perforación y bha14 diseño de sartas de perforación y bha
14 diseño de sartas de perforación y bha
 
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946
Clasificaciones Geomecánicas: Carga de Roca, Terzaghi, 1946
 

En vedette

CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTO
CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTOCAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTO
CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTOnelsonjuan
 
Diseño de-mallas-de-perforacion-mineria-subterranea
Diseño de-mallas-de-perforacion-mineria-subterraneaDiseño de-mallas-de-perforacion-mineria-subterranea
Diseño de-mallas-de-perforacion-mineria-subterraneaDavid Ronald Peraza Medina
 
Calculo matematico de los parametros de voladura
Calculo matematico de los parametros de voladuraCalculo matematico de los parametros de voladura
Calculo matematico de los parametros de voladuramirrochan
 
PLANEAMIENTO EN PERFORACION Y VOLADURA II
PLANEAMIENTO EN PERFORACION Y VOLADURA IIPLANEAMIENTO EN PERFORACION Y VOLADURA II
PLANEAMIENTO EN PERFORACION Y VOLADURA IIBequer Inocente Ocho
 
Operacion de voladura subterranea
Operacion de voladura subterraneaOperacion de voladura subterranea
Operacion de voladura subterraneaJuan Roque Boggiano
 
07 planificacion minera_a_cielo_abierto
07 planificacion minera_a_cielo_abierto07 planificacion minera_a_cielo_abierto
07 planificacion minera_a_cielo_abiertoOsmar Portela
 
Reduccion de costos con el uso del san g upc
Reduccion de costos con el uso del san g upcReduccion de costos con el uso del san g upc
Reduccion de costos con el uso del san g upcnelsonjuan
 
Voladura de rocas
Voladura de rocasVoladura de rocas
Voladura de rocasIrveen
 
1.1. exposicion clasificacion de rocas (clases) (1)
1.1.  exposicion  clasificacion  de  rocas  (clases) (1)1.1.  exposicion  clasificacion  de  rocas  (clases) (1)
1.1. exposicion clasificacion de rocas (clases) (1)Yoel Huayhua
 
Calor de explosion de los explosivos industriales
Calor de  explosion de los explosivos industrialesCalor de  explosion de los explosivos industriales
Calor de explosion de los explosivos industrialesPANTILINDO
 
Apuntes de mineri a a cielo abierto 2016
Apuntes de mineri a a cielo abierto 2016Apuntes de mineri a a cielo abierto 2016
Apuntes de mineri a a cielo abierto 2016Guillermo Gutiérrez
 
Calor de explosion de los explosivos industriales
Calor de explosion de los explosivos industrialesCalor de explosion de los explosivos industriales
Calor de explosion de los explosivos industrialesPANTILINDO
 
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...PERUMIN - Convención Minera
 
Mineria a tajo abierto extracion de cobre
Mineria a tajo  abierto extracion de  cobreMineria a tajo  abierto extracion de  cobre
Mineria a tajo abierto extracion de cobreVicente Huari
 

En vedette (20)

CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTO
CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTOCAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTO
CAMBIO DE EXPLOSIVO PARA REDUCIR COSTOS POR TONELADA EN MINERIA A TAJO ABIERTO
 
Diseño de-mallas-de-perforacion-mineria-subterranea
Diseño de-mallas-de-perforacion-mineria-subterraneaDiseño de-mallas-de-perforacion-mineria-subterranea
Diseño de-mallas-de-perforacion-mineria-subterranea
 
168 2013 loza_carazas_ra_fain_minas_2013
168 2013 loza_carazas_ra_fain_minas_2013168 2013 loza_carazas_ra_fain_minas_2013
168 2013 loza_carazas_ra_fain_minas_2013
 
Calculo matematico de los parametros de voladura
Calculo matematico de los parametros de voladuraCalculo matematico de los parametros de voladura
Calculo matematico de los parametros de voladura
 
PLANEAMIENTO EN PERFORACION Y VOLADURA II
PLANEAMIENTO EN PERFORACION Y VOLADURA IIPLANEAMIENTO EN PERFORACION Y VOLADURA II
PLANEAMIENTO EN PERFORACION Y VOLADURA II
 
Operacion de voladura subterranea
Operacion de voladura subterraneaOperacion de voladura subterranea
Operacion de voladura subterranea
 
07 planificacion minera_a_cielo_abierto
07 planificacion minera_a_cielo_abierto07 planificacion minera_a_cielo_abierto
07 planificacion minera_a_cielo_abierto
 
