SlideShare a Scribd company logo
1 of 55
Chapter 7 ,[object Object],[object Object],MANAGEMENT INFORMATION SYSTEMS 8/E Raymond McLeod, Jr. and George Schell Copyright 2001 Prentice-Hall, Inc. 7-
The Systems Life Cycle (SLC) ,[object Object],[object Object],[object Object],[object Object],7-
Phases in the SDLC ,[object Object],[object Object],[object Object],[object Object],[object Object],7-
The System Development Life Cycle (SDLC) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Life Cycle Management ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Executives MIS Steering Committee Project leader -Warehouse location model team Project leader MRP 11 team  Project leader ISDN  system team Project leader HRIS team Marketing Manufacturing Finance Human Resources Project leader Credit approval system team Managers of Systems Life Cycles are Arranged in a Hierarchy 7-
Main Advantages of  the Steering Committee ,[object Object],[object Object],[object Object],Since the steering committee will probably not get involved with the details of the work, a project team is usually appointed. 7-
Planning Phase ,[object Object],[object Object],[object Object],[object Object],[object Object],7-
Steps ,[object Object],[object Object],[object Object],[object Object],Recall that objectives, standards, and constraints are problem-solving elements. 7-
Steps (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Steps (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Steps (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Define  the problem Consult Prepare a system study proposal Establish a control mechanism Approve or disapprove the study project Recognize the problem Set system objectives Identify system constraints The Planning Phase MIS Steering Comm  Manager  Systems Analyst 1. 2. 3. 4. 5. 6. 7. 8. Conduct a feasibility study 7-
Outline of a System Study Proposal 1. Executive summary 2. Introduction 3. System objectives and constraints 4. Possible system alternatives 5. The recommended system study project 5.1 Tasks to be performed 5.2 Human resource requirements 5.3 Schedule of work 5.4 Estimated cost 6. Expected impact of the system 6.1 Impact on the firm’s organization structure 6.2 Impact on the firm’s operations 6.3 Impact on the firms resources 7. General development plan  (analysis, design, and implementation  phase) 8. Summary 7-
A Project Schedule Functional System: Marketing Subsystem: Product Model: Product Deletion Subtask Time Estimate (Person Months) Responsibility 1. Identify deletion criteria 2. Identify output information requirements Systems analyst Product manager Systems analyst Network specialist Product manager 0.75 0.25 7-
Project Schedule (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Project Schedule (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Analysis Phase   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Analysis Phase (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],A  project directory  can be maintained as an encompassing set of documentation to describe the system 7-
Analysis Phase (cont.) ,[object Object],[object Object],[object Object],[object Object],7-
The Analysis Phase MIS Steering Committee Manager Systems Analyst 7- Announce the system study Organize the project team Define information needs Define system performance criteria Prepare design proposal Approve or disapprove the design project 1. 2. 3. 4. 5. 6.
Outline of a Design Proposal 1. Executive summary 2. Introduction 3. Problem definition 4. System objectives and constraints 5. Performance criteria 6. Possible system alternatives 7. The recommended design project 7.1 Tasks to be performed 7.2 Human resource requirements 7.3 Schedule of work 7.4 Estimated cost 8. Expected impact of the system 8.1 Impact on the firm’s organization structure 8.2 Impact on the firm’s operations 8.3 Impact on the firms resources 9. General development plan (analysis, design, and implementation) 10. Summary 7-
Approve or disapprove the system implementation Prepare the detailed design system Identify alternate system configurations Evaluate system configurations Select the best configuration Prepare the implementation proposal 1. 2. 3. 4. 5. 6. MIS Steering Committee Manager Systems Analyst The Design Phase 7-
Design Phase ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Popular Documentation Tools Data Modeling Entity-relationship diagram Data dictionary Screen/printer layout form Process Modeling System flowchart Program flowchart Data flow diagram Structured English Object Modeling Object relationship model Class specification 7-
Data Flow Diagram of Four Data Processing Subsystems Customers 1.4 Accounts Receivable 1.1 Order Entry 1.3 Billing 1.2 Inventory Sales orders Rejected sales order notices Accepted orders Payments by customers Statements Invoices Billed orders Receivables ledger data Order log removals file Filled items Inventory ledger data Received items Purchasing  data 3 3 2 2 7-
Data Flow Diagram of Order Entry System Sales order edit rejects Order log Sales order credit rejects Customer credit file Customer 1.1.1 Edit order data 1.1.2 Compute credit check 1.1.3 Log in orders 1.1.4 Mark filled orders 1.2 1.3 Sales orders Edit rejects Rejected sales order notices Edited orders Credit data Edited and checked orders Credit rejects Accepted orders Completed orders Date filled Order data 7-
