Corporate Update
September 2013
agnicoeagle.com
FORWARD LOOKING STATEMENTS
The information in this document has been prepared as at September 9, 2013. Certain statements contained in this document constitute
“forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking
information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”,
“estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information.
Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates
of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of
return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and
expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates
of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and
production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and
information regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine sites and statements
and information regarding the sufficiency of the Company’s cash resources. Such statements and information reflect the Company’s views as at
the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such
statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or
implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other
metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production,
capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development
programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility
of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of
such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements
contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company’s
other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend,
and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the
Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s
reserve and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified
Persons for each project.
2agnicoeagle.com
agnicoeagle.com
NOTES TO INVESTORS
Note Regarding the Use of Non-GAAP Financial Measures
This document presents estimates of future “total cash cost per ounce” and “minesite cost per tonne” that are not recognized measures under
United States generally accepted accounting principles (“US GAAP”). This data may not be comparable to data presented by other gold
producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to
incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement
costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-
GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company’s total cash cost per ounce and minesite
cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company’s historical
results of operations is set forth in the notes to the financial statements included in the Company’s Annual Information Form and Annual Report
on Form 20-F, for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and
the SEC.
Note Regarding Production Guidance
The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign
exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance
presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves.
3agnicoeagle.com
agnicoeagle.com
KEY OPERATING HIGHLIGHTS – Q2 2013
• Q2 gold production of 224,089 oz at total cash costs per ounce of $785/oz1 –
in line with expectations
• Financial results impacted by lower commodity prices, maintenance shutdown
at Kittila and concentrate settlement adjustments
• Quarterly cash flows from operations of $75.3 million ($0.44 per share)
• Kittila autoclave now back to steady state levels
• Significant capital and cost reductions announced for 2013 and 2014,
production guidance maintained for 2013 to 2015
4
1 Expenditures at Kittila have been excluded from calculationsin the second quarter of 2013, given that the mine operated only 14 days during the quarter.
agnicoeagle.com
INVESTMENT HIGHLIGHTS
Significant reductions in capital and operating costs
2013
• Approximately $50 million in immediate capital and cost reductions
2014
• Approximately $200 million in capital cost reductions
• Exploration budget of approximately $50 million (compared to historical levels
of ~$100 million)
Production to increase in the 2H 2013 due to multiple catalysts:
Expectations:
– Normal production at Kittila
– Better grades at Meadowbank
– Start up production at Goldex
– Continued grade improvement at LaRonde
5
agnicoeagle.com
OPERATING RESULTS
Second quarter production and operating costs in line with expectations
Q2 2013 Total Operating Margin – $110 M
Gold
91%
Silver
6%
Base
Metals
3%
6
LaRonde
13% Kittila
0%
Lapa
15%
Pinos Altos
43%
Meadowbank
29%
Q2 2013 Revenue by Metal
Q2 2013 YTD 2013
Production Total Cash Cost Production Total Cash Cost
(Gold oz) ($/oz) (Gold oz) ($/oz)
LaRonde 46,119 $927 85,192 $831
Kittila 5,389 N/A 48,534 $6241
Lapa 23,178 $720 50,046 $699
Pinos Altos2 57,530 $496 103,601 $411
Meadowbank 91,873 $912 173,691 $986
Total 224,089 $785 461,064 $762
1. Kittila total cash cost excludes results from Q2, 2013 due to shutdown
2. Pinos Altos figures include Creston Mascota.
agnicoeagle.com
Q2 2013 FINANCIAL RESULTS
Results impacted by lower commodity prices, Kittila autoclave shut down and
byproduct settlement adjustments
7
All amounts are in US$, Q2 2013 Q2 2012 YTD 2013 YTD 2012
unless otherwise indicated
Revenues (millions) $336 $460 $757 $932
Earnings (millions) ($24) $43 ($1) $122
Earnings per share (basic) ($0.14) $0.25 ($0.00) $0.71
Cash provided by operating activities
(millions)
$75 $194 $221 $391
Payable Production Gold (ounces) 224,089 265,350 461,064 520,305
Silver (ounces in thousands) 1,066 1,095 2,317 2,310
Zinc (tonnes) 3,455 9,558 11,694 22,536
Copper (tonnes) 1,280 1,004 2,362 2,330
Total cash costs1
(gold, $/oz) $785 $660 $762 $628
1 Expenditures at Kittila have been excluded from calculationsin the second quarter of 2013, given that the mine operated only 14 days during the quarter.
agnicoeagle.com
FINANCIAL POSITION
Balance sheet flexibility maintained
Long-Term Debt Maturities
2017 2020 2022 2024
Notes Outstanding (millions) $115 $360 $225 $100
Coupon 6.13% 6.67% 5.93% 5.02%
8
ALL AMOUNTS ARE IN US$,
unless otherwise indicated Jun. 30, 2013
CASH AND CASH EQUIVALENTS (millions) $136
LONG TERM DEBT (millions) $850
AVAILABLE CREDIT FACILITIES $1.15 Billion
COMMON SHARES OUTSTANDING, BASIC (Q2’13 Weighted average, millions) 172.6
COMMON SHARES OUTSTANDING, FULLY DILUTED (Q2’13 Weighted average, millions) 172.6
agnicoeagle.com
MODERATE, ACHIEVABLE PRODUCTION GROWTH
Low political risk, mining-friendly jurisdictions
100,000
300,000
500,000
700,000
900,000
1,100,000
1,300,000
2008A 2009A 2010A 2011A 2012A 2013E 2014E 2015E
Actual Estimate
Payable Gold Production Profile (oz)
9
agnicoeagle.com
DISCIPLINED CAPITAL ALLOCATION
$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
2008A 2009A 2010A 2011A 2012A 2013E 2014E
Actual Estimate
Capital Expenditures (US$ 000’s)
10
agnicoeagle.com
OPERATIONS
agnicoeagle.com
LARONDE
Cooling plant infrastructure development progressing well
• Additional cooling capacity expected to be
installed in 4Q 2013
• Positive for operating flexibility
and production
• Approximately 60% of ore in Q2 2013 sourced
from deeper mine
• Value of ore per tonne approximately 50%
higher over life mine versus 2012 (assuming
the same metal prices)
P&P GOLD RESERVES (million oz) 4.2
AVERAGE GOLD RESERVE GRADE (g/t) 4.5
Indicated resource (million oz)
(5.4 M tonnes @ 1.88 g/t)
0.3
Inferred resource (million oz)
(11.9 M tonnes @ 3.73 g/t)
1.4
Estimated LOM (years) 14
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
