SlideShare une entreprise Scribd logo
1  sur  27
Télécharger pour lire hors ligne
agnicoeagle.com
The Meadowbank and Meliadine
Experience
“Mining and Exploring North of 60”
RBC Capital Markets
North of 60 Conference
April 30, 2013
Toronto
Louise Grondin
SVP Environment and
Sustainable Development
Agnico Eagle Mines Limited
Jean Robitaille
SVP Technical Services and
Project Development
Agnico Eagle Mines Limited
agnicoeagle.com
FORWARD LOOKING STATEMENTS
The information in this document has been prepared as at April 30, 2013. Certain statements contained in this document constitute “forward-looking
statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the
provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”,
and similar expressions are intended to identify forward-looking statements or information.
Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future
reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs,
cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding
thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and
production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such
exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration;
the anticipated timing of events with respect to the Company’s mine sites and statements and information regarding the sufficiency of the Company’s
cash resources. Such statements and information reflect the Company’s views as at the date of this document and are subject to certain risks,
uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could
cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks
include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and
mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital
requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental
and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies.
For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-
looking statements contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the
Company’s other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend,
and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the
Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s reserve
and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified Persons for each
project.
2
agnicoeagle.com
NOTES TO INVESTORS
Note Regarding the Use of Non-GAAP Financial Measures
This document presents estimates of future “total cash cost per ounce” and “minesite cost per tonne” that are not recognized measures under
United States generally accepted accounting principles (“US GAAP”). This data may not be comparable to data presented by other gold producers.
These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold
at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary
over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to
the most comparable GAAP measure. A reconciliation of the Company’s total cash cost per ounce and minesite cost per tonne to the most
comparable financial measures calculated and presented in accordance with US GAAP for the Company’s historical results of operations is set forth
in the notes to the financial statements included in the Company’s Annual Information Form and Annual Report on Form 20-F, for the year ended
December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the SEC.
Note Regarding Production Guidance
The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign
exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance
presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves.
3
agnicoeagle.com
AGENDA
• Introduction
• History of AEM’s 1st venture in Nunavut
• Why Meadowbank ?
• Permitting in Nunavut
• Meadowbank Mine: - Infrastructure
- Geology
- Challenges
- Accomplishments
- Meadowbank Today
• History of AEM’s 2nd venture in Nunavut
• Meliadine Project: - Infrastructure
- History and Acquisition Rationale
- Geology
- Exploration
- Current Status
• Summary
4
agnicoeagle.com
INTRODUCTION
Agnico Eagle has a 100% interest in the Meadowbank gold mine and the
Meliadine gold development project, both located in Nunavut.
H u d s o n
B a yCHURCHILL
RANKIN
INLET
YELLOWKNIFE
Railway
Seasonal Shipping
Scheduled Air Route
NUNAVUT TERRITORY
• CANADA •
MEADOWBANK
PROJECT