Hardware Choices Make Possible  Multiple System Configurations System Elements Alternatives ,[object Object],[object Object],[object Object],Input Order log Customer credit file Rejected orders file Accepted orders file Completed orders file Rejected orders notice Processing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Alternatives Selected for Detailed Study Alternative Input Order  Log Customer Credit File Accepted & Rejected Orders File Completed Orders File Rejected Orders Notice 1. 2. 3. Scanner Keyboard terminal Magnetic tape Keyboard terminal Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Printer Printer Hardcopy terminal 7-
Design Phase (cont.) ,[object Object],[object Object],[object Object],[object Object],7-
1. Executive summary 2. Introduction 3. Problem definition 4. System objectives and constraints 5. Performance criteria 6. System design 6.1 Summary description 6.2 Equipment configuration 7. The recommended implementation project 7.1 Tasks to be performed 7.2 Human resource requirements 7.3 Schedule of work 7.4 Estimated cost 8. Expected impact of the system 8.1 Impact on the firm’s organization structure 8.2 Impact on the firm’s operations 8.3 Impact on the firms resources 9. General implementation plan 10. Summary Outline of an Implementation Proposal 7-
Implementation Phase ,[object Object],7-
Steps for the Implementation Phase ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Plan the implementation Announce the implementation Control Cutover the new system Obtain the  hardware resources Obtain the software resources Prepare the database Educate the  participants and users Prepare the  physical facilities Control 1. 2. 3 4 5 6 7 8. The Implementation Phase MIS Steering Committee Manager Information Specialists 7-
Outline of a Request for Proposal 1. Letter of transmittal 2. System objective and applicable constraints 3. System design 3.1 Summary description 3.2 Performance criteria 3.3 Equipment configuration 3.4 Summary system documentation 3.5 Estimated transaction volume 3.6 Estimated file size 4. Installation schedule 7-
Outline of Supplier Proposal 1. Letter of transmittal 2. Summary of recommendations 3. Advantages 4. Equipment configuration 5. Equipment specifications 5.1 Performance data 5.2 Prices 6. Satisfaction and performance criteria 7. Delivery schedule 7-
Cutover Approaches Old System Old System New System Immediate cutover Phased cutover Parallel cutover Pilot System Immediate Old System New System Phased New system Old System Parallel Time Pilot 7-
Use Phase   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
The Use Phase Control Use the system Audit the system Maintain the system Prepare re- engineering proposal Approve or disapprove the reengineering proposal MIS Steering Committee Manager Information Specialists 1 2 3 4 5 7-
Prototyping ,[object Object],[object Object],7-
Development of a Type I Prototype 1. 2. 3. 4. N Identify user needs Develop a prototype Prototype acceptable? Y Use the prototype 7-
Development of a Type II Prototype N Identify user needs Develop a prototype Code  the operational system Test  the operational system Use  the operational system Prototype acceptable? System acceptable? Y Y 7- N
The Attraction of Prototyping ,[object Object],[object Object],[object Object],[object Object],[object Object],7-
Potential Pitfalls of Prototyping ,[object Object],[object Object],[object Object],[object Object],7-
Applications That Are Good Prospects for Prototyping ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Rapid Application Development (RAD) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-
Information strategy planning (ISP) Business area analysis (BAA) Rapid application development (RAD) . Strategic overview of the information needed to run an enterprise as efficiently as possible Data model Design of  records used  by specific procedures Strategic overview of the functions and goals of an enterprise The process needed to operate the enterprise and how they interrelate Design of procedures for specific  applications Rapid Application Development is an  Integral Part of Information Engineering Data Activities 7-
Business Process Redesign (BPR) ,[object Object],[object Object],[object Object],[object Object],[object Object],7-
Reverse Engineering Reverse Engineering Produces Documentation on Successively Higher Levels but Leaves the System Unchanged Reverse Engineering Engineering Reverse Engineering Reverse Engineering Reverse Planning  Phase Analysis  Phase Design  Phase Implementation Phase 7-
Restructuring Planning Phase Restructuring Restructuring Restructuring Restructuring Analysis Phase Design Phase Implementation Phase 7-
Reengineering Reverse Engineering Reverse Engineering Reverse Engineering Reverse Engineering Forward Engineering Forward Engineering Forward Engineering Forward Engineering Planning Phase Analysis Phase Design Phase Implementation Phase 7-
Selection of BPR Components ,[object Object],[object Object],[object Object],[object Object],[object Object],7-
Functional Quality (What?) Good Technical Quality (How?)   Poor Poor Good Selection of BPR Components Reverse  Engineer Restructure Do Nothing Forward Engineer Reengineer 7-
SLC, Prototyping, RAD, and BPR in Perspective ,[object Object],[object Object],[object Object],7-
Summary ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],7-

