DECEMBER 2012
TSX: QMX
OTCQX: QMXGF
Disclaimers

FORWARD-LOOKING INFORMATION:
This presentation contains certain “forward-looking information” under applicable securities laws concerning the business, operations and financial performance and condition of QMX Gold Corporation.
Forward-looking information includes, but is not limited to, statements with respect to estimated production and mine life of the various mineral projects of QMX Gold Corporation; the benefits and the
development potential of the properties of QMX Gold Corporation; the future price of gold; the estimation of mineral reserves and resources; the realization of mineral reserve estimates; the timing and
amount of estimated future production; costs of production; success of exploration activities; and currency exchange rate fluctuations. Forward-looking information may be characterized by words such as
“plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking information is based
on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that
could cause actual events or results to differ materially from those projected in the forward-looking information. Assumptions upon which such forward-looking information is based on the successful
completion of new development projects, planned expansions or other projects within the timelines anticipated and at anticipated production levels; the accuracy of mineral reserve and resource
estimates, grades, mine life and cash cost estimates; whether mineral resources can be developed; title to mineral properties; financing requirements; and general economic conditions. Many of these
assumptions are based on factors and events that are not within the control of QMX Gold and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially
from results anticipated by such forward-looking information includes changes in market conditions, variations in ore grade or recovery rates, fluctuating metal prices and currency exchange rates, changes
in project parameters, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate
as anticipated, the business of the companies not being integrated successfully or such integration proving more difficult, time consuming or costly than expected as well as those risk factors discussed or
referred to in the annual Management’s Discussion and Analysis and Annual Information Form for QMX Gold Corporation filed with the securities regulatory authorities in Canada and available at under the
corporations profile on SEDAR at www.sedar.com. Although QMX Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described
in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information
will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. QMX Gold undertakes no obligation to update forward-looking information if
circumstances or management’s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information.
Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent they involve estimates of the mineralization that will be
encountered if the property is developed. Comparative market information is as of a date prior to the date of this presentation.

IMPORTANT NOTICE:
This presentation does not constitute an offer to buy or an invitation to sell, any of the securities of QMX Gold Corporation. Such an offer may only be made pursuant to a registration statement and
prospectus filed with the U.S. Securities and Exchange Commission and an offer to purchase and circular filed with Canadian securities regulatory authorities.

CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES:
This presentation uses the terms “Measured, “Indicated” and “Inferred” Resources. U.S. investors are advised that while such terms are recognized and required by Canadian regulations, the Securities and
Exchange Commission does not recognize them. “Inferred Resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be
assumed that all or any part of an inferred resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Resources may not form the basis of feasibility or other economic
studies. U.S. investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable.

NATIONAL INSTRUMENT 43-101:
David Rigg, the Chairman of the Company and a Qualified Person under NI 43-101, has supervised the preparation of and approved the scientific and technical information in this presentation. This
presentation contains information relating to a feasibility study that includes Inferred mineral resources which are considered too speculative geologically to have economic considerations applied to them
that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary assessment will be realized.




DECEMBER 2012                                                                TSX: QMX                       OTCQX: QMXGF                                                                                   2
MANITOBA
                                                                   Snow Lake Mine
                                                                   Exploration:
                                                                   Snow Lake Camp
                                                                   - Gold
       Snow Lake Mining Camp
                                         Rouyn-Noranda &           QUEBEC
                                       Val-d’Or Mining Camps
                                                                   Lac Herbin Mine
                                                                   Lac Pelletier Project
                       Winnipeg
                                                                   Exploration:
                                                Toronto            Val d’Or Camp
                                                Corporate Office
                                                                   - Gold & VMS
                                                                   Rouyn-Noranda Camp
                                                                   - Gold & VMS




DECEMBER 2012                     TSX: QMX     OTCQX: QMXGF                                3
Snow Lake Mine – Growth


 Recently operated by Kinross/High River Gold from
  1995-2005, producing 822,550 ounces gold
 Total historic production of 1.44 M ounces gold
  from Main Mine, No. 3 Zone, and Birch deposits
    — Mined: 12.1 M tons @ 4.67 g/t Au
 All surface installations in place
   — Mine rebuilt in 1995 under TVX-High River JV
   — Crushing, milling and mine infrastructure in
       excellent condition
 Permitting and environmental licenses maintained
 Existing access to ore zone in Main Mine plus ramp
  access to ore zone in #3 Zone


DECEMBER 2012                  TSX: QMX    OTCQX: QMXGF          4
Snow Lake Mine – Feasibility

     Feasibility Study of Main Mine & #3 Zone – October 2010
     Pre-Production Capital Expenditures                                    $40.8 million
     Sustaining Capital Cost                                                $36.1 million
     Payback Period                                                         1.7 years
     Recoveries                                                             93.3 %
     Average Annual Production                                              83,000 oz.Au
     Mine Life                                                              5 years
     Cash Cost (LOM)                                                        US$ 640/oz.Au
     Cash Cost (LOM)                                                        CDN$ 81.41/ tonne
     Accumulated Cash Flow (Pre Tax)                                        $140.7 million ¹

     Reserves / Resources:
     Proven and Probable Reserve (4.04 g/t)                                 451,900 oz.Au
     Measured and Indicated Resources (4.14 g/t) ²                          728,000 oz.Au
     Inferred Resources (4.43 g/t) ²                                        336,700 oz.Au

   ¹ Bloomberg average consensus modelled gold price deck of 2011 – $1,277, 2012 – $1,303, 2013 – $1,276, 2014 onwards – $1,051;
   ¹ Canadian/US foreign exchange at 2011 – 1.04, 2012 at 1.04, 2013 at 1.04 and 1.06 onwards.
   ² Cut off grade of 1.95 g/t



DECEMBER 2012                                  TSX: QMX            OTCQX: QMXGF                                                5
Snow Lake Mine – Feasibility


   Recent internal review identified potential alternatives to the original
    estimates set forth in the Snow Lake Mine Feasibility Study
   Key potential changes include:
       Enlarging the man-camp from a 50-person camp to a 100-person camp
        to reflect the potential need to recruit additional workers from outside
        the local area
       Operating leases for equipment throughout life of mine vs. purchase
        after reaching commercial production

                Impact expected to increase cash costs to US$825/oz

       (additional US$185/oz of cash costs or US$75mm over life of mine)