POLARIS MINE
(closed)
NUNAVUT
BAKER
LAKE
IQALUIT
RAGLAN
MINE
DIAVIK DIAMONDS
LUPIN GOLD
(closed)
NANISIVIK MINE
(closed)
EKATI
DIAMONDS
TAHERA DIAMONDS
5
agnicoeagle.com
HISTORY OF AEM’S FIRST VENTURE IN NUNAVUT:
MEADOWBANK
History & Permitting Milestones
• 1987: First gold discovery
• 1990-1992: AEM former 55% option (spent C$3.5 M)
• 1997: Cumberland Resources acquires 100% for C$3.2M and 1.5M shares
• 2005: Feasibility announced: 2.8 Moz P&P within 3.8 MI&I
• 2006: Nunavut Impact Review Board recommends development of the project
and an Inuit Impact & Benefits Agreement (IIBA) is signed with Kivalliq Inuit
Association
• 2007: Agnico Eagle acquires Cumberland for $750 million ($650 net of cash)
• 2007 - 2010: Project construction – 8,500 tpd open pit and conventional mill with
initial capex of $710 million
• 2010: Commercial production achieved March 1
6
agnicoeagle.com
WHY MEADOWBANK?
Finland
Kittila
Mexico
Pinos Altos
Canada
Toronto, HQ
Canada
LaRonde,
Goldex & Lapa
Canada
Meadowbank
• Construction stage project with
feasibility and permitting
essentially complete
• Open pit operation, i.e. shorter time
to production
• Synergy: could be operated from
its base of operations in Val d’Or
• Forecasted to provide significant
gold production starting in 2010
• Located in a politically stable, pro-
mining jurisdiction
• Offered additional exploration
potential in a new camp
U.S.A.
Nevada
Strategic Rationale
7
agnicoeagle.com
PERMITTING IN NUNAVUT - INUIT OWNED LAND
8
Inuit owned
subsurface rights
(35,000 km2 or less than
2% of Nunavut)
Inuit owned surface
rights (350,000 km2
or 16% of Nunavut)
If claim on Inuit Owned
Lands, agreements with
Inuit Organisations will
be required
Inuit Land
Ownership
Nunavut
1.9 million km2
agnicoeagle.com
INUIT ORGANIZATIONS
9
Sub-surface rights on Inuit
Owned Lands are owned by
Nunavut Tungavik Incorporated
or NTI
Surface rights on Inuit
Owned Lands are owned by
the Regional Inuit Organization
Kitikmeok
Kivalliq
Qikiqktani
Meadowbank and Meliadine on Inuit
Owned Lands in the Kivalliq region
agnicoeagle.com
PERMITTING FOR EXPLORATION IN NUNAVUT
10
Federal Gov’t or
Inuit Organization
EXPLORATION
Nunavut Water Board
Screening by Nunavut Impact Review Board
Exploration Lease Type B Water License
Approximately
6-12 months
agnicoeagle.com
PERMITTING FOR MINING IN NUNAVUT – PROJECT
CERTIFICATE
11
Construction and
Operation
Nunavut Water Board (NWB)
Assessment and Public Hearings
Screening by Nunavut Impact Review Board (NIRB)
Environmental Impact
Assessment & Public
Hearings
Type A Water License
Approximately
3-4 years
Submit Project Description to Nunavut Impact
Review Board with Application for Water Licence
Referred to NIRB Hearings Process
Inuit Impact
Benefit
Agreement
(IIBA)
Mining Lease
Water
Compensation
Agreement
Agreements with Inuit Organizations
Surface Lease
Project Certificate
Approved land use permit conformity with Nunavut Planning
Commission
Project Construction can start
agnicoeagle.com
MEADOWBANK INFRASTRUCTURE : Air and water access
• Meadowbank
supported from Val
d’Or (air):
- Mine staff
- Technical Services
- Administration
- Supplies
• Supplies shipped by
barge (2-3 month
shipping season )
12
agnicoeagle.com Baker
BAKER
LAKE
Whitehills
Lake
AIRPORT
MEADOWBANK
Lake
0 10 Kilometres
Conventional Road
Bridge Crossing
MEADOWBANK INFRASTRUCTURE: Road
• All season access via a 102
km conventional gravel road
• Construction started winter
2007 and finished in 2008
13
agnicoeagle.com
5.6 M litre Fuel Tank Pad
Crushing Plant
Airstrip
Camp Facilities
MEADOWBANK PROJECT – APRIL 2007
Current Status - 2006 Site Construction
14
agnicoeagle.com
MEADOWBANK PROJECT – 2012
Meadowbank Access
Portage Pit
Goose Pit
airstrip
15
agnicoeagle.com
MEADOWBANK GEOLOGY
16
agnicoeagle.com
Prior to Start Up
• AEM had limited arctic experience
• Logistics – limited shipping season, air transport issues
• Fuel storage and management
• Mining in a lake: dewatering dikes
• Staffing – management team, training of Inuit workforce
After Start Up
• Mining – blizzard and cold temperatures– temporary shutdowns and equipment
issues – mining in permafrost – dewater to mine
• Process plant - challenges reaching 8,500 tpd capacity
• Ore storage - frozen stockpiles
