PROJECT MANAGEMENT SYSTEM

          PVNR
  ELEVATED EXPRESS WAY
        2005-2009
                     BY
         AKHILESH PADIGA GO6155
         VENKATESH PUTTY GO6162
      SASI KIRAN LINGAMPALLI GO6146
HMDA
INTEGRATION OF:
• Hyderabad Urban Development Authority (HUDA),
• Hyderabad Airport Development Authority (HADA),
• Cyberabad Development Authority (CDA)
• Buddha Poornima Project Authority (BPPA).
• the 2nd largest urban development area in India
  WITH 7,100 sq km
PVNR EXPRESSWAY
• 11.6 km,17.2m width Elevated Expressway connecting the
  HYDERABAD INTERNATIONAL AIRPORT with the
  city at MEHDIPATNAM.

• Opened for traffic at the end points on 2009-10-19

• The Hyderabad Metropolitan Development Authority is
  developing the Rs 439-crore PVNR Expressway
PROJECT IDEA!
The project comprises three main components

• 11.46-km four-lane elevated expressway
• 3.9-km long trumpet interchange
• 62-metre underpass.
DETAILS
Three sets of ramps at
• Laxminagar
• Upparpally
• Aramghar

• No of piers: 328
USP ??
 At present, it takes 45 minutes to an
  hour

 Travel time to the airport reduces by
  30 to 40 minutes

 Longest elevated expressway        in
  INDIA
 24 7 CCTV surveillance
JOINT VENTURES
• Span Consultants Pvt. Ltd is the consultant for
  the project
• Simplex Infrastructures Ltd has been
  appointed as the EPC and civil contractor for
  the expressway
• Helps to complete the work in expected time
GOVERNMENT AND LOCAL SUPPORT
• Location of new airport

• Easy to reach airport

• A must needed project to avoid traffic

• Combined support from govt and public
How it differs from other projects?
• Longest ELEVATED expressway in INDIA
• Appropriate use
• Connecting airport to city by cutting the travel
  time
• Connecting through interchanges
BENFITS TO SOCIETY
•   Reduction in Traffic problems
•   Connecting to IRR
•   Less area consumption
•   Fuel efficiency
•   No toll-govt project
BENFITS OF PROJECT
 No two wheeler traffic.
 No traffic jams.
 No bus stops.
 No hard work to chug
  behind an auto rickshaw or
  an RTC bus
 No traffic signals.
ORGANIZING STRUCTURE

                                  ENGINEERING   FINANCE
                         HR
                                     HEAD         HEAD
            SPAN
                        PROJECT      PROJECT
                                                ACCOUNTANT
                        MANAGER      MANAGER
Rajeshwar
  Tiwari                               SITE
                                     ENGINEER
FEASIBILITY STUDIES




PRI is greater than 4, hence feasible for this type of project
FINANCIAL MANAGEMENT
  GOVERNMENT

      HMDA

SPAN COUNSALTANCY

SIMPLEX INFRA LTD
        HMDA has to release Rs 25 crore
TENDRING, BIDDING
• By HMDA
• LUMP SUM CONTACT-
  439Cr
• Selected by closed BID
• SPAN consultancy is
  selected, SIMPLEX is the
  CONTRACTOR
LOANS
• HMDA taken loans from NATIONALISED
  banks for a loan of Rs 100 crore
• mortgage hundred acres of prime lands located
  in Jawahar Nagar and some other places
  belonging to it.
• Interest rates @12%
APPROVAL OF PROJECT

• HMDA approved and developed the project

• The water board was initially provided with
  Rs.3.70 crore and later provided with an
  additional Rs.1.30 crore by the HMDA
LATEST TECHNOLOGY
• EXCAVATORS

• PSC DECK SLABS

• PAVER, READY MIX ASPALT
AWARDS

• It is awarded as the
  INDIAN’S
  LONGEST
  ELEVATED
  EXPRESS WAY till
  date
CONTROVERSIES
• Quality aspects
• GMR-AIRPORT,
  GOVERNMENT-PVNR HW
• Relocation of temple, houses
• Delay in the project by 1 year
  & INCREASE IN COST
• Road accidents
ESTIMATED COST VS ACTUAL
            COST
• ESTIMATED COST: 439 CR (During
  bidding)
• Project cost: 480Cr appox
• Increase in Project cost=40Cr due to delays
  and increased rates of resources.
• Biggest defect of the project
ROLE OF PROJECT MANAGER