DECEMBER 2012                  TSX: QMX     OTCQX: QMXGF                           6
Snow Lake Mine




DECEMBER 2012   TSX: QMX   OTCQX: QMXGF               7
Snow Lake Mine – Schedule

Main Mine                                Boundary Zone                                             Kim Zone                                       No.3 Zone


             1                                                                                                                           1


                              2
                                                                                                                                                        2
                                     3


                                                                                                  1780L

                  Snow Lake
               Production Begins
                                                                          4
                                     Q    Q   Q   Q   Q   Q       Q   Q       Q   Q    Q     Q     Q        Q    Q    Q    Q        Q        Q     Q    Q    Q    Q        Q
                                     1    2   3   4   5   6       7   8       9   10   11    12    13       14   15   16   17       18       19    20   21   22   23       24
3 Zone Dewatering + Reconditioning
3 Zone Pre-Production from ramp
                                                              1                                                             Commercial Production
3 Zone Production from ramp                                                                  2
                                                                                                                               2,000 TPD in Q7
Shaft & Mine Reconditioning
Main Mine Pre-Production
Main Mine Production                                                          1                         2                       3                            4


DECEMBER 2012                                                 TSX: QMX                      OTCQX: QMXGF                                                               8
Snow Lake Mine - Exploration


  Birch Zone                                                      No. 3 Zone
                                                                                               Location and
                                                                  Snow Lake Mine
                                                                                                 Geology

                                                                                                Mining Camp
                                                                                               with 16 known
  #3 Zone
                                                                                               mineral deposits
  Kim Zone


  Boundary Zone


                              East Zone

                                                     Caper Zone                    Snow Lake
   Snow Lake Mine

                                                                               Lalor




                    Bounter Zone



DECEMBER 2012                             TSX: QMX       OTCQX: QMXGF                                       9
Snow Lake Mine - Exploration

Upper Main Mine Area
 2011 exploration identified additional extensions to mining areas on the upper mine levels
 Exploration effort increased our confidence in the mineralized structures within the zone and around the mine area
 Additional areas of potential will be delineated when they can be accessed from the underground




DECEMBER 2012                              TSX: QMX         OTCQX: QMXGF                                         10
Lac Herbin – Production

                                                                                          Lac Herbin Average Cash Cost
LAC HERBIN—Turnaround and Beyond
                                                                $3,000.00                                                          Turnaround
                                                                $2,500.00                                                          Commences
  2011
                                                                $2,000.00
        Review of Mineral Resources
                                                                $1,500.00                       $1,500
        Review of life of mine plan (and reserve)                                              $1,300

                                                                $1,000.00
        Increasing mine exploration to bolster current                                                                                   2012 Cash Cost
                                                                   $500.00                                                                  Guidance
         outlook
                                                                                     $-
        Launched turnaround plan in June, intensive                                            Q1        Q2           Q3      Q4        Q1      Q2      Q3
         development to give production flexibility
                                                                                                                2011                             2012
        Recruitment Phase—hiring skilled miners over the
         third quarter
        Production of 10,197 oz in 2011, with 3,724 in Q4                                      Lac Herbin Production
                                                                                    10,000.00
                                                                                     9,000.00
                                                                                     8,000.00
                                                                                                                                      2012 Quarterly



                                                                 Ounces Recovered
  2012                                                                               7,000.00                                         Production Goal
        Mineral Resource update part of year end exercises                          6,000.00
                                                                                     5,000.00
        Production guidance 18,500 oz to 20,500 oz                                  4,000.00
                                                                                     3,000.00
        Cost guidance of $1,300 - $1,500 per oz                                     2,000.00
                                                                                     1,000.00
        Continue to replace and grow resources                                          0.00
                                                                                                   Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
                                                                                                         2009               2010          2011          2012


DECEMBER 2012                             TSX: QMX            OTCQX: QMXGF                                                                                     11
Mineral Reserves and Resources


Mineral Reserves
                                                   LAC HERBIN(1)                                                                          SNOW LAKE(2)
                                                  (Cut-off 5.0 g/t )                                                                    (Cut-off 1.95 g/t )

                                   Tonnes                         g /t                 Oz Au                           Tonnes                            g /t                    Oz Au

    Proven                         43,000                        7.45                   (3)
                                                                                       10,300                            7,000                          3.81                         900

   Probable                        96,000                        6.45                  19,900                       3,470,000                           4.04                   451,000

    TOTAL                         138,000                        6.81                  30,200                       3,477,000                            3.9                   451,900



       *Mineral reserves are also included in Mineral resource values
       (1) 43-101 Technical Report on Mineral Reserve Estimate at the Lac Herbin Mine, April 18, 2011 prepared by Austin Hitchins, B.Sc., P. Geo., Audrey Lapointe, B.Sc., P. Geo.
       and Patrick Sévigny, Ing.,
       (2) Snow Lake Mine Re-activation Project Technical Report NI 43-101 , December 10. 2010 prepared by Mr. Andre Roy Eng.




DECEMBER 2012                                                     TSX: QMX                       OTCQX: QMXGF                                                                              12
Mineral Reserves and Resources



Mineral Resources
                                                      LAC HERBIN(1)                                                                         SNOW LAKE(2)

                                     Tonnes                        g /t                 Oz Au                            Tonnes                            g/t                     Oz Au

   MEASURED                            67,000                       9.2                 19,900                             7,000                          4.76                      1,000


   INDICATED                         117,600                        7.6                 28,800                         5,464,000                          4.14                   727,000


   INFERRED                          283,500                        7.4                 67,300                         2,367,000                          4.43                   336,700

    *Mineral Reserves are also included in Resource values
    (1) 43-101 Technical Report on Mineral Reserve Estimate at the Lac Herbin Mine, April 18, 2011 prepared by Austin Hitchins, B.Sc., P. Geo., Audrey Lapointe, B.Sc., P. Geo. and Patrick
    Sévigny, Ing.,
    (2) Snow Lake Mine Re-activation Project Technical Report NI 43-101 , December 10. 2010 prepared by Mr. Andre Roy Eng.