• Dilution - narrow mining widths, ore zone angle and ore dispersion from
blasting
• Turnover: 229 Inuit departures in 2011 (permanent and temporary)
• Kitchen fire in 2011
MEADOWBANK CHALLENGES
17
agnicoeagle.com
MEADOWBANK ACCOMPLISHMENTS
• Block model confirmed – locally
better grade reconciliation
• June 2011 - Installed permanent
secondary crusher, which allowed
designed mill throughput of 8,500
tpd to be consistently exceeded
(now >11,000 tpd)
• Feb. 2012 - New optimized mine
plan which reduced ore and waste
tonnes by 36%
• Now have a well trained Inuit and
expat workforce with arctic
experience, ~32% Inuit workforce
Q1 : 11,300 tpd
Secondary crusher increased
throughput from 6,800 tpd in mid
2011 to 11,300 in Q1, 2013
18
agnicoeagle.com
MEADOWBANK TODAY
• Record performance in 2012
• Expected to produce about 360,000
ozs at $985/oz in 2013.
• 2012 reserve growth (at higher
grades) could have a positive impact
on the current six year mine life
19
P&P GOLD RESERVES (million oz) 2.3
AVERAGE GOLD RESERVE
GRADE (g/t)
2.8
Measured & Indicated resource
(million oz)
(10.3 M tonnes @ 2.49 g/t)
0.8
Inferred resource (million oz)
(3.6 M tonnes @ 3.81 g/t)
0.4
2013 Sustaining capital (est.) $40
2013 exploration budget $4M
See AEM Feb 13, 2013 press release for detailed breakdown of reserves and
resources.
agnicoeagle.com
MELIADINE - PROJECT HISTORY
History & Permitting Milestones
• 1972: First gold discovery reported by Rankin Nickel Syndicate at Tonic Lake
• 1989: Asamera & Comaplex Minerals find the Discovery deposit (4.4 g/t over
4.0m) and form a 50:50 JV
• 1993: Discovery of Tiriganiaq (17.2/ g/t over 1.1m), F Zone and Pump Zones
• 1994: Asamera sells its interest to Cumberland Resources
• 1995: WMC options the Meliadine West property
• 2003: Comaplex Minerals buys WMC 56% interest to own 78% of the property,
Resource Capital Fund holds 50% interest in Meliadine East
• 2010: Comaplex acquires remaining interest in Meliadine East
• 2010: AEM acquires Comaplex in July for $668 million and gets 100% of the
Meliadine property.
20
agnicoeagle.com
MELIADINE INFRASTRUCTURE
• Similar concept to Meadowbank
• Shorter road access (~24 km) to a
larger community (Rankin Inlet)
• Airport can support larger aircraft
• Slightly longer shipping season with
better port facility
21
agnicoeagle.com
WHY MELIADINE?
• Better infrastructure than Meadowbank
• Large resource base with higher-grade
UG component
• Successor operation to Meadowbank
• Management and workforce now well
experienced with arctic operations
• AEM has built up strong relationships with
the government and local suppliers in
Nunavut
• Located in a politically stable, pro-mining
jurisdiction
• 100% ownership of an 80 km long belt
with significant exploration potential
Strategic Rationale
22
agnicoeagle.com
MELIADINE GEOLOGY – 80 KM LONG BELT
23
agnicoeagle.com
MELIADINE PROJECT – RESERVES & RESOURCES
• 2012 exploration resulted in significant new
resources, primarily at the new Normeg
deposit
• Normeg is about 100 metres from the main
Tiriganiaq deposit
- could enhance overall project economics
P&P GOLD RESERVES (million oz) 3.0
AVERAGE GOLD RESERVE GRADE
(g/t)
7.0
Indicated gold resource (million oz)
(17.2 M tonnes @ 3.9 g/t)
2.2
Inferred gold resource (million oz)
(14.8 M tonnes @ 6.2 g/t)
2.9
See AEM Feb 13, 2013 press release for detailed breakdown of reserves
and resources.
24
agnicoeagle.com
2013 MELIADINE EXPLORATION PROGRAM
• $31 million exploration program
for 2013
• Drilling restarted in March
• 9 rigs currently operating
• 90,000 m drilling planned
- Conversion of existing resources
- Extension of known deposits
• Potential for the discovery of
new zones like Normeg
• Portal cover will be installed this
year to allow restart of
exploration ramp
Portal
25
agnicoeagle.com
MELIADINE PROJECT – CURRENT STATUS
• Road connected to camp in March
- Final construction this summer
• Alternate energy study underway
- LNG and wind power
• Expect updated technical study in 2014
- Potential OP and UG operation
• Permitting activities are ongoing
- Project certificate expected in 2014
- Potential for first production in 2018
65m bridge span over Meliadine river
26
agnicoeagle.com
agnicoeagle.com
27