More Related Content

What's hot

Management information system
Management information systemManagement information system
Management information systemRoneet Kumar
 
Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)Fatih Algün
 
Systems development cycle
Systems development cycleSystems development cycle
Systems development cycleSamuel Igbanogu
 
Project management through the eye of the systems engineer
Project management through the eye of the systems engineerProject management through the eye of the systems engineer
Project management through the eye of the systems engineerevolve2013
 
System development phases
System development phasesSystem development phases
System development phasesPrabinBista05
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02Durga Prasad Mishra
 
Chapter 12 information system development
Chapter 12   information system developmentChapter 12   information system development
Chapter 12 information system developmenthaider ali
 
AMC Optimized Data Protection Strategy
AMC Optimized Data Protection StrategyAMC Optimized Data Protection Strategy
AMC Optimized Data Protection Strategytcollins3413
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsBjörn Jónsson
 
system development life cycle
system development life cycle system development life cycle
system development life cycle Sumit Yadav
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0Kittitouch Suteeca
 
Software re engineering
Software re engineeringSoftware re engineering
Software re engineeringdeshpandeamrut
 
Information system development
Information system developmentInformation system development
Information system developmentDhani Ahmad
 
Software Maintenance and Evolution
Software Maintenance and EvolutionSoftware Maintenance and Evolution
Software Maintenance and Evolutionkim.mens
 
System Development Life Cycle
System Development Life CycleSystem Development Life Cycle
System Development Life CycleSantosh Ravi
 
Software Engineering (Software Configuration Management)
Software Engineering (Software Configuration Management)Software Engineering (Software Configuration Management)
Software Engineering (Software Configuration Management)ShudipPal
 

What's hot (19)

Management information system
Management information systemManagement information system
Management information system
 
Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)Deciding the software development life cycle procedure (according to iso12207)
Deciding the software development life cycle procedure (according to iso12207)
 
Systems development cycle
Systems development cycleSystems development cycle
Systems development cycle
 
Project management through the eye of the systems engineer
Project management through the eye of the systems engineerProject management through the eye of the systems engineer
Project management through the eye of the systems engineer
 
System development phases
System development phasesSystem development phases
System development phases
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
Chapter 12 information system development
Chapter 12   information system developmentChapter 12   information system development
Chapter 12 information system development
 
AMC Optimized Data Protection Strategy
AMC Optimized Data Protection StrategyAMC Optimized Data Protection Strategy
AMC Optimized Data Protection Strategy
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methods
 
Introduction
IntroductionIntroduction
Introduction
 
system development life cycle
system development life cycle system development life cycle
system development life cycle
 
System development methodologies
System development methodologiesSystem development methodologies
System development methodologies
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0
 
