SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
M
a
d
e
in
th
e
U
K
Natural Ventilation
Control Solutions
Standalone Controller Range
Manual Positioning Unit
Our iSC™ range of intelligent
sensors has been developed in
house, by our control engineers
“
”
Our iSC™ range of intelligent
sensors has been developed in
house, by our control engineers
“
”
Low voltage 24V AC/DC operation,
0-10VDC signal
Louvres/Dampers can be manually
positioned to one of six positions at
anytime, including fully open and fully
closed.
Optional auto close energy saving
feature.
LED feedback display of
louvre/damper position selected.
Wall/Control panel mountable.
Optional rain sensor to automatically
close louvres/dampers where
necessary.
Can operate multiple
Louvres/Dampers depending on
power supply unit rating.
Standard Power Supply Unit sizes
PSU8 up to 8 Actuators
PSU30 up to 30 Actuators
Other Sizes Available on Request
Standalone Controllers
CTCI:
Temperature and CO2 Controller with CO2 level
indication
CTm:
Temperature Room Controller with Manual Override
CTCm:
Temperature Room and CO2 Controller with Manual
Override
CT:
Temperature Room Controller
CTC:
Temperature and CO2 Room Controller
CTCml:
Temperature and CO2 Sensor Controller with manual
override and CO2 Level Indicator
C: Controller, T: Temperature, C: Carbon Dioxide,
m: Manual Push Buttons, I: CO2 Indication
Our room sensor range has been
specifically designed for ease of use
by the client
“
”
Our unique range of standalone controllers can control Ventilation Dampers or
Automated Windows together with localised Heating, via on board, Temperature or
Optional CO2 Sensors to suit the requirements of each specific application. These
Controllers can be linked to either a time clock or receive a time signal from a BMS to
activate the optional Night Cooling programme (Night Cooling only available with the
Manual Override options).
Our room sensor range has been
specifically designed for ease of use
by the client
“
”
0/10 VDC Heating Signal
0/10 VDC Cooling/Ventilation
Signal
Frost Protection
Room Temp Set Point Adjustable
19°C to 26°C
Room CO2 Set Point Adjustable
900ppm to 1600ppm
Pre-wireable base and plug-on
fascia plate assists in easy, time
saving installation
Standalone Controllers
Temperature Control:-
The room set point for the control of the Ventilation Dampers/Automated Windows can
be adjusted in 1°C increments between 21°C and 26°C with a seasonal change over
and a night cooling option if a time clock or BMS time signal is available. Localised
Heating can also be controlled and is set 2°C below the room set point.
Manual Override (optional):-
Each room device has manual override capabilities which give the end user control of
the ventilation strategy to suit the room application. The device consists of two push
buttons and three LED lights, the push buttons enable the end user to open or close
the ventilation as required, the LED’s give an indication that the system has either been
overridden or is in Auto mode. Once the system has been overridden it will stay in that
mode for 30 minutes, after this time the system will revert back to Auto mode.
CO2 Indication (optional):-
Each room device can also be fitted with a further 3 LED’s to identify the level of CO2
within the space; these are green, amber and red. With green being healthy and red
being high levels of CO2 ppm`s.
Night Cooling:-
To enable the Night Cooling pre-programmed software, the device needs to be in
(Night Mode) and the night cooling enabled, this then cools the building to just below
the room set point. When the Time Switch is in (Night Mode), by holding down the
open/close buttons this will enable this mode to be turned on/off. (Indicated by the
Auto LED ON or OFF).
Summer/Winter:
The Summer set point can be selected to be below the Winter set point, this is 2°C
below that set value on the dip switches. To select Summer mode, in (Day Mode) hold
both the open/close buttons down for 5 seconds, lights flash, push the open button for
summer mode, or close button for winter mode.
Standalone Controllers
Four Zone Power Supply Unit (PSU)
+ Time Switch (TS) Interface Unit
This interface unit comprises of a power supply, coded terminals, frost protection
feature, optional digital time switch and night cooling (operated by the time switch or
external VFC)
Room Controller
230V Fused Spur
ZONE 1
ZONE 2 ZONE 3 ZONE 4
Ventilation
Damper/Window
Heating Valve
(optional)
Window Control
230V Fused Spur
Room Controller
ZONE 1
ZONE 2 ZONE 3 ZONE 4
Heating Valve
(optional)
Window
Actuator
The Window Control Module contains a 24v DC Power Supply and an iWAC module
per Window Actuator that controls via a 0/10 VDC positioning signal from a suitable
controller. The WCM features an intelligent ‘self stroking’ operation and controls the 24v
DC window actuator in steps to prevent noise disturbance to end users.
The Window Control Module allows only one window to operate at a time. This saves
the expense and space in only needing a DC power supply rated for the largest
actuator (maximum 3 Amp per controller) to be operated.
A: ONE Control Panel
B: ONE Pair of Cables
C: ONE Combined Room Unit#
D: ONE Power Supply#
E: ONE Set of
Louvres/Window#
F: ONE Modular Wiring Install
G: ONE Web Browser
H: ONE Web Browser Page for
Settings
I: ONE Web Browser Page for
Time Programs
J: ONE Onboard Proven and
Tested Software Protocol
K: ONE Open Source BACnet
Communication Protocol
L: ONE BACnet over IP output
M: EIGHT Zones
# Per Zone
SEE LIVE DEMO: http://217.41.89.69:5445
Username: Visitor
Password: Site123 (Case Sensitive)
0844 809 2509
info@airtherm.co.uk | www.airtherm.co.uk
The All New NV8 Natural Ventilation
Controls Package - As easy as ABC