Contenu connexe

Tendances

Precious Metals Summit, Zurich
Precious Metals Summit, ZurichPrecious Metals Summit, Zurich
Precious Metals Summit, ZurichNOVAGOLD
 
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation RedChip Companies, Inc.
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretiumR
 
Ur-Energy April 2016 Corporate Presentation
Ur-Energy April 2016 Corporate PresentationUr-Energy April 2016 Corporate Presentation
Ur-Energy April 2016 Corporate PresentationUr-Energy
 
Lundin Gold Corporate Presentation January 2018
Lundin Gold Corporate Presentation January 2018Lundin Gold Corporate Presentation January 2018
Lundin Gold Corporate Presentation January 2018Adnet Communications
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 finalPretiumR
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...PretiumR
 
September 2021 calibre corp presentation
September 2021 calibre corp presentationSeptember 2021 calibre corp presentation
September 2021 calibre corp presentationAdnet Communications
 
2017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 20172017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 2017Agnico Eagle Mines
 
Stornoway Corporate Update June 19, 2015
Stornoway Corporate Update June 19, 2015Stornoway Corporate Update June 19, 2015
Stornoway Corporate Update June 19, 2015Stornoway Diamonds
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferencePretiumR
 
Lundin Gold June 2019 Corporate Presentation
Lundin Gold June 2019 Corporate PresentationLundin Gold June 2019 Corporate Presentation
Lundin Gold June 2019 Corporate PresentationAdnet Communications
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017PretiumR
 

Tendances (18)

Precious Metals Summit, Zurich
Precious Metals Summit, ZurichPrecious Metals Summit, Zurich
Precious Metals Summit, Zurich
 
Scotiabank dec42017
Scotiabank dec42017Scotiabank dec42017
Scotiabank dec42017
 
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation
Texas Mineral Resources Corp (OTCQX:TMRC ) Investor Presentation
 
Pretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 finalPretium rodman renshaw sept 12 2017 final
Pretium rodman renshaw sept 12 2017 final
 
Ur-Energy April 2016 Corporate Presentation
Ur-Energy April 2016 Corporate PresentationUr-Energy April 2016 Corporate Presentation
Ur-Energy April 2016 Corporate Presentation
 
Lundin Gold Corporate Presentation January 2018
Lundin Gold Corporate Presentation January 2018Lundin Gold Corporate Presentation January 2018
Lundin Gold Corporate Presentation January 2018
 
Agm may 12 2017 final
Agm may 12 2017 finalAgm may 12 2017 final
Agm may 12 2017 final
 
Lug mar-2018-corp-ppt-final
Lug mar-2018-corp-ppt-finalLug mar-2018-corp-ppt-final
Lug mar-2018-corp-ppt-final
 
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
Ramping Up Brucejack Mine - Presented at the AFund Natural Resource Symposium...
 
2018 01-15-cp lug
2018 01-15-cp lug2018 01-15-cp lug
2018 01-15-cp lug
 
Lug q3 2020 call ppt final
Lug q3 2020 call ppt finalLug q3 2020 call ppt final
Lug q3 2020 call ppt final
 
September 2021 calibre corp presentation
September 2021 calibre corp presentationSeptember 2021 calibre corp presentation
September 2021 calibre corp presentation
 
2018 01-25-cp lug
2018 01-25-cp lug2018 01-25-cp lug
2018 01-25-cp lug
 
2017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 20172017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 2017
 
Stornoway Corporate Update June 19, 2015
Stornoway Corporate Update June 19, 2015Stornoway Corporate Update June 19, 2015
Stornoway Corporate Update June 19, 2015
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Lundin Gold June 2019 Corporate Presentation
Lundin Gold June 2019 Corporate PresentationLundin Gold June 2019 Corporate Presentation
Lundin Gold June 2019 Corporate Presentation
 
RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017RBC Global Mining & Materials Conference 2017
RBC Global Mining & Materials Conference 2017
 

Similaire à The meadowbank experience lessons learned about gold

LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013Agnico Eagle Mines
 
Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDetourGold
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Gold Corp
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate PresentationCrocodile Gold
 
Avion Corporate Presentation - November 12
Avion Corporate Presentation - November 12Avion Corporate Presentation - November 12
Avion Corporate Presentation - November 12Avion Gold Corp
 
