Introduction 
Turnout is the simplest combination of points and crossings which 
enables one track either a branch line or a siding, to take off from 
another track. So the object of turnout is to provide facilities for safe 
movement of trains in either direction on both the tracks. 
The assembly of various components which enables trains to move 
from one track to any other track either parallel to or diverging from 
track, is called a turnout or point and crossing. 
2
Turnout 
The combination of points and crossing of a railway track, is called a turn 
out. 
According to the direction of diversion, turnouts are classified as under:- 
Left hand turn out: The turnout which diverts the train to the left, is called 
a left hand turnout. 
Right hand turnout: The turnout which diverts the train to the right, is 
called a right hand turnout 
3
Left Hand Turnout 
4
Line Diagram of a left hand 
turnout 
5
Component Parts of a Turnout 
• A pair of tongue rails 
• A pair of stock rails 
• Two check rails 
• Four lead rails 
• A vee crossing 
• Slide chairs 
• Stretcher bar 
• A pair of heel blocks 
• Switch tie plate or gauge 
• Parts for operating points- Rods, cranks,levers etc 
• Locking system which includes locking box, lock bar, plunger 
bar etc 
6
Important Terms Used 
• Facing Direction: If someone stands at toe of switch and looks 
towards the crossing, then the direction is called “Facing Direction” 
• Trailing Direction: If someone stands at the crossing and looks 
towards the switches then the direction is called “Trailing Direction” 
• Facing Points of Turnouts:When a train travels from the switch to 
the frog, the points are known as facing points of turnouts. 
• Trailing Points of Turnouts:When a train travels in the direction 
from the crossing to the switches, the points are known as trailing 
points or trailing turnouts. 
7
Turnout are basically consists of two main parts 
Points 
Crossings 
Components of Points 
Stock rail: The rails of the main line track against which tongue rails 
snugly fit, are called stock rail 
Tongue rail: The tapered rails whose thicker ends known as heel are fixed 
to the main track and thinner ends known as toe of the switch to obtain a 
snug fit with the respective stock rails, are called tongue rails, switch rails 
or point rails 
Switch: A stock rail and its respective tongue rails form a switch. A set 
switch is known as points which divert the trains from one track to another. 
8
Heel block: The block which connects the heel of the tongue rail to the 
stock rail, with a ordinary fish plate and bolts, is called the heel block. 
Sliding plate: The metal plates which are provided for supporting and 
sliding the tongue rail to obtain snug fit against the stock rail is called the 
sliding plates. 
Stretcher bar: Two or three bars which are used to connect the ends of the 
tongue rail at the toe to ensure the movement of the tongues through the 
same distance, are called the stretcher bar. 
Point rod: The rod which moves the points by operating a point leaver, is 
called the point rod. 
Throw of switch: The distance through the tongue moves laterally at the 
toe of the switch for movement of trains is known as throw of switch. 
9
10
Components of crossings 
The arrangement of rails which provided to enable the flanges of wheels 
to cross the rail, of other track is called crossing. 
Crossing lead rail: The heels of tongue rail are connected to the crossing with 
two rails one straight rail and other curved rail. These two rails are called 
crossing lead rail. 
Point rail: The rail of the V-shaped portion of the crossing i.e. frog, which ends 
the nose of crossing, is called point rail. 
Splice rail: The rail of V-shaped portion of the crossing i.e. frog, which ends a 
little behind the nose of crossing is called splice rail. 
Wing rail: The two bent up rails of the crossing which are connected to the 
ends of the crossing lead rails( one straight and one curve rail) are called the 
wing rails. 
Toe of crossing: The line joining the joints of the rail of the crossing assembly 
with the end of crossing lead rails, is called the toe of crossing. 
Heels of crossing: The line which joins the ends of the point rail and splice rail 
of the crossing, is called the heel of the crossing. 
Throat: the narrowest space between the two wing rails of a crossing is called 
the throat of the crossing. 
11
12
13
Check Rail: It is the rail length provided on the opposite side of crossing to 
check the tendency of wheel to climb over the crossing 
Crossing angle: The angle between the gauge of the rail and splice rail, is 
called the crossing angle(α). The size of the crossing is designated by its 
crossing angle. 
Theoretical nose of crossing(T.N.C): The point of intersection of the gauge of 
the point rail and splice rail of a crossing, is called the theoretical nose of 
crossing. It is slightly away from the actual nose of the crossing. 
Actual nose of crossing(A.N.C): The ends of the point rail in the gap of the 
crossing is called actual nose of crossing. 
14
Working Principle of Turnout 
Referring to the previous figure, a turnout provides facilities for safe 
turning of vehicles from track to another. One turnout provides 
facilities for turning of vehicles from one direction only and not from 
both the directions of the straight path or route as in the case of roads. 
A turnout works with the combination of points and crossings. This 
consists of mainly a pair of points or switches, four lead rails(2-straight 
and 2-curved lead rails), two check rails and a crossing 
15
Types of Turnouts 
There are different types of turnouts designed to fit particular 
trackwork situations. And they are- 
Conventional :The diverging route curves away from a tangent 
(straight) track. Left- or right-hand designation is the direction of 
diversion when looking at the turnout from the switch-point end. On 
main lines the straight leg should be the main route, if possible. 
Curved :Both routes curve in the same direction, but with different 
radii. Left- or right-hand designation is the direction of curvature 
when looking at the turnout from the switch-point end. Curved 
turnouts can save space in some trackwork situations like yard leads. 
Equipment will track better on the larger radius leg, which should be 
the main route 
16
Conclusion 
In a developing country like India, the contribution of railway 
transport towards the economic growth is immense at other modes of 
transport ie roadways, airways ,inland waterways etc are not available 
at reasonable rates and in sizeable quantity to cope up with quantum of 
traffic. 
In order to move the traffic efficiently, it is felt that the speed of the rail 
transport shall be augmented. Turnout , an essential feature of the 
track structure for diversion of traffic from one road to another, poses 
at present a tricky problem in the context of achieving reasonably high 
speed over the turnout. 
Turnouts are an essential feature of trackwork but can be trouble 
makers if not done right 
Turnout points are hinged rails that move back and forth(left & right) 
and guide the train’s wheels throughout the turnout’s frog to either the 
straight leg of the turnout or through the curved leg of the turnout. 
17
Reference 
A text book of Railway Engineering-By S.C. Saxena and S.P. Arora 
www.wikipedia.com 
www.modelrectifier.com 
Transportation Engineering II: Railways-By Dr. Charisma Choudhury 
18
19