Reduccion de costos con el uso del san g upc
Reduccion de costos con el uso del san g upcReduccion de costos con el uso del san g upc
Reduccion de costos con el uso del san g upc
 
Vibraciones texto
Vibraciones textoVibraciones texto
Vibraciones texto
 
Libro de Elementos de Minería - George J. Young
Libro de Elementos de Minería - George J. YoungLibro de Elementos de Minería - George J. Young
Libro de Elementos de Minería - George J. Young
 
41968949b
41968949b41968949b
41968949b
 
Voladura de rocas
Voladura de rocasVoladura de rocas
Voladura de rocas
 
1.1. exposicion clasificacion de rocas (clases) (1)
1.1.  exposicion  clasificacion  de  rocas  (clases) (1)1.1.  exposicion  clasificacion  de  rocas  (clases) (1)
1.1. exposicion clasificacion de rocas (clases) (1)
 
Calor de explosion de los explosivos industriales
Calor de  explosion de los explosivos industrialesCalor de  explosion de los explosivos industriales
Calor de explosion de los explosivos industriales
 
Apuntes de mineri a a cielo abierto 2016
Apuntes de mineri a a cielo abierto 2016Apuntes de mineri a a cielo abierto 2016
Apuntes de mineri a a cielo abierto 2016
 
Tutorials v10
Tutorials v10Tutorials v10
Tutorials v10
 
39192498.2009
39192498.200939192498.2009
39192498.2009
 
Calor de explosion de los explosivos industriales
Calor de explosion de los explosivos industrialesCalor de explosion de los explosivos industriales
Calor de explosion de los explosivos industriales
 
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...
PERUMIN 31: Transición en la Aplicación del Método de Minado de Taladros Larg...
 
Mineria a tajo abierto extracion de cobre
Mineria a tajo  abierto extracion de  cobreMineria a tajo  abierto extracion de  cobre
Mineria a tajo abierto extracion de cobre
 

Similaire à 99702414 distribucion-explosivos-4-0-x-4-0-m-emulsion-y-anfo-copia

Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)
Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)
Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)Anupam Sharma
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualfudjjjskeskmmd
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualufjjsjekkdemd
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualufjjsjekkdemd
 
Claas dominator 98 (type 093) combine service repair manual
Claas dominator 98 (type 093) combine service repair manualClaas dominator 98 (type 093) combine service repair manual
Claas dominator 98 (type 093) combine service repair manualufjjsjekkdemd
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualjfjkskekfmsme
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualfjjsekwsxkdmmem
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualfjjskekkdmme
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualjfjedkmsmem
 
Claas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualClaas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualufjjsjekkdemd
 
Claas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualClaas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualfjjsekwsxkdmmem
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualfudjjjskeskmmd
 
Claas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualClaas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualfjjsekwsxkdmmem
 
Claas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualClaas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualfjjsekfksmemer
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualfjjsekwsxkdmmem
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualfjjsekfksmemer
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualfjjsekfksmemer
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualjfjedkmsmem
 

Similaire à 99702414 distribucion-explosivos-4-0-x-4-0-m-emulsion-y-anfo-copia (20)

Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)
Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)
Ac mandev broucher_25_09_2019_new_5_6_1[1] (1)
 
Analisis de Costo.pdf
Analisis de Costo.pdfAnalisis de Costo.pdf
Analisis de Costo.pdf
 
Fijacion 2016
Fijacion 2016Fijacion 2016
Fijacion 2016
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manual
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manual
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manual
 
Claas dominator 98 (type 093) combine service repair manual
Claas dominator 98 (type 093) combine service repair manualClaas dominator 98 (type 093) combine service repair manual
Claas dominator 98 (type 093) combine service repair manual
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manual
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manual
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manual
 
Claas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manualClaas dominator 76 (type 084) combine service repair manual
Claas dominator 76 (type 084) combine service repair manual
 
Claas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualClaas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manual
 
Claas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manualClaas dominator 86 (type 087) combine service repair manual
Claas dominator 86 (type 087) combine service repair manual
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manual
 
Claas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualClaas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manual
 
Claas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manualClaas dominator 106 (type 56) combine service repair manual
Claas dominator 106 (type 56) combine service repair manual
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manual
 
Claas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manualClaas dominator 88 (type 092) combine service repair manual
Claas dominator 88 (type 092) combine service repair manual
 