Lundin Gold Corporate Presentation - August 2019
Lundin Gold Corporate Presentation - August 2019Lundin Gold Corporate Presentation - August 2019
Lundin Gold Corporate Presentation - August 2019Adnet Communications
 
LUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfLUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfAdnetNew
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate PresentationDetourGold
 
Avion Corporate Presentation
Avion Corporate Presentation Avion Corporate Presentation
Avion Corporate Presentation Avion Gold Corp
 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDetourGold
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014Crocodile Gold
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate PresentationCrocodile Gold
 
Avion Corporate Presentation 10 11 04
Avion Corporate Presentation 10 11 04Avion Corporate Presentation 10 11 04
Avion Corporate Presentation 10 11 04Avion Gold Corp
 

Similaire à The meadowbank experience lessons learned about gold (20)

Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013LaRonde GMP Tour November 22 2013
LaRonde GMP Tour November 22 2013
 
Dgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conferenceDgc 14 04_23 - scotia conference
Dgc 14 04_23 - scotia conference
 
Agnico Eagle update
Agnico Eagle updateAgnico Eagle update
Agnico Eagle update
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010
 
La India Investor Tour
La India Investor TourLa India Investor Tour
La India Investor Tour
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate Presentation
 
Avion Corporate Presentation - November 12
Avion Corporate Presentation - November 12Avion Corporate Presentation - November 12
Avion Corporate Presentation - November 12
 
Lundin Gold Corporate Presentation - August 2019
Lundin Gold Corporate Presentation - August 2019Lundin Gold Corporate Presentation - August 2019
Lundin Gold Corporate Presentation - August 2019
 
Lundin Gold PPT July 2019
Lundin Gold PPT July 2019Lundin Gold PPT July 2019
Lundin Gold PPT July 2019
 
LUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdfLUG Q1 2022 Conf Call v5.pdf
LUG Q1 2022 Conf Call v5.pdf
 
Detour Gold Corporate Presentation
Detour Gold Corporate PresentationDetour Gold Corporate Presentation
Detour Gold Corporate Presentation
 
Avion Corporate Presentation
Avion Corporate Presentation Avion Corporate Presentation
Avion Corporate Presentation
 
Dgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conferenceDgc 14 03_19-20 - ms conference
Dgc 14 03_19-20 - ms conference
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate Presentation
 
Avion Corporate Presentation 10 11 04
Avion Corporate Presentation 10 11 04Avion Corporate Presentation 10 11 04
Avion Corporate Presentation 10 11 04
 

Plus de Agnico Eagle Mines

Supplemental Information - May 2021
Supplemental Information - May 2021Supplemental Information - May 2021
Supplemental Information - May 2021Agnico Eagle Mines
 
Q2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationQ2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationAgnico Eagle Mines
 
Raymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceRaymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceAgnico Eagle Mines
 
Q4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationQ4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationAgnico Eagle Mines
 
2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-versionAgnico Eagle Mines
 
Q3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationQ3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationAgnico Eagle Mines
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationAgnico Eagle Mines
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceAgnico Eagle Mines
 
Raymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceRaymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceAgnico Eagle Mines
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016Agnico Eagle Mines
 
Corporate Update - September 2016
Corporate Update - September 2016Corporate Update - September 2016
Corporate Update - September 2016Agnico Eagle Mines
 
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventBank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventAgnico Eagle Mines
 
Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Agnico Eagle Mines
 
Corporate Update - August 2016
Corporate Update - August 2016Corporate Update - August 2016
Corporate Update - August 2016Agnico Eagle Mines
 

Plus de Agnico Eagle Mines (20)

Supplemental Information - May 2021
Supplemental Information - May 2021Supplemental Information - May 2021
Supplemental Information - May 2021
 
Q2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationQ2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings Presentation
 
Raymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceRaymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conference
 
Q4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings PresentationQ4 2017 AEM Earnings Presentation
Q4 2017 AEM Earnings Presentation
 
2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version
 
Q3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationQ3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentation
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Raymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceRaymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors Conference
 
Q4-2016 Results
Q4-2016 ResultsQ4-2016 Results
Q4-2016 Results
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016
 
Kittila Site Visit
Kittila Site VisitKittila Site Visit
Kittila Site Visit
 
Barsele Gold Project
Barsele Gold ProjectBarsele Gold Project
Barsele Gold Project
 