Contenu connexe

En vedette

8. pedro y la roca
8. pedro y la roca8. pedro y la roca
8. pedro y la rocaA L
 
Highlightsoftax reforms 2011
Highlightsoftax reforms 2011Highlightsoftax reforms 2011
Highlightsoftax reforms 2011cyril pathirana
 
Tempo April 2014
Tempo April 2014 Tempo April 2014
Tempo April 2014 Tempoplanet
 
1530korterink 101107225906-phpapp02
1530korterink 101107225906-phpapp021530korterink 101107225906-phpapp02
1530korterink 101107225906-phpapp02Steph Cliche
 
Tempo November 2013
Tempo November 2013 Tempo November 2013
Tempo November 2013 Tempoplanet
 
Sc2014 proceedings
Sc2014 proceedingsSc2014 proceedings
Sc2014 proceedingsSteph Cliche
 
Growthhackingbelgium 0-kick-off-131121024141-phpapp01
Growthhackingbelgium 0-kick-off-131121024141-phpapp01Growthhackingbelgium 0-kick-off-131121024141-phpapp01
Growthhackingbelgium 0-kick-off-131121024141-phpapp01Steph Cliche
 
Report from iron_mountain
Report from iron_mountainReport from iron_mountain
Report from iron_mountainSteph Cliche
 
Αρχιτεκτονικη
ΑρχιτεκτονικηΑρχιτεκτονικη
Αρχιτεκτονικηgeormak
 

En vedette (13)

8. pedro y la roca
8. pedro y la roca8. pedro y la roca
8. pedro y la roca
 
Odnoklassniki_Serebryaniy_luchnik
Odnoklassniki_Serebryaniy_luchnikOdnoklassniki_Serebryaniy_luchnik
Odnoklassniki_Serebryaniy_luchnik
 
Trth2000 24 ofdm-tdma long distance wireless backhaul datasheet-v1.0.7
Trth2000 24 ofdm-tdma long distance wireless backhaul datasheet-v1.0.7Trth2000 24 ofdm-tdma long distance wireless backhaul datasheet-v1.0.7
Trth2000 24 ofdm-tdma long distance wireless backhaul datasheet-v1.0.7
 
Highlightsoftax reforms 2011
Highlightsoftax reforms 2011Highlightsoftax reforms 2011
Highlightsoftax reforms 2011
 
Tempo April 2014
Tempo April 2014 Tempo April 2014
Tempo April 2014
 
Tempo June 2014
Tempo June 2014Tempo June 2014
Tempo June 2014
 
5èb bongoh
5èb bongoh5èb bongoh
5èb bongoh
 
1530korterink 101107225906-phpapp02
1530korterink 101107225906-phpapp021530korterink 101107225906-phpapp02
1530korterink 101107225906-phpapp02
 
Tempo November 2013
Tempo November 2013 Tempo November 2013
Tempo November 2013
 
Sc2014 proceedings
Sc2014 proceedingsSc2014 proceedings
Sc2014 proceedings
 
Growthhackingbelgium 0-kick-off-131121024141-phpapp01
Growthhackingbelgium 0-kick-off-131121024141-phpapp01Growthhackingbelgium 0-kick-off-131121024141-phpapp01
Growthhackingbelgium 0-kick-off-131121024141-phpapp01
 
Report from iron_mountain
Report from iron_mountainReport from iron_mountain
Report from iron_mountain
 
Αρχιτεκτονικη
ΑρχιτεκτονικηΑρχιτεκτονικη
Αρχιτεκτονικη
 

Plus de Airtherm Engineering

Natural Ventilation Installation - Case study for Bridge House, Tipton
Natural Ventilation Installation - Case study for Bridge House, TiptonNatural Ventilation Installation - Case study for Bridge House, Tipton
Natural Ventilation Installation - Case study for Bridge House, TiptonAirtherm Engineering
 
