SlideShare a Scribd company logo
1 of 28
Dr. Ajay H. Vaidya (56)
Ms.Megha Bhand (7)
   Introduction
   Older system of ventilations
   New systems of ventilations
   Limitations and benefits of various ventilation
    methods
   Need of natural and mechanical ventilation
    system
   conclusion
People can suffer and even die as they are exposed
   to diseases they did not have when they come to the
hospital. Often there are things, we as hospital planners
  and engineers could have done to prevent that germs
from being there in the first place. These disease causing
  organisms enter the building on air supply ,moisture
 produce, breed in reservoirs installed, and move about
    on vehicles we maintain. Air contaminants, which
 includes fungus, mold, bacteria, inorganic, and organic
  matter, cause many problems from nuisance colds to
                     fatal pneumonia.
   Poor indoor air quality.

solution:-
       1. The need to restrict air movement in and
    between the various departments.

2. The specific requirements for ventilation and
filtration to dilute and remove contamination in the
form of odor, air-borne microorganisms and viruses,
and hazardous chemical and radioactive substances.
3.The different temperature and humidity requirements
   for various areas; and

4. The design sophistication needed to permit accurate
   control of environmental conditions.
(I) Air intake/exhaust outlet
(A) Air intake:-
             Intakes must be located to draw in the best
   quality air. They must be away from vehicle exhaust,
   plumbing stacks, and any other contaminant source.
      Louvers in outside air intakes should have surface
   so designed to prevent entry of rainwater.
These intakes should be located as far as practical
but not less than 9 m from combustion equipment stack
exhaust outlets, ventilation exhaust outlets from the
hospital or adjoining buildings, medical-surgical
  vacuum
systems, cooling towers, plumbing vent stacks, smoke
control exhaust outlets, and areas that may collect
vehicular exhaust and other noxious fumes.
      The bottom of outdoor air intakes serving central
  systems should be located as high as practical (3.6 m
  recommended) but not less than 1.8 m above ground
  level or if installed above the roof, 0.9m above the
  roof level.
These exhausts should be located a
minimum of 3 m above ground level and away from
doors, occupied areas and operable windows.
Preferred location for exhaust outlets is at roof level
projecting upward or horizontally away from
outdoor intakes.
 Care must be taken in locating highly contaminated
exhausts (e.g., from engines, fume hoods, biological
safety cabinets, kitchen hoods, and paint booths).
Prevailing winds, adjacent buildings, and discharge
velocities must be taken into account.
The main constituents of an AHU are
    Blower with drive mechanism, cooling/heating
    coils, condensate or drain pans and humidifier etc.
    As the air passes through various sections,
it is susceptible to various kinds of infections.
   (A) Drain pan
   (B) Housings
   (C) AHU Insulation
   (D) heating and cooling coil
To prevent the flow of air
containing infectious particulates, air filtration is
provided in Air Handling Units which filters
particles, pathogens and water droplets carried
into the air, either from the coils and humidifiers
or through leaks in the low-pressure side of the
unit.
      For critical care areas like operation theaters,
ICU, emergency and recovery areas normally
three-stage filtration is provided.
   Pre-Filters (BS-6540) :
                   These are first stage filters having efficiency
    70% down to 10 Microns. These filters are cleanable and
    washable and installed at inlet of airstream.

   Fine filters (BS-6540-part-I) :
                        Second stage filters having efficiency 99%
    down to 5 Microns. The pressure drop in dirty conditions
    should not exceed 20mm WG and the initial drop should be
    between 6.5 to 8.5mm WG. These filters are washable.

   Hepa filters:
           With efficiency 99.97% down to 0.3 Microns used for
    operating rooms and ICU's. These are special high flow types
    with more media to handle higher air quality (DOP tested as
    per federal standard 209).
The function of the duct is to convey the air between
  two points viz AHU and room to be conditioned.

 It also carries the room air back to the air-conditioning
   apparatus.