$0M
$80M
$160M
$240M
2010 2011 2012
Cash Operating Margin
12
agnicoeagle.com
LAPA
Zulapa drilling could have a positive impact on production and grades
• Lower unit costs due to reduced cement
consumption, productivity improvements,
and cost reductions
• Ongoing exploration could extend
the mine life beyond 2016
$0M
$40M
$80M
$120M
2010 2011 2012
Cash Operating Margin
P&P GOLD RESERVES (million oz) 0.4
AVERAGE GOLD RESERVE GRADE (g/t) 6.0
Indicated resource (million oz)
(1.1 M tonnes @ 4.08 g/t)
0.2
Inferred resource (million oz)
(0.9 M tonnes @ 6.69 g/t)
0.2
Estimated LOM (years) 3
13
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
agnicoeagle.com
KITTILA
Autoclave successfully restarted after extended maintenance
• Normal operations restarted at the end of Q2
• Throughput and recoveries back to steady state
• 750 tpd per day expansion on schedule for
completion in 2H 2015
$0M
$80M
$160M
$240M
2010 2011 2012
Cash Operating Margin
P&P GOLD RESERVES (million oz) 4.8
AVERAGE GOLD RESERVE GRADE (g/t) 4.5
Indicated resource (million oz)
(7.8 M tonnes @ 2.65 g/t)
0.7
Inferred resource (million oz)
(19.0 M tonnes @ 3.88 g/t)
2.4
Estimated LOM (years) 25
14
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
agnicoeagle.com
MEXICO – PINOS ALTOS & CRESTON MASCOTA
Steady production and operating cost control at Pinos Altos
• Restart of leaching at Creston Mascota
progressing well and production expected to
increase during the remainder of 2013
• Shaft construction at Pinos Altos in Q2:
• Preparation of the headframe foundation
• Construction of the hoist building
• Galloway assembly
P&P GOLD RESERVES (million oz) 2.7
AVERAGE GOLD RESERVE GRADE (g/t) 2.2
Indicated resource (million oz)
(17.9 M tonnes @ 1.52 g/t)
0.9
Inferred resource (million oz)
(24.6 M tonnes @ 1.19 g/t)
0.9
Estimated LOM (years) 17
$0M
$80M
$160M
$240M
$320M
2010 2011 2012
Cash Operating Margin
15
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
agnicoeagle.com
MEADOWBANK
Production expected to increase further in 2H 2013
• Production expected to be higher in H2 2013
due to higher anticipated grades
• Throughput maintained consistently above
11,000 tpd
• Excellent cost control due to improved
productivity and cost reduction initiatives
P&P GOLD RESERVES (million oz) 2.3
AVERAGE GOLD RESERVE GRADE (g/t) 2.8
Measured & Indicated resource (million oz)
(10.3 M tonnes @ 2.49 g/t)
0.8
Inferred resource (million oz)
(3.6 M tonnes @ 3.81 g/t)
0.4
Estimated LOM (years) 6
$0M
$80M
$160M
$240M
$320M
2010 2011 2012
Cash Operating Margin
16
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
agnicoeagle.com
DEVELOPMENT
agnicoeagle.com
LA INDIA
On schedule and budget for commissioning in Q4 2013
• Work advanced on the installation of the ADR
plant, crushing system, and leach pads
• Power generators installed and operational
• Estimated annual gold production of approx.
90 koz @ average total cash costs of approx.
$500/oz
• Open pit, heap leach mine, with stripping ratio
of 1:1
PROBABLE GOLD RESERVES (million oz) 0.8
AVERAGE GOLD RESERVE GRADE (g/t) 0.7
Indicated gold resource (million oz)
(43.2 M tonnes @ 0.4 g/t)
0.6
Inferred gold resource (million oz)
(81 M tonnes @ 0.4 g/t)
1.0
Estimated LOM (years) 8
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
18
agnicoeagle.com
GOLDEX
Commercial production expected in Q4 2013
• Expected to produce 15,000 oz, in 2013
• Construction of paste plant and ore pass
systems on target
• Initial focus on the M & E satellite zones –
GEZ remains suspended
• Technical studies are underway on several
other satellite zones with results expected
by year-end
P&P GOLD RESERVES (million oz) 0.35
AVERAGE GOLD RESERVE GRADE (g/t) 1.6
Measured & Indicated gold resource (million oz)
(27.2 M tonnes @ 1.8 g/t)
1.6
Inferred gold resource (million oz)
(34.6 M tonnes @ 1.5 g/t)
1.7
Estimated LOM (years) 4
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
19
agnicoeagle.com
P&P GOLD RESERVES (million oz) 3.0
AVERAGE GOLD RESERVE GRADE (g/t) 7.0
Indicated gold resource (million oz)
(17.2 M tonnes @ 3.9 g/t)
2.2
Inferred gold resource (million oz)
(14.8 M tonnes @ 6.2 g/t)
2.9
• 2013 project expenditures reduced by $10
million
• 2014 capital expenditures reduced by $80
million to $45 million
– Initial production could still be
achievable in 2018 under new
expenditures schedule
– Program will focus on ramp
development and exploration
drilling
• Updated technical study on track for Q2
2014
• Encouraging results from Tiriganiaq,
Normeg, Pump South, and F Zones
MELIADINE
Project size and scope evaluated under current gold price scenarios
20
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
agnicoeagle.com
ADAPTING BUSINESS TO CURRENT GOLD PRICE ENVIRONMENT
Operational review results in significant cost savings going forward
• AEM continues to be among industry leaders in per share reserves, production
and dividends
• Meaningful near-term production growth driven by LaRonde, La India and Goldex,
with manageable capex
• Solid, achievable production and cost guidance
• 22% production growth expected in 2013–2015 at stable costs
• Business generating strong cash flows in regions of low political risk
• Allocated to dividends, exploration and investing in strategic assets
21
0%
500%
1000%
1500%
6/30/1998 12/17/2001 6/03/2005 11/17/2008 5/03/2012
AEM-NYSE XAU Spot Gold
Source: FactSet
15-Year Indexed Price Performance
agnicoeagle.com
APPENDIX
agnicoeagle.com
COST EFFECTIVE EXPLORATION REFLECTS SUCCESSFUL M&A STRATEGY
Significant exploration results at acquired properties
0
3,000
6,000
9,000
Kittila'05
Kittila'12
Pinos
Altos'06
Pinos
Altos'12
Meadow
bank'07
Meadow
bank'12
Meliadine
'10
Meliadine
'12
LaIndia
'11
LaIndia
'12
Mined
Proven &
Probable
Measured &
Indicated
Inferred
+1105 koz
+5644 koz
+3161 koz
+3085 koz
+1097 koz
$54 $43
$173
$121
$186
$18 $27
$48
$26
$10
$0
$50
$100
$150
$200
Kittila Pinos Altos Meadowbank Meliadine La India
Purchase Cost per Oz
Discovery Cost per Oz
Note: The terms “measured resources”, “indicated resources” and “inferred resources” are not recognized under the SEC guidelines. Detailed information can be found in the February 13, 2013 press release.
23
agnicoeagle.com
OPERATING METRICS
$0/t
$20/t
$40/t
$60/t
$80/t
$100/t
$120/t
$140/t
4,000tpd
4,500tpd
5,000tpd
5,500tpd
6,000tpd
6,500tpd
7,000tpd
7,500tpd
Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13
LaRonde - Ore milled ('000 tonnes)
LaRonde - Minesite costs per tonne (C$)
$50/t
$70/t
$90/t
$110/t
$130/t
$150/t
$170/t
1,400tpd
1,450tpd
1,500tpd
1,550tpd
1,600tpd
1,650tpd
1,700tpd
1,750tpd
1,800tpd
1,850tpd
1,900tpd
Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13
Lapa - Ore milled ('000 tonnes)
Lapa - Minesite costs per tonne (C$)
Lapa
LaRonde
24
agnicoeagle.com
OPERATING METRICS
€40/t
€50/t
€60/t
€70/t
€80/t
€90/t
0tpd
500tpd
1,000tpd
1,500tpd
2,000tpd
2,500tpd
3,000tpd
3,500tpd
4,000tpd
Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13
Kittila - Ore milled('000 tonnes)
Kittila - Minesite costs per tonne (EUR)
$0/t
$20/t
$40/t
$60/t
$80/t
$100/t
$120/t
$140/t
0tpd
2,000tpd
4,000tpd
6,000tpd
8,000tpd
10,000tpd
12,000tpd
Q111
Q211
Q311
Q411
Q112
Q212
Q312
Q412
Q113
Q213
Meadowbank - Ore milled ('000 tonnes)
Meadowbank - Minesite costs per tonne (C$)
$0/t
$10/t
$20/t
$30/t
$40/t
$50/t
$60/t
4,000tpd
4,200tpd
4,400tpd
4,600tpd
4,800tpd
5,000tpd
5,200tpd
5,400tpd
Q111
Q211
Q311
Q411
Q112
Q212
Q312
Q412
Q113
Q213
Pinos Altos - Ore milled ('000 tonnes)