DECEMBER 2012                                                          TSX: QMX                       OTCQX: QMXGF                                                                            13
Production Profile




  100,000                                                      Snow Lake
                                                   80-90,000
                                                     (est.)
                                                               Production

Production                            OUTLOOK
   (oz)
                2009
                         2010
   20,000       33,000
                         23,000
                                      2011         18-20,000   Lac Herbin
                                      7-12,000       (est.)
                                        (est.)
                                                               Production


DECEMBER 2012              TSX: QMX      OTCQX: QMXGF                   14
Val D’Or Property



                                                             Aurbel Gold Mill   Val-d’Or, Quebec
                                                             Lac Herbin Mine
                                                                                 212 sq.km. 100%-
 IAMGOLD
                                                                                  owned by QMX Gold
           Agnico Eagle   Val-d’Or-Malartic Mining Camp (Historic Production)
                             0.7 Mt Cu, 0.7 Mt Zn, 27.2Moz Au, 50.0 Moz Ag
                                                                                 100%-owned Lac
                                                                                  Herbin Mine – in
                          QMX Gold                           QMX VMS              production


                Osisko
                          Agnico Eagle




DECEMBER 2012                                  TSX: QMX             OTCQX: QMXGF                   15
Current Financing Plans


     $17,500,000 Bridge Financing – Closed November 28, 2012
     Fully secured bridge financing provided by Third Eye Capital
     Loan Terms:
         1 year with interest payments starting 7 months from closing at
           $250,000 per month
     In consideration of the Bridge Financing, Third Eye will receive 2.9
      million warrants at $0.2525, the 10 day VWAP on closing
     First tranche was used to pay out previous bridge of $10.3 million
     Second tranche will be used for general company administration and
      expenses



DECEMBER 2012               TSX: QMX   OTCQX: QMXGF                     16
Upcoming Financing Plans


      Snow Lake Project Financing – Announced on May 29, 2012

     US $45 million debt facility
     Term of 4.5 years
     Interest rate of LIBOR + 5.5 % before commercial production and
      LIBOR + 4.5% after commercial production
     Hedging requirement from 40 to 50% of the 4.5 year production
      profile
     Technical due diligence complete
     Other conditions will be negotiated in the course of settling a
      definitive agreement



DECEMBER 2012             TSX: QMX   OTCQX: QMXGF                   17
Restructuring Exploration Assets


    Sale of Rouyn-Noranda Exploration Properties to Falco Pacific
                 Resources (previously Druk Capital)
                     Closed September 24, 2012

     Aggregate gross proceeds of $5 million in cash and
      approximately 18% ownership of Falco post-financing
     Exploration on properties to continue without dilution at the
      QMX level
     Exploration team to be transferred to Falco
     Exposure to exploration success will be experienced through
      equity participation


DECEMBER 2012             TSX: QMX   OTCQX: QMXGF                     18
Capital Structure


    Outstanding:        Issued                      30.8   Million
                        Warrants                    03.7   Million Average Price $6.67
                        Options                     00.8   Million Average Price $4.42
                        Fully Diluted               35.3   Million

    Share Price         (as of Nov. 30, 2012)       C$ 0.25

    Market Cap:         Basic                       C$ 7.5 Million

    Avg. trading volume (30 day average)            83,000 shares/day

    Debt Outstanding Convertible Debt               C$4.21 Million Conversion price $8.00
                     Bridge Loan                    C$17.5 Million




DECEMBER 2012                     TSX: QMX      OTCQX: QMXGF                                19
Comparable Company Analysis

                                                                                  Junior Gold Producers
                                           Market Cap       Cash + ST Inv.         TEV             Mineral                             Mineral              EV /          2012             2013
Company                   Share Price           (1)               (2)               (3)                            EV / Reserve
                                                                                                   Reserve                            Resource (4)        Resource    Production (5)   Production (5)

As at December 10, 2012      Local         US$ millions      US$ millions      US$ millions         mm oz             US$/oz             mm oz             US$/oz      000’s oz Au      000’s oz Au


  Argonaut                   C$9.67           $1 479             $216              $1 263              1.1              $1 153              12.8               $99          100.6           138.9
  Kirkland Lake              C$7.90            $567              $129               $563               1.5               $382                4.3              $132          100.3           130.8
  Timmins                    C$3.11            $482               $50               $452               1.3               $340                2.9              $154           98.2           126.0
  San Gold                   C$0.79            $269               $20               $252               0.2              $1 206               4.1               $62           92.3           102.8
  Brigus                      C$0.94           $224                $49              $273               1.9               $147                3.3               $82           76.7            96.4
  St Andrew                  C$0.43            $160               $22               $157               0.7               $221                4.4               $35           96.0           104.0
  Richmont                   US$3.10           $123                $67               $57               0.4               $151                3.8               $15           66.6            68.7
  Claude                      C$0.55            $98                 $0              $116               0.4               $326                4.1               $28           48.5            52.0
  Wesdome                     C$0.89            $92                 $4               $96               0.4               $273                1.7               $55           58.2            68.9
  Metanor                     C$0.21            $48                 $4               $59               0.2               $295                1.6               $37            3.0            29.0
  Golden Band                 C$0.12            $33                 $8               $38               0.0              $1 988               0.8               $48           41.9            42.5
  Average                                      $325                $52              $302               0.7               $589                4.0               $68           71.1            87.3
  Adjusted Average(6)                          $229                $39              $225               0.7               $483                3.4               $64           75.4            88.0
  QMX Gold                    C$0.24             $7                 $6               $23               0.5                $45                1.4               $17           19.0            19.0

                                        (1) Market Cap calculated on a fully-diluted basis including shares from the exercise of in-the-money options and warrants.
                                                     (2) Cash and ST Investments includes cash from the exercise of in-the-money options and warrants.
                                             (3) Total Enterprise Value ('TEV') equals market cap less cash plus debt plus minority interest and preferred equity.
                                               (4) Resource includes proven and probable reserves, measured and indicated resources and inferred resources.
                                                                       (5) Production estimates based on consensus analyst estimates.
                                                                              (6) Adjusted average excludes high and low figures.

                                                                Source: Corporate disclosure, Bloomberg, Capital IQ and Street Research.