Q3-2016 Results
Q3-2016 ResultsQ3-2016 Results
Q3-2016 Results
 
Corporate Update - September 2016
Corporate Update - September 2016Corporate Update - September 2016
Corporate Update - September 2016
 
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining EventBank of America Merrill Lynch 2016 Global Metals, Mining Event
Bank of America Merrill Lynch 2016 Global Metals, Mining Event
 
Denver Gold Forum - September 2016
Denver Gold Forum - September 2016Denver Gold Forum - September 2016
Denver Gold Forum - September 2016
 
Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016
 
Corporate Update - August 2016
Corporate Update - August 2016Corporate Update - August 2016
Corporate Update - August 2016
 
Q2-2016 Results
Q2-2016 ResultsQ2-2016 Results
Q2-2016 Results
 

Dernier

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 

Dernier (20)

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 

The meadowbank experience lessons learned about gold

  • 1. agnicoeagle.com The Meadowbank and Meliadine Experience “Mining and Exploring North of 60” RBC Capital Markets North of 60 Conference April 30, 2013 Toronto Louise Grondin SVP Environment and Sustainable Development Agnico Eagle Mines Limited Jean Robitaille SVP Technical Services and Project Development Agnico Eagle Mines Limited
  • 2. agnicoeagle.com FORWARD LOOKING STATEMENTS The information in this document has been prepared as at April 30, 2013. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information. Such statements include without limitation: statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, cash costs, minesite costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine sites and statements and information regarding the sufficiency of the Company’s cash resources. Such statements and information reflect the Company’s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward- looking statements contained in this document, see the Company’s Annual Report on Form 20-F for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the U.S. Securities and Exchange Commission. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. Alain Blackburn, a Qualified Person and the Company’s Senior Vice-President, Exploration, reviewed the technical information disclosed herein. For a detailed breakdown of the Company’s reserve and resource position see the February 13, 2013 press release on the Company’s website. That press release also lists the Qualified Persons for each project. 2
  • 3. agnicoeagle.com NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This document presents estimates of future “total cash cost per ounce” and “minesite cost per tonne” that are not recognized measures under United States generally accepted accounting principles (“US GAAP”). This data may not be comparable to data presented by other gold producers. These future estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at the applicable projects and do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-GAAP financial measures to the most comparable GAAP measure. A reconciliation of the Company’s total cash cost per ounce and minesite cost per tonne to the most comparable financial measures calculated and presented in accordance with US GAAP for the Company’s historical results of operations is set forth in the notes to the financial statements included in the Company’s Annual Information Form and Annual Report on Form 20-F, for the year ended December 31, 2012, as well as the Company’s other filings with the Canadian Securities Administrators and the SEC. Note Regarding Production Guidance The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves. 3
  • 4. agnicoeagle.com AGENDA • Introduction • History of AEM’s 1st venture in Nunavut • Why Meadowbank ? • Permitting in Nunavut • Meadowbank Mine: - Infrastructure - Geology - Challenges - Accomplishments - Meadowbank Today • History of AEM’s 2nd venture in Nunavut • Meliadine Project: - Infrastructure - History and Acquisition Rationale - Geology - Exploration - Current Status • Summary 4