Software re engineering
Software re engineeringSoftware re engineering
Software re engineering
 
Information system development
Information system developmentInformation system development
Information system development
 
Ray3
Ray3Ray3
Ray3
 
Software Maintenance and Evolution
Software Maintenance and EvolutionSoftware Maintenance and Evolution
Software Maintenance and Evolution
 
System Development Life Cycle
System Development Life CycleSystem Development Life Cycle
System Development Life Cycle
 
Software Engineering (Software Configuration Management)
Software Engineering (Software Configuration Management)Software Engineering (Software Configuration Management)
Software Engineering (Software Configuration Management)
 

Similar to Chap07

SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptxSAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptxJakeariesMacarayo
 
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Neetu Marwah
 
Systems Analysis And Design 2
Systems Analysis And Design 2Systems Analysis And Design 2
Systems Analysis And Design 2MISY
 
Software Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptxSoftware Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptxsandhyakiran10
 
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docxMcGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docxandreecapon
 
Unit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxUnit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxVrundaPatadia
 
IS L02 - Development of Information Systems
IS L02 - Development of Information SystemsIS L02 - Development of Information Systems
IS L02 - Development of Information SystemsJan Wong
 
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptSystem_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptMarissaPedragosa
 

Similar to Chap07 (20)

Sdlc1
Sdlc1Sdlc1
Sdlc1
 
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptxSAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
SAD REPORTING GROUP 2BCFGGGGHHHJJJJ.pptx
 
Week 10
Week 10Week 10
Week 10
 
Week 10
Week 10Week 10
Week 10
 
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
Report on SOFTWARE DEVELOPMENT LIFE CYCLE SDLC
 
SDLC
SDLC SDLC
SDLC
 
Systems Analysis And Design 2
Systems Analysis And Design 2Systems Analysis And Design 2
Systems Analysis And Design 2
 
Mba it unit 3 ppt
Mba it unit 3 pptMba it unit 3 ppt
Mba it unit 3 ppt
 
Mba it unit 3 ppt
Mba it unit 3 pptMba it unit 3 ppt
Mba it unit 3 ppt
 
Sdlc
SdlcSdlc
Sdlc
 
ISAD 313-3_ TOOLS OF THE SYSTEM ANALYSIS.pptx
ISAD 313-3_ TOOLS OF THE SYSTEM ANALYSIS.pptxISAD 313-3_ TOOLS OF THE SYSTEM ANALYSIS.pptx
ISAD 313-3_ TOOLS OF THE SYSTEM ANALYSIS.pptx
 
Software Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptxSoftware Development Life Cycle (SDLC).pptx
Software Development Life Cycle (SDLC).pptx
 
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docxMcGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
McGraw-HillIrwinCopyright © 2013 by The McGraw-Hill Compa.docx
 
666 computer technology 7th sem
666 computer technology 7th sem666 computer technology 7th sem
666 computer technology 7th sem
 
Database Design
Database Design Database Design
Database Design
 
Unit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptxUnit 2 Classical Systems Development Methodology.pptx
Unit 2 Classical Systems Development Methodology.pptx
 
IS L02 - Development of Information Systems
IS L02 - Development of Information SystemsIS L02 - Development of Information Systems
IS L02 - Development of Information Systems
 
Presentation2
Presentation2Presentation2
Presentation2
 
System_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.pptSystem_Analysis_and_Design_Assignment_New2.ppt
System_Analysis_and_Design_Assignment_New2.ppt
 
SDET UNIT 1.pptx
SDET UNIT 1.pptxSDET UNIT 1.pptx
SDET UNIT 1.pptx
 

More from Fathur Rohman

Pancasila di era reformasi
Pancasila di era reformasiPancasila di era reformasi
Pancasila di era reformasiFathur Rohman
 
Materi 1 c bentuk bentuk korupsi 2010
Materi 1 c bentuk bentuk korupsi 2010Materi 1 c bentuk bentuk korupsi 2010
Materi 1 c bentuk bentuk korupsi 2010Fathur Rohman
 