Duct cleaning has been vital and comple aspect of
  hospital infection control.
In addition to the contribution by HVAC, air
stream infection in a conditioned space is also added
by localfactor viz. wet walls, interior finishes,
furniture, tiles, carpets, cleaning and disinfection
agents, floor tiles, granite tops, patients and
attendants etc.
     Chemical pollutants ,odors and fungi are major
health hazards in indoor environment. This causes
allergies and sickness of respiratory tracts. High
incidence of sickness due to allergies, asthma,
fatigue, headache, cold and respiratory disorders are
results of poor indoor air quality.
   Keeping good Indore air quality (IAQ)
   Ensuring infection control. i.e. to protect the
    patient from becoming infected.
   Maintaining air temperature, relative humidity
    and air speed
   Avoid pollution
   Usage of natural air and light
   Patients rapid development and recovery
   Keeping good Indore air quality (IAQ)
   Ensuring infection control. i.e. to protect the
    patient from becoming infected.
   Maintaining air temperature, relative humidity
    and air speed
   Avoid pollution
   Usage of natural air and light
   Patients rapid development and recovery
Area of hospital   Temp. needed in         % of relative       Min. % of total air
                   0C                      humidity required   change
                                           of fresh air        required/hour


OT (need 100%      17 to 28 (adjustable)   40-45               25
fresh air)

Patient bedroom    24 to 28                30-40               15-25


ICU                24                      40-45               12-25


Recovery rooms     24 to 28                30-40               15


General areas      24 to 30                30-40               25
   Mechanical system of ventilations –
    Used in urban hospitals, where less space is
    available, no other natural alternative available.

   Natural system of ventilations- (not in OT and
    ICUs)
    Used in the green hospitals, where more space
    available , tall hospital buildings

   Conventional system- OR mixed ventilation
    ,system used in old hospitals.
   vacuum pipes
   Exhaust fans
   Compressors ,condensers, evaporator
   Automated temp. adjustment system
   Air distribution system
   Smoke detectors/exhauster
   High frequency alarm system in case of fire
   High energy consumption
   Maintenance
   Higher cost
   More space requirement
   High risk of accident due to high vacuumed
    pressure
   Technical support needed.
   Channel tunnel – used high pressure
    mechanical ventilation system. Connecting rail
    track between UK and France which has 50.50
    km distanced.
A properly designed ventilation system can clean
the air and creating clean air zones in hospitals

while badly designed ventilation system can be
source of airborne infection.
   Proper lay out design
   Divide area into zones
   Large windows for every room
   Sliding grill and duct windows
   Wide entrance
   Natural light and humidity and temperature
    maintained passages for keeping good (IAQ)
   All windows and passages angeled to ensure
    proper ventilation, natural light and heat
    control
   Reduce electricity consumption up to 27%
   Natural light /ventilation and solar energy
    system can save 40 lac. rupees /year in 500
    bedded hospital.
   No technical and engineering service required.
   Patients recovery rate increases.
   Patient prefer naturally ventilated rooms .
   Green hospitals using natural ventilations
   Constant flow of natural fresh air
   People feels better in the good quality Indore
    climate
   Staff people work more efficiently.
   Patients recover more quickly
   Hospital must have to consider proper
    ventilation and natural light system during
    planning.
   New systems of ventilation needed.
   New technology and engineers are playing
    vital roles in hospitals.
Thank you

More Related Content

What's hot

Hospital. engineering service
Hospital. engineering serviceHospital. engineering service
Hospital. engineering service
Nc Das
 
Air condition requirement in hospitals
Air condition requirement in hospitalsAir condition requirement in hospitals
Air condition requirement in hospitals
Heena Kousar
 
Guidelines & main requirements in the planning and design of hospitals
Guidelines & main requirements in the planning and design of hospitalsGuidelines & main requirements in the planning and design of hospitals
Guidelines & main requirements in the planning and design of hospitals
Mahmoud Shaqria
 

What's hot (20)

interior design for hospitals
interior design for hospitalsinterior design for hospitals
interior design for hospitals
 
(Hospital presentation)
(Hospital presentation)(Hospital presentation)
(Hospital presentation)
 
Hospital. engineering service
Hospital. engineering serviceHospital. engineering service
Hospital. engineering service
 
HVAC System
HVAC SystemHVAC System
HVAC System
 
Air condition requirement in hospitals
Air condition requirement in hospitalsAir condition requirement in hospitals
Air condition requirement in hospitals
 
Opd design and process
Opd design and processOpd design and process
Opd design and process
 
