SlideShare une entreprise Scribd logo
1  sur  66
We will be starting momentarily. For Audio Please Dial: Conference  Call 888.481.3032 Passcode 75892620# Press *6 to mute phone on/off
Cetra helps you create a warm and professional environment.
Durability and stability: Rigid Panels Solid Steel Construction Mixed Materials provide  elegance and  options: Panel fabric Painted Materials Glass tiles Warm woods
Panel Statement of Line Page 16 Cetra panels range in height from 30”-80”, widths from 18”-60” in 6” increments. Panel Highlights include: Combination panels offer a seamless appearance on one side with fabric on the other. They are used most commonly in reception stations. The full glass panel is available in limited heights and widths. Partial glass offers the glass to set above worksurface height. Tackable Acoustical Combination Mid-Wireway Ceiling Entry Sectional Panels Partial Glass Full Glass Sectional
Panel Statement of Line Page 17 These stack panel types compliment the base panel. Stackable Acoustical Stackable Combination Stackable Glass Stackable Ceiling Power Entry Privacy Panels Floor-to-Ceiling Components Hinge Door  Frameless Glass Panel Mounted Tackboards Starter Panel
Connectors and Trim Statement of Line End Trim X (4-way) L (2-way) softened or square  Page 18 Connectors are required with Cetra to create a directional change. End trims are required to terminate a run. You have a choice in a radius or square 2- way connector. S (straight) T (3-way) M  (5/8” wall mount) W ( 2 3/4” wall mount) Z   (3-way 135⁰/135/90) Y     (3-way 120⁰) Hi-Lo Trim Kits V, 135⁰
Power and Data Statement of Line Power Distribution Jumper Cables Power Entries Duplex Page 19 Remember to specify vertical cable managers as they are commonly left off  of specifications. Data locations can be placed in electrical punches as long as there is no power within the panel. Wireway covers can be moved to other panels in the field. Hardwire Branching Conduit New York Power Entries Hardwire Box Assemblies Ceiling Power  Entry Distribution Hardwire  Cover Plates Communication Wireway Covers Hardwire Ceiling Power Entry  Vertical Cable Manager
Cetra Overview Page 20 Three top cap profiles are available. Panel Thickness is 2 5/8” Power and Electrical run in the base. Panel has a steel J-Channel Connection. Connectors are required for a directional change or terminate a run. You can add stack to change heights.
CetraAccoustical Panel Details Page 21 Acoustical/ Monolithic Panels are the most popular. Panels include: Top cap Two wireway covers Power distribution assembly, if powered panel is specified. Attachment brackets. NRC rating = .75 STC rating = 22 Images taken from installation instructions.
Cetra Acoustical Panel Details Page 21 Panel s are joined with an attachment bracket at the top and base of the panel. Vertical slots are located at 1” increments.  Images taken from installation instructions.
Cetra Top Cap Options Top caps are available in either transitional, softened or square. You can select either a paint or wood finish for the same cost excluding transitional profile. Worksurfaces in Footprint offer similar rims to compliment the top cap profile.
Cetra Panel Heights 30-inch high panels Match the standard worksurface height. Recommended when accessibility between work stations is desired. 37-inch high panels Work well with Standing height worksurface. 42-inch high panels Best for areas with frequent transactions. Accommodate transaction surfaces with task lights and soffits.
Cetra Panel Heights 50-inch high panels Offers seated privacy. Can use transaction counter here as well. 56-inch high panels Match height of Radius Profile bookcases and lateral files. 61-inch high panels Can accommodate reduced height overhead storage and flat shelves.
Cetra Panel Heights 68-inch high panels Recommended by BOSTI for standing height privacy. Minimum height for overheads to allow clearance to the surfaces. Interworks overheads are ideal here. 80-inch high panels Allows enclosure with a door. Not much more privacy or acoustics. Stacking options You can only place 2 stackers on top of ANY panel not to exceed 118”.
Cetra  Mid-Wireway Panel  Page 22 Provides the ability to bring electrical and data to worksurface height. The vertical wireway is 2.6 sq.” and is located 14” from one edge of the panel. It is necessary to use mid-height connectors to continue power at a connector. A powered mid-height panel on ships with one harness. Image taken from installation instructions.
Cetra Ceiling Entry Panel Page 23 Ceiling Entry panel is at 68” and 80” heights widths is 30 - 48. You have the ability to go higher with stack, this option gives a cleaner look.   Ceiling entry is specified separately from panel. Images taken from installation instructions.
CetraGlass Panel Page 24 Full or Partial Glass options are available. Glass is ¼” thick.
Cetra Sectional Panel Page 25 Consider using these tiles as accents at the wing locations. Panel frames are not preassembled with tiles. Two tiles are required for each side. Fabric tiles are not tackable or acoustical. Remember that glass tiles reveal rails on three sides which is different a thickness. Slat tiles have 1”. Pass-thru is only offered at the heights shown with the arrows.
Cetra Sectional Panel Page 25 When selecting the glass tiles create a specification during installation to turn 1 upside down. Glass tiles can not be used in a 30” high panel. They are not recommend to be used with stack.  You would not want to place a glass or ventilated tile on one side with fabric, wood or ventilated on the opposite side. Tiles slide into place on the frame. Images taken from installation instructions.
Cetra Stackable Panel Page 26 Stack panels are available 7”, 12” and 19”. You can stack two panels on top of any one panel not to exceed 118” The window panel has an even “picture frame” on all four sides of the panel. The frame for the window panel can be painted, fabric or wood. A floor-to-ceiling top channel can be placed on top of a panel for the appearance of a floor-to-ceiling application. It connects to the panel not ceiling. The starter is available as a special for attaching to traditional Traxx. Ceiling Entry Acoustical Window Pass-thru Combination Starter Panel
Cetra Stackable Panel Page 26 Stack panels are available 7”, 12” and 19”. You can stack two panels on top of any one panel not to exceed 118” The window panel has an even “picture frame” on all four sides of the panel. The frame for the window panel can be painted, fabric or wood. A floor-to-ceiling top channel can be placed on top of a panel for the appearance of a floor-to-ceiling application. It connects to the panel not ceiling. *The starter is available as a special for attaching to traditional Traxx. Ceiling Entry Acoustical Window Pass-thru Combination Starter Panel
CetraFrameless Glass Page 27 Frameless glass reflects the flat profile top cap. The glass is 3/18” thick. The two aluminum glass holders can be in any paint color independent of the top cap. Frameless glass cannot span more than one panel.
Cetra Privacy Panels Page 28 Make sure your opening is smaller than the door to prevent opening into an oncoming aisle. Available 36” or 42”. Door is non-locking. Available as translucent, marker board and fabric. Non-handed and reversible.
Cetra Hinge Door Page 29 Available 36” or 42”. Locking lever is available and is ADA suitable. Doors are 1 ¾” thick with a honeycomb interior. Non-handed and reversible. Doors include: Frame and Threshold Top cap Full-length hinge Frame Gasket Attachment brackets Images taken from the pricelist and  installation instructions.
CetraTraxx Starter Panel  Page 30 This panel is none supporting for components. The panel is 6” and  non-powered. Image taken from installation instructions.
CetraTraxx Starter Panel M Mount You may want to consider creating a perimeter walls with Cetra panels only placing Traxx on the inside. Cetra requires the starter panel in order to connect.  This will not break your application of Traxx and offers the greatest possibilities for reconfiguration. Panel is 6” wide and is non-powered. Traxx Starter
