HVAC WORK
6TH OF OCTOBER VILLA




                   HVAC SYSTEMS COMPARISON




                                                               Mechanical - HVAC
                                             HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




APPLIED HVAC SYSTEMS.



There are more than one system can be selected to air conditioning for the buildings.


-Individual system.
-Semi-central system.
-Central system.



In the following pages a briefly description of the different systems can be applied in our project.




                                                                                                                         Mechanical - HVAC
                                                                                                                           1
                                                                                                       HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




FIRST ALTERNATIVE (INDIVIDUAL SYSTEM).
                                                                                                     -This system consists of indoor unit (inside space) suspended above false ceiling and outdoor unit
It composed of one split unit for air conditioning for each room, and also one fan for exhaust air
                                                                                                     suspended outdoor (outside space) .
from each toilet
Heating shall be directly by using electric heaters.
                                                                                                     -The main advantage of that system is the easiness of installation and dealing with technicians

                                                                                                     -Very cheap comparing with other systems.

                                                                                                     -That system requires an outdoor space to install the outdoor units (condensing units) like the
                                                                                                     faced of building or the roof in case if existing, and the number of outdoor unit is proportional
                                                                                                     with the number of rooms served, so in case of block A for example we will need a free space to
                                                                                                     handle 37 condensing units.

                                                                                                     -incase of operation of all units in the whole zone the area will be liable to noisy effect.

                                                                                                     -Very simple in maintenance but need large number of technicians to check the whole units.




                                                                                                                                                                                                    Mechanical - HVAC
                              Individual split unit (indoor-outdoor unit)




                                                                                                                                                                                                       2
                                                                                                                                                                              HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




SECOND ALTERNATIVE (SEMICENTRAL SYSTEM).
This system composed from central station for each block, and provide cooled air to each room of the block by a terminal unit .
-there are one central unit feed the block by required fresh air treated
a central fan to exhaust the air from the each toilet.
-heating could be attained by reverse acting of the system in addition to electric heaters.

The proposed system to fit that alternative is VRV system.

The VRV System comprises of :
   1-Outdoor air cooled condensing units
   2-Indoor units
   3-Simple refrigerant copper piping
   4-Power and control cables and
   5-Remote and centralized controllers for operating the system

   -Outdoor air cooled condensing units are easily located on roof tops of the building. They can also be located on each floor, in case of a high rise buildings.
   -There is therefore no need for a separate machine or equipment room as is the case with Chiller based system.
   Variety of VRV Indoor units are available to suit the requirements at individual locations in a premise and to meet the clients' special needs. Floor mounted, wall mounted, ceiling suspended, ceiling cassette
   as well as ceiling built-in type models are available in various cooling capacities.
   -very complicated system need to well trained technicians




                                                                                                                                                                                                                      Mechanical - HVAC
                                                                                         VRV system including (indoor-outdoor unit)




                                                                                                                                                                                                                        3
                                                                                                                                                                                                  HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




THIRD ALTERNATIVE (CENTRAL SYSTEM).

This system composed of main central station for generation the chilled and hot water for whole
buildings through an insulated piping network which will be connected to air distribution
equipments inside each room.
-the generated chilled water is circulated to the chilled water network through two set of pumps
installed in series, first one is primary pumps which circulate the chilled water inside the chiller
plant and second one is secondary pumps which deliver and circulate chilled water in the different
buildings.
-and a central feed by fresh air and central fan to exhaust air from toilets.


-water cooled chillers.

-Tow chillers selected (water cooled chiller 1x330T.R+1 standby) are proposed to offset the
                                                                                                       Water cooled chiller
calculated load.
-chilled water circulating pumps:
1-primary pumps(1 working+1 standby)
2-secondary pumps(1 working+1 standby)

- A preliminary selection for cooling tower have been made and the flowing in fig are the
dimensions of cooling tower area.




                                                                                                                                                Mechanical - HVAC
                                     FAN COIL UNIT
                                                                                                       Cooling tower




                                                                                                                                                  4
                                                                                                                              HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




COMPARISON BETWEEN SYSTEMS.

  Comparison Elements:

    1) Initial Cost:
         It is the cost of construction of the system until reach of regular operation.