Pinos Altos - Minesite costs per tonne (USD$)
Kittila
Pinos Altos Meadowbank
25
agnicoeagle.com
GOLD AND SILVER RESERVES AND RESOURCES
December 31, 2012
Gold
Tonnes
(000’s)
Gold
(g/t)
Gold
(ounces)
(000’s)
Proven 13,836 3.13 1,394
Probable 170,300 3.16 17,286
Total
Reserves
184,136 3.16 18,681
Measured &
Indicated
140,995 1.79 8,104
Inferred 199,503 1.90 12,159
Silver
Tonnes
(000’s)
Silver
(g/t)
Silver
(ounces)
(000’s)
Proven 9,390 47.30 14,281
Probable 57,536 43.93 81,256
Total
Reserves
66,926 44.40 95,537
Measured &
Indicated
23,379 31.95 24,015
Inferred 36,479 20.66 24,228
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
26
agnicoeagle.com
COPPER, ZINC AND LEAD RESERVES AND RESOURCES
December 31, 2012
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
Copper
Tonnes
(000’s)
Copper
(%)
Copper
(tonnes)
Proven 6,323 0.30 18,744
Probable 22,462 0.24 53,835
Total
Reserves
28,786 0.25 72,580
Indicated 5,432 0.12 6,644
Inferred 11,887 0.25 29,317
Zinc
Tonnes
(000’s)
Zinc
(%)
Zinc
(tonnes)
Proven 6,323 1.06 67,211
Probable 22,462 0.68 152,973
Total
Reserves
28,786 0.76 220,184
Indicated 5,432 1.50 81,551
Inferred 11,887 0.58 69,048
Lead
Tonnes
(000’s)
Lead
(%)
Lead
(tonnes)
Proven 6,323 0.12 7,738
Probable 22,462 0.05 10,304
Total
Reserves
28,786 0.06 18,042
Indicated 5,432 0.15 8,071
Inferred 11,887 0.05 5,375
27
agnicoeagle.com
NOTES TO INVESTORS REGARDING THE USE OF RESOURCES
Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources
This document uses the terms “measured resources” and “indicated resources”. We advise investors that while those terms are recognized and required by
Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these
categories will ever be converted into reserves.
Cautionary Note to Investors Concerning Estimates of Inferred Resources
This document also uses the term “inferred resources”. We advise investors that while this term is recognized and required by Canadian regulations, the SEC
does not recognize it. “Inferred resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal
feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates
of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that
part or all of an inferred resource exists, or is economically or legally mineable.
Scientific and Technical Data
Agnico Eagle Mines Limited is reporting mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and
reporting of resources and reserves.
Cautionary Note To U.S. Investors – The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a
company can economically and legally extract or produce. Agnico Eagle uses certain terms in this press release, such as “measured”, “indicated”, and
“inferred”, and “resources” that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are
urged to consider closely the disclosure in our Form 20-F, which may be obtained from us, or from the SEC’s website at: http://sec.gov/edgar.shtml. A “final” or
“bankable” feasibility study is required to meet the requirements to designate reserves under Industry Guide 7.
Estimates for all properties were calculated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC Industry
Guide 7. Industry Guide 7 requires the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC
has interpreted to mean historic three-year average prices. The assumptions used for the mineral reserves and resources estimates at the Lapa, Meadowbank
and Creston Mascota mines and the Goldex and Meliadine projects reported by the Company on February 13, 2013 are based on three-year average prices for
the period ending December 31, 2012 of $1,490 per ounce gold, $29.00 per ounce silver, $0.95 per pound zinc, $3.67 per pound copper, $1.00 per pound lead
and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.34 and 12.75, respectively. The assumptions used for the mineral reserves and resources
estimates at the LaRonde, Pinos Altos and Kittila mines and the La India and Tarachi projects reported by the Company on February 13, 2013 were based on
three-year average prices for the period ending June 30, 2012 of $1,345 per ounce gold, $25.00 per ounce silver, $0.95 per pound zinc, $3.49 per pound
copper, $0.99 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.30 and 13.00, respectively.
The Canadian Securities Administrators’ National Instrument 43-101 (“NI 43-101”) requires mining companies to disclose reserves and resources using the
subcategories of “proven” reserves, “probable” reserves, “measured” resources, “indicated” resources and “inferred” resources. Mineral resources that are not
mineral reserves do not have demonstrated economic viability.
28agnicoeagle.com
agnicoeagle.com
NOTES TO INVESTORS REGARDING THE USE OF RESOURCES
A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasibility study. This
study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting,
that economic extraction can be justified. A mineral reserve includes diluting materials and allows for losses that may occur when the material is mined. A
proven mineral reserve is the economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. A probable
mineral reserve is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a
preliminary feasibility study.
A mineral resource is a concentration or occurrence of natural, solid, inorganic material, or natural solid fossilized organic material including base and precious
metals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location,
quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and
knowledge. A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics
are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to
support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and
testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely
enough to confirm both geological and grade continuity. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality,
densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and
economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable
exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are
spaced closely enough for geological and grade continuity to be reasonably assumed. An inferred mineral resource is that part of a mineral resource for which
quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological
and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops,
trenches, pits, workings and drill holes. Mineral resources which are not mineral reserves do not have demonstrated economic viability.
Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately
detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental
considerations together with any other relevant operational factors and detailed financial analysis, that are necessary to demonstrate at the time of reporting
that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or
financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility
Study.
The effective date for all of the Company’s mineral resource and reserve estimates in this press release is December 31, 2012. Additional information about
each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports
referred to above, which may be found at www.sedar.com. Other important operating information can be found in the Company’s Form 20-F and this news
release dated February 13, 2013.
Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein.
29agnicoeagle.com
agnicoeagle.com
agnicoeagle.com
Trading Symbol:
AEM on TSX & NYSE
Investor Relations:
416-847-8665
info@agnicoeagle.com

