POST TENSIONING
Review Session
Review Session
Objective: Performance through product quality, as
well as effective installation, supervision and inspection
to achieve a successful completion of a project.
Note: This review session will not replace the training
that an installation/ inspection agency receives.
AMSYSCO, Inc. is not responsible for the training of the
installation crew or individual associated with the field
installation of the post tensioning material.
I. Change in ACI Code
• To use an encapsulated system at all locations
on a commercial structure.
II. Upgrade of AMSYSCO’s Encapsulated System
• No grease at “dead ends” and stressing ends
• Grease to be filled in sleeves of intermediate
anchors
• Plastic sheathing remains intact within the
extended sleeve of the anchor
– Field labor savings
III. Post Tensioning Field Operations
A. Storage & Handling
• Store PT bundles off ground
• Cover with tarp
• If bundle is shrink wrapped, punch holes in
wrapping to allow air circulation
• Use nylon slings for handling
• Do not drag by “dead end”
• All material (PT tendons, anchors, wedges) to be
stored in dry environment
• Mill certification
• Calibration chart of stressing equipment
III. Post Tensioning Field Operations
B. Installation
• Attach stressing anchors and intermediate
anchors to bulkhead
• Position of anchor with regards to bulkhead
• Tendons installed in a curve
• Anchor/ pocket former
• Pocket former and grease – What type of
grease
• Use WD-40
Installation (cont.)
• Overlapping anchors
• Reverse curvature
• Position of support and backup bars
• Wobble
• Standard friction loss
• Can tendon be moved vertically or horizontally?
• Can anchor (position) be moved vertically or
horizontally?
III. Post Tensioning Field Operations
C. Stressing
• Wedge orientation
• Gage pressure – What does it mean?
• Position of stressing jack
• Location and positioning of pump
• Eye contact by pump operator
• One-way stressing
• Two-way stressing
• Multiple pulls (stressing) on the same tendon
Stressing (cont.)
• Paint marking (benchmark)
• Scale and guide for paint marker
• Measurement of elongation
• Recording of elongation
• Recording of gage pressure
• Recording notes in the Elongation Report
Stressing (cont.)
• Elongation tolerances
• Under elongation
• Over elongation
• Instant comparison of field elongations vs.
mathematical elongations
• Decision making if there is deviation and
resultant action
• Submitting elongation report to the Structural
Engineer of Record
III. Post Tensioning Field Operations
D. Stressing Equipment
• Keep equipment dry at all times
• Service and maintenance of the stressing
equipment
• Calibration chart
• Safety
• Log of service by the operator or contractor’s
appointed person
III. Post Tensioning Field Operations
E. Miscellaneous
• Hairline cracks in wedges
• Strand break
– Why strand can break at a lower pressure/ force below the
ultimate breaking level
• Unraveled strand
• Kink in strand
• Length of electric cord from stressing pump
• Stressing equipment and rain
• Lift off
• Detensioning
• When to detension
• Overstressing (5%)

Contenu connexe

Tendances

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 
Post tensioning شد لاحق - مسبق الاجهاد
Post tensioning   شد لاحق - مسبق الاجهادPost tensioning   شد لاحق - مسبق الاجهاد
Post tensioning شد لاحق - مسبق الاجهادDr.Youssef Hammida
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Pre stressed concrete
Pre stressed concretePre stressed concrete
Pre stressed concreteGPT Stvd
 
comparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slabcomparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slab03065661166
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdSathish Kumar
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRahul
 
Introduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyIntroduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyEngr Shah Farooq
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential buildinggovt.poly kalamassery
 
Post tension tendon
Post tension tendonPost tension tendon
Post tension tendonipcbridge
 
5. pre stressed & pre-cast members
5. pre stressed & pre-cast members5. pre stressed & pre-cast members
5. pre stressed & pre-cast membersNoshad Ahmed Wahocho
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
Post tensioned (PT) slabs
Post tensioned (PT) slabsPost tensioned (PT) slabs
Post tensioned (PT) slabsFOYSOLMAHMUD1
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsAMSYSCO Inc.
 