Hospital report
Hospital report Hospital report
Hospital report
 
LIGHTING IN HOSPITALS
LIGHTING IN HOSPITALSLIGHTING IN HOSPITALS
LIGHTING IN HOSPITALS
 
Pims HOSPITAL case study
Pims HOSPITAL case studyPims HOSPITAL case study
Pims HOSPITAL case study
 
HVAC system
HVAC systemHVAC system
HVAC system
 
Air Conditioning & Hvac Systems
Air Conditioning & Hvac SystemsAir Conditioning & Hvac Systems
Air Conditioning & Hvac Systems
 
Green hospital
Green hospitalGreen hospital
Green hospital
 
Hvac
HvacHvac
Hvac
 
Air Conditioning For Hospital
Air Conditioning For HospitalAir Conditioning For Hospital
Air Conditioning For Hospital
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
 
Green hospitals
Green hospitalsGreen hospitals
Green hospitals
 
HVAC
HVACHVAC
HVAC
 
Guidelines & main requirements in the planning and design of hospitals
Guidelines & main requirements in the planning and design of hospitalsGuidelines & main requirements in the planning and design of hospitals
Guidelines & main requirements in the planning and design of hospitals
 
hospital case study
hospital case studyhospital case study
hospital case study
 
Mechanical Ventilation
Mechanical VentilationMechanical Ventilation
Mechanical Ventilation
 

Viewers also liked

Indoor air quality in hospitals
Indoor air quality in hospitalsIndoor air quality in hospitals
Indoor air quality in hospitals
kathikkhan0484
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New Hospital
Nc Das
 
Natural ventilation projects
Natural ventilation projectsNatural ventilation projects
Natural ventilation projects
windowmaster
 

Viewers also liked (20)

Indoor air quality in hospitals
Indoor air quality in hospitalsIndoor air quality in hospitals
Indoor air quality in hospitals
 
Natural ventilation in hospitals
Natural ventilation in hospitalsNatural ventilation in hospitals
Natural ventilation in hospitals
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Indoor and outdoor air quality in hospital environment
Indoor and outdoor air quality in hospital environmentIndoor and outdoor air quality in hospital environment
Indoor and outdoor air quality in hospital environment
 
Theatre design and ventilation
Theatre design and ventilationTheatre design and ventilation
Theatre design and ventilation
 
Operation theatre services
Operation theatre servicesOperation theatre services
Operation theatre services
 
Ventilation: Basic Principles
Ventilation: Basic PrinciplesVentilation: Basic Principles
Ventilation: Basic Principles
 
Hospital planning and designing
Hospital planning and designingHospital planning and designing
Hospital planning and designing
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
Planning for New Hospital
Planning for New HospitalPlanning for New Hospital
Planning for New Hospital
 
Hospital design
Hospital designHospital design
Hospital design
 
Hospital Mechanical Systems
Hospital Mechanical SystemsHospital Mechanical Systems
Hospital Mechanical Systems
 
Windows-visual dictionary
Windows-visual dictionaryWindows-visual dictionary
Windows-visual dictionary
 
Forced Draft Ventilation
Forced Draft VentilationForced Draft Ventilation
Forced Draft Ventilation
 
Presentation emb and industrial ventilation
Presentation emb and industrial ventilationPresentation emb and industrial ventilation
Presentation emb and industrial ventilation
 
HMX Ambiator
HMX AmbiatorHMX Ambiator
HMX Ambiator
 
Integration of the natural cross ventilation in the CFD software UrbaWind
Integration of the natural cross ventilation in the CFD software UrbaWindIntegration of the natural cross ventilation in the CFD software UrbaWind
Integration of the natural cross ventilation in the CFD software UrbaWind
 
Natural ventilation projects
Natural ventilation projectsNatural ventilation projects
Natural ventilation projects
 
Fans Vs. Natural Ventilation: Cost Comparison
Fans Vs. Natural Ventilation: Cost ComparisonFans Vs. Natural Ventilation: Cost Comparison
Fans Vs. Natural Ventilation: Cost Comparison
 
natural ventilation brochure
 natural ventilation brochure  natural ventilation brochure
natural ventilation brochure
 

