C  H  I  N  A      S  K  E  T  C  H  E  S  
A  High  Rise  Planning  Study    
Shanghai    
In June of 2011, I traveled to Shanghai to meet with the
Guang Group project team to kickoff the planning and
design of a major mixed-use project in the  suburbs.

The following probe / sketch book begins to test some of
the client presumptions and     opportunity.

The          program, density, F.A.R. and massing was
originally approved from the initial master plan and the
never completed project has footings in place for the first
phase high rise and hotel.

The sketches and comments are onsite observations and
are meant only for information rather than design direction.
That being said, the client group and their partner do have a
quality / character in mind that will help to establish a
Guang Group            in Shanghai.

This project is the            first entry into the Shanghai
market and will be followed by others that are currently
under development. The significance of the project is
underscored by the fact that its project manager is Guang
        President, Larry Zhang.

                                             Lewis T. May, FASLA
W            Gakuen Cocoon Tower
                         




                                                         The Guang Group
                                                         wants to make a
                                                         statement with an

S           N
                                                         iconic building and
                                                         this image
                                                         generated lots of
                                                         discussion.

                The site is in the Shanghai suburbs and is partially
                developed. Vehicular access is from the east, primarily
                with partial southern and northern connectors.

                A subway stop is being created along the southern edge
                affording a pedestrian link to the site. A creek parallels the
                southern edge to the property and will require remediation
                to accommodate pedestrian access to the subway
                station.

                The high speed rail linking Beijing and Shanghai lies west
                of the site about a mile away. Major roadways are
        E       parallel to the east and south property edges.
Al Dana at Al Raha Beach, Abu Dhabi, UAE




As part of the work sessions Lewis presented numerous
tower scenarios and the high rise on the right side of the Al
Dana image was of interest to them.


The site is featureless and very low / flood prone.
It is approximately 40 acres in size, rectilinear and
barren of trees and vegetation. Structural foundations
are in place for the 24 story tower and 9 story hotel.

Drawings do exist for what was proposed initially but
was not completed. These footprints and F.A.R. are
already established for Phase One. First task is to re-
think the original project and create a much more
                                   -skin, but a lot more.

Phase Two is up to us but as originally planned, it is
comprised of four 19 story commercial / office towers.
The mix of uses lends itself to a lively destination of residential,

is to be removed and the site re-developed.

The long narrow site is configured with a mix of uses
already approved by the local authorities though the
layout is flexible the F.A.R. is set.

An unusual discussion was to design the office towers
with a floor to floor height of 5.2 meters to be client
converted to two floors in future phases.
Gakuen Spiral Tower




                                      Though the Gakuen
                                      Tower was one of the
                                      preferred images
                                      presented to the
                                      client group, Lewis
                                      reminded the team
                                      that variance from a
                                      simple form could be
                                      a serious cost issue.



The project must be respondent to modest budget and
proforma. However the adjacent sketch was done for Larry
on one of several attempts to communicate the perimeter
wall complexity as a driver of project costs.

The
rents of downtown Shanghai respondent to a costly or
luxurious façade. Simple yet unique will be an appropriate
aesthetic.
Ocean Heights




selected by the client as possibly representative of the character
they liked for the towers in Shanghai.


The
Shanghai that reflects the suburban nature of the
development. The obvious nod to downtown and its iconic

interested in mimicking for their project.

Two towers adjacent to our site were less than what they
expected as well. The existing towers, though new and 90%
A well designed streetscape/access can create a significant
site amenity for the development. The entry way gets the


The entry drive, an east / west connector, is a possible
site form giver. Access from the north and south is limited
and does little to evoke a positive entry statement.

 A well designed cross-section and a significant
landscape scheme can create a dramatic approach to the
development. The north edge is built-out with high rises

subway constraining access.
The high rise image entryway phase #1 should be designed as a
destination and gathering space. It should be inviting and lively.


34 story high rise above a podium base retail / commercial
center.

A parking garage will serve both the signature office tower

like development is to be phase #1 of the project.
character described by the client on site in Shanghai. A
simplified skin and floor plate would also better reflect the
project budget and construction costs.
An idea discussed was to have the four buildings in the
rear of the site act as a single or standalone element. The
massing is peculiar and the constructability complicated
and costly.