Tendances (20)

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Final thesis presentation.
Final thesis presentation.Final thesis presentation.
Final thesis presentation.
 
Post tensioning شد لاحق - مسبق الاجهاد
Post tensioning   شد لاحق - مسبق الاجهادPost tensioning   شد لاحق - مسبق الاجهاد
Post tensioning شد لاحق - مسبق الاجهاد
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 
Pre stressed concrete
Pre stressed concretePre stressed concrete
Pre stressed concrete
 
comparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slabcomparison between Post tensioned slab and conventional slab
comparison between Post tensioned slab and conventional slab
 
Post Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt LtdPost Tensioning System Utracon Structural system Pvt Ltd
Post Tensioning System Utracon Structural system Pvt Ltd
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Introduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete TechnologyIntroduction to Pre-stressed and Precast Concrete Technology
Introduction to Pre-stressed and Precast Concrete Technology
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Post tension tendon
Post tension tendonPost tension tendon
Post tension tendon
 
5. pre stressed & pre-cast members
5. pre stressed & pre-cast members5. pre stressed & pre-cast members
5. pre stressed & pre-cast members
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Post tensioned (PT) slabs
Post tensioned (PT) slabsPost tensioned (PT) slabs
Post tensioned (PT) slabs
 
Post-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for ContractorsPost-Tension Concrete - Info session for Contractors
Post-Tension Concrete - Info session for Contractors
 

En vedette

CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningCTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningAMSYSCO Inc.
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckAMSYSCO Inc.
 
What Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionWhat Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionAMSYSCO Inc.
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningAMSYSCO Inc.
 
Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven TowerAMSYSCO Inc.
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldAMSYSCO Inc.
 
Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)AMSYSCO Inc.
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsCCL Concrete
 
Minnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningMinnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningAMSYSCO Inc.
 
Post operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peterPost operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peterKesho Conference
 
The Importance of Unbonded Field Certification
The Importance of Unbonded Field CertificationThe Importance of Unbonded Field Certification
The Importance of Unbonded Field CertificationAMSYSCO Inc.
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabsgopichand's
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab designSatish Narayan
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 

En vedette (15)

CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-TensioningCTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
CTBUH Innovation Award Nominee - Vertical Unbonded Post-Tensioning
 
OneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deckOneEleven Tower - post tensioned transfer deck
OneEleven Tower - post tensioned transfer deck
 
What Could You Buy For $263 Trillion
What Could You Buy For $263 TrillionWhat Could You Buy For $263 Trillion
What Could You Buy For $263 Trillion
 
Infrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post TensioningInfrastructure and Unbonded Post Tensioning
Infrastructure and Unbonded Post Tensioning
 
Case Study - One Eleven Tower
Case Study - One Eleven TowerCase Study - One Eleven Tower
Case Study - One Eleven Tower
 
Case Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and FieldCase Study - University of Colorado Parking Garage and Field
Case Study - University of Colorado Parking Garage and Field
 
Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)Amsysco Presentation (Slideshare)
Amsysco Presentation (Slideshare)
 
Build for You
Build for YouBuild for You
Build for You
 
Post formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabsPost formed holes-in_post-tensioned_slabs
Post formed holes-in_post-tensioned_slabs
 
Minnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post TensioningMinnesota Twins Target Field & Post Tensioning
Minnesota Twins Target Field & Post Tensioning
 
Post operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peterPost operative electron beam therapy for keloids by loreh peter
Post operative electron beam therapy for keloids by loreh peter
 
The Importance of Unbonded Field Certification
The Importance of Unbonded Field CertificationThe Importance of Unbonded Field Certification
The Importance of Unbonded Field Certification
 
post tensioning slabs
post tensioning slabspost tensioning slabs
post tensioning slabs
 
Civil structural engineering - Flat slab design
Civil structural engineering -  Flat slab designCivil structural engineering -  Flat slab design
Civil structural engineering - Flat slab design
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 