DECEMBER 2012                                                               TSX: QMX                   OTCQX: QMXGF                                                                            20
2012 Objectives


    Lac Herbin
       production 18,500 to 20,500
       Resource update as part of 2012 year end exercises
    Snow Lake Project to Production decisions
       Resource update as part of 2012 year end exercises
       Financing decisions
    Exploration (Ongoing)
       Regional compilation for next round of targets



DECEMBER 2012            TSX: QMX   OTCQX: QMXGF                21
Management Team

     Directors and Officers
     David Rigg, Chairman
     Maurice Colson, Director
     Robert Bryce, Director
     Mark Eaton, Director
     Chantal Lavoie, Director


     Senior Management
     Franҫois Perron, President and CEO
     Deb Battiston, CFO
     Gerald Thornton, VP Manitoba Operations
     Patrick Sévigny, VP Quebec Operations
     Jean Girard, Exploration Manager, Quebec

DECEMBER 2012                   TSX: QMX   OTCQX: QMXGF          22
Contact Information


                           QMX Gold Corporation

                                TSX: QMX
                              OTCQX: QMXGF


   Investor Relations
   Rob Hopkins (Toronto)     Louis Baribeau(Montreal)       info@qmxgold.ca
   +1 416 861 5899           +1 514 667-2304                www.qmxgold.ca



                                Find us on


DECEMBER 2012                 TSX: QMX       OTCQX: QMXGF                     23

Contenu connexe

Tendances

Alexis marketing presentation March 2012
Alexis marketing presentation March 2012Alexis marketing presentation March 2012
Alexis marketing presentation March 2012
QMX Gold Corporation
 
January 2012 Corporate Presentation
January 2012 Corporate Presentation  January 2012 Corporate Presentation
January 2012 Corporate Presentation
QMX Gold Corporation
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013
QMX Gold Corporation
 
Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012
QMX Gold Corporation
 
Rainy River Resources Ltd. Corporate Presentation - April 2013
Rainy River Resources Ltd. Corporate Presentation - April 2013Rainy River Resources Ltd. Corporate Presentation - April 2013
Rainy River Resources Ltd. Corporate Presentation - April 2013
RainyRiver
 
Rainy River Resources Ltd. Analyst Day - April 2013
Rainy River Resources Ltd. Analyst Day - April 2013Rainy River Resources Ltd. Analyst Day - April 2013
Rainy River Resources Ltd. Analyst Day - April 2013
RainyRiver
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate Presentation
DetourGold
 
Dgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vricDgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vric
DetourGold
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance call
Lake Shore Gold
 
Crocodile Gold Corporate Presentation August 15, 2011
Crocodile Gold Corporate Presentation August 15, 2011Crocodile Gold Corporate Presentation August 15, 2011
Crocodile Gold Corporate Presentation August 15, 2011
Crocodile Gold
 
Primero corporate presentation 2013 03 27
Primero corporate presentation 2013 03 27Primero corporate presentation 2013 03 27
Primero corporate presentation 2013 03 27
primero_mining
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012
Sagegold
 
Claude Resources Inc. Corporate Update Q3 2012
Claude Resources Inc. Corporate Update Q3 2012Claude Resources Inc. Corporate Update Q3 2012
Claude Resources Inc. Corporate Update Q3 2012
Claude Resources Inc.
 
Rainy River Resources Ltd. Corporate Presentation - May 2012
Rainy River Resources Ltd. Corporate Presentation - May 2012Rainy River Resources Ltd. Corporate Presentation - May 2012
Rainy River Resources Ltd. Corporate Presentation - May 2012
RainyRiver
 

Tendances (20)

Alexis marketing presentation March 2012
Alexis marketing presentation March 2012Alexis marketing presentation March 2012
Alexis marketing presentation March 2012
 
January 2012 Corporate Presentation
January 2012 Corporate Presentation  January 2012 Corporate Presentation
January 2012 Corporate Presentation
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012
 
Rainy River Resources Ltd. Corporate Presentation - April 2013
Rainy River Resources Ltd. Corporate Presentation - April 2013Rainy River Resources Ltd. Corporate Presentation - April 2013
Rainy River Resources Ltd. Corporate Presentation - April 2013
 
Rainy River Resources Ltd. Analyst Day - April 2013
Rainy River Resources Ltd. Analyst Day - April 2013Rainy River Resources Ltd. Analyst Day - April 2013
Rainy River Resources Ltd. Analyst Day - April 2013
 
National Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate PresentationNational Bank Financial London Gold Conference Corporate Presentation
National Bank Financial London Gold Conference Corporate Presentation
 
Dgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vricDgc 13 01_20-21_cambridge house vric
Dgc 13 01_20-21_cambridge house vric
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance call
 
Rainy River Resources Ltd. Corporate Presentation - October 2012
Rainy River Resources Ltd. Corporate Presentation - October 2012Rainy River Resources Ltd. Corporate Presentation - October 2012
Rainy River Resources Ltd. Corporate Presentation - October 2012
 
Fourth Quarter 2011
Fourth Quarter 2011Fourth Quarter 2011
Fourth Quarter 2011
 
Crocodile Gold Corporate Presentation August 15, 2011
Crocodile Gold Corporate Presentation August 15, 2011Crocodile Gold Corporate Presentation August 15, 2011
Crocodile Gold Corporate Presentation August 15, 2011
 
Primero corporate presentation 2013 03 27
Primero corporate presentation 2013 03 27Primero corporate presentation 2013 03 27
Primero corporate presentation 2013 03 27
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012
 
Claude Resources Inc. Corporate Update Q3 2012
Claude Resources Inc. Corporate Update Q3 2012Claude Resources Inc. Corporate Update Q3 2012
Claude Resources Inc. Corporate Update Q3 2012
 
Rainy River Resources Ltd. Corporate Presentation - May 2012
Rainy River Resources Ltd. Corporate Presentation - May 2012Rainy River Resources Ltd. Corporate Presentation - May 2012
Rainy River Resources Ltd. Corporate Presentation - May 2012
 
Second Quarter 2012
Second Quarter 2012Second Quarter 2012
Second Quarter 2012
 
Torex jan2013presentation
Torex jan2013presentationTorex jan2013presentation
Torex jan2013presentation
 

En vedette (6)

backlink
 backlink backlink
backlink
 
Oppvarming
OppvarmingOppvarming
Oppvarming
 
Jingua Xie, matfestivalen 2012
Jingua Xie, matfestivalen 2012Jingua Xie, matfestivalen 2012
Jingua Xie, matfestivalen 2012
 