More Related Content

What's hot

Building a manageable gold business zurich nov7
Building a manageable gold business   zurich nov7Building a manageable gold business   zurich nov7
Building a manageable gold business zurich nov7Agnico Eagle Mines
 
Scotia building a high quality manageable gold business in challenging times
Scotia  building a high quality manageable gold business in challenging timesScotia  building a high quality manageable gold business in challenging times
Scotia building a high quality manageable gold business in challenging timesAgnico Eagle Mines
 
Corporate Update - August 2016
Corporate Update - August 2016Corporate Update - August 2016
Corporate Update - August 2016Agnico Eagle Mines
 
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...Agnico Eagle Mines
 
CIBC Whistler Institutional Investor Conference 2014
CIBC Whistler Institutional Investor Conference 2014CIBC Whistler Institutional Investor Conference 2014
CIBC Whistler Institutional Investor Conference 2014Agnico Eagle Mines
 
Lug corporate presentation june 2021
Lug corporate presentation june 2021Lug corporate presentation june 2021
Lug corporate presentation june 2021Adnet Communications
 
Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Diamonds
 
Corporate Update, January 2015
Corporate Update, January 2015Corporate Update, January 2015
Corporate Update, January 2015StornowayDiamonds
 
Lug corporate presentation may 2021
Lug corporate presentation may 2021Lug corporate presentation may 2021
Lug corporate presentation may 2021AdnetNew
 
Lundin Gold Corporate Presentation - May 2021
Lundin Gold Corporate Presentation - May 2021Lundin Gold Corporate Presentation - May 2021
Lundin Gold Corporate Presentation - May 2021Adnet Communications
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial ResultsAuRico Gold
 
Hecla Mining - Corporate Presentation
Hecla  Mining - Corporate PresentationHecla  Mining - Corporate Presentation
Hecla Mining - Corporate PresentationCompany Spotlight
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferencePretiumR
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Marc Lepage, CPIR
 
Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Diamonds
 
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...Claude Resources Inc.
 

What's hot (18)

Q3 2013 Results
Q3 2013 ResultsQ3 2013 Results
Q3 2013 Results
 
Building a manageable gold business zurich nov7
Building a manageable gold business   zurich nov7Building a manageable gold business   zurich nov7
Building a manageable gold business zurich nov7
 
Scotia building a high quality manageable gold business in challenging times
Scotia  building a high quality manageable gold business in challenging timesScotia  building a high quality manageable gold business in challenging times
Scotia building a high quality manageable gold business in challenging times
 
Corporate Update - August 2016
Corporate Update - August 2016Corporate Update - August 2016
Corporate Update - August 2016
 
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...
Goldman Sachs Mining Conference - Building a High Quality Manageable Gold Bus...
 
CIBC Whistler Institutional Investor Conference 2014
CIBC Whistler Institutional Investor Conference 2014CIBC Whistler Institutional Investor Conference 2014
CIBC Whistler Institutional Investor Conference 2014
 
Lug corporate presentation june 2021
Lug corporate presentation june 2021Lug corporate presentation june 2021
Lug corporate presentation june 2021
 
Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015Stornoway Corporate Update Presentation January 22, 2015
Stornoway Corporate Update Presentation January 22, 2015
 
Corporate Update, January 2015
Corporate Update, January 2015Corporate Update, January 2015
Corporate Update, January 2015
 
Lug corporate presentation may 2021
Lug corporate presentation may 2021Lug corporate presentation may 2021
Lug corporate presentation may 2021
 
Lundin Gold Corporate Presentation - May 2021
Lundin Gold Corporate Presentation - May 2021Lundin Gold Corporate Presentation - May 2021
Lundin Gold Corporate Presentation - May 2021
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial Results
 
Scotiabank dec42017
Scotiabank dec42017Scotiabank dec42017
Scotiabank dec42017
 
Hecla Mining - Corporate Presentation
Hecla  Mining - Corporate PresentationHecla  Mining - Corporate Presentation
Hecla Mining - Corporate Presentation
 
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining ConferenceRamping Up Brucejack – Presented at the Scotiabank Mining Conference
Ramping Up Brucejack – Presented at the Scotiabank Mining Conference
 
Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016Claude Resources Inc. European Gold Forum Presentation April 2016
Claude Resources Inc. European Gold Forum Presentation April 2016
 
Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015
 
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...
Conference Call and Webcast for Q2/15 - Claude Generates Record Quarterly Ear...
 