Similar to Alternate ventilation in hospitals

Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
IOSR Journals
 
Sem 2 bs1 ventilation
Sem 2 bs1 ventilationSem 2 bs1 ventilation
Sem 2 bs1 ventilation
Est
 
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
slymartins
 
Ehedge controlling air in food industry
Ehedge controlling air in food industryEhedge controlling air in food industry
Ehedge controlling air in food industry
louisaaudrey
 
Brochure MedAir AHU & HVAC Services
Brochure MedAir AHU & HVAC ServicesBrochure MedAir AHU & HVAC Services
Brochure MedAir AHU & HVAC Services
Frank Crook
 
Ot infection control rkch
Ot infection control rkchOt infection control rkch
Ot infection control rkch
sabahjak
 
Atmospheric dampness and ventilation
Atmospheric dampness and ventilationAtmospheric dampness and ventilation
Atmospheric dampness and ventilation
chazza1234
 

Similar to Alternate ventilation in hospitals (20)

alturascontractors.com-HVAC Design for Healthcare Facilities.pdf
alturascontractors.com-HVAC Design for Healthcare Facilities.pdfalturascontractors.com-HVAC Design for Healthcare Facilities.pdf
alturascontractors.com-HVAC Design for Healthcare Facilities.pdf
 
Medical-PPT
Medical-PPTMedical-PPT
Medical-PPT
 
Air circulation
Air circulationAir circulation
Air circulation
 
Air based hazard
Air based hazardAir based hazard
Air based hazard
 
PTP 3111 - Hospital Air Distribution Systems (PDF).pdf
PTP 3111 - Hospital Air Distribution Systems (PDF).pdfPTP 3111 - Hospital Air Distribution Systems (PDF).pdf
PTP 3111 - Hospital Air Distribution Systems (PDF).pdf
 
Good containment practices
Good containment practicesGood containment practices
Good containment practices
 
Weiss technik-mc-op-decken-en
Weiss technik-mc-op-decken-enWeiss technik-mc-op-decken-en
Weiss technik-mc-op-decken-en
 
Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
Design, Installation and Commissioning Of Clean Room and Hvac Facility for St...
 
Sem 2 bs1 ventilation
Sem 2 bs1 ventilationSem 2 bs1 ventilation
Sem 2 bs1 ventilation
 
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
the Heating, Ventilating, and Air Conditioning (HVAC) system of Covid’19 Int...
 
Ehedge controlling air in food industry
Ehedge controlling air in food industryEhedge controlling air in food industry
Ehedge controlling air in food industry
 
Brochure MedAir AHU & HVAC Services
Brochure MedAir AHU & HVAC ServicesBrochure MedAir AHU & HVAC Services
Brochure MedAir AHU & HVAC Services
 
Dr chandrashekhar airborne infection
Dr chandrashekhar airborne infectionDr chandrashekhar airborne infection
Dr chandrashekhar airborne infection
 
Ot infection control rkch
Ot infection control rkchOt infection control rkch
Ot infection control rkch
 
Egonomics_and_work_place_engineering
Egonomics_and_work_place_engineeringEgonomics_and_work_place_engineering
Egonomics_and_work_place_engineering
 
Ventilation system
Ventilation systemVentilation system
Ventilation system
 
Building services.pptx
Building services.pptxBuilding services.pptx
Building services.pptx
 
Atmospheric dampness and ventilation
Atmospheric dampness and ventilationAtmospheric dampness and ventilation
Atmospheric dampness and ventilation
 
Risk with hvac system and mitigation plan
Risk with hvac system and mitigation planRisk with hvac system and mitigation plan
Risk with hvac system and mitigation plan
 
Chapter 9 room ventilation systems (1)
Chapter 9 room ventilation systems (1)Chapter 9 room ventilation systems (1)
Chapter 9 room ventilation systems (1)
 

Recently uploaded

KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
Cara Menggugurkan Kandungan 087776558899
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
ssuserdfec6a
 
the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentation
brynpueblos04
 
Girls in Mahipalpur (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Mahipalpur  (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Mahipalpur  (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Mahipalpur (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (15)

Colaba Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Colaba Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsColaba Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Colaba Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdfExploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
Exploring Stoic Philosophy From Ancient Wisdom to Modern Relevance.pdf
 
Emotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdfEmotional Freedom Technique Tapping Points Diagram.pdf
Emotional Freedom Technique Tapping Points Diagram.pdf
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theory
 
February 2024 Recommendations for newsletter
February 2024 Recommendations for newsletterFebruary 2024 Recommendations for newsletter
February 2024 Recommendations for newsletter
 
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
Call Girls In Mumbai Just Genuine Call ☎ 7738596112✅ Call Girl Andheri East G...
 