Sverre Søraa - Markedsperspektiv for norsk laks i 2012 - Coast Seafood
Sverre Søraa - Markedsperspektiv for norsk laks i 2012 - Coast SeafoodSverre Søraa - Markedsperspektiv for norsk laks i 2012 - Coast Seafood
Sverre Søraa - Markedsperspektiv for norsk laks i 2012 - Coast Seafood
 
Postcards from SXSW 3.10.13
Postcards from SXSW 3.10.13Postcards from SXSW 3.10.13
Postcards from SXSW 3.10.13
 
Save Tibet
Save TibetSave Tibet
Save Tibet
 

Similaire à Corporate Presentation December 2012

QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
QMX Gold Corporation
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
QMX Gold Corporation
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance Call
Lake Shore Gold
 
Ssp presentation
Ssp presentationSsp presentation
Ssp presentation
Sandspring
 
Ssp presentation
Ssp presentationSsp presentation
Ssp presentation
Sandspring
 
Primero egf presentation print
Primero egf presentation printPrimero egf presentation print
Primero egf presentation print
primero_mining
 
Primero pms geneva presentation final
Primero pms geneva presentation finalPrimero pms geneva presentation final
Primero pms geneva presentation final
primero_mining
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold
 
Crocodile Gold Investor Presentation
Crocodile Gold Investor PresentationCrocodile Gold Investor Presentation
Crocodile Gold Investor Presentation
Crocodile Gold
 
Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2
VMS Ventures
 
Primero corporate presentation may final
Primero corporate presentation may finalPrimero corporate presentation may final
Primero corporate presentation may final
primero_mining
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Symposium
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold
 
Crocodile Gold Investor Presentation
Crocodile Gold Investor PresentationCrocodile Gold Investor Presentation
Crocodile Gold Investor Presentation
Crocodile Gold
 
NOVAGOLD 2012 Denver Gold Forum
NOVAGOLD 2012 Denver Gold ForumNOVAGOLD 2012 Denver Gold Forum
NOVAGOLD 2012 Denver Gold Forum
Company Spotlight
 

Similaire à Corporate Presentation December 2012 (17)

QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance Call
 
Ssp presentation
Ssp presentationSsp presentation
Ssp presentation
 
Ssp presentation
Ssp presentationSsp presentation
Ssp presentation
 
Primero egf presentation print
Primero egf presentation printPrimero egf presentation print
Primero egf presentation print
 
Primero pms geneva presentation final
Primero pms geneva presentation finalPrimero pms geneva presentation final
Primero pms geneva presentation final
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
 
Crocodile Gold Investor Presentation
Crocodile Gold Investor PresentationCrocodile Gold Investor Presentation
Crocodile Gold Investor Presentation
 
Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2Vms nan jtvir october 2012 2
Vms nan jtvir october 2012 2
 
Primero corporate presentation may final
Primero corporate presentation may finalPrimero corporate presentation may final
Primero corporate presentation may final
 
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold LimitedGold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Kula Gold Limited
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold Producer
 
Crocodile Gold Investor Presentation
Crocodile Gold Investor PresentationCrocodile Gold Investor Presentation
Crocodile Gold Investor Presentation
 
Duncan Chessell Endeavour Discoveries
Duncan Chessell  Endeavour DiscoveriesDuncan Chessell  Endeavour Discoveries
Duncan Chessell Endeavour Discoveries
 
2012 Denver Gold Forum
2012 Denver Gold Forum 2012 Denver Gold Forum
2012 Denver Gold Forum
 
NOVAGOLD 2012 Denver Gold Forum
NOVAGOLD 2012 Denver Gold ForumNOVAGOLD 2012 Denver Gold Forum
NOVAGOLD 2012 Denver Gold Forum
 

Plus de QMX Gold Corporation

Presentation sur Corporation Aurifere QMX
Presentation sur Corporation Aurifere QMX Presentation sur Corporation Aurifere QMX
Presentation sur Corporation Aurifere QMX
QMX Gold Corporation
 
QMX marketing presentation sept 2012 french
QMX marketing presentation sept 2012 frenchQMX marketing presentation sept 2012 french
QMX marketing presentation sept 2012 french
QMX Gold Corporation
 
Présentation de Corporation QMX Gold Aout 2012
Présentation de Corporation QMX Gold Aout 2012Présentation de Corporation QMX Gold Aout 2012
Présentation de Corporation QMX Gold Aout 2012
QMX Gold Corporation
 
QMX Gold Corporate Presentation (French)
QMX Gold Corporate Presentation (French)QMX Gold Corporate Presentation (French)
QMX Gold Corporate Presentation (French)
QMX Gold Corporation
 
QMX Corporate Presentation (French)
QMX Corporate Presentation (French) QMX Corporate Presentation (French)
QMX Corporate Presentation (French)
QMX Gold Corporation
 
Alexis Corporate Presentation French
Alexis Corporate Presentation FrenchAlexis Corporate Presentation French
Alexis Corporate Presentation French
QMX Gold Corporation
 
Présentation de Corporation avril 2012
Présentation de Corporation avril 2012Présentation de Corporation avril 2012
Présentation de Corporation avril 2012
QMX Gold Corporation
 
Présentation de Corporation mars 2012
Présentation de Corporation mars 2012 Présentation de Corporation mars 2012
Présentation de Corporation mars 2012
QMX Gold Corporation
 
Présentation de Corporation mars 2012
Présentation de Corporation mars 2012 Présentation de Corporation mars 2012
Présentation de Corporation mars 2012
QMX Gold Corporation
 
Corporate Presentation January 2012 French
Corporate Presentation January 2012 FrenchCorporate Presentation January 2012 French
Corporate Presentation January 2012 French
QMX Gold Corporation
 
Alexis Minerals October 2011 (french)
Alexis Minerals October 2011 (french)Alexis Minerals October 2011 (french)
Alexis Minerals October 2011 (french)
QMX Gold Corporation
 

Plus de QMX Gold Corporation (14)

Presentation de Corporation janvier 2012
Presentation de Corporation janvier 2012 Presentation de Corporation janvier 2012
Presentation de Corporation janvier 2012
 
Presentation de Corporation Decembre 2012
Presentation de Corporation Decembre 2012Presentation de Corporation Decembre 2012
Presentation de Corporation Decembre 2012
 
Presentation de Corporation Nov 2012
Presentation de Corporation Nov 2012Presentation de Corporation Nov 2012
Presentation de Corporation Nov 2012
 