Claas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manualClaas dominator 78 h (type 079) combine service repair manual
Claas dominator 78 h (type 079) combine service repair manual
 
Claas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manualClaas dominator 78 (type 091) combine service repair manual
Claas dominator 78 (type 091) combine service repair manual
 

Dernier

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 

Dernier (20)

mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 

99702414 distribucion-explosivos-4-0-x-4-0-m-emulsion-y-anfo-copia

  • 1. ITEMS DE PERFORACION Y VOLADURA EQUIPO DE PERFORACION JUMBO SECCION DE LABOR 4.00 X DESMONTE 2.9 Metros Metros Metros TIPO DE ROCA M DURA TIPO DE MATERIAL Y DENSIDAD LONGITUD DE BARRA 4.27 LONGITUD DE PERFORACION 3.96 EFICIENCIA DE VOLADURA 3.69 TALADROS PERFORADOS MINERAL TALADROS RIMADOS 3.8 14 Pies 13 Pies 93 43 % Unidades / frente Unidades / frente 4 4 TALADROS DISPARADOS Unidades / frente 35 TALADROS DE ALIVIO Unidades / frente VOLUMEN CALCULADO (m3) DESMONTE 58.96 MINERAL 58.96 TONELAJE ROTO (TON.) DESMONTE 170.99 MINERAL 224.05 FACTOR DE CARGA - EMULSION Y ANFO FACTOR DE CARGA Kg/ M3 KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION) 133.53 Kilos 107.37 U$D Kilos 0.00 U$D EMULSION 1 x 8" Kilos 0.00 U$D EMULSION 1 1/8 x 12" Kilos 0.00 U$D EMULSION 1 1/4 x 12" 15.96 Kilos 26.18 U$D EMULSION 1 1/2 x 12" Kilos 0.00 U$D KILOS TOTAL DE EXPLOSIVOS 149.494 Kilos 133.55 U$D COSTOS DE ACCESORIOS (U$D) EXANEL 3.00 m Und 0 U$D EXANEL 4.20 m 35 Und 42 U$D CORDON DETONANTE - Metro 25 m 4 U$D FULMINANTE - Unidad 2 Und 0.22 U$D MECHA LENTA - Metro 6 m 1.62 U$D COSTO DE ACCESORIOS 47.84 U$D / DISPARO COSTO TOTAL - EMULSION Y ANFO 181.39 U$D / DISPARO ANFO 4.00 DINAMITA 7/8 x 7" DESMONTE 2.54 MINERAL FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.87 MINERAL 0.67 49.22 MINERAL 49.22 2.54 DINAMITA 7/8 x 7" 1.06 MINERAL 0.81 EMULSION 1 x 8" KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION EMULSION 1 1/8 x 12" FACTOR DE CARGA - EMULSION FACTOR DE CARGA Kg/ M3 EMULSION 1 1/4 x 12" DESMONTE 1.90 MINERAL 1.90 EMULSION 1 1/2 x 12" FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.65 MINERAL 0.50 KILOS TOTAL DE EXPLOSIVOS 60.96 MINERAL 65.55 COSTO DE ACCESORIOS 1.41 MINERAL 1.08 COSTO TOTAL - EMULSION 22.92 89.06 111.98 47.84 241.55 Kilos Kilos Kilos Kilos Kilos Kilos 0.00 0.00 0.00 37.59 156.12 193.71 U$D / DISPARO U$D / DISPARO DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DURA CANTIDAD DE TALADROS ARRANQUE 1RA. AYUDA 2DA. AYUDA AY. CUADRADOR CUADRADOR AY. CORONA CORONA ARRASTRE CUNETA TAL. RIMADOS