           In this slide show:
Waiting Room Plaster Work Update

        February 11, 2013
The waiting room looking east towards the trackside. Most of the vertical plaster work has been
completed.
A northeast view towards the future Men’s room.
A view looking north towards Amtrak’s new ticketing area. New lighting for the waiting room
and the second floor balcony with be LEDs to maximize efficiency.
The beautiful quarter circle balcony is almost fully repaired. The original damaged terrazzo floor
hidden under the plywood will also be repaired.
A view looking southwest. The original plaster is in surprisingly good condition. The new main
center chandelier will be a replicate with high powered LEDs for illumination.
A section of ceiling along the east wall with its final glossy white finish, similar to the original
condition when the station was first opened to the public in 1906.
The mustard color shown is one
of several paint colors applied
over the years. The final color
for the plaster will be white as
seen here.
Due to aesthetic reasons a sprinkler system will not be installed in the waiting room. Instead,
beam smoke detectors and 7 double door exits will ensure safe egress during emergency.
The waiting room west wall will get a
new 3 feet diameter clock.
Left: Looking into the new
stairwell in the waiting
room.

Right: Looking at the waiting
room from inside the new
stairwell.


Bottom: The new stairway
will provide public access to
the second floor balcony.
New marble column panels were being
installed next to the main waiting area.
New and original plaster pieces merge
together seamlessly.
Multiple elevated scaffolding was installed to aid in plaster restoration.
An original plaster detail shown with its damages repaired.
All tower levels will have
reinforcements over its original
cross frames. 4 new additional
columns were also installed for
additional load bearing on each
floor. The brick walls and floor
slabs are in mostly good
condition. An identified
damaged section on the 9th
floor was repaired.

Contenu connexe

Tendances

King Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showKing Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showallieger
 
King Street Station 7.27.10 update
King Street Station 7.27.10 update King Street Station 7.27.10 update
King Street Station 7.27.10 update allieger
 
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showKing Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showallieger
 
King Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showKing Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showallieger
 
King Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showKing Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showallieger
 
King Street Station 12.13.10 slideshow
King Street Station 12.13.10 slideshowKing Street Station 12.13.10 slideshow
King Street Station 12.13.10 slideshowallieger
 
King Street Station 8.23.10 update
King Street Station 8.23.10 updateKing Street Station 8.23.10 update
King Street Station 8.23.10 updateallieger
 
King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website updateallieger
 
1.1.11 King Street Station Update
1.1.11 King Street Station Update1.1.11 King Street Station Update
1.1.11 King Street Station Updateallieger
 
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plazaallieger
 
071611 slideshow phase2a
071611 slideshow phase2a071611 slideshow phase2a
071611 slideshow phase2aallieger
 
Alexan Uptown Tour
Alexan Uptown TourAlexan Uptown Tour
Alexan Uptown TourKEPHART
 
King Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showKing Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showallieger
 
townhouse 120 + 130
townhouse 120 + 130townhouse 120 + 130
townhouse 120 + 130phaus1
 
Split Level Residence
Split Level ResidenceSplit Level Residence
Split Level ResidenceHammad Haroon
 
The Lofts At The Lyric
The Lofts At The LyricThe Lofts At The Lyric
The Lofts At The Lyricdougwalsh
 
New Church (New York) Renovation Plans
New Church (New York) Renovation PlansNew Church (New York) Renovation Plans
New Church (New York) Renovation PlansNew York New Church
 

Tendances (20)

King Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showKing Street Station 3.31.11 slide show
King Street Station 3.31.11 slide show
 
King Street Station 7.27.10 update
King Street Station 7.27.10 update King Street Station 7.27.10 update
King Street Station 7.27.10 update
 
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showKing Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
 
King Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showKing Street Station 4.11.11 slide show
King Street Station 4.11.11 slide show
 
King Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showKing Street Station 3.30.11 slide show
King Street Station 3.30.11 slide show
 
King Street Station 12.13.10 slideshow
King Street Station 12.13.10 slideshowKing Street Station 12.13.10 slideshow
King Street Station 12.13.10 slideshow
 
King Street Station 8.23.10 update
King Street Station 8.23.10 updateKing Street Station 8.23.10 update
King Street Station 8.23.10 update
 
King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website update
 
1.1.11 King Street Station Update
1.1.11 King Street Station Update1.1.11 King Street Station Update
1.1.11 King Street Station Update
 
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
 
071611 slideshow phase2a
071611 slideshow phase2a071611 slideshow phase2a
071611 slideshow phase2a
 