Contenu connexe

Tendances

Points and crossings
Points and crossingsPoints and crossings
Points and crossingshiranrathva
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railwayRAMPRASAD KUMAWAT
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway linesMani Vel
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepRAMPRASAD KUMAWAT
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway addavidson
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)sharda university
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationMani Vel
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classificationLatif Hyder Wadho
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highwayPratikShinde113
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 

Tendances (20)

Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Point and crossing of railway
Point and crossing of railwayPoint and crossing of railway
Point and crossing of railway
 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Coning of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail CreepConing of Wheels in Railways & Rail Creep
Coning of Wheels in Railways & Rail Creep
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
classification of indian railway
classification of indian railway classification of indian railway
classification of indian railway
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Points and crossings
Points and crossingsPoints and crossings
Points and crossings
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 

En vedette

UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliManjurali Balya
 
Transportation Survey
Transportation SurveyTransportation Survey
Transportation SurveyDZzys
 
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEEL
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEELWEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEEL
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEELJosef Zbořil
 
Cordon line survey
Cordon line surveyCordon line survey
Cordon line surveyNilgabs1
 
Transportation Survey
Transportation SurveyTransportation Survey
Transportation SurveyNicole Cocco
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.ashrafdgrt
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveysDhwani Shah
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011photomatt
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017LinkedIn
 

En vedette (9)

UTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by ManjuraliUTS- Transportation Surveys by Manjurali
UTS- Transportation Surveys by Manjurali
 
Transportation Survey
Transportation SurveyTransportation Survey
Transportation Survey
 
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEEL
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEELWEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEEL
WEAR OF THE RAILWAY TURNOUT CROSSINGS MADE OF EXPLOSIVE HARDENED HADFIELD STEEL
 
Cordon line survey
Cordon line surveyCordon line survey
Cordon line survey
 
Transportation Survey
Transportation SurveyTransportation Survey
Transportation Survey
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 
The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017The Top Skills That Can Get You Hired in 2017
The Top Skills That Can Get You Hired in 2017
 

Similaire à Left hand turnout

Railway Engineering: Points and crossings
Railway Engineering: Points and crossingsRailway Engineering: Points and crossings
Railway Engineering: Points and crossingsBathla Tuition Centre
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )hiranrathva
 
Railway engineering
Railway engineeringRailway engineering
Railway engineeringhiranrathva
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and componentsSunil Kumar Meena
 
Points, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptxPoints, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptxdshah162002
 
1Point & crossing.pdf
1Point & crossing.pdf1Point & crossing.pdf
1Point & crossing.pdfS2Motivation1
 
Points and crossings.ppt
Points and crossings.pptPoints and crossings.ppt
Points and crossings.pptsamatha6
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdfRaj Bakhtani
 
POINTS AND CROSSINGS (1) FINAL.pptx
POINTS AND CROSSINGS (1) FINAL.pptxPOINTS AND CROSSINGS (1) FINAL.pptx
POINTS AND CROSSINGS (1) FINAL.pptxShruthiBS13
 
Points and crossing
Points and crossingPoints and crossing
Points and crossingAkash Patel
 