Flue Installation - Case study for marlow care home, marlow
Flue Installation - Case study for marlow care home, marlowFlue Installation - Case study for marlow care home, marlow
Flue Installation - Case study for marlow care home, marlowAirtherm Engineering
 
Case study for natural ventilation @ John Roan School
Case study for natural ventilation @ John Roan SchoolCase study for natural ventilation @ John Roan School
Case study for natural ventilation @ John Roan SchoolAirtherm Engineering
 
Natural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolNatural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolAirtherm Engineering
 
Airtherm case study coppice school, worcestershire
Airtherm case study   coppice school, worcestershireAirtherm case study   coppice school, worcestershire
Airtherm case study coppice school, worcestershireAirtherm Engineering
 
natural ventilation - Airtherm case study
natural ventilation - Airtherm case study   natural ventilation - Airtherm case study
natural ventilation - Airtherm case study Airtherm Engineering
 
Mini natural ventilation brochure 2013
Mini natural ventilation brochure 2013Mini natural ventilation brochure 2013
Mini natural ventilation brochure 2013Airtherm Engineering
 
Case study for lambeth hospital london
Case study for lambeth hospital    londonCase study for lambeth hospital    london
Case study for lambeth hospital londonAirtherm Engineering
 
Case study for coppice primary school
Case study for coppice primary schoolCase study for coppice primary school
Case study for coppice primary schoolAirtherm Engineering
 
Natural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolNatural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolAirtherm Engineering
 

Plus de Airtherm Engineering (20)

Airtherm nat vent brochure
Airtherm nat vent brochureAirtherm nat vent brochure
Airtherm nat vent brochure
 
Natural Ventilation Installation - Case study for Bridge House, Tipton
Natural Ventilation Installation - Case study for Bridge House, TiptonNatural Ventilation Installation - Case study for Bridge House, Tipton
Natural Ventilation Installation - Case study for Bridge House, Tipton
 
Flue Installation - Case study for marlow care home, marlow
Flue Installation - Case study for marlow care home, marlowFlue Installation - Case study for marlow care home, marlow
Flue Installation - Case study for marlow care home, marlow
 
Case study for natural ventilation @ John Roan School
Case study for natural ventilation @ John Roan SchoolCase study for natural ventilation @ John Roan School
Case study for natural ventilation @ John Roan School
 
Chimney & Flue Systems MF Brocure
Chimney & Flue Systems MF BrocureChimney & Flue Systems MF Brocure
Chimney & Flue Systems MF Brocure
 
Natural Ventilation Brochure 2014
Natural Ventilation Brochure 2014Natural Ventilation Brochure 2014
Natural Ventilation Brochure 2014
 
Natural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolNatural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary school
 
Airtherm case study coppice school, worcestershire
Airtherm case study   coppice school, worcestershireAirtherm case study   coppice school, worcestershire
Airtherm case study coppice school, worcestershire
 
natural ventilation - Airtherm case study
natural ventilation - Airtherm case study   natural ventilation - Airtherm case study
natural ventilation - Airtherm case study
 
Mini natural ventilation brochure 2013
Mini natural ventilation brochure 2013Mini natural ventilation brochure 2013
Mini natural ventilation brochure 2013
 
Case study for lambeth hospital london
Case study for lambeth hospital    londonCase study for lambeth hospital    london
Case study for lambeth hospital london
 
Case study for coppice primary school
Case study for coppice primary schoolCase study for coppice primary school
Case study for coppice primary school
 
Airtherm products
Airtherm productsAirtherm products
Airtherm products
 
Natural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary schoolNatural Ventilation - Case study for coppice primary school
Natural Ventilation - Case study for coppice primary school
 
Natural Ventilation case study
Natural Ventilation case studyNatural Ventilation case study
Natural Ventilation case study
 
Generator Flues Brochure
Generator Flues BrochureGenerator Flues Brochure
Generator Flues Brochure
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
 
Airtherm product range
Airtherm product rangeAirtherm product range
Airtherm product range
 
Airtherm grilles & louvre booklet
Airtherm grilles & louvre bookletAirtherm grilles & louvre booklet
Airtherm grilles & louvre booklet
 
flues and chimneys brochure 2013
flues and chimneys brochure 2013flues and chimneys brochure 2013
flues and chimneys brochure 2013
 

Dernier

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Dernier (20)