Viewers also liked

2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentationAgnico Eagle Mines
 
49 north conference building a high quality manageable gold business in cha...
49 north conference   building a high quality manageable gold business in cha...49 north conference   building a high quality manageable gold business in cha...
49 north conference building a high quality manageable gold business in cha...Agnico Eagle Mines
 
AEM September 2012 Corporate Update
AEM September 2012 Corporate UpdateAEM September 2012 Corporate Update
AEM September 2012 Corporate UpdateAgnico Eagle Mines
 
2011-08-18 AEM Technical Update
2011-08-18 AEM Technical Update2011-08-18 AEM Technical Update
2011-08-18 AEM Technical UpdateAgnico Eagle Mines
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf callAgnico Eagle Mines
 

Viewers also liked (8)

2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation2011 10-26 q3-2011 presentation
2011 10-26 q3-2011 presentation
 
AEM/Yamana Offer for Osisko
AEM/Yamana Offer for OsiskoAEM/Yamana Offer for Osisko
AEM/Yamana Offer for Osisko
 
49 north conference building a high quality manageable gold business in cha...
49 north conference   building a high quality manageable gold business in cha...49 north conference   building a high quality manageable gold business in cha...
49 north conference building a high quality manageable gold business in cha...
 
Q3 2012 results
Q3 2012 resultsQ3 2012 results
Q3 2012 results
 
AEM September 2012 Corporate Update
AEM September 2012 Corporate UpdateAEM September 2012 Corporate Update
AEM September 2012 Corporate Update
 
2011-08-18 AEM Technical Update
2011-08-18 AEM Technical Update2011-08-18 AEM Technical Update
2011-08-18 AEM Technical Update
 
Q2 2012 results presentation conf call
Q2 2012 results presentation conf callQ2 2012 results presentation conf call
Q2 2012 results presentation conf call
 
CFA Society April 9 2014
CFA Society April 9 2014CFA Society April 9 2014
CFA Society April 9 2014
 

Similar to Corporate Update Highlights Cost Cuts Growth

Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentationDetourGold
 
Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial ResultsAuRico Gold
 
BMO Global Metal & Mining Conference
BMO Global Metal & Mining ConferenceBMO Global Metal & Mining Conference
BMO Global Metal & Mining ConferenceAgnico Eagle Mines
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceAgnico Eagle Mines
 
Macquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkMacquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkAgnico Eagle Mines
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporateDetourGold
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDetourGold
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014Agnico Eagle Mines
 
Raymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceRaymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceAgnico Eagle Mines
 
Q2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincQ2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincClaude Resources Inc.
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentationDetourGold
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold ForumDetourGold
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial ResultsAuRico Gold
 
Corporate Update - November 2014
Corporate Update - November 2014Corporate Update - November 2014
Corporate Update - November 2014Agnico Eagle Mines
 

Similar to Corporate Update Highlights Cost Cuts Growth (20)

Q2 2013 Results
Q2 2013 ResultsQ2 2013 Results
Q2 2013 Results
 
Q1 2013 Results
Q1 2013 ResultsQ1 2013 Results
Q1 2013 Results
 
Corporate Update - June 2013
Corporate Update - June 2013Corporate Update - June 2013
Corporate Update - June 2013
 
Agnico Eagle update
Agnico Eagle updateAgnico Eagle update
Agnico Eagle update
 
Detour Gold corporate presentation
Detour Gold corporate presentationDetour Gold corporate presentation
Detour Gold corporate presentation
 
Q3 2013 Financial Results
Q3 2013 Financial ResultsQ3 2013 Financial Results
Q3 2013 Financial Results
 
BMO Global Metal & Mining Conference
BMO Global Metal & Mining ConferenceBMO Global Metal & Mining Conference
BMO Global Metal & Mining Conference
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Macquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkMacquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New York
 
Dgc 13 08_13_corporate
Dgc 13 08_13_corporateDgc 13 08_13_corporate
Dgc 13 08_13_corporate
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Dgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conferenceDgc 16 01_20 - cibc whistler conference
Dgc 16 01_20 - cibc whistler conference
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014
 
Raymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceRaymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors Conference
 
Q2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesincQ2 2013 conference call and webcast claude resourcesinc
Q2 2013 conference call and webcast claude resourcesinc
 
Denver Gold corporate presentation
Denver Gold corporate presentationDenver Gold corporate presentation
Denver Gold corporate presentation
 
Dgc Denver Gold Forum
Dgc Denver Gold ForumDgc Denver Gold Forum
Dgc Denver Gold Forum
 
La India Investor Tour
La India Investor TourLa India Investor Tour
La India Investor Tour
 
Q1 2013 Financial Results
Q1 2013 Financial ResultsQ1 2013 Financial Results
Q1 2013 Financial Results
 
Corporate Update - November 2014
Corporate Update - November 2014Corporate Update - November 2014
Corporate Update - November 2014
 

More from Agnico Eagle Mines

Supplemental Information - May 2021
Supplemental Information - May 2021Supplemental Information - May 2021
Supplemental Information - May 2021Agnico Eagle Mines
 
Q2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationQ2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationAgnico Eagle Mines
 
Raymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceRaymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceAgnico Eagle Mines
 
Q4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationQ4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationAgnico Eagle Mines
 
2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-versionAgnico Eagle Mines
 
2017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 20172017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 2017Agnico Eagle Mines
 
Q3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationQ3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationAgnico Eagle Mines
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationAgnico Eagle Mines
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016Agnico Eagle Mines
 
Corporate Update - September 2016
Corporate Update - September 2016Corporate Update - September 2016
Corporate Update - September 2016Agnico Eagle Mines
 
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventBank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventAgnico Eagle Mines
 
Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Agnico Eagle Mines
 
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceBank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceAgnico Eagle Mines
 

More from Agnico Eagle Mines (20)

Supplemental Information - May 2021
Supplemental Information - May 2021Supplemental Information - May 2021
Supplemental Information - May 2021
 
Q2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationQ2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings Presentation
 
Raymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceRaymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conference
 
Q4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationQ4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings Presentation
 
2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version
 
2017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 20172017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 2017
 
Q3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationQ3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentation
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
Q4-2016 Results
Q4-2016 ResultsQ4-2016 Results
Q4-2016 Results
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016
 
Kittila Site Visit
Kittila Site VisitKittila Site Visit
Kittila Site Visit
 
Barsele Gold Project
Barsele Gold ProjectBarsele Gold Project
Barsele Gold Project
 
Q3-2016 Results
Q3-2016 ResultsQ3-2016 Results
Q3-2016 Results
 
Corporate Update - September 2016
Corporate Update - September 2016Corporate Update - September 2016
Corporate Update - September 2016
 
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventBank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
 
Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Denver Gold Forum - September 2016
Denver Gold Forum - September 2016
 
Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016
 
Q2-2016 Results
Q2-2016 ResultsQ2-2016 Results
Q2-2016 Results
 
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceBank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
 