    2) Maintenance and Operation Cost:
         It is the cost of system operation includes the material, power consumption cost and the labors salaries and any spare parts expenses.

    3) Effect on Architect:
         It is the influence raised by use of the system on the shape, faced and internal spaces utilization and special requirements needed by machines.

    4) Effects on Structure:
         It is the impact on the structure be weight of the machines and equipment and the effect of opening & provisions on the structure.

    5) Effect On Environment:
         Includes the heat emission, humidity, noise vibration and chemicals propagation.

    6) Estimated Operation Life:
         It is the life of the system from start up till become not able to form continuous operation.

    7) Effect On Utilities & Others:
         It is the system effect due to the nature of demand of the power, drainage and connection to other equipments located for serving it or part of its equipment.




                                                                                                                                                                                            Mechanical - HVAC
    8) Flexibility During Construction:
         It is the measure by which that the system facilitates partial and quick construction plans.

    9) Development Capability:
         It is ability of the system to be connected with other systems and complying with addition of other facilities in future.

    10) Operation Facilities:
         It is the measure of how the system is operating and treats for trouble shooting during operation.

    11) Coordination Needs:
         Contain the needs for engineering activity to be needed to assure proper installation and how much it would be essential.

    12) Quality of Inside Air Conditions:
         It is the measure of indoor air quality been produced by the system.

    13)Time For Delivery:
         It is the factor that shows the system expected time delivery to cope with time program for the project construction.
                                                                                                                                                                                              5
                                                                                                                                                                          HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




Order Of The Comparison Element

     The comparison element shall be arranged from our side as a mechanical engineer in the following form:



     The elements                                                         given points



     1.   Quality of inside air conditions.                                   20
     2.   Effect on architect and structure                                   18
     3.   Power consumption .                                                 16
     4.   Effect on environment.                                              15
     5.   Estimated operation life.                                           12
     6.   Initial cost.                                                       11
     7.   Maintenance and operation cost.                                     11
     8.   Flexibility during of construction.                                  10
     9.   Time for delivery.                                                   10
     10. Operation facilities.                                                 9
     11. Development capability.                                               8
     12. Effect on utilities and others.                                       6




                                                                                                                                Mechanical - HVAC
     13. Coordination needs.                                                   4




                                                                                                                                  6
                                                                                                              HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




                                              INDIVIDUAL SYTEM                           VRV SYSTEM                           CENTRAL SYSTEM

                                     POINTS         ITEM           EVALUATUIN POINT         ITEM           EVALUATUIN PIONT          ITEM           EVALUATUIN

  QUALITY OF INSIDE AIR CONDITIONS     20           LOW                   10                HIGH                  20                HIGH                 20

 EFFECT ON ARCHETICT AND STRUCTURE     18            LOW                  14                 LOW                  14                HIGH                 10

        POWER CONSUMPTION              16           HIGH                  6                 LOW                   10             MODERATE                9

      EFFECT ON ENVIRONMENT            15      HOT AIR / NOISE            5                HOT AIR                10              HUMID AIR              13

     ESTIMATED OPERATION LIFE          12         7-10 YEARS              5              13-17 YEARS              8              18-20 YEARS             11

            INITIAL COST               11           LOW                   10               MEDIUM                 7                 HIGH                  5

  MAINTENANCE AND OPERATION COST       11     2% OF INITIAL COST          10          3% OF INITIAL COST          8           5% OF INITIAL COST          6

  FLEXIBILITY DURING CONSTRUCTION      10      HIGH PER ROOM              9                LIMITED                7                LIMITED                7

         TIME FOR DELIVERY             10           FAST                  9                 LONG                  8                 LONG                  7

        OPERATION FACILITIES           9            EASY                  8           SEMI-COMPLECATED            7             COMPLECATED               6

      DEVELPOMENT CAPABILITY           8            LOW                   4                LIMITED                6                 HIGH                  7
                                               SINGLE PHASE /                                                                     3PHASE /
   EFFECT ON UTILITIES AND OTHERS      6        UNBALANCED                3           3PHASE / BALANCED           6              BALANCED                 6




