2. Site Preparation/Site Clearance
SMM2 / SECTION D / Page 16
Site Preparation / Site Clearance is a work of
clearing the ensure that the project site, ready to
built the building
The work involved as follows: -
4.Clearing of grass, shrubs.
5.Cutting trees.
6.Take out their root.
7. 105.00m
Symbol :
*** Bushes &
*** Grass
Hedges
Tree
210.00m
Girth
U
145.00m
SMM2 T.O LIST
8. CQ
Taking Off List
Bil Item Unit
1. Clearing undergrowth m2
2. Cutting down trees not exceeding 300mm girth No
3. Cutting down trees 300mm b.n.e 600mm girth No
4. Cutting down trees 600mm b.n.e 900mm girth No
5. Cutting down trees 900 b.n.e 1200mm girth No
6. Cutting down hedges m
SMM2 SITE PLAN
9. CQ
Clearing site Cutting down trees
Area
Ave. length Cutting down trees n.e 300mm
105.00 girth at 1.00m high above
Add 145.00 ground level and grubbing up
2 their roots and filling voids left
2 250.00 by removal of roots with
2
material arising from
125.00 excavation
Width
210.00
Cutting down trees 300mm
Clearing site of undergrowth, b.n.e 600mm girth at 1.00m
125.00 bushes, scrub and the like and high above ground level and
210.00 grubbing up their roots 2 grubbing up their roots and
26250.00
2 filling voids left by removal of
roots with material arising from
excavation
SMM 2 T.O List SITE PLAN
10. Cutting down trees
U = Girth
1m
According to D5 SMM2 page 16 SECTION D
SMM 2 T.O List SITE PLAN
11. Cutting down trees
U = 900 U = 250
U = 300 U = 450
U = 550
U = 1000
Not exceeding 300 2 nos
Exceeding 300mm but not exceeding 600 2 nos
Exceeding 600mm b.n.e 900mm 1 no
Exceeding 900mm b.n.e 1200mm 1 no
SMM 2 T.O List SITE PLAN
12. Cutting down hedges
Length
High
According to D2SMM2 page 16 SECTION D
SMM 2 T.O List SITE PLAN
13. CQ
Cutting down Cutting down
trees hedges
length
Cutting down trees n.e 600mm 45000
b.n.e 900mm girth at 1.00m Add 39000
high above ground level and 84000
2 grubbing up their roots and
2 filling voids left by removal of
roots with material arising from Cutting down hedges average
excavation 900mm high and grubbing up
their roots and filling voids left
84.00 by removal of roots with
84.00 material arising from
Cutting down trees 900mm excavation
b.n.e 1200mm girth at 1.00m
high above ground level and
5 grubbing up their roots and
5 filling voids left by removal of
roots with material arising from
excavation
Sekian
SMM 2 T.O List SITE PLAN
14. T.Off List SITE PLAN
STANDARD METHOD OF MEASUREMENT
(Building Works) SMM 2 SECTION D Page 16
Item Description Explanation of Explanation of
(Taking Off List) taking-off measurement
1. Clearing site 1. Clearing site of D.3 –Removal of Title of work shall
undergrowth bushes, vegetation that was be described to
scrub & the like & cut does not need to facilitate
grubbing up their be mentioned review
roots because of the work
included in the D.3 – Site clearance must
7. Cutting down • Cutting down trees measurement items be measured in m2.
trees n.e 300mm girth at
1.oom high above D.4 - Give back filling the D.4 – Cutting tree must
ground level & hole dug where be measured in no.
grubbing up their necessary and work
roots & filling voids are separated by
left by removal of cutting trees in the
roots with material tree circumference
arising from measured at 300mm
excavation
D.23 – Specify the type
• Ditto; 300mm b.n.e of material used to
600mm girth; ditto bury behind the hole
according to the
• Ditto; 600mm b.n.e classification given.
900mm girth; ditto
• Ditto; 900mm b.n.e
1200mm girth; ditto
16. T.Off List SITE PLAN
STANDARD METHOD OF MEASUREMENT
(Building Works) SMM 2 SECTION D Page 16
Item Description Explanation of Explanation of
(Taking Off List) taking-off measurement
1. Cutting down 1. Cutting down hibiscus D.2 – state the type and Title of work shall
hedges hedges average high of cutting down be described to
900mm high & hedges facilitate
grubbing their roots review
D.2 – Cutting down hedges
shall be measured in m
18. KUIZ 1
masa: 10Minit
1. Specify the type of material used to bury behind the hole
according to the classification given.
Specify the girth "diameter" trees that should be
considered in the work of cutting trees (5 Markah)
2. State the unit of measurement for the following work: -
vi. Clearing site
vii. Cutting down trees
viii. Cutting down hedges
(5 Markah)
19. 103.45m
Symbol :
*** Bushes &
* * * * U= *** Grass
750
Hedges
*
*
45000
U=
* 1250
*
* U= Tree
* ** 750
* * *
* *
207.50m
Girth
*
U=
650 * U
* U=
350 *
U=
220 *
* U=
U=
350
*
650
*
39000
CADANGAN MEMBINA DAN
U= MENYIAPKAN SEBUAH
* 1250
BANGLO 2 TINGKAT DI
U= * LOT 123 MUKIM AMAN,
1050
JITRA
* * U=
1050
155.00m
Drwg No: CQ103/SC/STD WK 1/DUB 1