To best reflect the modest budget requirements, a much
more straight-forward design response is required..
Agato            Asymmetrical      Asymmetrical    Cut Out




Ornamental Top   Setbacks       Tapered Top       Wedge Cuts
C  H  I  N  A      S  K  E  T  C  H  E  S  
C  H  I  N  A      S  K  E  T  C  H  E  S  



           Ken  Bailey,  Studio  Director,  receives  direction  from  Lewis.  
China Sketches by PSP Vol. 1 Shanghai

Contenu connexe

Tendances

Deliverable Layout
Deliverable LayoutDeliverable Layout
Deliverable Layout
Karen Hao
 
Ma'en Bata - Bachelor Thesis Booklet
Ma'en Bata - Bachelor Thesis BookletMa'en Bata - Bachelor Thesis Booklet
Ma'en Bata - Bachelor Thesis Booklet
Ma'en Bata
 
Portfolio2015Printable
Portfolio2015PrintablePortfolio2015Printable
Portfolio2015Printable
Naomi Siodmok
 
Ashley_Colquhoun_Portfolio
Ashley_Colquhoun_PortfolioAshley_Colquhoun_Portfolio
Ashley_Colquhoun_Portfolio
acolquh
 
Ma'en Bata - Portfolio
Ma'en Bata - PortfolioMa'en Bata - Portfolio
Ma'en Bata - Portfolio
Ma'en Bata
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element final
Elaine Bong
 
TinPhamTran Portfolio 2015
TinPhamTran Portfolio 2015TinPhamTran Portfolio 2015
TinPhamTran Portfolio 2015
Tin Pham-Tran
 

Tendances (18)

Deliverable Layout
Deliverable LayoutDeliverable Layout
Deliverable Layout
 
House X by Peter Eisenmen
House X by Peter EisenmenHouse X by Peter Eisenmen
House X by Peter Eisenmen
 
Master of Landscape Architecture Portfolio Yihui Chen
Master of Landscape Architecture Portfolio Yihui ChenMaster of Landscape Architecture Portfolio Yihui Chen
Master of Landscape Architecture Portfolio Yihui Chen
 
Ma'en Bata - Bachelor Thesis Booklet
Ma'en Bata - Bachelor Thesis BookletMa'en Bata - Bachelor Thesis Booklet
Ma'en Bata - Bachelor Thesis Booklet
 
Landscape Architecture Portfolio Chen
Landscape Architecture Portfolio ChenLandscape Architecture Portfolio Chen
Landscape Architecture Portfolio Chen
 
Portfolio2015Printable
Portfolio2015PrintablePortfolio2015Printable
Portfolio2015Printable
 
Martha schwartz
Martha schwartzMartha schwartz
Martha schwartz
 
Ashley_Colquhoun_Portfolio
Ashley_Colquhoun_PortfolioAshley_Colquhoun_Portfolio
Ashley_Colquhoun_Portfolio
 
Landscape Architecture Portfolio
Landscape Architecture PortfolioLandscape Architecture Portfolio
Landscape Architecture Portfolio
 
Landspace Ar.martha schwart
Landspace Ar.martha schwartLandspace Ar.martha schwart
Landspace Ar.martha schwart
 
Portfolio
PortfolioPortfolio
Portfolio
 
Ma'en Bata - Portfolio
Ma'en Bata - PortfolioMa'en Bata - Portfolio
Ma'en Bata - Portfolio
 
Portfolio.o
Portfolio.oPortfolio.o
Portfolio.o
 
HighRise Presentation
HighRise PresentationHighRise Presentation
HighRise Presentation
 
Energy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood RiskEnergy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood Risk
 
July 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts PresentationJuly 24, 2013 City Council Freeway Aesthetic Concepts Presentation
July 24, 2013 City Council Freeway Aesthetic Concepts Presentation
 
Contradictory levels the double functioning element final
Contradictory levels the double functioning element finalContradictory levels the double functioning element final
Contradictory levels the double functioning element final
 
TinPhamTran Portfolio 2015
TinPhamTran Portfolio 2015TinPhamTran Portfolio 2015
TinPhamTran Portfolio 2015
 

Similaire à China Sketches by PSP Vol. 1 Shanghai (13)

Shanghai office tower (salsa)
Shanghai office tower (salsa)Shanghai office tower (salsa)
Shanghai office tower (salsa)
 
Osama abd elmohsen
Osama abd elmohsenOsama abd elmohsen
Osama abd elmohsen
 
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
2443-rags-to-riches-how-chicagos-111-west-wacker-finally-got-built
 
XXL2013 - Team 3 - PinUp Presentation
XXL2013 - Team 3 - PinUp PresentationXXL2013 - Team 3 - PinUp Presentation
XXL2013 - Team 3 - PinUp Presentation
 
Project Management Project 1 Final slides
Project Management Project 1 Final slidesProject Management Project 1 Final slides
Project Management Project 1 Final slides
 
2016-0116_JShim Personal
2016-0116_JShim Personal2016-0116_JShim Personal
2016-0116_JShim Personal
 
ESTHER_DESIGN PORTFOLIO_UPDATED.ppt
ESTHER_DESIGN PORTFOLIO_UPDATED.pptESTHER_DESIGN PORTFOLIO_UPDATED.ppt
ESTHER_DESIGN PORTFOLIO_UPDATED.ppt
 
Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01
 
Design Portfolio
Design PortfolioDesign Portfolio
Design Portfolio
 
Portfolio 2013
Portfolio 2013Portfolio 2013
Portfolio 2013
 
CV & portfolio Vedika Mathur
CV & portfolio  Vedika MathurCV & portfolio  Vedika Mathur
CV & portfolio Vedika Mathur
 
NR Profile 2017
NR Profile 2017NR Profile 2017
NR Profile 2017
 
BMorales_Portfolio
BMorales_PortfolioBMorales_Portfolio
BMorales_Portfolio
 

Dernier

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Dernier (20)

Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 

China Sketches by PSP Vol. 1 Shanghai

  • 1. C  H  I  N  A      S  K  E  T  C  H  E  S  
  • 2. A  High  Rise  Planning  Study     Shanghai     In June of 2011, I traveled to Shanghai to meet with the Guang Group project team to kickoff the planning and design of a major mixed-use project in the suburbs. The following probe / sketch book begins to test some of the client presumptions and opportunity. The program, density, F.A.R. and massing was originally approved from the initial master plan and the never completed project has footings in place for the first phase high rise and hotel. The sketches and comments are onsite observations and are meant only for information rather than design direction. That being said, the client group and their partner do have a quality / character in mind that will help to establish a Guang Group in Shanghai. This project is the first entry into the Shanghai market and will be followed by others that are currently under development. The significance of the project is underscored by the fact that its project manager is Guang President, Larry Zhang. Lewis T. May, FASLA
  • 3. W Gakuen Cocoon Tower     The Guang Group wants to make a statement with an S N iconic building and this image generated lots of discussion. The site is in the Shanghai suburbs and is partially developed. Vehicular access is from the east, primarily with partial southern and northern connectors. A subway stop is being created along the southern edge affording a pedestrian link to the site. A creek parallels the southern edge to the property and will require remediation to accommodate pedestrian access to the subway station. The high speed rail linking Beijing and Shanghai lies west of the site about a mile away. Major roadways are E parallel to the east and south property edges.
  • 4. Al Dana at Al Raha Beach, Abu Dhabi, UAE As part of the work sessions Lewis presented numerous tower scenarios and the high rise on the right side of the Al Dana image was of interest to them. The site is featureless and very low / flood prone. It is approximately 40 acres in size, rectilinear and barren of trees and vegetation. Structural foundations are in place for the 24 story tower and 9 story hotel. Drawings do exist for what was proposed initially but was not completed. These footprints and F.A.R. are already established for Phase One. First task is to re- think the original project and create a much more -skin, but a lot more. Phase Two is up to us but as originally planned, it is comprised of four 19 story commercial / office towers.
  • 5. The mix of uses lends itself to a lively destination of residential, is to be removed and the site re-developed. The long narrow site is configured with a mix of uses already approved by the local authorities though the layout is flexible the F.A.R. is set. An unusual discussion was to design the office towers with a floor to floor height of 5.2 meters to be client converted to two floors in future phases.
  • 6. Gakuen Spiral Tower Though the Gakuen Tower was one of the preferred images presented to the client group, Lewis reminded the team that variance from a simple form could be a serious cost issue. The project must be respondent to modest budget and proforma. However the adjacent sketch was done for Larry on one of several attempts to communicate the perimeter wall complexity as a driver of project costs. The rents of downtown Shanghai respondent to a costly or luxurious façade. Simple yet unique will be an appropriate aesthetic.
  • 7. Ocean Heights selected by the client as possibly representative of the character they liked for the towers in Shanghai. The Shanghai that reflects the suburban nature of the development. The obvious nod to downtown and its iconic interested in mimicking for their project. Two towers adjacent to our site were less than what they expected as well. The existing towers, though new and 90%
  • 8. A well designed streetscape/access can create a significant site amenity for the development. The entry way gets the The entry drive, an east / west connector, is a possible site form giver. Access from the north and south is limited and does little to evoke a positive entry statement. A well designed cross-section and a significant landscape scheme can create a dramatic approach to the development. The north edge is built-out with high rises subway constraining access.
  • 9. The high rise image entryway phase #1 should be designed as a destination and gathering space. It should be inviting and lively. 34 story high rise above a podium base retail / commercial center. A parking garage will serve both the signature office tower like development is to be phase #1 of the project.
  • 10. character described by the client on site in Shanghai. A simplified skin and floor plate would also better reflect the project budget and construction costs. An idea discussed was to have the four buildings in the rear of the site act as a single or standalone element. The massing is peculiar and the constructability complicated and costly. To best reflect the modest budget requirements, a much more straight-forward design response is required..
  • 11. Agato Asymmetrical Asymmetrical Cut Out Ornamental Top Setbacks Tapered Top Wedge Cuts
  • 12.
  • 13. C  H  I  N  A      S  K  E  T  C  H  E  S   C  H  I  N  A      S  K  E  T  C  H  E  S   Ken  Bailey,  Studio  Director,  receives  direction  from  Lewis.