Presentation sur Corporation Aurifere QMX
Presentation sur Corporation Aurifere QMX Presentation sur Corporation Aurifere QMX
Presentation sur Corporation Aurifere QMX
 
QMX marketing presentation sept 2012 french
QMX marketing presentation sept 2012 frenchQMX marketing presentation sept 2012 french
QMX marketing presentation sept 2012 french
 
Présentation de Corporation QMX Gold Aout 2012
Présentation de Corporation QMX Gold Aout 2012Présentation de Corporation QMX Gold Aout 2012
Présentation de Corporation QMX Gold Aout 2012
 
QMX Gold Corporate Presentation (French)
QMX Gold Corporate Presentation (French)QMX Gold Corporate Presentation (French)
QMX Gold Corporate Presentation (French)
 
QMX Corporate Presentation (French)
QMX Corporate Presentation (French) QMX Corporate Presentation (French)
QMX Corporate Presentation (French)
 
Alexis Corporate Presentation French
Alexis Corporate Presentation FrenchAlexis Corporate Presentation French
Alexis Corporate Presentation French
 
Présentation de Corporation avril 2012
Présentation de Corporation avril 2012Présentation de Corporation avril 2012
Présentation de Corporation avril 2012
 
Présentation de Corporation mars 2012
Présentation de Corporation mars 2012 Présentation de Corporation mars 2012
Présentation de Corporation mars 2012
 
Présentation de Corporation mars 2012
Présentation de Corporation mars 2012 Présentation de Corporation mars 2012
Présentation de Corporation mars 2012
 
Corporate Presentation January 2012 French
Corporate Presentation January 2012 FrenchCorporate Presentation January 2012 French
Corporate Presentation January 2012 French
 
Alexis Minerals October 2011 (french)
Alexis Minerals October 2011 (french)Alexis Minerals October 2011 (french)
Alexis Minerals October 2011 (french)
 