Similaire à Post Tensioning Review Session for Installers

Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kilnmkpq pasha
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSandeep Jain
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfPinakRay1
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252zul husni
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyNSW Environment and Planning
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 
Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...NSW Environment and Planning
 
Tire Testing Applications & Solutions
Tire Testing Applications & SolutionsTire Testing Applications & Solutions
Tire Testing Applications & SolutionsInstron
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)SAJJAD KHUDHUR ABBAS
 
Locating and clamping devices.pptx
Locating and clamping devices.pptxLocating and clamping devices.pptx
Locating and clamping devices.pptxSadhasivam38
 
apm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.pptapm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.pptssuser54b5c5
 

Similaire à Post Tensioning Review Session for Installers (20)

Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Safety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of ConstructionSafety & Quality Aspects in '3-S' System of Construction
Safety & Quality Aspects in '3-S' System of Construction
 
Scaffold safe work method statement
Scaffold safe work method statementScaffold safe work method statement
Scaffold safe work method statement
 
UNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdfUNIT 3 Part B - Safety in Special Construction Operations.pdf
UNIT 3 Part B - Safety in Special Construction Operations.pdf
 
safety while prestressed concrete
safety while prestressed concretesafety while prestressed concrete
safety while prestressed concrete
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
Understanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard ChittyUnderstanding the cause - Alan Burns and Gerard Chitty
Understanding the cause - Alan Burns and Gerard Chitty
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 
Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...Application of Standards and guidelines for access systems to manage fall fro...
Application of Standards and guidelines for access systems to manage fall fro...
 
CS S3
CS S3CS S3
CS S3
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION Episode 22 : PROJECT EXECUTION
Episode 22 : PROJECT EXECUTION
 
Tire Testing Applications & Solutions
Tire Testing Applications & SolutionsTire Testing Applications & Solutions
Tire Testing Applications & Solutions
 
Episode 34 : Project Execution Part (5)
Episode 34 :  Project Execution Part (5)Episode 34 :  Project Execution Part (5)
Episode 34 : Project Execution Part (5)
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Locating and clamping devices.pptx
Locating and clamping devices.pptxLocating and clamping devices.pptx
Locating and clamping devices.pptx
 
apm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.pptapm-et13e-chapter-21-woodworking-machinery.ppt
apm-et13e-chapter-21-woodworking-machinery.ppt
 

Plus de AMSYSCO Inc.

Concrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureConcrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureAMSYSCO Inc.
 
AMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO Inc.
 
PTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementPTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementAMSYSCO Inc.
 
Case Study – Social Media Small Business
Case Study – Social Media Small BusinessCase Study – Social Media Small Business
Case Study – Social Media Small BusinessAMSYSCO Inc.
 
2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow AwardsAMSYSCO Inc.
 
2008 PTI Awards Booklet
2008 PTI Awards Booklet2008 PTI Awards Booklet
2008 PTI Awards BookletAMSYSCO Inc.
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned ConcreteAMSYSCO Inc.
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post TensioningAMSYSCO Inc.
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville ArenaAMSYSCO Inc.
 
ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosAMSYSCO Inc.
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & GarageAMSYSCO Inc.
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkAMSYSCO Inc.
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageAMSYSCO Inc.
 

Plus de AMSYSCO Inc. (14)

Concrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay InfrastructureConcrete International - Wayzata Bay Infrastructure
Concrete International - Wayzata Bay Infrastructure
 
AMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall BuildingsAMSYSCO's resume of Tall Buildings
AMSYSCO's resume of Tall Buildings
 
PTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavementPTI Journal : Buford Ave post-tensioned pavement
PTI Journal : Buford Ave post-tensioned pavement
 
Case Study – Social Media Small Business
Case Study – Social Media Small BusinessCase Study – Social Media Small Business
Case Study – Social Media Small Business
 
2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards2009 PTI Legends & Fellow Awards
2009 PTI Legends & Fellow Awards
 
