SlideShare une entreprise Scribd logo
1  sur  16
Improvements for
           Chowgule & Co. Ltd. – Shipbuilding
                       Division

Ambattuparambil Gopi Nikhil – 09NA1008
• Located on River
  Zuari at Loutulim
• Builders, owners &
  repairers of river       – Iron Ore Barges
  fleets since 1951        – Deep Sea Refrigerated
                             Fishing Trawlers
• Developing               – Grab & Cutter Section
  waterways economy          Dredgers
                           – Tugs
• Built over 100 vessels
                           – Twin-Hull Catamarans
  including                – Floating Restaurants
GOA




      River Zuari
• Construction Bays on either side of Slipway
• Main yard near Outfitting Jetty
• Ample amount of Skids for module assembly
  but scattered
• Distance between Stockyard & Main yard
• Space between Gate & Main Yard unutilized
  (trees?)
Production                Grit Blasting/
Design Room   Department   Scheduling
                                          painting
Assembly
           CNC                   Modular
Lofting                of
          Cutting              Construction
                    Modules
Survey   Movement   Launching   Sea Trials
• Slipway – 220m x 20m
• 2 Construction bays – either side of slipway
  – 90m x 30m open space
  – 90m x 40m open space
• Outfitting Jetty 7m x 10m x 15m
• Sufficient skids for pre-fabrication of
  modules/panels
• Well equipped workshop
• Shipyard specializes in smaller vessels especially those
  used in waterways and for fishing
• Capacity is limited
• Delivery time is of utmost importance
   – Being a private yard (no Govt support)
   – To get more orders
   – Maintain credibility
• Will need more facilities if it wants to extend its
  product catalogue
• Best way to improve layout maybe to induct a
  production flow line model that allows easy flow of
  materials without bottlenecks
• Set up Stockyard near Checkpoint to reduce travel
  time of plates coming in and to be nearer to Main
  yard. Shift Sand blasting unit accordingly
• Use the unutilized area to set up Grit
  blasting/painting & CNC Cutting units – Reduces
  travel time of modules/plates
• Add more (or shift existing) skids nearer to Main yard
  to reduce travel time of modules
• Shift Main office building to give direct access of main
  yard to construction bays
• May shift store to north of Main yard if space permits
•   Faster production line
•   Lesser delivery time  more orders
•   Lower man-time requirement
•   Use of lifting equipment freed for better
    purposes (due to lower amount of shifting of
    modules & panels)
• Cannot increase production too much due to
  space constraints
• Lack of dry dock reduces capability for
  advanced outfitting
09NA1008
              Presentation on Improvement of
             Shipyard Layout in Chowgule & Co.
                 Ltd. – Shipbuilding Division


Ambattuparambil Gopi Nikhil – 09NA1008

Contenu connexe

Tendances

Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)Marine Study
 
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURES
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURESREVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURES
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURESOrlando Leite
 
Then and Now - Offshore Support Vessel
Then and Now - Offshore Support VesselThen and Now - Offshore Support Vessel
Then and Now - Offshore Support VesselPrabhash Sinha
 
Introducing about Spar platform
Introducing about Spar platformIntroducing about Spar platform
Introducing about Spar platformAgus Madatama Puja
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentMuhammad MuhdKhairul
 
Offshore 187
Offshore 187Offshore 187
Offshore 187leemayza
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklistNor Masyiah
 
Ism curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcciónIsm curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcciónAlejandro Díez Fernández
 
offshore support vessel design
offshore support vessel designoffshore support vessel design
offshore support vessel designAhmed Taha
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production SystemspetroEDGE
 
Lessons Learnt - Linde Engg-Piping Final.ppt
Lessons Learnt  - Linde Engg-Piping Final.pptLessons Learnt  - Linde Engg-Piping Final.ppt
Lessons Learnt - Linde Engg-Piping Final.pptgautam883482
 
shipyard hazards rev 01 2009 01
 shipyard hazards rev 01 2009 01 shipyard hazards rev 01 2009 01
shipyard hazards rev 01 2009 01Ainnz Abiggaill
 
Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec Corporation
 

Tendances (20)

I.T. Report
I.T. ReportI.T. Report
I.T. Report
 
Ship Construction (Structure Part)
Ship Construction (Structure Part)Ship Construction (Structure Part)
Ship Construction (Structure Part)
 
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURES
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURESREVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURES
REVIEW OF DESIGN PROCEDURES FOR MONOPILE OFFSHORE WIND STRUCTURES
 
Then and Now - Offshore Support Vessel
Then and Now - Offshore Support VesselThen and Now - Offshore Support Vessel
Then and Now - Offshore Support Vessel
 
Introducing about Spar platform
Introducing about Spar platformIntroducing about Spar platform
Introducing about Spar platform
 
Offshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction SuperintendentOffshore shift supervisor cum Offshore Construction Superintendent
Offshore shift supervisor cum Offshore Construction Superintendent
 
Offshore packages
Offshore packagesOffshore packages
Offshore packages
 
Offshore 187
Offshore 187Offshore 187
Offshore 187
 
Marine operations
Marine operationsMarine operations
Marine operations
 
Final training report PDF
Final training report PDFFinal training report PDF
Final training report PDF
 
Example bunker checklist
Example bunker checklistExample bunker checklist
Example bunker checklist
 
Ism curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcciónIsm curso conocimientos generales 2 construcción
Ism curso conocimientos generales 2 construcción
 
offshore support vessel design
offshore support vessel designoffshore support vessel design
offshore support vessel design
 
Merchant navy ppt
Merchant navy pptMerchant navy ppt
Merchant navy ppt
 
Konstruksi geladak
Konstruksi geladakKonstruksi geladak
Konstruksi geladak
 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
 
Engineering of Subsea Production Systems
Engineering of Subsea Production SystemsEngineering of Subsea Production Systems
Engineering of Subsea Production Systems
 
Lessons Learnt - Linde Engg-Piping Final.ppt
Lessons Learnt  - Linde Engg-Piping Final.pptLessons Learnt  - Linde Engg-Piping Final.ppt
Lessons Learnt - Linde Engg-Piping Final.ppt
 
shipyard hazards rev 01 2009 01
 shipyard hazards rev 01 2009 01 shipyard hazards rev 01 2009 01
shipyard hazards rev 01 2009 01
 
Nidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deffNidec asi marine electric propulsion deff
Nidec asi marine electric propulsion deff
 

En vedette

Shipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsShipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsJune Tan
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentationLoksaShipyard
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projectsFernando Remolina, PMP
 
Life and Work of a Naval Architect
Life and Work of a Naval ArchitectLife and Work of a Naval Architect
Life and Work of a Naval ArchitectCallum Campbell
 
Want To Pursue A Career In Naval Architecture?
Want To Pursue A Career In Naval Architecture?Want To Pursue A Career In Naval Architecture?
Want To Pursue A Career In Naval Architecture?maritimeacademy1
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiJishnu Saji
 
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopPROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopFernando Remolina, PMP
 
Osx project update inglês_setembro_final
Osx project update inglês_setembro_finalOsx project update inglês_setembro_final
Osx project update inglês_setembro_finalosxri
 
Painting in confined spaces
Painting in confined spacesPainting in confined spaces
Painting in confined spacesKomarul Fausiyah
 
Presentation2
Presentation2Presentation2
Presentation2rizalris
 
Empowering Seafarer Manpower Solution of Shipping Industry
Empowering Seafarer Manpower Solution of Shipping IndustryEmpowering Seafarer Manpower Solution of Shipping Industry
Empowering Seafarer Manpower Solution of Shipping IndustryInderveer Solanki
 
프레젠테이션1
프레젠테이션1프레젠테이션1
프레젠테이션1이름 성
 
In class exercise #1.ppt
In class exercise #1.pptIn class exercise #1.ppt
In class exercise #1.pptdennis129
 
D. David Andrews London College
D. David Andrews London CollegeD. David Andrews London College
D. David Andrews London CollegeAuxnavalia
 