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

Airtherm natural ventilation controls brochure

  • 2. Manual Positioning Unit Our iSC™ range of intelligent sensors has been developed in house, by our control engineers “ ” Our iSC™ range of intelligent sensors has been developed in house, by our control engineers “ ” Low voltage 24V AC/DC operation, 0-10VDC signal Louvres/Dampers can be manually positioned to one of six positions at anytime, including fully open and fully closed. Optional auto close energy saving feature. LED feedback display of louvre/damper position selected. Wall/Control panel mountable. Optional rain sensor to automatically close louvres/dampers where necessary. Can operate multiple Louvres/Dampers depending on power supply unit rating. Standard Power Supply Unit sizes PSU8 up to 8 Actuators PSU30 up to 30 Actuators Other Sizes Available on Request
  • 3. Standalone Controllers CTCI: Temperature and CO2 Controller with CO2 level indication CTm: Temperature Room Controller with Manual Override CTCm: Temperature Room and CO2 Controller with Manual Override CT: Temperature Room Controller CTC: Temperature and CO2 Room Controller CTCml: Temperature and CO2 Sensor Controller with manual override and CO2 Level Indicator C: Controller, T: Temperature, C: Carbon Dioxide, m: Manual Push Buttons, I: CO2 Indication
  • 4. Our room sensor range has been specifically designed for ease of use by the client “ ” Our unique range of standalone controllers can control Ventilation Dampers or Automated Windows together with localised Heating, via on board, Temperature or Optional CO2 Sensors to suit the requirements of each specific application. These Controllers can be linked to either a time clock or receive a time signal from a BMS to activate the optional Night Cooling programme (Night Cooling only available with the Manual Override options). Our room sensor range has been specifically designed for ease of use by the client “ ” 0/10 VDC Heating Signal 0/10 VDC Cooling/Ventilation Signal Frost Protection Room Temp Set Point Adjustable 19°C to 26°C Room CO2 Set Point Adjustable 900ppm to 1600ppm Pre-wireable base and plug-on fascia plate assists in easy, time saving installation Standalone Controllers
  • 5. Temperature Control:- The room set point for the control of the Ventilation Dampers/Automated Windows can be adjusted in 1°C increments between 21°C and 26°C with a seasonal change over and a night cooling option if a time clock or BMS time signal is available. Localised Heating can also be controlled and is set 2°C below the room set point. Manual Override (optional):- Each room device has manual override capabilities which give the end user control of the ventilation strategy to suit the room application. The device consists of two push buttons and three LED lights, the push buttons enable the end user to open or close the ventilation as required, the LED’s give an indication that the system has either been overridden or is in Auto mode. Once the system has been overridden it will stay in that mode for 30 minutes, after this time the system will revert back to Auto mode. CO2 Indication (optional):- Each room device can also be fitted with a further 3 LED’s to identify the level of CO2 within the space; these are green, amber and red. With green being healthy and red being high levels of CO2 ppm`s. Night Cooling:- To enable the Night Cooling pre-programmed software, the device needs to be in (Night Mode) and the night cooling enabled, this then cools the building to just below the room set point. When the Time Switch is in (Night Mode), by holding down the open/close buttons this will enable this mode to be turned on/off. (Indicated by the Auto LED ON or OFF). Summer/Winter: The Summer set point can be selected to be below the Winter set point, this is 2°C below that set value on the dip switches. To select Summer mode, in (Day Mode) hold both the open/close buttons down for 5 seconds, lights flash, push the open button for summer mode, or close button for winter mode. Standalone Controllers
  • 6. Four Zone Power Supply Unit (PSU) + Time Switch (TS) Interface Unit This interface unit comprises of a power supply, coded terminals, frost protection feature, optional digital time switch and night cooling (operated by the time switch or external VFC) Room Controller 230V Fused Spur ZONE 1 ZONE 2 ZONE 3 ZONE 4 Ventilation Damper/Window Heating Valve (optional)
  • 7. Window Control 230V Fused Spur Room Controller ZONE 1 ZONE 2 ZONE 3 ZONE 4 Heating Valve (optional) Window Actuator The Window Control Module contains a 24v DC Power Supply and an iWAC module per Window Actuator that controls via a 0/10 VDC positioning signal from a suitable controller. The WCM features an intelligent ‘self stroking’ operation and controls the 24v DC window actuator in steps to prevent noise disturbance to end users. The Window Control Module allows only one window to operate at a time. This saves the expense and space in only needing a DC power supply rated for the largest actuator (maximum 3 Amp per controller) to be operated.
  • 8. A: ONE Control Panel B: ONE Pair of Cables C: ONE Combined Room Unit# D: ONE Power Supply# E: ONE Set of Louvres/Window# F: ONE Modular Wiring Install G: ONE Web Browser H: ONE Web Browser Page for Settings I: ONE Web Browser Page for Time Programs J: ONE Onboard Proven and Tested Software Protocol K: ONE Open Source BACnet Communication Protocol L: ONE BACnet over IP output M: EIGHT Zones # Per Zone SEE LIVE DEMO: http://217.41.89.69:5445 Username: Visitor Password: Site123 (Case Sensitive) 0844 809 2509 info@airtherm.co.uk | www.airtherm.co.uk The All New NV8 Natural Ventilation Controls Package - As easy as ABC