Planning
Scheduling
Co ordination IN ORGANIZATION
Prevents over cost
Using of project management systems
Monitoring
Settlement of ISSUES
Delay in project increases the                            Decrease in the expected
cost by nearly 10% of over all                            quality will increase the
project cost                                              maintaining cost




                 Benefits to the society is more reducing traffic
                 problems

    If this project is a PPP with a                      Role of project manager is
    toll it will be a better project                     crucial in schedule, cost,
                                                         performance of project
PVNR ELEVATED EXPRESSWAY

Contenu connexe

Tendances

Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study Soumya Bhadani
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAIAnshuman Jaiswal
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metrosatish choudhari
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalRajesh Prasad
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisPiyusha Rustagi
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21Rajesh Prasad
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-projectVikas Saini
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro ProjectASHISH SINGH
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project caseRahul Pagaria
 
Ahmedabad metro rail project (amrc) deepen
Ahmedabad metro rail project (amrc)   deepenAhmedabad metro rail project (amrc)   deepen
Ahmedabad metro rail project (amrc) deepenDeepen Upadhyay
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai MetroHansel D'Souza
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersAnil Kumar Gupta
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixNISHCHAY SAXENA
 

Tendances (20)

Delhi Metro Project Case Study
Delhi Metro Project Case Study  Delhi Metro Project Case Study
Delhi Metro Project Case Study
 
Project management in NHAI
Project management in NHAIProject management in NHAI
Project management in NHAI
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
The delhi-metro-project
The delhi-metro-projectThe delhi-metro-project
The delhi-metro-project
 
Ahmedabad Metro Project
Ahmedabad Metro ProjectAhmedabad Metro Project
Ahmedabad Metro Project
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Appraising kolkata metro rail project case
Appraising kolkata metro rail project caseAppraising kolkata metro rail project case
Appraising kolkata metro rail project case
 
Ahmedabad metro rail project (amrc) deepen
Ahmedabad metro rail project (amrc)   deepenAhmedabad metro rail project (amrc)   deepen
Ahmedabad metro rail project (amrc) deepen
 
lucknow metro ppt
lucknow metro pptlucknow metro ppt
lucknow metro ppt
 
Go Underground Mumbai Metro
Go Underground Mumbai MetroGo Underground Mumbai Metro
Go Underground Mumbai Metro
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
 
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrixAmritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
Amritsar Inter City Bus Terminal PPP Structure and Risk mitigation matrix
 
Yogyakarta Bus Terminal
Yogyakarta Bus TerminalYogyakarta Bus Terminal
Yogyakarta Bus Terminal
 
The RVNL Story 2019
The RVNL Story 2019The RVNL Story 2019
The RVNL Story 2019
 

En vedette

PPT On High level bridge
PPT On High level bridgePPT On High level bridge
PPT On High level bridgeLOKESH
 
1 roads classification
1 roads classification1 roads classification
1 roads classificationBharath Raj
 
Block making machine - Compacta
Block making machine - CompactaBlock making machine - Compacta
Block making machine - CompactaPrensoland S.A.
 
Road Types and Road Transportation
Road Types and Road TransportationRoad Types and Road Transportation
Road Types and Road TransportationNavindu Munidasa
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERINGAzan Shukor
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topicsShubham Sadh
 

En vedette (9)

PPT On High level bridge
PPT On High level bridgePPT On High level bridge
PPT On High level bridge
 
1 roads classification
1 roads classification1 roads classification
1 roads classification
 
Block making machine - Compacta
Block making machine - CompactaBlock making machine - Compacta
Block making machine - Compacta
 
Road Types and Road Transportation
Road Types and Road TransportationRoad Types and Road Transportation
Road Types and Road Transportation
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
Types of highways
Types of highwaysTypes of highways
Types of highways
 
Types of roads
Types of roadsTypes of roads
Types of roads
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERING
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 

