1. The document describes the PVNR Elevated Expressway project in Hyderabad connecting the Hyderabad International Airport to Mehdipatnam.
2. The 11.6 km four-lane elevated expressway was opened in 2009 and reduced travel time between the airport and the city by 30-40 minutes.
3. The project cost Rs. 480 crore and was funded through loans taken by the Hyderabad Metropolitan Development Authority from nationalized banks.
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
PVNR ELEVATED EXPRESSWAY
1. PROJECT MANAGEMENT SYSTEM
PVNR
ELEVATED EXPRESS WAY
2005-2009
BY
AKHILESH PADIGA GO6155
VENKATESH PUTTY GO6162
SASI KIRAN LINGAMPALLI GO6146
2. HMDA
INTEGRATION OF:
• Hyderabad Urban Development Authority (HUDA),
• Hyderabad Airport Development Authority (HADA),
• Cyberabad Development Authority (CDA)
• Buddha Poornima Project Authority (BPPA).
• the 2nd largest urban development area in India
WITH 7,100 sq km
3. PVNR EXPRESSWAY
• 11.6 km,17.2m width Elevated Expressway connecting the
HYDERABAD INTERNATIONAL AIRPORT with the
city at MEHDIPATNAM.
• Opened for traffic at the end points on 2009-10-19
• The Hyderabad Metropolitan Development Authority is
developing the Rs 439-crore PVNR Expressway
4. PROJECT IDEA!
The project comprises three main components
• 11.46-km four-lane elevated expressway
• 3.9-km long trumpet interchange
• 62-metre underpass.
5. DETAILS
Three sets of ramps at
• Laxminagar
• Upparpally
• Aramghar
• No of piers: 328
6.
7.
8.
9.
10. USP ??
At present, it takes 45 minutes to an
hour
Travel time to the airport reduces by
30 to 40 minutes
Longest elevated expressway in
INDIA
24 7 CCTV surveillance
11. JOINT VENTURES
• Span Consultants Pvt. Ltd is the consultant for
the project
• Simplex Infrastructures Ltd has been
appointed as the EPC and civil contractor for
the expressway
• Helps to complete the work in expected time
12. GOVERNMENT AND LOCAL SUPPORT
• Location of new airport
• Easy to reach airport
• A must needed project to avoid traffic
• Combined support from govt and public
13. How it differs from other projects?
• Longest ELEVATED expressway in INDIA
• Appropriate use
• Connecting airport to city by cutting the travel
time
• Connecting through interchanges
14. BENFITS TO SOCIETY
• Reduction in Traffic problems
• Connecting to IRR
• Less area consumption
• Fuel efficiency
• No toll-govt project
15. BENFITS OF PROJECT
No two wheeler traffic.
No traffic jams.
No bus stops.
No hard work to chug
behind an auto rickshaw or
an RTC bus
No traffic signals.
16. ORGANIZING STRUCTURE
ENGINEERING FINANCE
HR
HEAD HEAD
SPAN
PROJECT PROJECT
ACCOUNTANT
MANAGER MANAGER
Rajeshwar
Tiwari SITE
ENGINEER
18. FINANCIAL MANAGEMENT
GOVERNMENT
HMDA
SPAN COUNSALTANCY
SIMPLEX INFRA LTD
HMDA has to release Rs 25 crore
19. TENDRING, BIDDING
• By HMDA
• LUMP SUM CONTACT-
439Cr
• Selected by closed BID
• SPAN consultancy is
selected, SIMPLEX is the
CONTRACTOR
20. LOANS
• HMDA taken loans from NATIONALISED
banks for a loan of Rs 100 crore
• mortgage hundred acres of prime lands located
in Jawahar Nagar and some other places
belonging to it.
• Interest rates @12%
21. APPROVAL OF PROJECT
• HMDA approved and developed the project
• The water board was initially provided with
Rs.3.70 crore and later provided with an
additional Rs.1.30 crore by the HMDA
23. AWARDS
• It is awarded as the
INDIAN’S
LONGEST
ELEVATED
EXPRESS WAY till
date
24. CONTROVERSIES
• Quality aspects
• GMR-AIRPORT,
GOVERNMENT-PVNR HW
• Relocation of temple, houses
• Delay in the project by 1 year
& INCREASE IN COST
• Road accidents
25. ESTIMATED COST VS ACTUAL
COST
• ESTIMATED COST: 439 CR (During
bidding)
• Project cost: 480Cr appox
• Increase in Project cost=40Cr due to delays
and increased rates of resources.
• Biggest defect of the project
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43. ROLE OF PROJECT MANAGER
Planning
Scheduling
Co ordination IN ORGANIZATION
Prevents over cost
Using of project management systems
Monitoring
Settlement of ISSUES
44. Delay in project increases the Decrease in the expected
cost by nearly 10% of over all quality will increase the
project cost maintaining cost
Benefits to the society is more reducing traffic
problems
If this project is a PPP with a Role of project manager is
toll it will be a better project crucial in schedule, cost,
performance of project