Annual and Special Meeting
Annual and Special MeetingAnnual and Special Meeting
Annual and Special Meeting
 

Recently uploaded

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 

Recently uploaded (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 

Corporate Update Highlights Cost Cuts Growth

  • 2. agnicoeagle.com FORWARD LOOKING STATEMENTS The information in this document has been prepared as at September 9, 2013. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information. Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine sites and statements and information regarding the sufficiency of the Company’s cash resources. Such statements and information reflect the Company’s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s reserve and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified Persons for each project. 2agnicoeagle.com
  • 3. agnicoeagle.com NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This document presents estimates of future “total cash cost per ounce” and “minesite cost per tonne” that are not recognized measures under United States generally accepted accounting principles (“US GAAP”). This data may not be comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non- GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company’s total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company’s historical results of operations is set forth in the notes to the financial statements included in the Company’s Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the SEC. Note Regarding Production Guidance The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves. 3agnicoeagle.com
  • 4. agnicoeagle.com KEY OPERATING HIGHLIGHTS – Q2 2013 • Q2 gold production of 224,089 oz at total cash costs per ounce of $785/oz1 – in line with expectations • Financial results impacted by lower commodity prices, maintenance shutdown at Kittila and concentrate settlement adjustments • Quarterly cash flows from operations of $75.3 million ($0.44 per share) • Kittila autoclave now back to steady state levels • Significant capital and cost reductions announced for 2013 and 2014, production guidance maintained for 2013 to 2015 4 1 Expenditures at Kittila have been excluded from calculationsin the second quarter of 2013, given that the mine operated only 14 days during the quarter.
  • 5. agnicoeagle.com INVESTMENT HIGHLIGHTS Significant reductions in capital and operating costs 2013 • Approximately $50 million in immediate capital and cost reductions 2014 • Approximately $200 million in capital cost reductions • Exploration budget of approximately $50 million (compared to historical levels of ~$100 million) Production to increase in the 2H 2013 due to multiple catalysts: Expectations: – Normal production at Kittila – Better grades at Meadowbank – Start up production at Goldex – Continued grade improvement at LaRonde 5
  • 6. agnicoeagle.com OPERATING RESULTS Second quarter production and operating costs in line with expectations Q2 2013 Total Operating Margin – $110 M Gold 91% Silver 6% Base Metals 3% 6 LaRonde 13% Kittila 0% Lapa 15% Pinos Altos 43% Meadowbank 29% Q2 2013 Revenue by Metal Q2 2013 YTD 2013 Production Total Cash Cost Production Total Cash Cost (Gold oz) ($/oz) (Gold oz) ($/oz) LaRonde 46,119 $927 85,192 $831 Kittila 5,389 N/A 48,534 $6241 Lapa 23,178 $720 50,046 $699 Pinos Altos2 57,530 $496 103,601 $411 Meadowbank 91,873 $912 173,691 $986 Total 224,089 $785 461,064 $762 1. Kittila total cash cost excludes results from Q2, 2013 due to shutdown 2. Pinos Altos figures include Creston Mascota.
  • 7. agnicoeagle.com Q2 2013 FINANCIAL RESULTS Results impacted by lower commodity prices, Kittila autoclave shut down and byproduct settlement adjustments 7 All amounts are in US$, Q2 2013 Q2 2012 YTD 2013 YTD 2012 unless otherwise indicated Revenues (millions) $336 $460 $757 $932 Earnings (millions) ($24) $43 ($1) $122 Earnings per share (basic) ($0.14) $0.25 ($0.00) $0.71 Cash provided by operating activities (millions) $75 $194 $221 $391 Payable Production Gold (ounces) 224,089 265,350 461,064 520,305 Silver (ounces in thousands) 1,066 1,095 2,317 2,310 Zinc (tonnes) 3,455 9,558 11,694 22,536 Copper (tonnes) 1,280 1,004 2,362 2,330 Total cash costs1 (gold, $/oz) $785 $660 $762 $628 1 Expenditures at Kittila have been excluded from calculationsin the second quarter of 2013, given that the mine operated only 14 days during the quarter.
  • 8. agnicoeagle.com FINANCIAL POSITION Balance sheet flexibility maintained Long-Term Debt Maturities 2017 2020 2022 2024 Notes Outstanding (millions) $115 $360 $225 $100 Coupon 6.13% 6.67% 5.93% 5.02% 8 ALL AMOUNTS ARE IN US$, unless otherwise indicated Jun. 30, 2013 CASH AND CASH EQUIVALENTS (millions) $136 LONG TERM DEBT (millions) $850 AVAILABLE CREDIT FACILITIES $1.15 Billion COMMON SHARES OUTSTANDING, BASIC (Q2’13 Weighted average, millions) 172.6 COMMON SHARES OUTSTANDING, FULLY DILUTED (Q2’13 Weighted average, millions) 172.6
  • 9. agnicoeagle.com MODERATE, ACHIEVABLE PRODUCTION GROWTH Low political risk, mining-friendly jurisdictions 100,000 300,000 500,000 700,000 900,000 1,100,000 1,300,000 2008A 2009A 2010A 2011A 2012A 2013E 2014E 2015E Actual Estimate Payable Gold Production Profile (oz) 9
  • 10. agnicoeagle.com DISCIPLINED CAPITAL ALLOCATION $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 2008A 2009A 2010A 2011A 2012A 2013E 2014E Actual Estimate Capital Expenditures (US$ 000’s) 10
  • 12. agnicoeagle.com LARONDE Cooling plant infrastructure development progressing well • Additional cooling capacity expected to be installed in 4Q 2013 • Positive for operating flexibility and production • Approximately 60% of ore in Q2 2013 sourced from deeper mine • Value of ore per tonne approximately 50% higher over life mine versus 2012 (assuming the same metal prices) P&P GOLD RESERVES (million oz) 4.2 AVERAGE GOLD RESERVE GRADE (g/t) 4.5 Indicated resource (million oz) (5.4 M tonnes @ 1.88 g/t) 0.3 Inferred resource (million oz) (11.9 M tonnes @ 3.73 g/t) 1.4 Estimated LOM (years) 14 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. $0M $80M $160M $240M 2010 2011 2012 Cash Operating Margin 12