Akzonobel networked innovation
Akzonobel networked innovationAkzonobel networked innovation
Akzonobel networked innovationRick Wielens
 

En vedette (20)

Shipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & OperationsShipyard Management - Design, Planning & Operations
Shipyard Management - Design, Planning & Operations
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentation
 
Project management standards for shipyard projects
Project management standards for shipyard projectsProject management standards for shipyard projects
Project management standards for shipyard projects
 
Dept NA-ME
Dept NA-MEDept NA-ME
Dept NA-ME
 
Life and Work of a Naval Architect
Life and Work of a Naval ArchitectLife and Work of a Naval Architect
Life and Work of a Naval Architect
 
Want To Pursue A Career In Naval Architecture?
Want To Pursue A Career In Naval Architecture?Want To Pursue A Career In Naval Architecture?
Want To Pursue A Career In Naval Architecture?
 
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECTINTRODUCTION TO TERM USED IN NAVAL ARCHITECT
INTRODUCTION TO TERM USED IN NAVAL ARCHITECT
 
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu sajiSHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
SHIP THEORY : Basics Of Ship Geometry : Lines Plan__by jishnu saji
 
Hydrostatics
HydrostaticsHydrostatics
Hydrostatics
 
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - WorkshopPROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
PROJECT MANAGEMENT TOOLS FOR SHIPYARD PROJECT MANAGERS/ Course - Workshop
 
Osx project update inglês_setembro_final
Osx project update inglês_setembro_finalOsx project update inglês_setembro_final
Osx project update inglês_setembro_final
 
present abm
present abmpresent abm
present abm
 
Painting in confined spaces
Painting in confined spacesPainting in confined spaces
Painting in confined spaces
 
Presentation2
Presentation2Presentation2
Presentation2
 
Empowering Seafarer Manpower Solution of Shipping Industry
Empowering Seafarer Manpower Solution of Shipping IndustryEmpowering Seafarer Manpower Solution of Shipping Industry
Empowering Seafarer Manpower Solution of Shipping Industry
 
프레젠테이션1
프레젠테이션1프레젠테이션1
프레젠테이션1
 
프레젠테이션
프레젠테이션프레젠테이션
프레젠테이션
 
In class exercise #1.ppt
In class exercise #1.pptIn class exercise #1.ppt
In class exercise #1.ppt
 
D. David Andrews London College
D. David Andrews London CollegeD. David Andrews London College
D. David Andrews London College
 
Akzonobel networked innovation
Akzonobel networked innovationAkzonobel networked innovation
Akzonobel networked innovation
 

Similaire à Shipyard layout improvement

Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptdevmarineacademy
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling ProjectAndika Mahardika
 
Design and Manufacturing Development of Thick
Design and Manufacturing Development of ThickDesign and Manufacturing Development of Thick
Design and Manufacturing Development of ThickBill Cleary
 
120625 0814 Tops
120625 0814 Tops120625 0814 Tops
120625 0814 Topseboroil
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
Blastechnik blastrooms presentation
Blastechnik blastrooms presentationBlastechnik blastrooms presentation
Blastechnik blastrooms presentationblastechnik
 
GTL Oil & Gas Supplement
GTL Oil & Gas SupplementGTL Oil & Gas Supplement
GTL Oil & Gas Supplementgavinrixon
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Seatrains for Marine Highway
Seatrains for Marine HighwaySeatrains for Marine Highway
Seatrains for Marine HighwayStephanie Camay
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resourcesMartin de Beer
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC
 
HydroWorks innovation
HydroWorks innovationHydroWorks innovation
HydroWorks innovationIan McInnes
 
Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovationIan McInnes
 
Innovation Presentation
Innovation PresentationInnovation Presentation
Innovation PresentationIvan Kablar
 

Similaire à Shipyard layout improvement (20)

Marine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.pptMarine-Shipbuilding-and-Onboard-Systems.ppt
Marine-Shipbuilding-and-Onboard-Systems.ppt
 
Re - Entry Drilling Project
Re - Entry Drilling ProjectRe - Entry Drilling Project
Re - Entry Drilling Project
 