Traxx & Tiles with Cetra in CAP Notice the right side of the drawing the overheads are hanging off the Cetra panels. The left side the overheads are hanging from Traxx.
Traxx & Tiles Trim Cap with Cetra Page 314 The trim cap is compliments the wood top cap profile of Cetra.  The trim cap is not structural. The trim cap is 72” and is available either painted or a wood stain.
Panel spacing with Traxx in CAP  Considering the spacing of the panel when working with defined dimensions.
Cetra Connectors Page 30 Connectors are 2 5/8” thick. Connectors need to be specified when changing direction or at the end of a panel run. End trim is consider a connector as is comes with the necessary bracket assembly for support at the end of a run. An S connector (straight) are available to fill parallel panel runs where one panel run has a connector and the other does not. An S connector is not required to join panels.
Cetra Stackable Connectors Page 32 There are three ways to order stack connectors which solve different planning solutions based on application. Stackable connector models include: Connector Connection bracketry Note: Top caps are not included. Top cap from base connector will be used. Order the connector to equal the stackable height. Order the connector to equal the height of both stacked units. Order the connector full height of the base and stack panel.
Cetra Hi-Lo Connector Page 33 Three and half key points  for the specification. Of a hi-lo connector. 1.  Direction of hi-lo. 2.  Height of your drop. 3.  Width of the lower panel. ½. If it is a connector-to-panel hi-lo you need to specify a new connector top cap located on page 100. End trim is 1” thick. Hi-lo Trim Kits Include: Vertical end trim Bracket Top cap for the lower panel
Cetra Application and Planning for Panel Runs Page 34
CetraApplication Guidelines for Stack Panels Page 26, 32, 35 Two stacks can be placed on top of one panel, the total height can not exceed 118”. Stack panels are load bearing. Stack must equal the same height on all sides of a stack connector. A hi-lo can not be located at a stack connector. A hi-lo can only be created in line with stack. One ATET bracket ships with each stack panel. Overheads cannot hang on wing wall.
Placing Stack in a 4-station cluster The person located in the lower left (chair) position will have stack added to there workstation.
Placing Stack in a 4-station cluster There are 3 possible solutions.
Placing Stack in a 4-station cluster Solution 1: Creates odd spaces that extends stack into other areas. 3-Way/ T Base Connector 3 Way/ T Stack Connector 4-Way/ X Base Connector 4-Way/ Stack Connector
Placing Stack in a 4-station cluster Solution 2: Least expensive solution however not ideal based on connector height as long as it is under 80” total height. 3-Way/ T Base Connector 4-Way/ X Base Connector
Placing Stack in a 4-station cluster Solution 3: Alternative solution that retains flexibility. 3-Way/ T Base Connector 2-way/ L Stack Connector 4-Way/ X Connector
How many ATET are used in this example? Think about how many stack panels you see in this example. How many stacks are at a connector? How many are left over?
ATET used in this example Did you count 4? Placement of ATET bracket.
Floor to Ceiling Applications Floor to ceiling top channel is available in 12’ lengths. It may be cut in width and depth in the field to the desired length. The height can be cut to a maximum of 2” given the channel is 4” tall.  It is available in core finishes.
Cetra Power and Data Overview Page 36 Powered panels are shipped with an electrical distribution installed. Duplex receptacles are rated at 15 amps. 18” panels can be used to pass power to another however it cannot accept receptacles. Up to 4 duplex receptacles can be used in a powered panels and 8 in a mid-height electrical panel. Refer to page 67 for examples on the variety of jumpers used in a mixture of configurations.
Cetra Power Distribution Assemblies Page  37 Power Distributions match the same size as the panel and can be installed on a non-powered panel. There are two wire configurations available for matching building power, 8 and 10-wire. Imagse taken from installation instructions.
Cetra Jumpers Page  37 Jumpers are used to pass power from one panel to the next. 18” panels can pass power to an adjacent panel however it offer no power access. When an 18” is used in a t configuration one  AEJ2 and  one AEJ5 must be used to route power through a connector. Note mid-wire jumper examples on the right-hand side of the page.
Cetra Pass- Thru Page  37 A pass-thru is used in instances where you are continuing power from base to mid-height. Image taken from installation instructions.
Cetra Receptacles Page  37 Each duplex is marked with a circuit designation. All circuits are rated at 15 amps. Image taken from installation instructions.
Cetra Power Entries Page  38 Ceiling entry is specified in addition to the ceiling entry panel. Ceiling Power Entry Assembly Includes: Junction Box 12’ jumper cable Hardware Basefeed enters from the side of a panel. The typical length is 72”. A power feed reduces one duplex receptacle location. Images taken from installation instructions.
Cetra New York Components Page  39 A special power entry is required for New York. All panels should be specified as non-powered given distribution assemblies should be specified separately. Installation for this power connection must be made by a licensed electrician only. Images taken from installation instructions.
Cetra Hardwire Components Page  39 and 43 Components should be specified to accommodate hardwire applications. The junction box specified separately is required for each panel that receives a field-installed hardwired electrical. Branching conduit is used between junction boxes and panel-to-panel connections.  Cover plates are available in black only. Cover plate is required to cover junction box or power entry boxes. Images taken from the pricelist and installation instructions.
Cetra 8-wire Electrical System Page 40 .
Cetra 10-wire Electrical System Page 41 .
Cetra Cable Management Page 42 Data cables are routed through the base and mid—wireways. 30” or wider panels are available to accept optional communication wireway covers. The opening is left of the center to allow for proper clearance. Verify the size of any commercial ports for application of the proper fit.
CetraWireway Cover Punch Options Page 43 Images taken from the pricelist and installation instructions.
CetraWorksurface Brackets Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”.
Cetra Application and Support Page 328 & 329 (Footprint)
Cetra Edge Support Brackets Page 449(Footprint) Edge brackets are handed depending on where you are standing, facing the panel. Edge brackets at corner locations are not specific to hand of bracket. Images taken from installation instructions.
Cetra Cantilever Page 450(Footprint) Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Images taken from installation instructions.
Cetra Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 519(Footprint) Ganging Brackets Page 523(Footprint)
Cetra Square, Radius, and Curved Profile Overhead Brackets Page 519& 523(Footprint) Images taken from pricelist and installation instructions.
Cetra Flat and Bevel Profile Overhead Brackets Page 519& 523(Footprint) Images taken from the pricelist and installation instructions. .
Cetra Lunar Profile Overhead Brackets Page 519& 523(Footprint) Images taken from pricelist and installation instructions. .
Cetra Flat Shelf Bracket Page 519(Footprint) Images taken from the pricelist and installation instructions. . Bracket image not available. 
Kimball Office Resources Dealer Sales Manager Sales Specialist Customer Care/ By Design 800.482.1818  Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com
www.kimballoffice.com