Alexan Uptown Tour
Alexan Uptown TourAlexan Uptown Tour
Alexan Uptown Tour
 
TUSCAN APT RENO
TUSCAN APT RENOTUSCAN APT RENO
TUSCAN APT RENO
 
King Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showKing Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide show
 
townhouse 120 + 130
townhouse 120 + 130townhouse 120 + 130
townhouse 120 + 130
 
Split Level Residence
Split Level ResidenceSplit Level Residence
Split Level Residence
 
Du House
Du HouseDu House
Du House
 
The Lofts At The Lyric
The Lofts At The LyricThe Lofts At The Lyric
The Lofts At The Lyric
 
New Church (New York) Renovation Plans
New Church (New York) Renovation PlansNew Church (New York) Renovation Plans
New Church (New York) Renovation Plans
 
Energy modelling Report
Energy modelling ReportEnergy modelling Report
Energy modelling Report
 

Similaire à 2.11.2013 King Street Station

1326 Cunningham - The Basement
1326 Cunningham - The Basement1326 Cunningham - The Basement
1326 Cunningham - The Basementronmidwest
 
GeorgiaStonePortfolio
GeorgiaStonePortfolioGeorgiaStonePortfolio
GeorgiaStonePortfolioGeorgia Stone
 
King Street Station 7.5.10 website update
King Street Station 7.5.10 website updateKing Street Station 7.5.10 website update
King Street Station 7.5.10 website updateallieger
 
64 Patterson Renovation
64 Patterson Renovation64 Patterson Renovation
64 Patterson RenovationMark Venture
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work Nakul Kongovi
 
Passive house report
Passive house reportPassive house report
Passive house reportMartín Amado
 
S.Palo portfolio
S.Palo portfolioS.Palo portfolio
S.Palo portfolioSimona Palo
 
LECTURE - Easton House - VDIS10006 Restoration Interiors 1
LECTURE - Easton House - VDIS10006 Restoration Interiors 1LECTURE - Easton House - VDIS10006 Restoration Interiors 1
LECTURE - Easton House - VDIS10006 Restoration Interiors 1Virtu Institute
 
11.1.10 King Street Station website update
11.1.10 King Street Station  website update11.1.10 King Street Station  website update
11.1.10 King Street Station website updateallieger
 
Short Sale Presentation
Short Sale PresentationShort Sale Presentation
Short Sale PresentationAlison Torba
 
Hinsdale Public Library Renovation Project Part 1
Hinsdale Public Library Renovation Project Part 1Hinsdale Public Library Renovation Project Part 1
Hinsdale Public Library Renovation Project Part 1Hinsdale Public Library
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual DictionaryStorefront
 
Construction and Architecture Magazine
Construction and Architecture MagazineConstruction and Architecture Magazine
Construction and Architecture MagazineRemona Divekar
 
King Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showKing Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showallieger
 
Dad's Remodel 1326 continues
Dad's Remodel 1326 continuesDad's Remodel 1326 continues
Dad's Remodel 1326 continuesronmidwest
 

Similaire à 2.11.2013 King Street Station (20)

1314 2nd Street
1314 2nd Street1314 2nd Street
1314 2nd Street
 
1326 Cunningham - The Basement
1326 Cunningham - The Basement1326 Cunningham - The Basement
1326 Cunningham - The Basement
 
GeorgiaStonePortfolio
GeorgiaStonePortfolioGeorgiaStonePortfolio
GeorgiaStonePortfolio
 
Carving studio
Carving studioCarving studio
Carving studio
 
CotY National Web Version
CotY National Web VersionCotY National Web Version
CotY National Web Version
 
King Street Station 7.5.10 website update
King Street Station 7.5.10 website updateKing Street Station 7.5.10 website update
King Street Station 7.5.10 website update
 
64 Patterson Renovation
64 Patterson Renovation64 Patterson Renovation
64 Patterson Renovation
 
Lozier Scope of Work
Lozier Scope of Work Lozier Scope of Work
Lozier Scope of Work
 
Passive house report
Passive house reportPassive house report
Passive house report
 
S.Palo portfolio
S.Palo portfolioS.Palo portfolio
S.Palo portfolio
 
LECTURE - Easton House - VDIS10006 Restoration Interiors 1
LECTURE - Easton House - VDIS10006 Restoration Interiors 1LECTURE - Easton House - VDIS10006 Restoration Interiors 1
LECTURE - Easton House - VDIS10006 Restoration Interiors 1
 
11.1.10 King Street Station website update
11.1.10 King Street Station  website update11.1.10 King Street Station  website update
11.1.10 King Street Station website update
 
Backed by Real Experience
Backed by Real ExperienceBacked by Real Experience
Backed by Real Experience
 