Materi 2 faktor penyebab korupsi 2010
Materi 2 faktor penyebab korupsi 2010Materi 2 faktor penyebab korupsi 2010
Materi 2 faktor penyebab korupsi 2010Fathur Rohman
 
Materi 5 dampak korupsi 2010
Materi 5 dampak korupsi 2010Materi 5 dampak korupsi 2010
Materi 5 dampak korupsi 2010Fathur Rohman
 
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010Fathur Rohman
 
Materi 6 b lembaga anti_korupsii_non-pemerintah 2010
Materi 6 b  lembaga anti_korupsii_non-pemerintah 2010Materi 6 b  lembaga anti_korupsii_non-pemerintah 2010
Materi 6 b lembaga anti_korupsii_non-pemerintah 2010Fathur Rohman
 
Materi 7 nilai nilai anti-korupsi dalam agama 2010
Materi 7 nilai nilai anti-korupsi dalam agama 2010Materi 7 nilai nilai anti-korupsi dalam agama 2010
Materi 7 nilai nilai anti-korupsi dalam agama 2010Fathur Rohman
 
Materi 8 pemberantasan korupsi_negara_lain 2010_
Materi 8 pemberantasan korupsi_negara_lain 2010_Materi 8 pemberantasan korupsi_negara_lain 2010_
Materi 8 pemberantasan korupsi_negara_lain 2010_Fathur Rohman
 

More from Fathur Rohman (20)

Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Kuliah ke 1
Kuliah ke 1Kuliah ke 1
Kuliah ke 1
 
Kuliah ke 1
Kuliah ke 1Kuliah ke 1
Kuliah ke 1
 
Kuliah ke 4
Kuliah ke 4Kuliah ke 4
Kuliah ke 4
 
Kuliah ke 3
Kuliah ke 3Kuliah ke 3
Kuliah ke 3
 
Kuliah ke 2
Kuliah ke 2Kuliah ke 2
Kuliah ke 2
 
Kuliah ke 5
Kuliah ke 5Kuliah ke 5
Kuliah ke 5
 
Rpb chapter 1
Rpb   chapter 1Rpb   chapter 1
Rpb chapter 1
 
Kelahiran pancasila
Kelahiran pancasilaKelahiran pancasila
Kelahiran pancasila
 
Pancasila di era reformasi
Pancasila di era reformasiPancasila di era reformasi
Pancasila di era reformasi
 
Waralaba
WaralabaWaralaba
Waralaba
 
Materi 1 c bentuk bentuk korupsi 2010
Materi 1 c bentuk bentuk korupsi 2010Materi 1 c bentuk bentuk korupsi 2010
Materi 1 c bentuk bentuk korupsi 2010
 
Materi 2 faktor penyebab korupsi 2010
Materi 2 faktor penyebab korupsi 2010Materi 2 faktor penyebab korupsi 2010
Materi 2 faktor penyebab korupsi 2010
 
Materi 5 dampak korupsi 2010
Materi 5 dampak korupsi 2010Materi 5 dampak korupsi 2010
Materi 5 dampak korupsi 2010
 
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010
Materi 6 a pemberantasan korupsi di indonesia dalam lintasan sejarah 2010
 
Materi 6 b lembaga anti_korupsii_non-pemerintah 2010
Materi 6 b  lembaga anti_korupsii_non-pemerintah 2010Materi 6 b  lembaga anti_korupsii_non-pemerintah 2010
Materi 6 b lembaga anti_korupsii_non-pemerintah 2010
 
Materi 7 nilai nilai anti-korupsi dalam agama 2010
Materi 7 nilai nilai anti-korupsi dalam agama 2010Materi 7 nilai nilai anti-korupsi dalam agama 2010
Materi 7 nilai nilai anti-korupsi dalam agama 2010
 
Materi 8 pemberantasan korupsi_negara_lain 2010_
Materi 8 pemberantasan korupsi_negara_lain 2010_Materi 8 pemberantasan korupsi_negara_lain 2010_
Materi 8 pemberantasan korupsi_negara_lain 2010_
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030tarushabhavsar
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challengeshemanthkumar470700
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Omaninstagramfab782445
 