TAL. ALIVIOS TOTAL 3 4 4 4 6 3 5 5 1 4 4 43 CARTUCHOS DE EMULSION / TALADROS 1 1/2 x 12" 1 1/4 x 12" 12 0 11 0 10 0 9 0 8 0 8 0 0 6 0 10 0 8 0 0 0 0 228 88 TOTAL EN KILOS 14.08 17.20 15.64 14.08 18.77 9.38 7.80 13.00 2.08 0.00 0.00 112.03 CEBO EMULSION Y COLUMNA DE ANFO EMULSION COLUMNA KILOS EXPLOSIVOS 1 1/4 x 12" ANFO (m) EMULSION ANFO 3 3.00 0.80 16.11 4 3.00 1.06 21.48 4 2.40 1.06 17.18 4 2.40 1.06 17.18 6 2.40 1.60 25.78 3 2.00 0.80 10.74 30 0.00 7.98 0.00 5 2.40 1.33 21.48 1 2.00 0.27 3.58 0 0.00 0.00 0.00 0 0.00 0.00 0.00 60 74.60 15.96 133.53 TOTAL EN KILOS 16.91 22.54 18.25 18.25 27.37 11.54 7.98 22.81 3.85 0.00 0.00 149.49 U$D U$D U$D U$D U$D U$D
  • 2. PRECIOS DE EXPLOSIVOS Y ACCESORIOS Explosivo UN 3.00 m CART EXANEL U$D - Unidad PESOS (Kg) Costo Unid us$/Kg 1.13 4.20 m 1.2 0.16 0.11 0.12 0.27 CORDON DETONANTE - Metro FULMINANTE N° 8 - Unidad MECHA - Metro MECHA RAPIDA - Metro CORDON DETONANTE PENTACORD 3P M 1,800 0.014 DINAMITA SEMEXSA 45% DE 7/8 X 7 CJ 316 0.079 NITRATO DE AMONIO TECNICO, * GRADO ANFO- KG 25 1.000 EMULSION EMULEX 65 1 1/8X12" UN 104 0.240 EMULEX 65% 1 1/2 X 12" EMULEX 65% 1 1/4 X 12" UN 64 0.391 UN 96 0.260 EMULSION 1 x 8" UN 0.16 0.18 0.80 0.44 0.68 0.43 11.80 2.31 0.80 1.85 1.75 1.64
  • 3. ITEMS DE PERFORACION Y VOLADURA EQUIPO DE PERFORACION JUMBO SECCION DE LABOR 4.00 X TIPO DE ROCA 4.00 M SEMI DURA TIPO DE MATERIAL Y DENSIDAD DESMONTE 4.27 LONGITUD DE BARRA 2.9 Metros Metros Metros MINERAL 3.8 14 Pies 12 Pies 90 % LONGITUD DE PERFORACION 3.66 EFICIENCIA DE VOLADURA 3.29 TALADROS PERFORADOS 42 Unidades / frente TALADROS RIMADOS 4 Unidades / frente TALADROS DE ALIVIO 4 Unidades / frente 34 Unidades / frente TALADROS DISPARADOS VOLUMEN CALCULADO (m3) DESMONTE 52.67 MINERAL 52.67 TONELAJE ROTO (TON.) DESMONTE 152.74 MINERAL 200.14 FACTOR DE CARGA - EMULSION Y ANFO FACTOR DE CARGA Kg/ M3 DESMONTE 2.68 MINERAL FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.93 MINERAL 2.68 0.71 52.68 MINERAL 52.68 1.14 MINERAL 0.87 1.96 FACTOR DE CARGA - EMULSION FACTOR DE CARGA Kg/ M3 DESMONTE 1.96 MINERAL FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.67 MINERAL 0.51 61.41 MINERAL 68.23 1.47 MINERAL 1.12 DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DU CANTIDAD DE TALADROS ARRANQUE 1RA. AYUDA 2DA. AYUDA AY. CUADRADOR CUADRADOR AY. CORONA CORONA ARRASTRE CUNETA TAL. RIMADOS TAL. ALIVIOS TOTAL 3 4 4 4 6 2 5 5 1 4 4 42 CARTUCHOS DE EMULSION / TALADROS 1 1/2 x 12" 1 1/4 x 12" 11 0 10 0 9 0 8 0 8 0 8 0 0 6 0 10 0 8 0 0 0 0 205 88 TOTAL EN KILOS 12.90 15.64 14.08 12.51 18.77 6.26 7.80 13.00 2.08 0.00 0.00 103.04
  • 4.
  • 5.