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Dadar West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
March 2023 Recommendations for newsletter
March 2023 Recommendations for newsletterMarch 2023 Recommendations for newsletter
March 2023 Recommendations for newsletter
 
the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentation
 
Social Learning Theory presentation.pptx
Social Learning Theory presentation.pptxSocial Learning Theory presentation.pptx
Social Learning Theory presentation.pptx
 
Goregaon West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Goregaon West Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsGoregaon West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Goregaon West Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Girls in Mahipalpur (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Mahipalpur  (delhi) call me [🔝9953056974🔝] escort service 24X7Girls in Mahipalpur  (delhi) call me [🔝9953056974🔝] escort service 24X7
Girls in Mahipalpur (delhi) call me [🔝9953056974🔝] escort service 24X7
 
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptxSIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
SIKP311 Sikolohiyang Pilipino - Ginhawa.pptx
 
2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga2023 - Between Philosophy and Practice: Introducing Yoga
2023 - Between Philosophy and Practice: Introducing Yoga
 

Alternate ventilation in hospitals

  • 1. Dr. Ajay H. Vaidya (56) Ms.Megha Bhand (7)
  • 2. Introduction  Older system of ventilations  New systems of ventilations  Limitations and benefits of various ventilation methods  Need of natural and mechanical ventilation system  conclusion
  • 3. People can suffer and even die as they are exposed to diseases they did not have when they come to the hospital. Often there are things, we as hospital planners and engineers could have done to prevent that germs from being there in the first place. These disease causing organisms enter the building on air supply ,moisture produce, breed in reservoirs installed, and move about on vehicles we maintain. Air contaminants, which includes fungus, mold, bacteria, inorganic, and organic matter, cause many problems from nuisance colds to fatal pneumonia.
  • 4. Poor indoor air quality. solution:- 1. The need to restrict air movement in and between the various departments. 2. The specific requirements for ventilation and filtration to dilute and remove contamination in the form of odor, air-borne microorganisms and viruses, and hazardous chemical and radioactive substances.
  • 5. 3.The different temperature and humidity requirements for various areas; and 4. The design sophistication needed to permit accurate control of environmental conditions.
  • 6. (I) Air intake/exhaust outlet (A) Air intake:- Intakes must be located to draw in the best quality air. They must be away from vehicle exhaust, plumbing stacks, and any other contaminant source. Louvers in outside air intakes should have surface so designed to prevent entry of rainwater.
  • 7. These intakes should be located as far as practical but not less than 9 m from combustion equipment stack exhaust outlets, ventilation exhaust outlets from the hospital or adjoining buildings, medical-surgical vacuum systems, cooling towers, plumbing vent stacks, smoke control exhaust outlets, and areas that may collect vehicular exhaust and other noxious fumes. The bottom of outdoor air intakes serving central systems should be located as high as practical (3.6 m recommended) but not less than 1.8 m above ground level or if installed above the roof, 0.9m above the roof level.
  • 8. These exhausts should be located a minimum of 3 m above ground level and away from doors, occupied areas and operable windows. Preferred location for exhaust outlets is at roof level projecting upward or horizontally away from outdoor intakes. Care must be taken in locating highly contaminated exhausts (e.g., from engines, fume hoods, biological safety cabinets, kitchen hoods, and paint booths). Prevailing winds, adjacent buildings, and discharge velocities must be taken into account.
  • 9. The main constituents of an AHU are Blower with drive mechanism, cooling/heating coils, condensate or drain pans and humidifier etc. As the air passes through various sections, it is susceptible to various kinds of infections.
  • 10. (A) Drain pan  (B) Housings  (C) AHU Insulation  (D) heating and cooling coil