Similaire à PVNR ELEVATED EXPRESSWAY

11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...FICCINorthEast
 
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)DBTGrupoIndia
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1OmkarRasal
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnershipSuryansh Kori
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveRajesh Prasad
 
Feasibility study on expansion of state highway
Feasibility study on expansion of state highwayFeasibility study on expansion of state highway
Feasibility study on expansion of state highwaysnehakaira
 
Resume - Vikas Datta-v2
Resume - Vikas Datta-v2Resume - Vikas Datta-v2
Resume - Vikas Datta-v2VIKAS DATTA
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1Sneha Kaira
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metroanandkc77
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfAl Darwish Engineering
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.Axay Sharma
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L NBasavaraj L N
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project managerYogesh Vijay
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and EconomicsKunal Bhadane
 

Similaire à PVNR ELEVATED EXPRESSWAY (20)

11. NECS 2016 _Current status and the way ahead for road development in the ...
11.  NECS 2016 _Current status and the way ahead for road development in the ...11.  NECS 2016 _Current status and the way ahead for road development in the ...
11. NECS 2016 _Current status and the way ahead for road development in the ...
 
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
Karnataka, India : Antecedentes de los proyectos PPP (marzo 2008)
 
CHVR CV
CHVR CVCHVR CV
CHVR CV
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
Public private partnership
Public private partnershipPublic private partnership
Public private partnership
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian PerspectiveHigh Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
High Speed Rail- Need, Challenges, Key Issues and Options: Indian Perspective
 
Ppp
PppPpp
Ppp
 
Feasibility study on expansion of state highway
Feasibility study on expansion of state highwayFeasibility study on expansion of state highway
Feasibility study on expansion of state highway
 
Resume - Vikas Datta-v2
Resume - Vikas Datta-v2Resume - Vikas Datta-v2
Resume - Vikas Datta-v2
 
Expansion of state highway 1
Expansion of state highway 1Expansion of state highway 1
Expansion of state highway 1
 
Nagpur metro
Nagpur metroNagpur metro
Nagpur metro
 
Sheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdfSheahan peter d'souza executive cv.pdf
Sheahan peter d'souza executive cv.pdf
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
KHURRAM ASHFAQ KHAN CV updated
KHURRAM ASHFAQ KHAN  CV updatedKHURRAM ASHFAQ KHAN  CV updated
KHURRAM ASHFAQ KHAN CV updated
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 

Plus de Akhil Padiga

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQMAkhil Padiga
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring roadAkhil Padiga
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concreteAkhil Padiga
 
sales vs marketing
sales vs marketingsales vs marketing
sales vs marketingAkhil Padiga
 
Earth quake resistant structures
Earth quake resistant structuresEarth quake resistant structures
Earth quake resistant structuresAkhil Padiga
 
rain water harvesting business plan
rain water harvesting business planrain water harvesting business plan
rain water harvesting business planAkhil Padiga
 

Plus de Akhil Padiga (8)

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQM
 
Stress management
Stress managementStress management
Stress management
 
Kaizen
KaizenKaizen
Kaizen
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Geopolymer concrete
Geopolymer concreteGeopolymer concrete
Geopolymer concrete
 
sales vs marketing
sales vs marketingsales vs marketing
sales vs marketing
 
Earth quake resistant structures
Earth quake resistant structuresEarth quake resistant structures
Earth quake resistant structures
 
rain water harvesting business plan
rain water harvesting business planrain water harvesting business plan
rain water harvesting business plan
 

Dernier

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 

Dernier (20)

Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 

PVNR ELEVATED EXPRESSWAY

  • 1. PROJECT MANAGEMENT SYSTEM PVNR ELEVATED EXPRESS WAY 2005-2009 BY AKHILESH PADIGA GO6155 VENKATESH PUTTY GO6162 SASI KIRAN LINGAMPALLI GO6146
  • 2. HMDA INTEGRATION OF: • Hyderabad Urban Development Authority (HUDA), • Hyderabad Airport Development Authority (HADA), • Cyberabad Development Authority (CDA) • Buddha Poornima Project Authority (BPPA). • the 2nd largest urban development area in India WITH 7,100 sq km
  • 3. PVNR EXPRESSWAY • 11.6 km,17.2m width Elevated Expressway connecting the HYDERABAD INTERNATIONAL AIRPORT with the city at MEHDIPATNAM. • Opened for traffic at the end points on 2009-10-19 • The Hyderabad Metropolitan Development Authority is developing the Rs 439-crore PVNR Expressway
  • 4. PROJECT IDEA! The project comprises three main components • 11.46-km four-lane elevated expressway • 3.9-km long trumpet interchange • 62-metre underpass.
  • 5. DETAILS Three sets of ramps at • Laxminagar • Upparpally • Aramghar • No of piers: 328
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. USP ??  At present, it takes 45 minutes to an hour  Travel time to the airport reduces by 30 to 40 minutes  Longest elevated expressway in INDIA  24 7 CCTV surveillance
  • 11. JOINT VENTURES • Span Consultants Pvt. Ltd is the consultant for the project • Simplex Infrastructures Ltd has been appointed as the EPC and civil contractor for the expressway • Helps to complete the work in expected time
  • 12. GOVERNMENT AND LOCAL SUPPORT • Location of new airport • Easy to reach airport • A must needed project to avoid traffic • Combined support from govt and public
  • 13. How it differs from other projects? • Longest ELEVATED expressway in INDIA • Appropriate use • Connecting airport to city by cutting the travel time • Connecting through interchanges
  • 14. BENFITS TO SOCIETY • Reduction in Traffic problems • Connecting to IRR • Less area consumption • Fuel efficiency • No toll-govt project
  • 15. BENFITS OF PROJECT  No two wheeler traffic.  No traffic jams.  No bus stops.  No hard work to chug behind an auto rickshaw or an RTC bus  No traffic signals.
  • 16. ORGANIZING STRUCTURE ENGINEERING FINANCE HR HEAD HEAD SPAN PROJECT PROJECT ACCOUNTANT MANAGER MANAGER Rajeshwar Tiwari SITE ENGINEER
  • 17. FEASIBILITY STUDIES PRI is greater than 4, hence feasible for this type of project
  • 18. FINANCIAL MANAGEMENT GOVERNMENT HMDA SPAN COUNSALTANCY SIMPLEX INFRA LTD HMDA has to release Rs 25 crore
  • 19. TENDRING, BIDDING • By HMDA • LUMP SUM CONTACT- 439Cr • Selected by closed BID • SPAN consultancy is selected, SIMPLEX is the CONTRACTOR
  • 20. LOANS • HMDA taken loans from NATIONALISED banks for a loan of Rs 100 crore • mortgage hundred acres of prime lands located in Jawahar Nagar and some other places belonging to it. • Interest rates @12%
  • 21. APPROVAL OF PROJECT • HMDA approved and developed the project • The water board was initially provided with Rs.3.70 crore and later provided with an additional Rs.1.30 crore by the HMDA
  • 22. LATEST TECHNOLOGY • EXCAVATORS • PSC DECK SLABS • PAVER, READY MIX ASPALT
  • 23. AWARDS • It is awarded as the INDIAN’S LONGEST ELEVATED EXPRESS WAY till date
  • 24. CONTROVERSIES • Quality aspects • GMR-AIRPORT, GOVERNMENT-PVNR HW • Relocation of temple, houses • Delay in the project by 1 year & INCREASE IN COST • Road accidents
  • 25. ESTIMATED COST VS ACTUAL COST • ESTIMATED COST: 439 CR (During bidding) • Project cost: 480Cr appox • Increase in Project cost=40Cr due to delays and increased rates of resources. • Biggest defect of the project
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43. ROLE OF PROJECT MANAGER Planning Scheduling Co ordination IN ORGANIZATION Prevents over cost Using of project management systems Monitoring Settlement of ISSUES
  • 44. Delay in project increases the Decrease in the expected cost by nearly 10% of over all quality will increase the project cost maintaining cost Benefits to the society is more reducing traffic problems If this project is a PPP with a Role of project manager is toll it will be a better project crucial in schedule, cost, performance of project

Notes de l'éditeur

  1. Engineering, Procurement and Construction