2008 PTI Awards Booklet
2008 PTI Awards Booklet2008 PTI Awards Booklet
2008 PTI Awards Booklet
 
White paper - Encapsulated Post Tensioned Concrete
White paper -  Encapsulated Post Tensioned ConcreteWhite paper -  Encapsulated Post Tensioned Concrete
White paper - Encapsulated Post Tensioned Concrete
 
What Is Post Tensioning
What Is Post TensioningWhat Is Post Tensioning
What Is Post Tensioning
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville Arena
 
ENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan CondosENR Article: 1620 S. Michigan Condos
ENR Article: 1620 S. Michigan Condos
 
ENR Article; New Guthrie Theater & Garage
ENR Article;  New Guthrie Theater & GarageENR Article;  New Guthrie Theater & Garage
ENR Article; New Guthrie Theater & Garage
 
PTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The ParkPTI Journal Article: 340 On The Park
PTI Journal Article: 340 On The Park
 
ENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport GarageENR Article: Minneapolis St. Paul Airport Garage
ENR Article: Minneapolis St. Paul Airport Garage
 
Amsysco Brochure
Amsysco BrochureAmsysco Brochure
Amsysco Brochure
 

Dernier

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Dernier (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 

Post Tensioning Review Session for Installers

  • 2. Review Session Objective: Performance through product quality, as well as effective installation, supervision and inspection to achieve a successful completion of a project. Note: This review session will not replace the training that an installation/ inspection agency receives. AMSYSCO, Inc. is not responsible for the training of the installation crew or individual associated with the field installation of the post tensioning material.
  • 3. I. Change in ACI Code • To use an encapsulated system at all locations on a commercial structure.
  • 4. II. Upgrade of AMSYSCO’s Encapsulated System • No grease at “dead ends” and stressing ends • Grease to be filled in sleeves of intermediate anchors • Plastic sheathing remains intact within the extended sleeve of the anchor – Field labor savings
  • 5. III. Post Tensioning Field Operations A. Storage & Handling • Store PT bundles off ground • Cover with tarp • If bundle is shrink wrapped, punch holes in wrapping to allow air circulation • Use nylon slings for handling • Do not drag by “dead end” • All material (PT tendons, anchors, wedges) to be stored in dry environment • Mill certification • Calibration chart of stressing equipment
  • 6. III. Post Tensioning Field Operations B. Installation • Attach stressing anchors and intermediate anchors to bulkhead • Position of anchor with regards to bulkhead • Tendons installed in a curve • Anchor/ pocket former • Pocket former and grease – What type of grease • Use WD-40
  • 7. Installation (cont.) • Overlapping anchors • Reverse curvature • Position of support and backup bars • Wobble • Standard friction loss • Can tendon be moved vertically or horizontally? • Can anchor (position) be moved vertically or horizontally?
  • 8. III. Post Tensioning Field Operations C. Stressing • Wedge orientation • Gage pressure – What does it mean? • Position of stressing jack • Location and positioning of pump • Eye contact by pump operator • One-way stressing • Two-way stressing • Multiple pulls (stressing) on the same tendon
  • 9. Stressing (cont.) • Paint marking (benchmark) • Scale and guide for paint marker • Measurement of elongation • Recording of elongation • Recording of gage pressure • Recording notes in the Elongation Report
  • 10. Stressing (cont.) • Elongation tolerances • Under elongation • Over elongation • Instant comparison of field elongations vs. mathematical elongations • Decision making if there is deviation and resultant action • Submitting elongation report to the Structural Engineer of Record
  • 11. III. Post Tensioning Field Operations D. Stressing Equipment • Keep equipment dry at all times • Service and maintenance of the stressing equipment • Calibration chart • Safety • Log of service by the operator or contractor’s appointed person
  • 12. III. Post Tensioning Field Operations E. Miscellaneous • Hairline cracks in wedges • Strand break – Why strand can break at a lower pressure/ force below the ultimate breaking level • Unraveled strand • Kink in strand • Length of electric cord from stressing pump • Stressing equipment and rain • Lift off • Detensioning • When to detension • Overstressing (5%)