  • 5. agnicoeagle.com INTRODUCTION Agnico Eagle has a 100% interest in the Meadowbank gold mine and the Meliadine gold development project, both located in Nunavut. H u d s o n B a yCHURCHILL RANKIN INLET YELLOWKNIFE Railway Seasonal Shipping Scheduled Air Route NUNAVUT TERRITORY • CANADA • MEADOWBANK PROJECT POLARIS MINE (closed) NUNAVUT BAKER LAKE IQALUIT RAGLAN MINE DIAVIK DIAMONDS LUPIN GOLD (closed) NANISIVIK MINE (closed) EKATI DIAMONDS TAHERA DIAMONDS 5
  • 6. agnicoeagle.com HISTORY OF AEM’S FIRST VENTURE IN NUNAVUT: MEADOWBANK History & Permitting Milestones • 1987: First gold discovery • 1990-1992: AEM former 55% option (spent C$3.5 M) • 1997: Cumberland Resources acquires 100% for C$3.2M and 1.5M shares • 2005: Feasibility announced: 2.8 Moz P&P within 3.8 MI&I • 2006: Nunavut Impact Review Board recommends development of the project and an Inuit Impact & Benefits Agreement (IIBA) is signed with Kivalliq Inuit Association • 2007: Agnico Eagle acquires Cumberland for $750 million ($650 net of cash) • 2007 - 2010: Project construction – 8,500 tpd open pit and conventional mill with initial capex of $710 million • 2010: Commercial production achieved March 1 6
  • 7. agnicoeagle.com WHY MEADOWBANK? Finland Kittila Mexico Pinos Altos Canada Toronto, HQ Canada LaRonde, Goldex & Lapa Canada Meadowbank • Construction stage project with feasibility and permitting essentially complete • Open pit operation, i.e. shorter time to production • Synergy: could be operated from its base of operations in Val d’Or • Forecasted to provide significant gold production starting in 2010 • Located in a politically stable, pro- mining jurisdiction • Offered additional exploration potential in a new camp U.S.A. Nevada Strategic Rationale 7
  • 8. agnicoeagle.com PERMITTING IN NUNAVUT - INUIT OWNED LAND 8 Inuit owned subsurface rights (35,000 km2 or less than 2% of Nunavut) Inuit owned surface rights (350,000 km2 or 16% of Nunavut) If claim on Inuit Owned Lands, agreements with Inuit Organisations will be required Inuit Land Ownership Nunavut 1.9 million km2
  • 9. agnicoeagle.com INUIT ORGANIZATIONS 9 Sub-surface rights on Inuit Owned Lands are owned by Nunavut Tungavik Incorporated or NTI Surface rights on Inuit Owned Lands are owned by the Regional Inuit Organization Kitikmeok Kivalliq Qikiqktani Meadowbank and Meliadine on Inuit Owned Lands in the Kivalliq region
  • 10. agnicoeagle.com PERMITTING FOR EXPLORATION IN NUNAVUT 10 Federal Gov’t or Inuit Organization EXPLORATION Nunavut Water Board Screening by Nunavut Impact Review Board Exploration Lease Type B Water License Approximately 6-12 months
  • 11. agnicoeagle.com PERMITTING FOR MINING IN NUNAVUT – PROJECT CERTIFICATE 11 Construction and Operation Nunavut Water Board (NWB) Assessment and Public Hearings Screening by Nunavut Impact Review Board (NIRB) Environmental Impact Assessment & Public Hearings Type A Water License Approximately 3-4 years Submit Project Description to Nunavut Impact Review Board with Application for Water Licence Referred to NIRB Hearings Process Inuit Impact Benefit Agreement (IIBA) Mining Lease Water Compensation Agreement Agreements with Inuit Organizations Surface Lease Project Certificate Approved land use permit conformity with Nunavut Planning Commission Project Construction can start
  • 12. agnicoeagle.com MEADOWBANK INFRASTRUCTURE : Air and water access • Meadowbank supported from Val d’Or (air): - Mine staff - Technical Services - Administration - Supplies • Supplies shipped by barge (2-3 month shipping season ) 12
  • 13. agnicoeagle.com Baker BAKER LAKE Whitehills Lake AIRPORT MEADOWBANK Lake 0 10 Kilometres Conventional Road Bridge Crossing MEADOWBANK INFRASTRUCTURE: Road • All season access via a 102 km conventional gravel road • Construction started winter 2007 and finished in 2008 13
  • 14. agnicoeagle.com 5.6 M litre Fuel Tank Pad Crushing Plant Airstrip Camp Facilities MEADOWBANK PROJECT – APRIL 2007 Current Status - 2006 Site Construction 14
  • 15. agnicoeagle.com MEADOWBANK PROJECT – 2012 Meadowbank Access Portage Pit Goose Pit airstrip 15
  • 17. agnicoeagle.com Prior to Start Up • AEM had limited arctic experience • Logistics – limited shipping season, air transport issues • Fuel storage and management • Mining in a lake: dewatering dikes • Staffing – management team, training of Inuit workforce After Start Up • Mining – blizzard and cold temperatures– temporary shutdowns and equipment issues – mining in permafrost – dewater to mine • Process plant - challenges reaching 8,500 tpd capacity • Ore storage - frozen stockpiles • Dilution - narrow mining widths, ore zone angle and ore dispersion from blasting • Turnover: 229 Inuit departures in 2011 (permanent and temporary) • Kitchen fire in 2011 MEADOWBANK CHALLENGES 17