  • 6. KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION) 125.66 Kilos 101.04 U$D DINAMITA 7/8 x 7" Kilos 0.00 U$D EMULSION 1 x 8" Kilos 0.00 U$D EMULSION 1 1/8 x 12" Kilos 0.00 U$D EMULSION 1 1/4 x 12" 15.69 Kilos 25.74 U$D EMULSION 1 1/2 x 12" Kilos 0.00 U$D KILOS TOTAL DE EXPLOSIVOS 141.352 Kilos 126.78 U$D COSTOS DE ACCESORIOS (U$D) EXANEL 3.00 m Und 0 U$D EXANEL 4.20 m 34 Und 40.8 U$D CORDON DETONANTE - Metro 25 m 4 U$D FULMINANTE - Unidad 2 Und 0.22 U$D MECHA LENTA - Metro 6 m 1.62 U$D COSTO DE ACCESORIOS 46.64 U$D / DISPARO COSTO TOTAL - EMULSION Y ANFO 173.42 U$D / DISPARO ANFO KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION DINAMITA 7/8 x 7" EMULSION 1 x 8" EMULSION 1 1/8 x 12" EMULSION 1 1/4 x 12" EMULSION 1 1/2 x 12" KILOS TOTAL DE EXPLOSIVOS COSTO DE ACCESORIOS COSTO TOTAL - EMULSION 22.92 80.08 102.99 46.64 224.60 Kilos Kilos Kilos Kilos Kilos Kilos 0.00 0.00 0.00 37.59 140.37 177.96 U$D / DISPARO U$D / DISPARO EMULSION Y ANFO) - ROCA DURA CEBO EMULSION Y COLUMNA DE ANFO COLUMNA KILOS EXPLOSIVOS EMULSION 1 1/4 x 12" ANFO (m) EMULSION ANFO 3 3.00 0.80 16.11 4 3.00 1.06 21.48 4 2.40 1.06 17.18 4 2.40 1.06 17.18 6 2.00 1.60 21.48 2 2.00 0.53 7.16 30 0.00 7.98 0.00 5 2.40 1.33 21.48 1 2.00 0.27 3.58 0.00 0.00 0 0.00 0.00 0.00 0 0.00 59 70.20 15.69 125.66 TOTAL EN KILOS 16.91 22.54 18.25 18.25 23.08 7.69 7.98 22.81 3.85 0.00 0.00 141.35 U$D U$D U$D U$D U$D U$D
  • 7.
  • 8.
  • 9. PRECIOS DE EXPLOSIVOS Y ACCESORIOS Explosivo UN EXANEL U$D - Unidad 3.00 m CART PESOS (Kg) Costo Unid 1.13 4.20 m 1.2 0.16 0.11 0.12 0.27 CORDON DETONANTE - Metro FULMINANTE N° 8 - Unidad MECHA - Metro MECHA RAPIDA - Metro CORDON DETONANTE PENTACORD 3P M 1,800 0.014 DINAMITA SEMEXSA 45% DE 7/8 X 7 CJ 316 0.079 NITRATO DE AMONIO TECNICO, * GRADO ANFO- KG 25 1.000 EMULSION EMULEX 65 1 1/8X12" UN 104 0.240 EMULEX 65% 1 1/2 X 12" EMULEX 65% 1 1/4 X 12" UN 64 0.391 UN 96 0.260 EMULSION 1 x 8" UN 0.16 0.18 0.80 0.44 0.68 0.43
  • 10.
  • 11.
  • 13. ITEMS DE PERFORACION Y VOLADURA EQUIPO DE PERFORACION JUMBO SECCION DE LABOR 4.00 X TIPO DE ROCA 4.00 M SUAVE TIPO DE MATERIAL Y DENSIDAD DESMONTE 4.27 LONGITUD DE BARRA 2.9 Metros Metros Metros MINERAL 3.8 14 Pies 10 Pies 90 % LONGITUD DE PERFORACION 3.05 EFICIENCIA DE VOLADURA 2.74 TALADROS PERFORADOS 39 Unidades / frente TALADROS RIMADOS 4 Unidades / frente TALADROS DE ALIVIO 5 Unidades / frente 30 Unidades / frente TALADROS DISPARADOS VOLUMEN CALCULADO (m3) DESMONTE 43.89 MINERAL 43.89 TONELAJE ROTO (TON.) DESMONTE 127.28 MINERAL 166.79 FACTOR DE CARGA - EMULSION Y ANFO FACTOR DE CARGA Kg/ M3 DESMONTE 2.60 MINERAL FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.90 MINERAL 2.60 0.69 