Contenu connexe

Tendances

CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoastal Joinery Hardware
 
Loewen\'s New Double Hung Window
Loewen\'s New Double Hung WindowLoewen\'s New Double Hung Window
Loewen\'s New Double Hung Windowsbutler28
 
Gintaras_Valiulis_Portfolio_Condensed
Gintaras_Valiulis_Portfolio_CondensedGintaras_Valiulis_Portfolio_Condensed
Gintaras_Valiulis_Portfolio_CondensedGintaras Valiulis
 
Moderco Crystal Glass Walls - 44 STC
Moderco Crystal Glass Walls - 44 STCModerco Crystal Glass Walls - 44 STC
Moderco Crystal Glass Walls - 44 STCCharles Joslin
 
Good better-best
Good better-bestGood better-best
Good better-bestWB Doors
 
Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16John Zierke
 
Complete steel-door-solutions
Complete steel-door-solutionsComplete steel-door-solutions
Complete steel-door-solutionsabhiram227
 
Marathon ma dnx300 flight road case
Marathon ma dnx300 flight road caseMarathon ma dnx300 flight road case
Marathon ma dnx300 flight road caseAughyeresskimu
 
M25 concept caem brochure 2014
M25 concept caem  brochure 2014M25 concept caem  brochure 2014
M25 concept caem brochure 2014CAEM Magrini spa
 
Quest Manufacturing Product Training 2013
Quest Manufacturing Product Training 2013Quest Manufacturing Product Training 2013
Quest Manufacturing Product Training 2013QuestTechnologyIntl
 

Tendances (19)

CoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation InstructionsCoFold Mortice Sliding Folding Door Gear Installation Instructions
CoFold Mortice Sliding Folding Door Gear Installation Instructions
 
Loewen\'s New Double Hung Window
Loewen\'s New Double Hung WindowLoewen\'s New Double Hung Window
Loewen\'s New Double Hung Window
 
Gintaras_Valiulis_Portfolio_Condensed
Gintaras_Valiulis_Portfolio_CondensedGintaras_Valiulis_Portfolio_Condensed
Gintaras_Valiulis_Portfolio_Condensed
 
Moderco Crystal Glass Walls - 44 STC
Moderco Crystal Glass Walls - 44 STCModerco Crystal Glass Walls - 44 STC
Moderco Crystal Glass Walls - 44 STC
 
Good better-best
Good better-bestGood better-best
Good better-best
 
CAEM Gold Checkout
CAEM Gold CheckoutCAEM Gold Checkout
CAEM Gold Checkout
 
Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16Faimon Initial Packet 2.22.16
Faimon Initial Packet 2.22.16
 
Design Guide2016-2
Design Guide2016-2Design Guide2016-2
Design Guide2016-2
 
Complete steel-door-solutions
Complete steel-door-solutionsComplete steel-door-solutions
Complete steel-door-solutions
 
Caem S50 system 2015
Caem S50 system 2015Caem S50 system 2015
Caem S50 system 2015
 
12777 coastal single pages part121
12777  coastal single pages part12112777  coastal single pages part121
12777 coastal single pages part121
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
M25 Wire
M25 WireM25 Wire
M25 Wire
 
Marathon ma dnx300 flight road case
Marathon ma dnx300 flight road caseMarathon ma dnx300 flight road case
Marathon ma dnx300 flight road case
 
M25 concept caem brochure 2014
M25 concept caem  brochure 2014M25 concept caem  brochure 2014
M25 concept caem brochure 2014
 
Quest Manufacturing Product Training 2013
Quest Manufacturing Product Training 2013Quest Manufacturing Product Training 2013
Quest Manufacturing Product Training 2013
 
Cast Iron Heritage Feeder Pillars
Cast Iron Heritage Feeder PillarsCast Iron Heritage Feeder Pillars
Cast Iron Heritage Feeder Pillars
 
Cascade Window WinPro Brochure
Cascade Window WinPro BrochureCascade Window WinPro Brochure
Cascade Window WinPro Brochure
 