Recently uploaded (20)

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 

Chap07

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. Executives MIS Steering Committee Project leader -Warehouse location model team Project leader MRP 11 team Project leader ISDN system team Project leader HRIS team Marketing Manufacturing Finance Human Resources Project leader Credit approval system team Managers of Systems Life Cycles are Arranged in a Hierarchy 7-
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13. Define the problem Consult Prepare a system study proposal Establish a control mechanism Approve or disapprove the study project Recognize the problem Set system objectives Identify system constraints The Planning Phase MIS Steering Comm Manager Systems Analyst 1. 2. 3. 4. 5. 6. 7. 8. Conduct a feasibility study 7-
  • 14. Outline of a System Study Proposal 1. Executive summary 2. Introduction 3. System objectives and constraints 4. Possible system alternatives 5. The recommended system study project 5.1 Tasks to be performed 5.2 Human resource requirements 5.3 Schedule of work 5.4 Estimated cost 6. Expected impact of the system 6.1 Impact on the firm’s organization structure 6.2 Impact on the firm’s operations 6.3 Impact on the firms resources 7. General development plan (analysis, design, and implementation phase) 8. Summary 7-
  • 15. A Project Schedule Functional System: Marketing Subsystem: Product Model: Product Deletion Subtask Time Estimate (Person Months) Responsibility 1. Identify deletion criteria 2. Identify output information requirements Systems analyst Product manager Systems analyst Network specialist Product manager 0.75 0.25 7-
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. The Analysis Phase MIS Steering Committee Manager Systems Analyst 7- Announce the system study Organize the project team Define information needs Define system performance criteria Prepare design proposal Approve or disapprove the design project 1. 2. 3. 4. 5. 6.
  • 22. Outline of a Design Proposal 1. Executive summary 2. Introduction 3. Problem definition 4. System objectives and constraints 5. Performance criteria 6. Possible system alternatives 7. The recommended design project 7.1 Tasks to be performed 7.2 Human resource requirements 7.3 Schedule of work 7.4 Estimated cost 8. Expected impact of the system 8.1 Impact on the firm’s organization structure 8.2 Impact on the firm’s operations 8.3 Impact on the firms resources 9. General development plan (analysis, design, and implementation) 10. Summary 7-
  • 23. Approve or disapprove the system implementation Prepare the detailed design system Identify alternate system configurations Evaluate system configurations Select the best configuration Prepare the implementation proposal 1. 2. 3. 4. 5. 6. MIS Steering Committee Manager Systems Analyst The Design Phase 7-
  • 24.
  • 25. Popular Documentation Tools Data Modeling Entity-relationship diagram Data dictionary Screen/printer layout form Process Modeling System flowchart Program flowchart Data flow diagram Structured English Object Modeling Object relationship model Class specification 7-
  • 26. Data Flow Diagram of Four Data Processing Subsystems Customers 1.4 Accounts Receivable 1.1 Order Entry 1.3 Billing 1.2 Inventory Sales orders Rejected sales order notices Accepted orders Payments by customers Statements Invoices Billed orders Receivables ledger data Order log removals file Filled items Inventory ledger data Received items Purchasing data 3 3 2 2 7-
  • 27. Data Flow Diagram of Order Entry System Sales order edit rejects Order log Sales order credit rejects Customer credit file Customer 1.1.1 Edit order data 1.1.2 Compute credit check 1.1.3 Log in orders 1.1.4 Mark filled orders 1.2 1.3 Sales orders Edit rejects Rejected sales order notices Edited orders Credit data Edited and checked orders Credit rejects Accepted orders Completed orders Date filled Order data 7-
  • 28.
  • 29. Alternatives Selected for Detailed Study Alternative Input Order Log Customer Credit File Accepted & Rejected Orders File Completed Orders File Rejected Orders Notice 1. 2. 3. Scanner Keyboard terminal Magnetic tape Keyboard terminal Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Magnetic tape Printer Printer Hardcopy terminal 7-