Short Sale Presentation
Short Sale PresentationShort Sale Presentation
Short Sale Presentation
 
all sheets
all sheetsall sheets
all sheets
 
Hinsdale Public Library Renovation Project Part 1
Hinsdale Public Library Renovation Project Part 1Hinsdale Public Library Renovation Project Part 1
Hinsdale Public Library Renovation Project Part 1
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Construction and Architecture Magazine
Construction and Architecture MagazineConstruction and Architecture Magazine
Construction and Architecture Magazine
 
King Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showKing Street Station 7.16.11 slide show
King Street Station 7.16.11 slide show
 
Dad's Remodel 1326 continues
Dad's Remodel 1326 continuesDad's Remodel 1326 continues
Dad's Remodel 1326 continues
 

Plus de allieger

Seattle's Protected Bike Lanes
Seattle's Protected Bike LanesSeattle's Protected Bike Lanes
Seattle's Protected Bike Lanesallieger
 
Cycletracks
CycletracksCycletracks
Cycletracksallieger
 
5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint updateallieger
 
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showKing Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showallieger
 
Gardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park PresentationGardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park Presentationallieger
 
Greenwood 2
Greenwood 2Greenwood 2
Greenwood 2allieger
 
11.30.10 King Street Station Update
11.30.10 King Street Station Update11.30.10 King Street Station Update
11.30.10 King Street Station Updateallieger
 
King Street Station 8.12.10 website update
King Street Station 8.12.10 website updateKing Street Station 8.12.10 website update
King Street Station 8.12.10 website updateallieger
 

Plus de allieger (8)

Seattle's Protected Bike Lanes
Seattle's Protected Bike LanesSeattle's Protected Bike Lanes
Seattle's Protected Bike Lanes
 
Cycletracks
CycletracksCycletracks
Cycletracks
 
5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update
 
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showKing Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
 
Gardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park PresentationGardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park Presentation
 
Greenwood 2
Greenwood 2Greenwood 2
Greenwood 2
 
11.30.10 King Street Station Update
11.30.10 King Street Station Update11.30.10 King Street Station Update
11.30.10 King Street Station Update
 
King Street Station 8.12.10 website update
King Street Station 8.12.10 website updateKing Street Station 8.12.10 website update
King Street Station 8.12.10 website update
 

2.11.2013 King Street Station

  • 1. Phase 2B In this slide show: Waiting Room Plaster Work Update February 11, 2013
  • 2. The waiting room looking east towards the trackside. Most of the vertical plaster work has been completed.
  • 3. A northeast view towards the future Men’s room.
  • 4. A view looking north towards Amtrak’s new ticketing area. New lighting for the waiting room and the second floor balcony with be LEDs to maximize efficiency.
  • 5. The beautiful quarter circle balcony is almost fully repaired. The original damaged terrazzo floor hidden under the plywood will also be repaired.
  • 6. A view looking southwest. The original plaster is in surprisingly good condition. The new main center chandelier will be a replicate with high powered LEDs for illumination.
  • 7. A section of ceiling along the east wall with its final glossy white finish, similar to the original condition when the station was first opened to the public in 1906.
  • 8. The mustard color shown is one of several paint colors applied over the years. The final color for the plaster will be white as seen here.
  • 9. Due to aesthetic reasons a sprinkler system will not be installed in the waiting room. Instead, beam smoke detectors and 7 double door exits will ensure safe egress during emergency.
  • 10. The waiting room west wall will get a new 3 feet diameter clock.
  • 11. Left: Looking into the new stairwell in the waiting room. Right: Looking at the waiting room from inside the new stairwell. Bottom: The new stairway will provide public access to the second floor balcony.
  • 12. New marble column panels were being installed next to the main waiting area.
  • 13. New and original plaster pieces merge together seamlessly.
  • 14. Multiple elevated scaffolding was installed to aid in plaster restoration.
  • 15. An original plaster detail shown with its damages repaired.
  • 16. All tower levels will have reinforcements over its original cross frames. 4 new additional columns were also installed for additional load bearing on each floor. The brick walls and floor slabs are in mostly good condition. An identified damaged section on the 9th floor was repaired.

Notes de l'éditeur

  1. White paint final color or just under coat?Was all original plaster white?Turn yellow overtime?Chandelier in the making? Made of glass and brasss?
  2. Men’s restroom ahead?Total number of exits?Newaddional wall plugs for computers?Fire sprinklers system? Terraso floors repair?
  3. Lighting source? Orginal Plaster condition still good after 100+ years?
  4. What Richter scale can the new building stand? Bricks or floor finishes? Brick and floor condition?