Glass systems
Glass systemsGlass systems
Glass systems
 

En vedette

Pitfalls of Information Access with Visualizations in Remote Collaborative An...
Pitfalls of Information Access with Visualizations in Remote Collaborative An...Pitfalls of Information Access with Visualizations in Remote Collaborative An...
Pitfalls of Information Access with Visualizations in Remote Collaborative An...Aruna Balakrishnan
 
2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods SpecificationAlibia de Vente
 
Foursquare for Business & Retail
Foursquare for Business & RetailFoursquare for Business & Retail
Foursquare for Business & RetailBWEST Interactive
 
Access technology
Access technologyAccess technology
Access technology김 성남
 
Ooyala video-index-report-Q3-2011
Ooyala video-index-report-Q3-2011Ooyala video-index-report-Q3-2011
Ooyala video-index-report-Q3-2011IAB México
 
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcn
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcnSearch Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcn
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcnGillian Muessig
 
Online consumer marzo 2014 - Nielsen
Online consumer marzo 2014 - NielsenOnline consumer marzo 2014 - Nielsen
Online consumer marzo 2014 - NielsenIAB México
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdcAvi Grigorescu
 
Presentación de Joakim Borgström en IAB Conecta 2012
Presentación de Joakim Borgström en IAB Conecta 2012Presentación de Joakim Borgström en IAB Conecta 2012
Presentación de Joakim Borgström en IAB Conecta 2012IAB México
 
Mission Hills Christmas Eve Promotion
Mission Hills Christmas  Eve PromotionMission Hills Christmas  Eve Promotion
Mission Hills Christmas Eve PromotionDavid Schroeter
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationMaciej Bilas
 
웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전김 성남
 
2012-04 Inbound Marketing; Survival in Classified Ads
2012-04 Inbound Marketing; Survival in Classified Ads2012-04 Inbound Marketing; Survival in Classified Ads
2012-04 Inbound Marketing; Survival in Classified AdsGillian Muessig
 
2011-11 Chennai Social Media Summit Keynote
2011-11 Chennai Social Media Summit Keynote2011-11 Chennai Social Media Summit Keynote
2011-11 Chennai Social Media Summit KeynoteGillian Muessig
 
The Hollinters Go Camping
The Hollinters Go CampingThe Hollinters Go Camping
The Hollinters Go CampingHeather B.
 

En vedette (20)

Pitfalls of Information Access with Visualizations in Remote Collaborative An...
Pitfalls of Information Access with Visualizations in Remote Collaborative An...Pitfalls of Information Access with Visualizations in Remote Collaborative An...
Pitfalls of Information Access with Visualizations in Remote Collaborative An...
 
2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification2010 Contemporary Casegoods Specification
2010 Contemporary Casegoods Specification
 
Foursquare for Business & Retail
Foursquare for Business & RetailFoursquare for Business & Retail
Foursquare for Business & Retail
 
Gri Online Survey 2009
Gri Online Survey 2009Gri Online Survey 2009
Gri Online Survey 2009
 
Access technology
Access technologyAccess technology
Access technology
 
Ooyala video-index-report-Q3-2011
Ooyala video-index-report-Q3-2011Ooyala video-index-report-Q3-2011
Ooyala video-index-report-Q3-2011
 
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcn
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcnSearch Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcn
Search Engine Ranking Factors Today & Tomorrow by SEOmom of SEOmoz #scbcn
 
20111020 ure corporate presentation (october 2011) +wdeq
20111020  ure corporate presentation (october 2011) +wdeq20111020  ure corporate presentation (october 2011) +wdeq
20111020 ure corporate presentation (october 2011) +wdeq
 
Online consumer marzo 2014 - Nielsen
Online consumer marzo 2014 - NielsenOnline consumer marzo 2014 - Nielsen
Online consumer marzo 2014 - Nielsen
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
Ur-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate PresentationUr-Energy January 2016 Corporate Presentation
Ur-Energy January 2016 Corporate Presentation
 
Presentación de Joakim Borgström en IAB Conecta 2012
Presentación de Joakim Borgström en IAB Conecta 2012Presentación de Joakim Borgström en IAB Conecta 2012
Presentación de Joakim Borgström en IAB Conecta 2012
 
Copyright
CopyrightCopyright
Copyright
 
Mission Hills Christmas Eve Promotion
Mission Hills Christmas  Eve PromotionMission Hills Christmas  Eve Promotion
Mission Hills Christmas Eve Promotion
 
J-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your applicationJ-Day Kraków: Listen to the sounds of your application
J-Day Kraków: Listen to the sounds of your application
 
웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전웹2.0 시대, 보조공학의 의미와 발전
웹2.0 시대, 보조공학의 의미와 발전
 
ACH 216 Lecture 11 (Safety)
ACH 216 Lecture 11 (Safety)ACH 216 Lecture 11 (Safety)
ACH 216 Lecture 11 (Safety)
 
2012-04 Inbound Marketing; Survival in Classified Ads
2012-04 Inbound Marketing; Survival in Classified Ads2012-04 Inbound Marketing; Survival in Classified Ads
2012-04 Inbound Marketing; Survival in Classified Ads
 
2011-11 Chennai Social Media Summit Keynote
2011-11 Chennai Social Media Summit Keynote2011-11 Chennai Social Media Summit Keynote
2011-11 Chennai Social Media Summit Keynote
 
The Hollinters Go Camping
The Hollinters Go CampingThe Hollinters Go Camping
The Hollinters Go Camping
 

Similaire à 2010 Cetra

MDSI Series 30 Product Data Sheet
MDSI Series 30 Product Data SheetMDSI Series 30 Product Data Sheet
MDSI Series 30 Product Data SheetTom Keesy
 
Internal Oak EASI-Frame System
Internal Oak EASI-Frame System Internal Oak EASI-Frame System
Internal Oak EASI-Frame System Helen Smith
 
Column Covers Product Data Sheet
Column Covers Product Data SheetColumn Covers Product Data Sheet
Column Covers Product Data SheetTom Keesy
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2siding
 