Corporate Presentation December 2012

  • 2. Disclaimers FORWARD-LOOKING INFORMATION: This presentation contains certain “forward-looking information” under applicable securities laws concerning the business, operations and financial performance and condition of QMX Gold Corporation. Forward-looking information includes, but is not limited to, statements with respect to estimated production and mine life of the various mineral projects of QMX Gold Corporation; the benefits and the development potential of the properties of QMX Gold Corporation; the future price of gold; the estimation of mineral reserves and resources; the realization of mineral reserve estimates; the timing and amount of estimated future production; costs of production; success of exploration activities; and currency exchange rate fluctuations. Forward-looking information may be characterized by words such as “plan,” “expect,” “project,” “intend,” “believe,” “anticipate”, “estimate” and other similar words, or statements that certain events or conditions “may” or “will” occur. Forward-looking information is based on the opinions and estimates of management at the date the statements are made, and are based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Assumptions upon which such forward-looking information is based on the successful completion of new development projects, planned expansions or other projects within the timelines anticipated and at anticipated production levels; the accuracy of mineral reserve and resource estimates, grades, mine life and cash cost estimates; whether mineral resources can be developed; title to mineral properties; financing requirements; and general economic conditions. Many of these assumptions are based on factors and events that are not within the control of QMX Gold and there is no assurance they will prove to be correct. Factors that could cause actual results to vary materially from results anticipated by such forward-looking information includes changes in market conditions, variations in ore grade or recovery rates, fluctuating metal prices and currency exchange rates, changes in project parameters, the possibility of project cost overruns or unanticipated costs and expenses, labour disputes and other risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, the business of the companies not being integrated successfully or such integration proving more difficult, time consuming or costly than expected as well as those risk factors discussed or referred to in the annual Management’s Discussion and Analysis and Annual Information Form for QMX Gold Corporation filed with the securities regulatory authorities in Canada and available at under the corporations profile on SEDAR at www.sedar.com. Although QMX Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. QMX Gold undertakes no obligation to update forward-looking information if circumstances or management’s estimates or opinions should change except as required by applicable securities laws. The reader is cautioned not to place undue reliance on forward-looking information. Statements concerning mineral reserve and resource estimates may also be deemed to constitute forward-looking information to the extent they involve estimates of the mineralization that will be encountered if the property is developed. Comparative market information is as of a date prior to the date of this presentation. IMPORTANT NOTICE: This presentation does not constitute an offer to buy or an invitation to sell, any of the securities of QMX Gold Corporation. Such an offer may only be made pursuant to a registration statement and prospectus filed with the U.S. Securities and Exchange Commission and an offer to purchase and circular filed with Canadian securities regulatory authorities. CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES: This presentation uses the terms “Measured, “Indicated” and “Inferred” Resources. U.S. investors are advised that while such terms are recognized and required by Canadian regulations, the Securities and Exchange Commission does not recognize them. “Inferred Resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Resources may not form the basis of feasibility or other economic studies. U.S. investors are also cautioned not to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable. NATIONAL INSTRUMENT 43-101: David Rigg, the Chairman of the Company and a Qualified Person under NI 43-101, has supervised the preparation of and approved the scientific and technical information in this presentation. This presentation contains information relating to a feasibility study that includes Inferred mineral resources which are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary assessment will be realized. DECEMBER 2012 TSX: QMX OTCQX: QMXGF 2
  • 3. MANITOBA Snow Lake Mine Exploration: Snow Lake Camp - Gold Snow Lake Mining Camp Rouyn-Noranda & QUEBEC Val-d’Or Mining Camps Lac Herbin Mine Lac Pelletier Project Winnipeg Exploration: Toronto Val d’Or Camp Corporate Office - Gold & VMS Rouyn-Noranda Camp - Gold & VMS DECEMBER 2012 TSX: QMX OTCQX: QMXGF 3
  • 4. Snow Lake Mine – Growth  Recently operated by Kinross/High River Gold from 1995-2005, producing 822,550 ounces gold  Total historic production of 1.44 M ounces gold from Main Mine, No. 3 Zone, and Birch deposits — Mined: 12.1 M tons @ 4.67 g/t Au  All surface installations in place — Mine rebuilt in 1995 under TVX-High River JV — Crushing, milling and mine infrastructure in excellent condition  Permitting and environmental licenses maintained  Existing access to ore zone in Main Mine plus ramp access to ore zone in #3 Zone DECEMBER 2012 TSX: QMX OTCQX: QMXGF 4
  • 5. Snow Lake Mine – Feasibility Feasibility Study of Main Mine & #3 Zone – October 2010 Pre-Production Capital Expenditures $40.8 million Sustaining Capital Cost $36.1 million Payback Period 1.7 years Recoveries 93.3 % Average Annual Production 83,000 oz.Au Mine Life 5 years Cash Cost (LOM) US$ 640/oz.Au Cash Cost (LOM) CDN$ 81.41/ tonne Accumulated Cash Flow (Pre Tax) $140.7 million ¹ Reserves / Resources: Proven and Probable Reserve (4.04 g/t) 451,900 oz.Au Measured and Indicated Resources (4.14 g/t) ² 728,000 oz.Au Inferred Resources (4.43 g/t) ² 336,700 oz.Au ¹ Bloomberg average consensus modelled gold price deck of 2011 – $1,277, 2012 – $1,303, 2013 – $1,276, 2014 onwards – $1,051; ¹ Canadian/US foreign exchange at 2011 – 1.04, 2012 at 1.04, 2013 at 1.04 and 1.06 onwards. ² Cut off grade of 1.95 g/t DECEMBER 2012 TSX: QMX OTCQX: QMXGF 5
  • 6. Snow Lake Mine – Feasibility  Recent internal review identified potential alternatives to the original estimates set forth in the Snow Lake Mine Feasibility Study  Key potential changes include:  Enlarging the man-camp from a 50-person camp to a 100-person camp to reflect the potential need to recruit additional workers from outside the local area  Operating leases for equipment throughout life of mine vs. purchase after reaching commercial production Impact expected to increase cash costs to US$825/oz (additional US$185/oz of cash costs or US$75mm over life of mine) DECEMBER 2012 TSX: QMX OTCQX: QMXGF 6
  • 7. Snow Lake Mine DECEMBER 2012 TSX: QMX OTCQX: QMXGF 7
  • 8. Snow Lake Mine – Schedule Main Mine Boundary Zone Kim Zone No.3 Zone 1 1 2 2 3 1780L Snow Lake Production Begins 4 Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 3 Zone Dewatering + Reconditioning 3 Zone Pre-Production from ramp 1 Commercial Production 3 Zone Production from ramp 2 2,000 TPD in Q7 Shaft & Mine Reconditioning Main Mine Pre-Production Main Mine Production 1 2 3 4 DECEMBER 2012 TSX: QMX OTCQX: QMXGF 8
  • 9. Snow Lake Mine - Exploration Birch Zone No. 3 Zone Location and Snow Lake Mine Geology Mining Camp with 16 known #3 Zone mineral deposits Kim Zone Boundary Zone East Zone Caper Zone Snow Lake Snow Lake Mine Lalor Bounter Zone DECEMBER 2012 TSX: QMX OTCQX: QMXGF 9