                                                                                                                                                                     Mechanical - HVAC
        COORDINATION NEEDS             4            LOW                   4                MEDIUM                 3                MEDIUM                3

                                      150                                 97                                     114                                    110




                                                                                                                                                                       7
                                                                                                                                                   HVAC-AHMED ATTA
HVAC WORK
6TH OF OCTOBER VILLA




                       COST & CONSUMPTION CAOMPARISON




                                     COST   (LE)             POWER CONSUMPTION   (KW)          KWH (1year)


                       SPIT UNIT                   192,500                              52.5        1,379,700


                       VRV                         442,500                              39.5        1,038,060




                                                                                                                                  Mechanical - HVAC
                       CENTRAL                     505,500                               49         1,287,720




                                                                                                                                    8
                                                                                                                HVAC-AHMED ATTA

Contenu connexe

Tendances

Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1
Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1
Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1Copywriter Collective
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSENicholas Chazapis
 
Beijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureBeijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureElectromate
 
day 3: Control Concepts & BMS
day 3: Control Concepts & BMS day 3: Control Concepts & BMS
day 3: Control Concepts & BMS RCREEE
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentationVSRAGHU
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
Sb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enSb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enYury Naumov
 
TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017James Huffstutler
 
Technical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightTechnical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightAdicomp s.r.l
 
Keraflo Tanktronic Digital Tank Management System - Brochure
Keraflo Tanktronic Digital Tank Management System - BrochureKeraflo Tanktronic Digital Tank Management System - Brochure
Keraflo Tanktronic Digital Tank Management System - BrochureThorne & Derrick UK
 
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgFuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgDien Ha The
 
Bock Semi-hermetic Compressors: Electronic Controls
Bock Semi-hermetic Compressors: Electronic ControlsBock Semi-hermetic Compressors: Electronic Controls
Bock Semi-hermetic Compressors: Electronic ControlsGEA Bock GmbH
 
14 Vrv Global Applications
14 Vrv Global Applications14 Vrv Global Applications
14 Vrv Global ApplicationsTNIFTP
 
Technical description vg 2014 (en) light
Technical description vg 2014 (en) lightTechnical description vg 2014 (en) light
Technical description vg 2014 (en) lightAdicomp s.r.l
 
VARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWVARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWRIDDHESH VARIK
 

Tendances (20)

Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1
Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1
Copywriter Collective - Denzil - Dm compressors 12p_brochure_2014_0522-1
 
BMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSEBMS COMMISSIONING CODE C_CIBSE
BMS COMMISSIONING CODE C_CIBSE
 
Product manual hps
Product manual hpsProduct manual hps
Product manual hps
 
Beijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochureBeijer hvac inverter_h2_brochure
Beijer hvac inverter_h2_brochure
 
day 3: Control Concepts & BMS
day 3: Control Concepts & BMS day 3: Control Concepts & BMS
day 3: Control Concepts & BMS
 
Control and instrumentation
Control and instrumentationControl and instrumentation
Control and instrumentation
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
Sb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_enSb ls scroll-uc-ii_ver.1.0_en
Sb ls scroll-uc-ii_ver.1.0_en
 
TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017
 
Technical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) lightTechnical description bvg 2014 (upgrading) (en) light
Technical description bvg 2014 (upgrading) (en) light
 
Keraflo Tanktronic Digital Tank Management System - Brochure
Keraflo Tanktronic Digital Tank Management System - BrochureKeraflo Tanktronic Digital Tank Management System - Brochure
Keraflo Tanktronic Digital Tank Management System - Brochure
 
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgFuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
 
Bock Semi-hermetic Compressors: Electronic Controls
Bock Semi-hermetic Compressors: Electronic ControlsBock Semi-hermetic Compressors: Electronic Controls
Bock Semi-hermetic Compressors: Electronic Controls
 
14 Vrv Global Applications
14 Vrv Global Applications14 Vrv Global Applications
14 Vrv Global Applications
 
Technical description vg 2014 (en) light
Technical description vg 2014 (en) lightTechnical description vg 2014 (en) light
Technical description vg 2014 (en) light
 
Dekon vrf system brief introduction
Dekon vrf system brief introductionDekon vrf system brief introduction
Dekon vrf system brief introduction
 