MDSI Series 10 Product Data Sheet
MDSI Series 10 Product Data SheetMDSI Series 10 Product Data Sheet
MDSI Series 10 Product Data SheetTom Keesy
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler
 
Visual Dictionary- Sp10Crawlspace
Visual Dictionary- Sp10CrawlspaceVisual Dictionary- Sp10Crawlspace
Visual Dictionary- Sp10CrawlspaceSp10Crawlspace
 
PALMETTO PRODUCT INFORMATION
PALMETTO PRODUCT INFORMATIONPALMETTO PRODUCT INFORMATION
PALMETTO PRODUCT INFORMATIONCindy Burrell
 
Reznoclad Brochure final_2016
Reznoclad Brochure final_2016Reznoclad Brochure final_2016
Reznoclad Brochure final_2016Reznoclad HPL
 
Electrical and Panel Systems
Electrical and Panel SystemsElectrical and Panel Systems
Electrical and Panel SystemsAlibia de Vente
 
MDSI Series 80 Product Data Sheet
MDSI Series 80 Product Data SheetMDSI Series 80 Product Data Sheet
MDSI Series 80 Product Data SheetTom Keesy
 
Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005Mike Coughlin
 
Planning a new internal partition
Planning a new internal partitionPlanning a new internal partition
Planning a new internal partitionZulaiha Amaria
 
MDSI Series 20 Product Data Sheet
MDSI Series 20 Product Data SheetMDSI Series 20 Product Data Sheet
MDSI Series 20 Product Data SheetTom Keesy
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialRoland Laufer
 

Similaire à 2010 Cetra (20)

2010 Xsite
2010 Xsite2010 Xsite
2010 Xsite
 
2010 Interworks EQ
2010 Interworks EQ2010 Interworks EQ
2010 Interworks EQ
 
MDSI Series 30 Product Data Sheet
MDSI Series 30 Product Data SheetMDSI Series 30 Product Data Sheet
MDSI Series 30 Product Data Sheet
 
Internal Oak EASI-Frame System
Internal Oak EASI-Frame System Internal Oak EASI-Frame System
Internal Oak EASI-Frame System
 
Column Covers Product Data Sheet
Column Covers Product Data SheetColumn Covers Product Data Sheet
Column Covers Product Data Sheet
 
Visual Dictionary Revised 2
Visual Dictionary Revised 2Visual Dictionary Revised 2
Visual Dictionary Revised 2
 
MDSI Series 10 Product Data Sheet
MDSI Series 10 Product Data SheetMDSI Series 10 Product Data Sheet
MDSI Series 10 Product Data Sheet
 
AmeriKooler Architectural Specifications
AmeriKooler Architectural SpecificationsAmeriKooler Architectural Specifications
AmeriKooler Architectural Specifications
 
Visual Dictionary- Sp10Crawlspace
Visual Dictionary- Sp10CrawlspaceVisual Dictionary- Sp10Crawlspace
Visual Dictionary- Sp10Crawlspace
 
Sp10Crawlspace
Sp10CrawlspaceSp10Crawlspace
Sp10Crawlspace
 
PALMETTO PRODUCT INFORMATION
PALMETTO PRODUCT INFORMATIONPALMETTO PRODUCT INFORMATION
PALMETTO PRODUCT INFORMATION
 
Brochure May 15
Brochure May 15Brochure May 15
Brochure May 15
 
Reznoclad Brochure final_2016
Reznoclad Brochure final_2016Reznoclad Brochure final_2016
Reznoclad Brochure final_2016
 
Electrical and Panel Systems
Electrical and Panel SystemsElectrical and Panel Systems
Electrical and Panel Systems
 
MDSI Series 80 Product Data Sheet
MDSI Series 80 Product Data SheetMDSI Series 80 Product Data Sheet
MDSI Series 80 Product Data Sheet
 
Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005Vent-Top X 1 and X 2 2005
Vent-Top X 1 and X 2 2005
 
Planning a new internal partition
Planning a new internal partitionPlanning a new internal partition
Planning a new internal partition
 
MDSI Series 20 Product Data Sheet
MDSI Series 20 Product Data SheetMDSI Series 20 Product Data Sheet
MDSI Series 20 Product Data Sheet
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann CommercialresidentialEuro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
Euro Style Design Ltd Arxx P Panel Dura Viessmann Commercialresidential
 

Plus de Alibia de Vente

Plus de Alibia de Vente (17)

2016 Traxx Checklist
2016 Traxx Checklist2016 Traxx Checklist
2016 Traxx Checklist
 
2016 Traxx Presentation
2016 Traxx Presentation2016 Traxx Presentation
2016 Traxx Presentation
 
Neo con e tool overview
Neo con e tool overviewNeo con e tool overview
Neo con e tool overview
 
2012 Traxx Specification Presentation
2012 Traxx Specification Presentation2012 Traxx Specification Presentation
2012 Traxx Specification Presentation
 
2012 Hum Specification Presentation
2012 Hum Specification Presentation2012 Hum Specification Presentation
2012 Hum Specification Presentation
 
Brackets
BracketsBrackets
Brackets
 
Lateral Filing
Lateral FilingLateral Filing
Lateral Filing
 
2010 Hum
2010 Hum2010 Hum
2010 Hum
 
2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification2010 Traditional Casegoods Specification
2010 Traditional Casegoods Specification
 
2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification2010 Transitional Casegoods Specification
2010 Transitional Casegoods Specification
 
2010 Xsite Checklist
2010 Xsite Checklist2010 Xsite Checklist
2010 Xsite Checklist
 
2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)2010 Xsite Checklist (.doc)
2010 Xsite Checklist (.doc)
 
2007 Electrical Regions
2007 Electrical Regions2007 Electrical Regions
2007 Electrical Regions
 
2008 Electrical & Data
2008 Electrical & Data2008 Electrical & Data
2008 Electrical & Data
 
Traxx Checklist (word)
Traxx Checklist (word)Traxx Checklist (word)
Traxx Checklist (word)
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 
Xsite Checklist
Xsite ChecklistXsite Checklist
Xsite Checklist
 