  • 13. agnicoeagle.com LAPA Zulapa drilling could have a positive impact on production and grades • Lower unit costs due to reduced cement consumption, productivity improvements, and cost reductions • Ongoing exploration could extend the mine life beyond 2016 $0M $40M $80M $120M 2010 2011 2012 Cash Operating Margin P&P GOLD RESERVES (million oz) 0.4 AVERAGE GOLD RESERVE GRADE (g/t) 6.0 Indicated resource (million oz) (1.1 M tonnes @ 4.08 g/t) 0.2 Inferred resource (million oz) (0.9 M tonnes @ 6.69 g/t) 0.2 Estimated LOM (years) 3 13 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 14. agnicoeagle.com KITTILA Autoclave successfully restarted after extended maintenance • Normal operations restarted at the end of Q2 • Throughput and recoveries back to steady state • 750 tpd per day expansion on schedule for completion in 2H 2015 $0M $80M $160M $240M 2010 2011 2012 Cash Operating Margin P&P GOLD RESERVES (million oz) 4.8 AVERAGE GOLD RESERVE GRADE (g/t) 4.5 Indicated resource (million oz) (7.8 M tonnes @ 2.65 g/t) 0.7 Inferred resource (million oz) (19.0 M tonnes @ 3.88 g/t) 2.4 Estimated LOM (years) 25 14 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 15. agnicoeagle.com MEXICO – PINOS ALTOS & CRESTON MASCOTA Steady production and operating cost control at Pinos Altos • Restart of leaching at Creston Mascota progressing well and production expected to increase during the remainder of 2013 • Shaft construction at Pinos Altos in Q2: • Preparation of the headframe foundation • Construction of the hoist building • Galloway assembly P&P GOLD RESERVES (million oz) 2.7 AVERAGE GOLD RESERVE GRADE (g/t) 2.2 Indicated resource (million oz) (17.9 M tonnes @ 1.52 g/t) 0.9 Inferred resource (million oz) (24.6 M tonnes @ 1.19 g/t) 0.9 Estimated LOM (years) 17 $0M $80M $160M $240M $320M 2010 2011 2012 Cash Operating Margin 15 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 16. agnicoeagle.com MEADOWBANK Production expected to increase further in 2H 2013 • Production expected to be higher in H2 2013 due to higher anticipated grades • Throughput maintained consistently above 11,000 tpd • Excellent cost control due to improved productivity and cost reduction initiatives P&P GOLD RESERVES (million oz) 2.3 AVERAGE GOLD RESERVE GRADE (g/t) 2.8 Measured & Indicated resource (million oz) (10.3 M tonnes @ 2.49 g/t) 0.8 Inferred resource (million oz) (3.6 M tonnes @ 3.81 g/t) 0.4 Estimated LOM (years) 6 $0M $80M $160M $240M $320M 2010 2011 2012 Cash Operating Margin 16 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 18. agnicoeagle.com LA INDIA On schedule and budget for commissioning in Q4 2013 • Work advanced on the installation of the ADR plant, crushing system, and leach pads • Power generators installed and operational • Estimated annual gold production of approx. 90 koz @ average total cash costs of approx. $500/oz • Open pit, heap leach mine, with stripping ratio of 1:1 PROBABLE GOLD RESERVES (million oz) 0.8 AVERAGE GOLD RESERVE GRADE (g/t) 0.7 Indicated gold resource (million oz) (43.2 M tonnes @ 0.4 g/t) 0.6 Inferred gold resource (million oz) (81 M tonnes @ 0.4 g/t) 1.0 Estimated LOM (years) 8 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. 18
  • 19. agnicoeagle.com GOLDEX Commercial production expected in Q4 2013 • Expected to produce 15,000 oz, in 2013 • Construction of paste plant and ore pass systems on target • Initial focus on the M & E satellite zones – GEZ remains suspended • Technical studies are underway on several other satellite zones with results expected by year-end P&P GOLD RESERVES (million oz) 0.35 AVERAGE GOLD RESERVE GRADE (g/t) 1.6 Measured & Indicated gold resource (million oz) (27.2 M tonnes @ 1.8 g/t) 1.6 Inferred gold resource (million oz) (34.6 M tonnes @ 1.5 g/t) 1.7 Estimated LOM (years) 4 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. 19
  • 20. agnicoeagle.com P&P GOLD RESERVES (million oz) 3.0 AVERAGE GOLD RESERVE GRADE (g/t) 7.0 Indicated gold resource (million oz) (17.2 M tonnes @ 3.9 g/t) 2.2 Inferred gold resource (million oz) (14.8 M tonnes @ 6.2 g/t) 2.9 • 2013 project expenditures reduced by $10 million • 2014 capital expenditures reduced by $80 million to $45 million – Initial production could still be achievable in 2018 under new expenditures schedule – Program will focus on ramp development and exploration drilling • Updated technical study on track for Q2 2014 • Encouraging results from Tiriganiaq, Normeg, Pump South, and F Zones MELIADINE Project size and scope evaluated under current gold price scenarios 20 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 21. agnicoeagle.com ADAPTING BUSINESS TO CURRENT GOLD PRICE ENVIRONMENT Operational review results in significant cost savings going forward • AEM continues to be among industry leaders in per share reserves, production and dividends • Meaningful near-term production growth driven by LaRonde, La India and Goldex, with manageable capex • Solid, achievable production and cost guidance • 22% production growth expected in 2013–2015 at stable costs • Business generating strong cash flows in regions of low political risk • Allocated to dividends, exploration and investing in strategic assets 21 0% 500% 1000% 1500% 6/30/1998 12/17/2001 6/03/2005 11/17/2008 5/03/2012 AEM-NYSE XAU Spot Gold Source: FactSet 15-Year Indexed Price Performance
  • 23. agnicoeagle.com COST EFFECTIVE EXPLORATION REFLECTS SUCCESSFUL M&A STRATEGY Significant exploration results at acquired properties 0 3,000 6,000 9,000 Kittila'05 Kittila'12 Pinos Altos'06 Pinos Altos'12 Meadow bank'07 Meadow bank'12 Meliadine '10 Meliadine '12 LaIndia '11 LaIndia '12 Mined Proven & Probable Measured & Indicated Inferred +1105 koz +5644 koz +3161 koz +3085 koz +1097 koz $54 $43 $173 $121 $186 $18 $27 $48 $26 $10 $0 $50 $100 $150 $200 Kittila Pinos Altos Meadowbank Meliadine La India Purchase Cost per Oz Discovery Cost per Oz Note: The terms “measured resources”, “indicated resources” and “inferred resources” are not recognized under the SEC guidelines. Detailed information can be found in the February 13, 2013 press release. 23
  • 24. agnicoeagle.com OPERATING METRICS $0/t $20/t $40/t $60/t $80/t $100/t $120/t $140/t 4,000tpd 4,500tpd 5,000tpd 5,500tpd 6,000tpd 6,500tpd 7,000tpd 7,500tpd Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 LaRonde - Ore milled ('000 tonnes) LaRonde - Minesite costs per tonne (C$) $50/t $70/t $90/t $110/t $130/t $150/t $170/t 1,400tpd 1,450tpd 1,500tpd 1,550tpd 1,600tpd 1,650tpd 1,700tpd 1,750tpd 1,800tpd 1,850tpd 1,900tpd Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Q2 13 Lapa - Ore milled ('000 tonnes) Lapa - Minesite costs per tonne (C$) Lapa LaRonde 24