Urhe cf y-un50_00
Urhe cf y-un50_00Urhe cf y-un50_00
Urhe cf y-un50_00
 
VARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOWVARIABLE REFRIGERATE FLOW
VARIABLE REFRIGERATE FLOW
 
Unico Residential HVAC System Installation Guide
Unico Residential HVAC System Installation Guide Unico Residential HVAC System Installation Guide
Unico Residential HVAC System Installation Guide
 
Unico System for Commercial HVAC Promotional Flyer
Unico System for Commercial HVAC Promotional FlyerUnico System for Commercial HVAC Promotional Flyer
Unico System for Commercial HVAC Promotional Flyer
 

En vedette

Villa at Nova Santa Ponsa with stunning views - Mallorca
Villa at Nova Santa Ponsa with stunning views - MallorcaVilla at Nova Santa Ponsa with stunning views - Mallorca
Villa at Nova Santa Ponsa with stunning views - MallorcaMallorca Golf
 
Golf Solimania Villa for Sale , Plam Spring
Golf Solimania Villa for Sale , Plam SpringGolf Solimania Villa for Sale , Plam Spring
Golf Solimania Villa for Sale , Plam SpringZayed Home
 
HXR 2016: Designing Within a Hospital System: Challenges and Strategies
HXR 2016: Designing Within a Hospital System: Challenges and StrategiesHXR 2016: Designing Within a Hospital System: Challenges and Strategies
HXR 2016: Designing Within a Hospital System: Challenges and StrategiesHxRefactored
 
Content curation: A Perfect Tool for Content Marketing
Content curation: A Perfect  Tool for Content MarketingContent curation: A Perfect  Tool for Content Marketing
Content curation: A Perfect Tool for Content MarketingWITS ZEN Blog
 
villa savoye Le Corbusier
villa savoye Le Corbusiervilla savoye Le Corbusier
villa savoye Le CorbusierGhareeb Mohamed
 
hospital design and construction
hospital design and constructionhospital design and construction
hospital design and constructionjayconstructions1
 
Eilish hardiman planning and designing the new children’s hospital
Eilish hardiman planning and designing the new children’s hospitalEilish hardiman planning and designing the new children’s hospital
Eilish hardiman planning and designing the new children’s hospitalInvestnet
 
Trg trc017-en hvac system control
Trg trc017-en hvac system controlTrg trc017-en hvac system control
Trg trc017-en hvac system controlVoVi Phap Danh
 
ماهو برنامج يسّر للتعاملات الالكترونية الحكومية
ماهو برنامج يسّر للتعاملات الالكترونية الحكوميةماهو برنامج يسّر للتعاملات الالكترونية الحكومية
ماهو برنامج يسّر للتعاملات الالكترونية الحكوميةYesserProgram
 
InterTech is an international hospital construction company
InterTech is an international hospital construction companyInterTech is an international hospital construction company
InterTech is an international hospital construction companyMaxim Gavrik
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 
Public Private Partnerships In Egovernment
Public Private Partnerships In EgovernmentPublic Private Partnerships In Egovernment
Public Private Partnerships In EgovernmentRobin Teigland
 
Engineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsEngineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsFrancis Philip Duremdes Doromal
 
Hospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceHospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceSara Marberry
 
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...NBBJDesign
 
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنPush over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنDr.Youssef Hammida
 

En vedette (20)

AKOYA THE BEVERLY HILLS OF DUBAI
AKOYA THE BEVERLY HILLS OF DUBAIAKOYA THE BEVERLY HILLS OF DUBAI
AKOYA THE BEVERLY HILLS OF DUBAI
 
Villa at Nova Santa Ponsa with stunning views - Mallorca
Villa at Nova Santa Ponsa with stunning views - MallorcaVilla at Nova Santa Ponsa with stunning views - Mallorca
Villa at Nova Santa Ponsa with stunning views - Mallorca
 
Golf Solimania Villa for Sale , Plam Spring
Golf Solimania Villa for Sale , Plam SpringGolf Solimania Villa for Sale , Plam Spring
Golf Solimania Villa for Sale , Plam Spring
 