Dernier

group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxmapanig881
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改yuu sss
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 

Dernier (20)

group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
Untitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptxUntitled presedddddddddddddddddntation (1).pptx
Untitled presedddddddddddddddddntation (1).pptx
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
1比1办理美国北卡罗莱纳州立大学毕业证成绩单pdf电子版制作修改
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 

2010 Cetra

  • 1. We will be starting momentarily. For Audio Please Dial: Conference Call 888.481.3032 Passcode 75892620# Press *6 to mute phone on/off
  • 2. Cetra helps you create a warm and professional environment.
  • 3. Durability and stability: Rigid Panels Solid Steel Construction Mixed Materials provide elegance and options: Panel fabric Painted Materials Glass tiles Warm woods
  • 4. Panel Statement of Line Page 16 Cetra panels range in height from 30”-80”, widths from 18”-60” in 6” increments. Panel Highlights include: Combination panels offer a seamless appearance on one side with fabric on the other. They are used most commonly in reception stations. The full glass panel is available in limited heights and widths. Partial glass offers the glass to set above worksurface height. Tackable Acoustical Combination Mid-Wireway Ceiling Entry Sectional Panels Partial Glass Full Glass Sectional
  • 5. Panel Statement of Line Page 17 These stack panel types compliment the base panel. Stackable Acoustical Stackable Combination Stackable Glass Stackable Ceiling Power Entry Privacy Panels Floor-to-Ceiling Components Hinge Door Frameless Glass Panel Mounted Tackboards Starter Panel
  • 6. Connectors and Trim Statement of Line End Trim X (4-way) L (2-way) softened or square Page 18 Connectors are required with Cetra to create a directional change. End trims are required to terminate a run. You have a choice in a radius or square 2- way connector. S (straight) T (3-way) M (5/8” wall mount) W ( 2 3/4” wall mount) Z (3-way 135⁰/135/90) Y (3-way 120⁰) Hi-Lo Trim Kits V, 135⁰
  • 7. Power and Data Statement of Line Power Distribution Jumper Cables Power Entries Duplex Page 19 Remember to specify vertical cable managers as they are commonly left off of specifications. Data locations can be placed in electrical punches as long as there is no power within the panel. Wireway covers can be moved to other panels in the field. Hardwire Branching Conduit New York Power Entries Hardwire Box Assemblies Ceiling Power Entry Distribution Hardwire Cover Plates Communication Wireway Covers Hardwire Ceiling Power Entry Vertical Cable Manager
  • 8. Cetra Overview Page 20 Three top cap profiles are available. Panel Thickness is 2 5/8” Power and Electrical run in the base. Panel has a steel J-Channel Connection. Connectors are required for a directional change or terminate a run. You can add stack to change heights.
  • 9. CetraAccoustical Panel Details Page 21 Acoustical/ Monolithic Panels are the most popular. Panels include: Top cap Two wireway covers Power distribution assembly, if powered panel is specified. Attachment brackets. NRC rating = .75 STC rating = 22 Images taken from installation instructions.
  • 10. Cetra Acoustical Panel Details Page 21 Panel s are joined with an attachment bracket at the top and base of the panel. Vertical slots are located at 1” increments. Images taken from installation instructions.
  • 11. Cetra Top Cap Options Top caps are available in either transitional, softened or square. You can select either a paint or wood finish for the same cost excluding transitional profile. Worksurfaces in Footprint offer similar rims to compliment the top cap profile.
  • 12. Cetra Panel Heights 30-inch high panels Match the standard worksurface height. Recommended when accessibility between work stations is desired. 37-inch high panels Work well with Standing height worksurface. 42-inch high panels Best for areas with frequent transactions. Accommodate transaction surfaces with task lights and soffits.
  • 13. Cetra Panel Heights 50-inch high panels Offers seated privacy. Can use transaction counter here as well. 56-inch high panels Match height of Radius Profile bookcases and lateral files. 61-inch high panels Can accommodate reduced height overhead storage and flat shelves.
  • 14. Cetra Panel Heights 68-inch high panels Recommended by BOSTI for standing height privacy. Minimum height for overheads to allow clearance to the surfaces. Interworks overheads are ideal here. 80-inch high panels Allows enclosure with a door. Not much more privacy or acoustics. Stacking options You can only place 2 stackers on top of ANY panel not to exceed 118”.
  • 15. Cetra Mid-Wireway Panel Page 22 Provides the ability to bring electrical and data to worksurface height. The vertical wireway is 2.6 sq.” and is located 14” from one edge of the panel. It is necessary to use mid-height connectors to continue power at a connector. A powered mid-height panel on ships with one harness. Image taken from installation instructions.
  • 16. Cetra Ceiling Entry Panel Page 23 Ceiling Entry panel is at 68” and 80” heights widths is 30 - 48. You have the ability to go higher with stack, this option gives a cleaner look. Ceiling entry is specified separately from panel. Images taken from installation instructions.
  • 17. CetraGlass Panel Page 24 Full or Partial Glass options are available. Glass is ¼” thick.
  • 18. Cetra Sectional Panel Page 25 Consider using these tiles as accents at the wing locations. Panel frames are not preassembled with tiles. Two tiles are required for each side. Fabric tiles are not tackable or acoustical. Remember that glass tiles reveal rails on three sides which is different a thickness. Slat tiles have 1”. Pass-thru is only offered at the heights shown with the arrows.
  • 19. Cetra Sectional Panel Page 25 When selecting the glass tiles create a specification during installation to turn 1 upside down. Glass tiles can not be used in a 30” high panel. They are not recommend to be used with stack. You would not want to place a glass or ventilated tile on one side with fabric, wood or ventilated on the opposite side. Tiles slide into place on the frame. Images taken from installation instructions.
  • 20. Cetra Stackable Panel Page 26 Stack panels are available 7”, 12” and 19”. You can stack two panels on top of any one panel not to exceed 118” The window panel has an even “picture frame” on all four sides of the panel. The frame for the window panel can be painted, fabric or wood. A floor-to-ceiling top channel can be placed on top of a panel for the appearance of a floor-to-ceiling application. It connects to the panel not ceiling. The starter is available as a special for attaching to traditional Traxx. Ceiling Entry Acoustical Window Pass-thru Combination Starter Panel
  • 21. Cetra Stackable Panel Page 26 Stack panels are available 7”, 12” and 19”. You can stack two panels on top of any one panel not to exceed 118” The window panel has an even “picture frame” on all four sides of the panel. The frame for the window panel can be painted, fabric or wood. A floor-to-ceiling top channel can be placed on top of a panel for the appearance of a floor-to-ceiling application. It connects to the panel not ceiling. *The starter is available as a special for attaching to traditional Traxx. Ceiling Entry Acoustical Window Pass-thru Combination Starter Panel
  • 22. CetraFrameless Glass Page 27 Frameless glass reflects the flat profile top cap. The glass is 3/18” thick. The two aluminum glass holders can be in any paint color independent of the top cap. Frameless glass cannot span more than one panel.
  • 23. Cetra Privacy Panels Page 28 Make sure your opening is smaller than the door to prevent opening into an oncoming aisle. Available 36” or 42”. Door is non-locking. Available as translucent, marker board and fabric. Non-handed and reversible.
  • 24. Cetra Hinge Door Page 29 Available 36” or 42”. Locking lever is available and is ADA suitable. Doors are 1 ¾” thick with a honeycomb interior. Non-handed and reversible. Doors include: Frame and Threshold Top cap Full-length hinge Frame Gasket Attachment brackets Images taken from the pricelist and installation instructions.
  • 25. CetraTraxx Starter Panel Page 30 This panel is none supporting for components. The panel is 6” and non-powered. Image taken from installation instructions.