  • 10. Snow Lake Mine - Exploration Upper Main Mine Area  2011 exploration identified additional extensions to mining areas on the upper mine levels  Exploration effort increased our confidence in the mineralized structures within the zone and around the mine area  Additional areas of potential will be delineated when they can be accessed from the underground DECEMBER 2012 TSX: QMX OTCQX: QMXGF 10
  • 11. Lac Herbin – Production Lac Herbin Average Cash Cost LAC HERBIN—Turnaround and Beyond $3,000.00 Turnaround $2,500.00 Commences 2011 $2,000.00  Review of Mineral Resources $1,500.00 $1,500  Review of life of mine plan (and reserve) $1,300 $1,000.00  Increasing mine exploration to bolster current 2012 Cash Cost $500.00 Guidance outlook $-  Launched turnaround plan in June, intensive Q1 Q2 Q3 Q4 Q1 Q2 Q3 development to give production flexibility 2011 2012  Recruitment Phase—hiring skilled miners over the third quarter  Production of 10,197 oz in 2011, with 3,724 in Q4 Lac Herbin Production 10,000.00 9,000.00 8,000.00 2012 Quarterly Ounces Recovered 2012 7,000.00 Production Goal  Mineral Resource update part of year end exercises 6,000.00 5,000.00  Production guidance 18,500 oz to 20,500 oz 4,000.00 3,000.00  Cost guidance of $1,300 - $1,500 per oz 2,000.00 1,000.00  Continue to replace and grow resources 0.00 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2009 2010 2011 2012 DECEMBER 2012 TSX: QMX OTCQX: QMXGF 11
  • 12. Mineral Reserves and Resources Mineral Reserves LAC HERBIN(1) SNOW LAKE(2) (Cut-off 5.0 g/t ) (Cut-off 1.95 g/t ) Tonnes g /t Oz Au Tonnes g /t Oz Au Proven 43,000 7.45 (3) 10,300 7,000 3.81 900 Probable 96,000 6.45 19,900 3,470,000 4.04 451,000 TOTAL 138,000 6.81 30,200 3,477,000 3.9 451,900 *Mineral reserves are also included in Mineral resource values (1) 43-101 Technical Report on Mineral Reserve Estimate at the Lac Herbin Mine, April 18, 2011 prepared by Austin Hitchins, B.Sc., P. Geo., Audrey Lapointe, B.Sc., P. Geo. and Patrick Sévigny, Ing., (2) Snow Lake Mine Re-activation Project Technical Report NI 43-101 , December 10. 2010 prepared by Mr. Andre Roy Eng. DECEMBER 2012 TSX: QMX OTCQX: QMXGF 12
  • 13. Mineral Reserves and Resources Mineral Resources LAC HERBIN(1) SNOW LAKE(2) Tonnes g /t Oz Au Tonnes g/t Oz Au MEASURED 67,000 9.2 19,900 7,000 4.76 1,000 INDICATED 117,600 7.6 28,800 5,464,000 4.14 727,000 INFERRED 283,500 7.4 67,300 2,367,000 4.43 336,700 *Mineral Reserves are also included in Resource values (1) 43-101 Technical Report on Mineral Reserve Estimate at the Lac Herbin Mine, April 18, 2011 prepared by Austin Hitchins, B.Sc., P. Geo., Audrey Lapointe, B.Sc., P. Geo. and Patrick Sévigny, Ing., (2) Snow Lake Mine Re-activation Project Technical Report NI 43-101 , December 10. 2010 prepared by Mr. Andre Roy Eng. DECEMBER 2012 TSX: QMX OTCQX: QMXGF 13
  • 14. Production Profile 100,000 Snow Lake 80-90,000 (est.) Production Production OUTLOOK (oz) 2009 2010 20,000 33,000 23,000 2011 18-20,000 Lac Herbin 7-12,000 (est.) (est.) Production DECEMBER 2012 TSX: QMX OTCQX: QMXGF 14
  • 15. Val D’Or Property Aurbel Gold Mill Val-d’Or, Quebec Lac Herbin Mine  212 sq.km. 100%- IAMGOLD owned by QMX Gold Agnico Eagle Val-d’Or-Malartic Mining Camp (Historic Production) 0.7 Mt Cu, 0.7 Mt Zn, 27.2Moz Au, 50.0 Moz Ag  100%-owned Lac Herbin Mine – in QMX Gold QMX VMS production Osisko Agnico Eagle DECEMBER 2012 TSX: QMX OTCQX: QMXGF 15
  • 16. Current Financing Plans $17,500,000 Bridge Financing – Closed November 28, 2012  Fully secured bridge financing provided by Third Eye Capital  Loan Terms:  1 year with interest payments starting 7 months from closing at $250,000 per month  In consideration of the Bridge Financing, Third Eye will receive 2.9 million warrants at $0.2525, the 10 day VWAP on closing  First tranche was used to pay out previous bridge of $10.3 million  Second tranche will be used for general company administration and expenses DECEMBER 2012 TSX: QMX OTCQX: QMXGF 16
  • 17. Upcoming Financing Plans Snow Lake Project Financing – Announced on May 29, 2012  US $45 million debt facility  Term of 4.5 years  Interest rate of LIBOR + 5.5 % before commercial production and LIBOR + 4.5% after commercial production  Hedging requirement from 40 to 50% of the 4.5 year production profile  Technical due diligence complete  Other conditions will be negotiated in the course of settling a definitive agreement DECEMBER 2012 TSX: QMX OTCQX: QMXGF 17
  • 18. Restructuring Exploration Assets Sale of Rouyn-Noranda Exploration Properties to Falco Pacific Resources (previously Druk Capital) Closed September 24, 2012  Aggregate gross proceeds of $5 million in cash and approximately 18% ownership of Falco post-financing  Exploration on properties to continue without dilution at the QMX level  Exploration team to be transferred to Falco  Exposure to exploration success will be experienced through equity participation DECEMBER 2012 TSX: QMX OTCQX: QMXGF 18
  • 19. Capital Structure Outstanding: Issued 30.8 Million Warrants 03.7 Million Average Price $6.67 Options 00.8 Million Average Price $4.42 Fully Diluted 35.3 Million Share Price (as of Nov. 30, 2012) C$ 0.25 Market Cap: Basic C$ 7.5 Million Avg. trading volume (30 day average) 83,000 shares/day Debt Outstanding Convertible Debt C$4.21 Million Conversion price $8.00 Bridge Loan C$17.5 Million DECEMBER 2012 TSX: QMX OTCQX: QMXGF 19
  • 20. Comparable Company Analysis Junior Gold Producers Market Cap Cash + ST Inv. TEV Mineral Mineral EV / 2012 2013 Company Share Price (1) (2) (3) EV / Reserve Reserve Resource (4) Resource Production (5) Production (5) As at December 10, 2012 Local US$ millions US$ millions US$ millions mm oz US$/oz mm oz US$/oz 000’s oz Au 000’s oz Au Argonaut C$9.67 $1 479 $216 $1 263 1.1 $1 153 12.8 $99 100.6 138.9 Kirkland Lake C$7.90 $567 $129 $563 1.5 $382 4.3 $132 100.3 130.8 Timmins C$3.11 $482 $50 $452 1.3 $340 2.9 $154 98.2 126.0 San Gold C$0.79 $269 $20 $252 0.2 $1 206 4.1 $62 92.3 102.8 Brigus C$0.94 $224 $49 $273 1.9 $147 3.3 $82 76.7 96.4 St Andrew C$0.43 $160 $22 $157 0.7 $221 4.4 $35 96.0 104.0 Richmont US$3.10 $123 $67 $57 0.4 $151 3.8 $15 66.6 68.7 Claude C$0.55 $98 $0 $116 0.4 $326 4.1 $28 48.5 52.0 Wesdome C$0.89 $92 $4 $96 0.4 $273 1.7 $55 58.2 68.9 Metanor C$0.21 $48 $4 $59 0.2 $295 1.6 $37 3.0 29.0 Golden Band C$0.12 $33 $8 $38 0.0 $1 988 0.8 $48 41.9 42.5 Average $325 $52 $302 0.7 $589 4.0 $68 71.1 87.3 Adjusted Average(6) $229 $39 $225 0.7 $483 3.4 $64 75.4 88.0 QMX Gold C$0.24 $7 $6 $23 0.5 $45 1.4 $17 19.0 19.0 (1) Market Cap calculated on a fully-diluted basis including shares from the exercise of in-the-money options and warrants. (2) Cash and ST Investments includes cash from the exercise of in-the-money options and warrants. (3) Total Enterprise Value ('TEV') equals market cap less cash plus debt plus minority interest and preferred equity. (4) Resource includes proven and probable reserves, measured and indicated resources and inferred resources. (5) Production estimates based on consensus analyst estimates. (6) Adjusted average excludes high and low figures. Source: Corporate disclosure, Bloomberg, Capital IQ and Street Research. DECEMBER 2012 TSX: QMX OTCQX: QMXGF 20
  • 21. 2012 Objectives  Lac Herbin  production 18,500 to 20,500  Resource update as part of 2012 year end exercises  Snow Lake Project to Production decisions  Resource update as part of 2012 year end exercises  Financing decisions  Exploration (Ongoing)  Regional compilation for next round of targets DECEMBER 2012 TSX: QMX OTCQX: QMXGF 21
  • 22. Management Team Directors and Officers David Rigg, Chairman Maurice Colson, Director Robert Bryce, Director Mark Eaton, Director Chantal Lavoie, Director Senior Management Franҫois Perron, President and CEO Deb Battiston, CFO Gerald Thornton, VP Manitoba Operations Patrick Sévigny, VP Quebec Operations Jean Girard, Exploration Manager, Quebec DECEMBER 2012 TSX: QMX OTCQX: QMXGF 22