Classic Villa
Classic VillaClassic Villa
Classic Villa
 
Riffa views portfolio
Riffa views portfolioRiffa views portfolio
Riffa views portfolio
 
HXR 2016: Designing Within a Hospital System: Challenges and Strategies
HXR 2016: Designing Within a Hospital System: Challenges and StrategiesHXR 2016: Designing Within a Hospital System: Challenges and Strategies
HXR 2016: Designing Within a Hospital System: Challenges and Strategies
 
Content curation: A Perfect Tool for Content Marketing
Content curation: A Perfect  Tool for Content MarketingContent curation: A Perfect  Tool for Content Marketing
Content curation: A Perfect Tool for Content Marketing
 
villa savoye Le Corbusier
villa savoye Le Corbusiervilla savoye Le Corbusier
villa savoye Le Corbusier
 
hospital design and construction
hospital design and constructionhospital design and construction
hospital design and construction
 
Eilish hardiman planning and designing the new children’s hospital
Eilish hardiman planning and designing the new children’s hospitalEilish hardiman planning and designing the new children’s hospital
Eilish hardiman planning and designing the new children’s hospital
 
Trg trc017-en hvac system control
Trg trc017-en hvac system controlTrg trc017-en hvac system control
Trg trc017-en hvac system control
 
ماهو برنامج يسّر للتعاملات الالكترونية الحكومية
ماهو برنامج يسّر للتعاملات الالكترونية الحكوميةماهو برنامج يسّر للتعاملات الالكترونية الحكومية
ماهو برنامج يسّر للتعاملات الالكترونية الحكومية
 
Cpns bnn 2013
Cpns bnn 2013Cpns bnn 2013
Cpns bnn 2013
 
InterTech is an international hospital construction company
InterTech is an international hospital construction companyInterTech is an international hospital construction company
InterTech is an international hospital construction company
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Public Private Partnerships In Egovernment
Public Private Partnerships In EgovernmentPublic Private Partnerships In Egovernment
Public Private Partnerships In Egovernment
 
Engineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitalsEngineering design parameters and requirement for hospitals
Engineering design parameters and requirement for hospitals
 
Hospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient ExperienceHospital Facility Design: It's Impact on the Patient Experience
Hospital Facility Design: It's Impact on the Patient Experience
 
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...
Human-Centered Hospital Design in an Era of Digital Diagnostics, Robotics and...
 
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدنPush over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
Push over analysis-technique - التحليل اللاخطي الزلزالي والمفصل اللدن
 

Similaire à Hvac comparison

vapour absorption refrigeration system
vapour absorption refrigeration systemvapour absorption refrigeration system
vapour absorption refrigeration systemMrman210
 
Mechanical systems
Mechanical systemsMechanical systems
Mechanical systemsSunil Surya
 
Auditac tg3 system recognition for field visit
Auditac tg3 system recognition for field visitAuditac tg3 system recognition for field visit
Auditac tg3 system recognition for field visitRoyal Mail
 
Best Intelligent Building in Russia (ENG)
Best Intelligent Building in Russia (ENG)Best Intelligent Building in Russia (ENG)
Best Intelligent Building in Russia (ENG)Vitaly Fedorov
 
VARIABLE REFRIGERANT FLOW(VRF) ppt
VARIABLE REFRIGERANT FLOW(VRF)  pptVARIABLE REFRIGERANT FLOW(VRF)  ppt
VARIABLE REFRIGERANT FLOW(VRF) pptEzhil Raj s
 
VET4SBO Level 1 module 2 - unit 2 - v1.0 en
VET4SBO Level 1   module 2 - unit 2 - v1.0 enVET4SBO Level 1   module 2 - unit 2 - v1.0 en
VET4SBO Level 1 module 2 - unit 2 - v1.0 enKarel Van Isacker
 
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT EnvironmentsWP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT Environmentszain kirmani
 
Air conditioning for large multistory buildings
Air conditioning for large multistory buildingsAir conditioning for large multistory buildings
Air conditioning for large multistory buildingspnazila
 