  • 26. CetraTraxx Starter Panel M Mount You may want to consider creating a perimeter walls with Cetra panels only placing Traxx on the inside. Cetra requires the starter panel in order to connect. This will not break your application of Traxx and offers the greatest possibilities for reconfiguration. Panel is 6” wide and is non-powered. Traxx Starter
  • 27. Traxx & Tiles with Cetra in CAP Notice the right side of the drawing the overheads are hanging off the Cetra panels. The left side the overheads are hanging from Traxx.
  • 28. Traxx & Tiles Trim Cap with Cetra Page 314 The trim cap is compliments the wood top cap profile of Cetra. The trim cap is not structural. The trim cap is 72” and is available either painted or a wood stain.
  • 29. Panel spacing with Traxx in CAP Considering the spacing of the panel when working with defined dimensions.
  • 30. Cetra Connectors Page 30 Connectors are 2 5/8” thick. Connectors need to be specified when changing direction or at the end of a panel run. End trim is consider a connector as is comes with the necessary bracket assembly for support at the end of a run. An S connector (straight) are available to fill parallel panel runs where one panel run has a connector and the other does not. An S connector is not required to join panels.
  • 31. Cetra Stackable Connectors Page 32 There are three ways to order stack connectors which solve different planning solutions based on application. Stackable connector models include: Connector Connection bracketry Note: Top caps are not included. Top cap from base connector will be used. Order the connector to equal the stackable height. Order the connector to equal the height of both stacked units. Order the connector full height of the base and stack panel.
  • 32. Cetra Hi-Lo Connector Page 33 Three and half key points for the specification. Of a hi-lo connector. 1. Direction of hi-lo. 2. Height of your drop. 3. Width of the lower panel. ½. If it is a connector-to-panel hi-lo you need to specify a new connector top cap located on page 100. End trim is 1” thick. Hi-lo Trim Kits Include: Vertical end trim Bracket Top cap for the lower panel
  • 33. Cetra Application and Planning for Panel Runs Page 34
  • 34. CetraApplication Guidelines for Stack Panels Page 26, 32, 35 Two stacks can be placed on top of one panel, the total height can not exceed 118”. Stack panels are load bearing. Stack must equal the same height on all sides of a stack connector. A hi-lo can not be located at a stack connector. A hi-lo can only be created in line with stack. One ATET bracket ships with each stack panel. Overheads cannot hang on wing wall.
  • 35. Placing Stack in a 4-station cluster The person located in the lower left (chair) position will have stack added to there workstation.
  • 36. Placing Stack in a 4-station cluster There are 3 possible solutions.
  • 37. Placing Stack in a 4-station cluster Solution 1: Creates odd spaces that extends stack into other areas. 3-Way/ T Base Connector 3 Way/ T Stack Connector 4-Way/ X Base Connector 4-Way/ Stack Connector
  • 38. Placing Stack in a 4-station cluster Solution 2: Least expensive solution however not ideal based on connector height as long as it is under 80” total height. 3-Way/ T Base Connector 4-Way/ X Base Connector
  • 39. Placing Stack in a 4-station cluster Solution 3: Alternative solution that retains flexibility. 3-Way/ T Base Connector 2-way/ L Stack Connector 4-Way/ X Connector
  • 40. How many ATET are used in this example? Think about how many stack panels you see in this example. How many stacks are at a connector? How many are left over?
  • 41. ATET used in this example Did you count 4? Placement of ATET bracket.
  • 42. Floor to Ceiling Applications Floor to ceiling top channel is available in 12’ lengths. It may be cut in width and depth in the field to the desired length. The height can be cut to a maximum of 2” given the channel is 4” tall. It is available in core finishes.
  • 43. Cetra Power and Data Overview Page 36 Powered panels are shipped with an electrical distribution installed. Duplex receptacles are rated at 15 amps. 18” panels can be used to pass power to another however it cannot accept receptacles. Up to 4 duplex receptacles can be used in a powered panels and 8 in a mid-height electrical panel. Refer to page 67 for examples on the variety of jumpers used in a mixture of configurations.
  • 44. Cetra Power Distribution Assemblies Page 37 Power Distributions match the same size as the panel and can be installed on a non-powered panel. There are two wire configurations available for matching building power, 8 and 10-wire. Imagse taken from installation instructions.
  • 45. Cetra Jumpers Page 37 Jumpers are used to pass power from one panel to the next. 18” panels can pass power to an adjacent panel however it offer no power access. When an 18” is used in a t configuration one AEJ2 and one AEJ5 must be used to route power through a connector. Note mid-wire jumper examples on the right-hand side of the page.
  • 46. Cetra Pass- Thru Page 37 A pass-thru is used in instances where you are continuing power from base to mid-height. Image taken from installation instructions.
  • 47. Cetra Receptacles Page 37 Each duplex is marked with a circuit designation. All circuits are rated at 15 amps. Image taken from installation instructions.
  • 48. Cetra Power Entries Page 38 Ceiling entry is specified in addition to the ceiling entry panel. Ceiling Power Entry Assembly Includes: Junction Box 12’ jumper cable Hardware Basefeed enters from the side of a panel. The typical length is 72”. A power feed reduces one duplex receptacle location. Images taken from installation instructions.
  • 49. Cetra New York Components Page 39 A special power entry is required for New York. All panels should be specified as non-powered given distribution assemblies should be specified separately. Installation for this power connection must be made by a licensed electrician only. Images taken from installation instructions.
  • 50. Cetra Hardwire Components Page 39 and 43 Components should be specified to accommodate hardwire applications. The junction box specified separately is required for each panel that receives a field-installed hardwired electrical. Branching conduit is used between junction boxes and panel-to-panel connections. Cover plates are available in black only. Cover plate is required to cover junction box or power entry boxes. Images taken from the pricelist and installation instructions.
  • 51. Cetra 8-wire Electrical System Page 40 .
  • 52. Cetra 10-wire Electrical System Page 41 .
  • 53. Cetra Cable Management Page 42 Data cables are routed through the base and mid—wireways. 30” or wider panels are available to accept optional communication wireway covers. The opening is left of the center to allow for proper clearance. Verify the size of any commercial ports for application of the proper fit.
  • 54. CetraWireway Cover Punch Options Page 43 Images taken from the pricelist and installation instructions.
  • 55. CetraWorksurface Brackets Important: Brackets must be specified separately and sold individually. 1 3/16” needs support every 48”. 1 9/16” needs support every 60”.
  • 56. Cetra Application and Support Page 328 & 329 (Footprint)
  • 57. Cetra Edge Support Brackets Page 449(Footprint) Edge brackets are handed depending on where you are standing, facing the panel. Edge brackets at corner locations are not specific to hand of bracket. Images taken from installation instructions.
  • 58. Cetra Cantilever Page 450(Footprint) Cantilevers are handed. Flat brackets are sold individually however must be used in pairs with a cantilever when located at the seam of two surfaces. Images taken from installation instructions.
  • 59. Cetra Overhead Mounting Brackets & Overhead Ganging Brackets Overhead Brackets Page 519(Footprint) Ganging Brackets Page 523(Footprint)
  • 60. Cetra Square, Radius, and Curved Profile Overhead Brackets Page 519& 523(Footprint) Images taken from pricelist and installation instructions.
  • 61. Cetra Flat and Bevel Profile Overhead Brackets Page 519& 523(Footprint) Images taken from the pricelist and installation instructions. .
  • 62. Cetra Lunar Profile Overhead Brackets Page 519& 523(Footprint) Images taken from pricelist and installation instructions. .
  • 63. Cetra Flat Shelf Bracket Page 519(Footprint) Images taken from the pricelist and installation instructions. . Bracket image not available. 
  • 64. Kimball Office Resources Dealer Sales Manager Sales Specialist Customer Care/ By Design 800.482.1818 Product Technical Support 800.481.6696 Product Specifier Alibia de Vente Market Education 770.265.4006 or Alibia.devente@kimball.com
  • 65.