  • 25. agnicoeagle.com OPERATING METRICS €40/t €50/t €60/t €70/t €80/t €90/t 0tpd 500tpd 1,000tpd 1,500tpd 2,000tpd 2,500tpd 3,000tpd 3,500tpd 4,000tpd Q1 11 Q2 11 Q3 11 Q4 11 Q1 12 Q2 12 Q3 12 Q4 12 Q1 13 Kittila - Ore milled('000 tonnes) Kittila - Minesite costs per tonne (EUR) $0/t $20/t $40/t $60/t $80/t $100/t $120/t $140/t 0tpd 2,000tpd 4,000tpd 6,000tpd 8,000tpd 10,000tpd 12,000tpd Q111 Q211 Q311 Q411 Q112 Q212 Q312 Q412 Q113 Q213 Meadowbank - Ore milled ('000 tonnes) Meadowbank - Minesite costs per tonne (C$) $0/t $10/t $20/t $30/t $40/t $50/t $60/t 4,000tpd 4,200tpd 4,400tpd 4,600tpd 4,800tpd 5,000tpd 5,200tpd 5,400tpd Q111 Q211 Q311 Q411 Q112 Q212 Q312 Q412 Q113 Q213 Pinos Altos - Ore milled ('000 tonnes) Pinos Altos - Minesite costs per tonne (USD$) Kittila Pinos Altos Meadowbank 25
  • 26. agnicoeagle.com GOLD AND SILVER RESERVES AND RESOURCES December 31, 2012 Gold Tonnes (000’s) Gold (g/t) Gold (ounces) (000’s) Proven 13,836 3.13 1,394 Probable 170,300 3.16 17,286 Total Reserves 184,136 3.16 18,681 Measured & Indicated 140,995 1.79 8,104 Inferred 199,503 1.90 12,159 Silver Tonnes (000’s) Silver (g/t) Silver (ounces) (000’s) Proven 9,390 47.30 14,281 Probable 57,536 43.93 81,256 Total Reserves 66,926 44.40 95,537 Measured & Indicated 23,379 31.95 24,015 Inferred 36,479 20.66 24,228 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources. 26
  • 27. agnicoeagle.com COPPER, ZINC AND LEAD RESERVES AND RESOURCES December 31, 2012 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources. Copper Tonnes (000’s) Copper (%) Copper (tonnes) Proven 6,323 0.30 18,744 Probable 22,462 0.24 53,835 Total Reserves 28,786 0.25 72,580 Indicated 5,432 0.12 6,644 Inferred 11,887 0.25 29,317 Zinc Tonnes (000’s) Zinc (%) Zinc (tonnes) Proven 6,323 1.06 67,211 Probable 22,462 0.68 152,973 Total Reserves 28,786 0.76 220,184 Indicated 5,432 1.50 81,551 Inferred 11,887 0.58 69,048 Lead Tonnes (000’s) Lead (%) Lead (tonnes) Proven 6,323 0.12 7,738 Probable 22,462 0.05 10,304 Total Reserves 28,786 0.06 18,042 Indicated 5,432 0.15 8,071 Inferred 11,887 0.05 5,375 27
  • 28. agnicoeagle.com NOTES TO INVESTORS REGARDING THE USE OF RESOURCES Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This document uses the terms “measured resources” and “indicated resources”. We advise investors that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Cautionary Note to Investors Concerning Estimates of Inferred Resources This document also uses the term “inferred resources”. We advise investors that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. “Inferred resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Scientific and Technical Data Agnico Eagle Mines Limited is reporting mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and reporting of resources and reserves. Cautionary Note To U.S. Investors – The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Agnico Eagle uses certain terms in this press release, such as “measured”, “indicated”, and “inferred”, and “resources” that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. U.S. investors are urged to consider closely the disclosure in our Form 20-F, which may be obtained from us, or from the SEC’s website at: http://sec.gov/edgar.shtml. A “final” or “bankable” feasibility study is required to meet the requirements to designate reserves under Industry Guide 7. Estimates for all properties were calculated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC Industry Guide 7. Industry Guide 7 requires the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC has interpreted to mean historic three-year average prices. The assumptions used for the mineral reserves and resources estimates at the Lapa, Meadowbank and Creston Mascota mines and the Goldex and Meliadine projects reported by the Company on February 13, 2013 are based on three-year average prices for the period ending December 31, 2012 of $1,490 per ounce gold, $29.00 per ounce silver, $0.95 per pound zinc, $3.67 per pound copper, $1.00 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.34 and 12.75, respectively. The assumptions used for the mineral reserves and resources estimates at the LaRonde, Pinos Altos and Kittila mines and the La India and Tarachi projects reported by the Company on February 13, 2013 were based on three-year average prices for the period ending June 30, 2012 of $1,345 per ounce gold, $25.00 per ounce silver, $0.95 per pound zinc, $3.49 per pound copper, $0.99 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.00, 1.30 and 13.00, respectively. The Canadian Securities Administrators’ National Instrument 43-101 (“NI 43-101”) requires mining companies to disclose reserves and resources using the subcategories of “proven” reserves, “probable” reserves, “measured” resources, “indicated” resources and “inferred” resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability. 28agnicoeagle.com
  • 29. agnicoeagle.com NOTES TO INVESTORS REGARDING THE USE OF RESOURCES A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve includes diluting materials and allows for losses that may occur when the material is mined. A proven mineral reserve is the economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. A probable mineral reserve is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource demonstrated by at least a preliminary feasibility study. A mineral resource is a concentration or occurrence of natural, solid, inorganic material, or natural solid fossilized organic material including base and precious metals in or on the Earth’s crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge. A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. A Feasibility Study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing, legal, environmental, social and governmental considerations together with any other relevant operational factors and detailed financial analysis, that are necessary to demonstrate at the time of reporting that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study. The effective date for all of the Company’s mineral resource and reserve estimates in this press release is December 31, 2012. Additional information about each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports referred to above, which may be found at www.sedar.com. Other important operating information can be found in the Company’s Form 20-F and this news release dated February 13, 2013. Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. 29agnicoeagle.com
  • 30. agnicoeagle.com agnicoeagle.com Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-847-8665 info@agnicoeagle.com