  • 11. To prevent the flow of air containing infectious particulates, air filtration is provided in Air Handling Units which filters particles, pathogens and water droplets carried into the air, either from the coils and humidifiers or through leaks in the low-pressure side of the unit. For critical care areas like operation theaters, ICU, emergency and recovery areas normally three-stage filtration is provided.
  • 12. Pre-Filters (BS-6540) : These are first stage filters having efficiency 70% down to 10 Microns. These filters are cleanable and washable and installed at inlet of airstream.  Fine filters (BS-6540-part-I) : Second stage filters having efficiency 99% down to 5 Microns. The pressure drop in dirty conditions should not exceed 20mm WG and the initial drop should be between 6.5 to 8.5mm WG. These filters are washable.  Hepa filters: With efficiency 99.97% down to 0.3 Microns used for operating rooms and ICU's. These are special high flow types with more media to handle higher air quality (DOP tested as per federal standard 209).
  • 13. The function of the duct is to convey the air between two points viz AHU and room to be conditioned. It also carries the room air back to the air-conditioning apparatus. Duct cleaning has been vital and comple aspect of hospital infection control.
  • 14. In addition to the contribution by HVAC, air stream infection in a conditioned space is also added by localfactor viz. wet walls, interior finishes, furniture, tiles, carpets, cleaning and disinfection agents, floor tiles, granite tops, patients and attendants etc. Chemical pollutants ,odors and fungi are major health hazards in indoor environment. This causes allergies and sickness of respiratory tracts. High incidence of sickness due to allergies, asthma, fatigue, headache, cold and respiratory disorders are results of poor indoor air quality.
  • 15. Keeping good Indore air quality (IAQ)  Ensuring infection control. i.e. to protect the patient from becoming infected.  Maintaining air temperature, relative humidity and air speed  Avoid pollution  Usage of natural air and light  Patients rapid development and recovery
  • 16. Keeping good Indore air quality (IAQ)  Ensuring infection control. i.e. to protect the patient from becoming infected.  Maintaining air temperature, relative humidity and air speed  Avoid pollution  Usage of natural air and light  Patients rapid development and recovery
  • 17. Area of hospital Temp. needed in % of relative Min. % of total air 0C humidity required change of fresh air required/hour OT (need 100% 17 to 28 (adjustable) 40-45 25 fresh air) Patient bedroom 24 to 28 30-40 15-25 ICU 24 40-45 12-25 Recovery rooms 24 to 28 30-40 15 General areas 24 to 30 30-40 25
  • 18. Mechanical system of ventilations – Used in urban hospitals, where less space is available, no other natural alternative available.  Natural system of ventilations- (not in OT and ICUs) Used in the green hospitals, where more space available , tall hospital buildings  Conventional system- OR mixed ventilation ,system used in old hospitals.
  • 19. vacuum pipes  Exhaust fans  Compressors ,condensers, evaporator  Automated temp. adjustment system  Air distribution system  Smoke detectors/exhauster  High frequency alarm system in case of fire
  • 20.
  • 21. High energy consumption  Maintenance  Higher cost  More space requirement  High risk of accident due to high vacuumed pressure  Technical support needed.
  • 22. Channel tunnel – used high pressure mechanical ventilation system. Connecting rail track between UK and France which has 50.50 km distanced.
  • 23. A properly designed ventilation system can clean the air and creating clean air zones in hospitals while badly designed ventilation system can be source of airborne infection.
  • 24.
  • 25. Proper lay out design  Divide area into zones  Large windows for every room  Sliding grill and duct windows  Wide entrance  Natural light and humidity and temperature maintained passages for keeping good (IAQ)  All windows and passages angeled to ensure proper ventilation, natural light and heat control
  • 26. Reduce electricity consumption up to 27%  Natural light /ventilation and solar energy system can save 40 lac. rupees /year in 500 bedded hospital.  No technical and engineering service required.  Patients recovery rate increases.  Patient prefer naturally ventilated rooms .  Green hospitals using natural ventilations  Constant flow of natural fresh air
  • 27. People feels better in the good quality Indore climate  Staff people work more efficiently.  Patients recover more quickly  Hospital must have to consider proper ventilation and natural light system during planning.  New systems of ventilation needed.  New technology and engineers are playing vital roles in hospitals.