Notes de l'éditeur

  1. Cetra panel system evolved from the acquisition of a company named Artec around 1980. This cornerstone to our product portfolio is what we believe is the strongest panel system in the industry.
  2. Base waireways can accommodate (18) ¼” cables at 40% file and (44) 1/4” cables at 100%.
  3. Solid hardboard center septum is covered with two densities of fiberglass and the selected fabric. 18” W panels can be used to pass power from one panel to another, but cannot accept receptacles. When specifying two grades of fabric on a panel the price of the panel is divided by the total cost.
  4. These notes are not available in the pricelist.
  5. These notes are not available in the pricelist.
  6. These notes are not available in the pricelist.
  7. The first panel width mid-height power needs a jumper to go from base to mid-height with an additional distribution specified. Jumper cables will displace one receptacle at base and mid-height. On panels that are 24” and 30” wide jumper cables can connect to at the same or opposite end of an AED. Panels that are 36” wider must have the jumper installed on the same side.
  8. An extruded aluminum vertical power pole ships inside of the panel and attaches to the top of the panel with a top cap that is pre-cut. Any excess height telescopes into the ceiling or can be cut to size at the installation site.
  9. Sectional tile heights include heights at 7”, 12”,19” and 24”. These panels can be used in combination to other panel types within Cetra without adapter brackets. The placement for tiles is determined based on the frame configuration.
  10. Door, for the 80” Panels only. Bottom bracketry to secure the door is generated using the auto-connectors routine when a door is attached to a directional connector. Doors can not be hung on Y, V or Z connectors. Gates can not be hung on L, Y, V, Z, M or W connectors. The gate referenced on this page has been discontinued.
  11. The advantage in using this panel is to not have any breaks in Traxx while connecting at any point without interuption.
  12. V, Y and Z connectors cannot be used next to hinged doors. Power and data can be routed through connectors. M wall mount works with the thickness of Traxx. It offers no adjustment for out-of-plumb walls. W wall mount offers 5/8” lateral adjustment for out-of-plumb walls in addition to allowing for an adjacent door mount.
  13. The hi-lo connector kits cannot be used next to a connector, a z or y connector or floor-to-ceiling channel.
  14. Note the minimum wing chart on the right hand side of the page.
  15. Overheads cannot be hung in a row of stackable panels where there is a hi-lo.
  16. All sides of the stack connector must be counterbalanced. You cannot change height with a stack connector at a connector. Stack can only drop one height coming off of the stack connector at the first panel touching the stack connector.
  17. 18” panels are only available with non-punched wireway covers.