Automātikas loma energoefektīvā apkurē.
Automātikas loma energoefektīvā apkurē.Automātikas loma energoefektīvā apkurē.
Automātikas loma energoefektīvā apkurē.Elektrumlv
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case studySona Rawat
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practicesPrem Baboo
 
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A Review
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A ReviewIRJET - Variable Refrigerant Volume:- Air Conditioning Part: A Review
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A ReviewIRJET Journal
 
Net$ync II Air Compressor Conductor System
Net$ync II Air Compressor Conductor SystemNet$ync II Air Compressor Conductor System
Net$ync II Air Compressor Conductor SystemJaime Burkhard
 
Integrated building systems.pdf
Integrated building systems.pdfIntegrated building systems.pdf
Integrated building systems.pdfHoruyraNour1
 
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKF
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKFRemko WKF inverter heat pump/ Bomba de calor inverter Remko WKF
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKFDynamic444
 

Similaire à Hvac comparison (20)

Module (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apexModule (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apex
 
vapour absorption refrigeration system
vapour absorption refrigeration systemvapour absorption refrigeration system
vapour absorption refrigeration system
 
Mechanical systems
Mechanical systemsMechanical systems
Mechanical systems
 
Auditac tg3 system recognition for field visit
Auditac tg3 system recognition for field visitAuditac tg3 system recognition for field visit
Auditac tg3 system recognition for field visit
 
Best Intelligent Building in Russia (ENG)
Best Intelligent Building in Russia (ENG)Best Intelligent Building in Russia (ENG)
Best Intelligent Building in Russia (ENG)
 
VARIABLE REFRIGERANT FLOW(VRF) ppt
VARIABLE REFRIGERANT FLOW(VRF)  pptVARIABLE REFRIGERANT FLOW(VRF)  ppt
VARIABLE REFRIGERANT FLOW(VRF) ppt
 
VET4SBO Level 1 module 2 - unit 2 - v1.0 en
VET4SBO Level 1   module 2 - unit 2 - v1.0 enVET4SBO Level 1   module 2 - unit 2 - v1.0 en
VET4SBO Level 1 module 2 - unit 2 - v1.0 en
 
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT EnvironmentsWP-59 The Different Types of Air Conditioning Equipment for IT Environments
WP-59 The Different Types of Air Conditioning Equipment for IT Environments
 
Air conditioning for large multistory buildings
Air conditioning for large multistory buildingsAir conditioning for large multistory buildings
Air conditioning for large multistory buildings
 
hvac-systems.ppt
hvac-systems.ppthvac-systems.ppt
hvac-systems.ppt
 
Automātikas loma energoefektīvā apkurē.
Automātikas loma energoefektīvā apkurē.Automātikas loma energoefektīvā apkurē.
Automātikas loma energoefektīvā apkurē.
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case study
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Hvac System
Hvac SystemHvac System
Hvac System
 
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A Review
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A ReviewIRJET - Variable Refrigerant Volume:- Air Conditioning Part: A Review
IRJET - Variable Refrigerant Volume:- Air Conditioning Part: A Review
 
Bs ii
Bs iiBs ii
Bs ii
 
Net$ync II Air Compressor Conductor System
Net$ync II Air Compressor Conductor SystemNet$ync II Air Compressor Conductor System
Net$ync II Air Compressor Conductor System
 
Integrated building systems.pdf
Integrated building systems.pdfIntegrated building systems.pdf
Integrated building systems.pdf
 
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKF
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKFRemko WKF inverter heat pump/ Bomba de calor inverter Remko WKF
Remko WKF inverter heat pump/ Bomba de calor inverter Remko WKF
 

Plus de ahmedmigi

Plus de ahmedmigi (9)

Final plans model (1)
Final plans model (1)Final plans model (1)
Final plans model (1)
 
Old hvac boq
Old hvac boqOld hvac boq
Old hvac boq
 
H r-01
H r-01H r-01
H r-01
 
H g-01
H g-01H g-01
H g-01
 
H d-02
H d-02H d-02
H d-02
 
H b-01
H b-01H b-01
H b-01
 
H 2-01
H 2-01H 2-01
H 2-01
 
H 1-01
H 1-01H 1-01
H 1-01
 
H d-01
H d-01H d-01
H d-01
 

Dernier

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 

Dernier (20)

Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 

Hvac comparison

  • 1. HVAC WORK 6TH OF OCTOBER VILLA HVAC SYSTEMS COMPARISON Mechanical - HVAC HVAC-AHMED ATTA
  • 2. HVAC WORK 6TH OF OCTOBER VILLA APPLIED HVAC SYSTEMS. There are more than one system can be selected to air conditioning for the buildings. -Individual system. -Semi-central system. -Central system. In the following pages a briefly description of the different systems can be applied in our project. Mechanical - HVAC 1 HVAC-AHMED ATTA
  • 3. HVAC WORK 6TH OF OCTOBER VILLA FIRST ALTERNATIVE (INDIVIDUAL SYSTEM). -This system consists of indoor unit (inside space) suspended above false ceiling and outdoor unit It composed of one split unit for air conditioning for each room, and also one fan for exhaust air suspended outdoor (outside space) . from each toilet Heating shall be directly by using electric heaters. -The main advantage of that system is the easiness of installation and dealing with technicians -Very cheap comparing with other systems. -That system requires an outdoor space to install the outdoor units (condensing units) like the faced of building or the roof in case if existing, and the number of outdoor unit is proportional with the number of rooms served, so in case of block A for example we will need a free space to handle 37 condensing units. -incase of operation of all units in the whole zone the area will be liable to noisy effect. -Very simple in maintenance but need large number of technicians to check the whole units. Mechanical - HVAC Individual split unit (indoor-outdoor unit) 2 HVAC-AHMED ATTA
  • 4. HVAC WORK 6TH OF OCTOBER VILLA SECOND ALTERNATIVE (SEMICENTRAL SYSTEM). This system composed from central station for each block, and provide cooled air to each room of the block by a terminal unit . -there are one central unit feed the block by required fresh air treated a central fan to exhaust the air from the each toilet. -heating could be attained by reverse acting of the system in addition to electric heaters. The proposed system to fit that alternative is VRV system. The VRV System comprises of : 1-Outdoor air cooled condensing units 2-Indoor units 3-Simple refrigerant copper piping 4-Power and control cables and 5-Remote and centralized controllers for operating the system -Outdoor air cooled condensing units are easily located on roof tops of the building. They can also be located on each floor, in case of a high rise buildings. -There is therefore no need for a separate machine or equipment room as is the case with Chiller based system. Variety of VRV Indoor units are available to suit the requirements at individual locations in a premise and to meet the clients' special needs. Floor mounted, wall mounted, ceiling suspended, ceiling cassette as well as ceiling built-in type models are available in various cooling capacities. -very complicated system need to well trained technicians Mechanical - HVAC VRV system including (indoor-outdoor unit) 3 HVAC-AHMED ATTA
  • 5. HVAC WORK 6TH OF OCTOBER VILLA THIRD ALTERNATIVE (CENTRAL SYSTEM). This system composed of main central station for generation the chilled and hot water for whole buildings through an insulated piping network which will be connected to air distribution equipments inside each room. -the generated chilled water is circulated to the chilled water network through two set of pumps installed in series, first one is primary pumps which circulate the chilled water inside the chiller plant and second one is secondary pumps which deliver and circulate chilled water in the different buildings. -and a central feed by fresh air and central fan to exhaust air from toilets. -water cooled chillers. -Tow chillers selected (water cooled chiller 1x330T.R+1 standby) are proposed to offset the Water cooled chiller calculated load. -chilled water circulating pumps: 1-primary pumps(1 working+1 standby) 2-secondary pumps(1 working+1 standby) - A preliminary selection for cooling tower have been made and the flowing in fig are the dimensions of cooling tower area. Mechanical - HVAC FAN COIL UNIT Cooling tower 4 HVAC-AHMED ATTA