52.15 MINERAL 52.15 1.12 MINERAL 0.86 1.81 FACTOR DE CARGA - EMULSION FACTOR DE CARGA Kg/ M3 DESMONTE 1.81 MINERAL FACTOR DE POTENCIA Kg / TM DESMONTE COSTO POR METRO DE AVANCE (U$D / ML) DESMONTE COSTO POR TONELADAS (U$D / TM) DESMONTE 0.62 MINERAL 0.48 58.75 MINERAL 65.28 1.41 MINERAL 1.07 DISTRIBUCION DE CARGA (EMULSION Y ANFO) - ROCA DU CANTIDAD DE TALADROS ARRANQUE 1RA. AYUDA 2DA. AYUDA AY. CUADRADOR CUADRADOR AY. CORONA CORONA ARRASTRE CUNETA TAL. RIMADOS TAL. ALIVIOS TOTAL 3 4 4 0 6 3 4 5 1 4 5 39 CARTUCHOS DE EMULSION / TALADROS 1 1/2 x 12" 1 1/4 x 12" 9 0 9 0 8 0 0 0 7 0 7 0 0 4 0 9 0 7 0 0 0 0 158 68 TOTAL EN KILOS 10.56 14.08 12.51 0.00 16.42 8.21 4.16 11.70 1.82 0.00 0.00 79.46
  • 14.
  • 15. KILOS DE EXPLOSIVOS Y COSTOS (U$D) - ANFO Y EMULSION) 103.10 Kilos 82.90 U$D DINAMITA 7/8 x 7" Kilos 0.00 U$D EMULSION 1 x 8" Kilos 0.00 U$D EMULSION 1 1/8 x 12" Kilos 0.00 U$D EMULSION 1 1/4 x 12" 11.17 Kilos 18.32 U$D EMULSION 1 1/2 x 12" Kilos 0.00 U$D KILOS TOTAL DE EXPLOSIVOS 114.276 Kilos 101.23 U$D COSTOS DE ACCESORIOS (U$D) EXANEL 3.00 m Und 0 U$D EXANEL 4.20 m 30 Und 36 U$D CORDON DETONANTE - Metro 25 m 4 U$D FULMINANTE - Unidad 2 Und 0.22 U$D MECHA LENTA - Metro 6 m 1.62 U$D COSTO DE ACCESORIOS 41.84 U$D / DISPARO COSTO TOTAL - EMULSION Y ANFO 143.07 U$D / DISPARO ANFO KILOS DE EXPLOSIVOS Y COSTOS (U$D) - EMULSION DINAMITA 7/8 x 7" EMULSION 1 x 8" EMULSION 1 1/8 x 12" EMULSION 1 1/4 x 12" EMULSION 1 1/2 x 12" KILOS TOTAL DE EXPLOSIVOS COSTO DE ACCESORIOS COSTO TOTAL - EMULSION 17.71 61.72 79.43 41.84 179.07 Kilos Kilos Kilos Kilos Kilos Kilos 0.00 0.00 0.00 29.04 108.19 137.23 U$D / DISPARO U$D / DISPARO EMULSION Y ANFO) - ROCA DURA CEBO EMULSION Y COLUMNA DE ANFO COLUMNA KILOS EXPLOSIVOS EMULSION 1 1/4 x 12" ANFO (m) EMULSION ANFO 3 2.80 0.80 15.04 4 2.80 1.06 20.05 4 2.50 1.06 17.90 0 2.00 0.00 0.00 6 1.80 1.60 19.33 3 1.80 0.80 9.67 16 0.00 4.26 0.00 5 2.00 1.33 17.90 1 1.80 0.27 3.22 0.00 0.00 0 0.00 0.00 0.00 0 0.00 42 57.60 11.17 103.10 TOTAL EN KILOS 15.83 21.11 18.96 0.00 20.93 10.46 4.26 19.23 3.49 0.00 0.00 114.28 U$D U$D U$D U$D U$D U$D
  • 16.
  • 17. PRECIOS DE EXPLOSIVOS Y ACCESORIOS Explosivo UN EXANEL U$D - Unidad 3.00 m CART PESOS (Kg) Costo Unid 1.13 4.20 m 1.2 0.16 0.11 0.12 0.27 CORDON DETONANTE - Metro FULMINANTE N° 8 - Unidad MECHA - Metro MECHA RAPIDA - Metro CORDON DETONANTE PENTACORD 3P M 1,800 0.014 DINAMITA SEMEXSA 45% DE 7/8 X 7 CJ 316 0.079 NITRATO DE AMONIO TECNICO, * GRADO ANFO- KG 25 1.000 EMULSION EMULEX 65 1 1/8X12" UN 104 0.240 EMULEX 65% 1 1/2 X 12" EMULEX 65% 1 1/4 X 12" UN 64 0.391 UN 96 0.260 EMULSION 1 x 8" UN 0.16 0.18 0.80 0.44 0.68 0.43
  • 18.