  • 30.
  • 31. 1. Executive summary 2. Introduction 3. Problem definition 4. System objectives and constraints 5. Performance criteria 6. System design 6.1 Summary description 6.2 Equipment configuration 7. The recommended implementation project 7.1 Tasks to be performed 7.2 Human resource requirements 7.3 Schedule of work 7.4 Estimated cost 8. Expected impact of the system 8.1 Impact on the firm’s organization structure 8.2 Impact on the firm’s operations 8.3 Impact on the firms resources 9. General implementation plan 10. Summary Outline of an Implementation Proposal 7-
  • 32.
  • 33.
  • 34. Plan the implementation Announce the implementation Control Cutover the new system Obtain the hardware resources Obtain the software resources Prepare the database Educate the participants and users Prepare the physical facilities Control 1. 2. 3 4 5 6 7 8. The Implementation Phase MIS Steering Committee Manager Information Specialists 7-
  • 35. Outline of a Request for Proposal 1. Letter of transmittal 2. System objective and applicable constraints 3. System design 3.1 Summary description 3.2 Performance criteria 3.3 Equipment configuration 3.4 Summary system documentation 3.5 Estimated transaction volume 3.6 Estimated file size 4. Installation schedule 7-
  • 36. Outline of Supplier Proposal 1. Letter of transmittal 2. Summary of recommendations 3. Advantages 4. Equipment configuration 5. Equipment specifications 5.1 Performance data 5.2 Prices 6. Satisfaction and performance criteria 7. Delivery schedule 7-
  • 37. Cutover Approaches Old System Old System New System Immediate cutover Phased cutover Parallel cutover Pilot System Immediate Old System New System Phased New system Old System Parallel Time Pilot 7-
  • 38.
  • 39. The Use Phase Control Use the system Audit the system Maintain the system Prepare re- engineering proposal Approve or disapprove the reengineering proposal MIS Steering Committee Manager Information Specialists 1 2 3 4 5 7-
  • 40.
  • 41. Development of a Type I Prototype 1. 2. 3. 4. N Identify user needs Develop a prototype Prototype acceptable? Y Use the prototype 7-
  • 42. Development of a Type II Prototype N Identify user needs Develop a prototype Code the operational system Test the operational system Use the operational system Prototype acceptable? System acceptable? Y Y 7- N
  • 43.
  • 44.
  • 45.
  • 46.
  • 47. Information strategy planning (ISP) Business area analysis (BAA) Rapid application development (RAD) . Strategic overview of the information needed to run an enterprise as efficiently as possible Data model Design of records used by specific procedures Strategic overview of the functions and goals of an enterprise The process needed to operate the enterprise and how they interrelate Design of procedures for specific applications Rapid Application Development is an Integral Part of Information Engineering Data Activities 7-
  • 48.
  • 49. Reverse Engineering Reverse Engineering Produces Documentation on Successively Higher Levels but Leaves the System Unchanged Reverse Engineering Engineering Reverse Engineering Reverse Engineering Reverse Planning Phase Analysis Phase Design Phase Implementation Phase 7-
  • 50. Restructuring Planning Phase Restructuring Restructuring Restructuring Restructuring Analysis Phase Design Phase Implementation Phase 7-
  • 51. Reengineering Reverse Engineering Reverse Engineering Reverse Engineering Reverse Engineering Forward Engineering Forward Engineering Forward Engineering Forward Engineering Planning Phase Analysis Phase Design Phase Implementation Phase 7-
  • 52.
  • 53. Functional Quality (What?) Good Technical Quality (How?) Poor Poor Good Selection of BPR Components Reverse Engineer Restructure Do Nothing Forward Engineer Reengineer 7-
  • 54.
  • 55.

Editor's Notes

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 14
  14. 15
  15. 16
  16. 17
  17. 18
  18. 19
  19. 20
  20. 22
  21. 23
  22. 29
  23. 30
  24. 24
  25. 33
  26. 34
  27. 35
  28. 38
  29. 39
  30. 41
  31. 42
  32. 43
  33. 44
  34. 45
  35. 46
  36. 47
  37. 49