PFS.pptx
PFS.pptxPFS.pptx
PFS.pptx
 
Design and Manufacturing Development of Thick
Design and Manufacturing Development of ThickDesign and Manufacturing Development of Thick
Design and Manufacturing Development of Thick
 
120625 0814 Tops
120625 0814 Tops120625 0814 Tops
120625 0814 Tops
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Blastechnik blastrooms presentation
Blastechnik blastrooms presentationBlastechnik blastrooms presentation
Blastechnik blastrooms presentation
 
GTL Oil & Gas Supplement
GTL Oil & Gas SupplementGTL Oil & Gas Supplement
GTL Oil & Gas Supplement
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Seatrains for Marine Highway
Seatrains for Marine HighwaySeatrains for Marine Highway
Seatrains for Marine Highway
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
Propel ppt
Propel pptPropel ppt
Propel ppt
 
Propel ppt
Propel pptPropel ppt
Propel ppt
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resources
 
Royal IHC corporate presentation
Royal IHC corporate presentationRoyal IHC corporate presentation
Royal IHC corporate presentation
 
HydroWorks innovation
HydroWorks innovationHydroWorks innovation
HydroWorks innovation
 
Hydroworks innovation
Hydroworks innovationHydroworks innovation
Hydroworks innovation
 
Innovation Presentation
Innovation PresentationInnovation Presentation
Innovation Presentation
 
Cosworth process
Cosworth processCosworth process
Cosworth process
 

Dernier

fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Dernier (20)

fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

Shipyard layout improvement

  • 1. Improvements for Chowgule & Co. Ltd. – Shipbuilding Division Ambattuparambil Gopi Nikhil – 09NA1008
  • 2. • Located on River Zuari at Loutulim • Builders, owners & repairers of river – Iron Ore Barges fleets since 1951 – Deep Sea Refrigerated Fishing Trawlers • Developing – Grab & Cutter Section waterways economy Dredgers – Tugs • Built over 100 vessels – Twin-Hull Catamarans including – Floating Restaurants
  • 3. GOA River Zuari
  • 4.
  • 5. • Construction Bays on either side of Slipway • Main yard near Outfitting Jetty • Ample amount of Skids for module assembly but scattered • Distance between Stockyard & Main yard • Space between Gate & Main Yard unutilized (trees?)
  • 6.
  • 7. Production Grit Blasting/ Design Room Department Scheduling painting
  • 8. Assembly CNC Modular Lofting of Cutting Construction Modules
  • 9. Survey Movement Launching Sea Trials
  • 10. • Slipway – 220m x 20m • 2 Construction bays – either side of slipway – 90m x 30m open space – 90m x 40m open space • Outfitting Jetty 7m x 10m x 15m • Sufficient skids for pre-fabrication of modules/panels • Well equipped workshop
  • 11. • Shipyard specializes in smaller vessels especially those used in waterways and for fishing • Capacity is limited • Delivery time is of utmost importance – Being a private yard (no Govt support) – To get more orders – Maintain credibility • Will need more facilities if it wants to extend its product catalogue • Best way to improve layout maybe to induct a production flow line model that allows easy flow of materials without bottlenecks
  • 12.
  • 13. • Set up Stockyard near Checkpoint to reduce travel time of plates coming in and to be nearer to Main yard. Shift Sand blasting unit accordingly • Use the unutilized area to set up Grit blasting/painting & CNC Cutting units – Reduces travel time of modules/plates • Add more (or shift existing) skids nearer to Main yard to reduce travel time of modules • Shift Main office building to give direct access of main yard to construction bays • May shift store to north of Main yard if space permits
  • 14. Faster production line • Lesser delivery time  more orders • Lower man-time requirement • Use of lifting equipment freed for better purposes (due to lower amount of shifting of modules & panels)
  • 15. • Cannot increase production too much due to space constraints • Lack of dry dock reduces capability for advanced outfitting
  • 16. 09NA1008 Presentation on Improvement of Shipyard Layout in Chowgule & Co. Ltd. – Shipbuilding Division Ambattuparambil Gopi Nikhil – 09NA1008