  • 6. HVAC WORK 6TH OF OCTOBER VILLA COMPARISON BETWEEN SYSTEMS. Comparison Elements: 1) Initial Cost: It is the cost of construction of the system until reach of regular operation. 2) Maintenance and Operation Cost: It is the cost of system operation includes the material, power consumption cost and the labors salaries and any spare parts expenses. 3) Effect on Architect: It is the influence raised by use of the system on the shape, faced and internal spaces utilization and special requirements needed by machines. 4) Effects on Structure: It is the impact on the structure be weight of the machines and equipment and the effect of opening & provisions on the structure. 5) Effect On Environment: Includes the heat emission, humidity, noise vibration and chemicals propagation. 6) Estimated Operation Life: It is the life of the system from start up till become not able to form continuous operation. 7) Effect On Utilities & Others: It is the system effect due to the nature of demand of the power, drainage and connection to other equipments located for serving it or part of its equipment. Mechanical - HVAC 8) Flexibility During Construction: It is the measure by which that the system facilitates partial and quick construction plans. 9) Development Capability: It is ability of the system to be connected with other systems and complying with addition of other facilities in future. 10) Operation Facilities: It is the measure of how the system is operating and treats for trouble shooting during operation. 11) Coordination Needs: Contain the needs for engineering activity to be needed to assure proper installation and how much it would be essential. 12) Quality of Inside Air Conditions: It is the measure of indoor air quality been produced by the system. 13)Time For Delivery: It is the factor that shows the system expected time delivery to cope with time program for the project construction. 5 HVAC-AHMED ATTA
  • 7. HVAC WORK 6TH OF OCTOBER VILLA Order Of The Comparison Element The comparison element shall be arranged from our side as a mechanical engineer in the following form: The elements given points 1. Quality of inside air conditions. 20 2. Effect on architect and structure 18 3. Power consumption . 16 4. Effect on environment. 15 5. Estimated operation life. 12 6. Initial cost. 11 7. Maintenance and operation cost. 11 8. Flexibility during of construction. 10 9. Time for delivery. 10 10. Operation facilities. 9 11. Development capability. 8 12. Effect on utilities and others. 6 Mechanical - HVAC 13. Coordination needs. 4 6 HVAC-AHMED ATTA
  • 8. HVAC WORK 6TH OF OCTOBER VILLA INDIVIDUAL SYTEM VRV SYSTEM CENTRAL SYSTEM POINTS ITEM EVALUATUIN POINT ITEM EVALUATUIN PIONT ITEM EVALUATUIN QUALITY OF INSIDE AIR CONDITIONS 20 LOW 10 HIGH 20 HIGH 20 EFFECT ON ARCHETICT AND STRUCTURE 18 LOW 14 LOW 14 HIGH 10 POWER CONSUMPTION 16 HIGH 6 LOW 10 MODERATE 9 EFFECT ON ENVIRONMENT 15 HOT AIR / NOISE 5 HOT AIR 10 HUMID AIR 13 ESTIMATED OPERATION LIFE 12 7-10 YEARS 5 13-17 YEARS 8 18-20 YEARS 11 INITIAL COST 11 LOW 10 MEDIUM 7 HIGH 5 MAINTENANCE AND OPERATION COST 11 2% OF INITIAL COST 10 3% OF INITIAL COST 8 5% OF INITIAL COST 6 FLEXIBILITY DURING CONSTRUCTION 10 HIGH PER ROOM 9 LIMITED 7 LIMITED 7 TIME FOR DELIVERY 10 FAST 9 LONG 8 LONG 7 OPERATION FACILITIES 9 EASY 8 SEMI-COMPLECATED 7 COMPLECATED 6 DEVELPOMENT CAPABILITY 8 LOW 4 LIMITED 6 HIGH 7 SINGLE PHASE / 3PHASE / EFFECT ON UTILITIES AND OTHERS 6 UNBALANCED 3 3PHASE / BALANCED 6 BALANCED 6 Mechanical - HVAC COORDINATION NEEDS 4 LOW 4 MEDIUM 3 MEDIUM 3 150 97 114 110 7 HVAC-AHMED ATTA
  • 9. HVAC WORK 6TH OF OCTOBER VILLA COST & CONSUMPTION CAOMPARISON COST (LE) POWER CONSUMPTION (KW) KWH (1year) SPIT UNIT 192,500 52.5 1,379,700 VRV 442,500 39.5 1,038,060 Mechanical - HVAC CENTRAL 505,500 49 1,287,720 8 HVAC-AHMED ATTA