  • 18. agnicoeagle.com MEADOWBANK ACCOMPLISHMENTS • Block model confirmed – locally better grade reconciliation • June 2011 - Installed permanent secondary crusher, which allowed designed mill throughput of 8,500 tpd to be consistently exceeded (now >11,000 tpd) • Feb. 2012 - New optimized mine plan which reduced ore and waste tonnes by 36% • Now have a well trained Inuit and expat workforce with arctic experience, ~32% Inuit workforce Q1 : 11,300 tpd Secondary crusher increased throughput from 6,800 tpd in mid 2011 to 11,300 in Q1, 2013 18
  • 19. agnicoeagle.com MEADOWBANK TODAY • Record performance in 2012 • Expected to produce about 360,000 ozs at $985/oz in 2013. • 2012 reserve growth (at higher grades) could have a positive impact on the current six year mine life 19 P&P GOLD RESERVES (million oz) 2.3 AVERAGE GOLD RESERVE GRADE (g/t) 2.8 Measured & Indicated resource (million oz) (10.3 M tonnes @ 2.49 g/t) 0.8 Inferred resource (million oz) (3.6 M tonnes @ 3.81 g/t) 0.4 2013 Sustaining capital (est.) $40 2013 exploration budget $4M See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources.
  • 20. agnicoeagle.com MELIADINE - PROJECT HISTORY History & Permitting Milestones • 1972: First gold discovery reported by Rankin Nickel Syndicate at Tonic Lake • 1989: Asamera & Comaplex Minerals find the Discovery deposit (4.4 g/t over 4.0m) and form a 50:50 JV • 1993: Discovery of Tiriganiaq (17.2/ g/t over 1.1m), F Zone and Pump Zones • 1994: Asamera sells its interest to Cumberland Resources • 1995: WMC options the Meliadine West property • 2003: Comaplex Minerals buys WMC 56% interest to own 78% of the property, Resource Capital Fund holds 50% interest in Meliadine East • 2010: Comaplex acquires remaining interest in Meliadine East • 2010: AEM acquires Comaplex in July for $668 million and gets 100% of the Meliadine property. 20
  • 21. agnicoeagle.com MELIADINE INFRASTRUCTURE • Similar concept to Meadowbank • Shorter road access (~24 km) to a larger community (Rankin Inlet) • Airport can support larger aircraft • Slightly longer shipping season with better port facility 21
  • 22. agnicoeagle.com WHY MELIADINE? • Better infrastructure than Meadowbank • Large resource base with higher-grade UG component • Successor operation to Meadowbank • Management and workforce now well experienced with arctic operations • AEM has built up strong relationships with the government and local suppliers in Nunavut • Located in a politically stable, pro-mining jurisdiction • 100% ownership of an 80 km long belt with significant exploration potential Strategic Rationale 22
  • 24. agnicoeagle.com MELIADINE PROJECT – RESERVES & RESOURCES • 2012 exploration resulted in significant new resources, primarily at the new Normeg deposit • Normeg is about 100 metres from the main Tiriganiaq deposit - could enhance overall project economics P&P GOLD RESERVES (million oz) 3.0 AVERAGE GOLD RESERVE GRADE (g/t) 7.0 Indicated gold resource (million oz) (17.2 M tonnes @ 3.9 g/t) 2.2 Inferred gold resource (million oz) (14.8 M tonnes @ 6.2 g/t) 2.9 See AEM Feb 13, 2013 press release for detailed breakdown of reserves and resources. 24
  • 25. agnicoeagle.com 2013 MELIADINE EXPLORATION PROGRAM • $31 million exploration program for 2013 • Drilling restarted in March • 9 rigs currently operating • 90,000 m drilling planned - Conversion of existing resources - Extension of known deposits • Potential for the discovery of new zones like Normeg • Portal cover will be installed this year to allow restart of exploration ramp Portal 25
  • 26. agnicoeagle.com MELIADINE PROJECT – CURRENT STATUS • Road connected to camp in March - Final construction this summer • Alternate energy study underway - LNG and wind power • Expect updated technical study in 2014 - Potential OP and UG operation • Permitting activities are ongoing - Project certificate expected in 2014 - Potential for first production in 2018 65m bridge span over Meliadine river 26