Track junction and simple track layouts
Track junction and simple track layoutsTrack junction and simple track layouts
Track junction and simple track layoutsMaulik Vithalapara
 
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfNeerockKhatri
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
Points and switch ##
Points and switch ##Points and switch ##
Points and switch ##JYOTIRANJAN43
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 

Similaire à Left hand turnout (20)

Points and Crossings
Points and Crossings Points and Crossings
Points and Crossings
 
Railway Engineering: Points and crossings
Railway Engineering: Points and crossingsRailway Engineering: Points and crossings
Railway Engineering: Points and crossings
 
Points and crossings ( special assigments )
Points and crossings ( special assigments )Points and crossings ( special assigments )
Points and crossings ( special assigments )
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Railway points, crossings and components
Railway points, crossings and componentsRailway points, crossings and components
Railway points, crossings and components
 
Points, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptxPoints, Crossings and Turnouts of Railways.pptx
Points, Crossings and Turnouts of Railways.pptx
 
1Point & crossing.pdf
1Point & crossing.pdf1Point & crossing.pdf
1Point & crossing.pdf
 
Points and crossings.ppt
Points and crossings.pptPoints and crossings.ppt
Points and crossings.ppt
 
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
139091630-Points-Crossings-and-Station-Platforms-Yards.pdf
 
POINTS AND CROSSINGS (1) FINAL.pptx
POINTS AND CROSSINGS (1) FINAL.pptxPOINTS AND CROSSINGS (1) FINAL.pptx
POINTS AND CROSSINGS (1) FINAL.pptx
 
Points and crossing
Points and crossingPoints and crossing
Points and crossing
 
Track junction and simple track layouts
Track junction and simple track layoutsTrack junction and simple track layouts
Track junction and simple track layouts
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdfahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
ahmed abd elmomen khalil_Week 13 Turnouts and crossings (4).pdf
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Points and switch ##
Points and switch ##Points and switch ##
Points and switch ##
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 

Plus de Ana Debbarma

Short Presentation on "Adsorption"
Short Presentation on "Adsorption"Short Presentation on "Adsorption"
Short Presentation on "Adsorption"Ana Debbarma
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysisAna Debbarma
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil samplingAna Debbarma
 
Scope of irrigation engg
Scope of irrigation enggScope of irrigation engg
Scope of irrigation enggAna Debbarma
 
Solid waste management in Guwahati city
Solid waste management in Guwahati citySolid waste management in Guwahati city
Solid waste management in Guwahati cityAna Debbarma
 
Handling & management of hazardous and biomedical waste
Handling & management of hazardous and biomedical wasteHandling & management of hazardous and biomedical waste
Handling & management of hazardous and biomedical wasteAna Debbarma
 

Plus de Ana Debbarma (8)

Short Presentation on "Adsorption"
Short Presentation on "Adsorption"Short Presentation on "Adsorption"
Short Presentation on "Adsorption"
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysis
 
Summer training
Summer trainingSummer training
Summer training
 
Types of samplers used in soil sampling
Types of samplers used in soil samplingTypes of samplers used in soil sampling
Types of samplers used in soil sampling
 
Scope of irrigation engg
Scope of irrigation enggScope of irrigation engg
Scope of irrigation engg
 
Microwave Band
Microwave BandMicrowave Band
Microwave Band
 
Solid waste management in Guwahati city
Solid waste management in Guwahati citySolid waste management in Guwahati city
Solid waste management in Guwahati city
 
Handling & management of hazardous and biomedical waste
Handling & management of hazardous and biomedical wasteHandling & management of hazardous and biomedical waste
Handling & management of hazardous and biomedical waste
 

Dernier

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptbibisarnayak0
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 

Dernier (20)

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Autonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.pptAutonomous emergency braking system (aeb) ppt.ppt
Autonomous emergency braking system (aeb) ppt.ppt
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 

Left hand turnout

  • 1. Presented by- Anamika Debbarma(DC2011BTE0127) 1
  • 2. Introduction Turnout is the simplest combination of points and crossings which enables one track either a branch line or a siding, to take off from another track. So the object of turnout is to provide facilities for safe movement of trains in either direction on both the tracks. The assembly of various components which enables trains to move from one track to any other track either parallel to or diverging from track, is called a turnout or point and crossing. 2
  • 3. Turnout The combination of points and crossing of a railway track, is called a turn out. According to the direction of diversion, turnouts are classified as under:- Left hand turn out: The turnout which diverts the train to the left, is called a left hand turnout. Right hand turnout: The turnout which diverts the train to the right, is called a right hand turnout 3
  • 5. Line Diagram of a left hand turnout 5
  • 6. Component Parts of a Turnout • A pair of tongue rails • A pair of stock rails • Two check rails • Four lead rails • A vee crossing • Slide chairs • Stretcher bar • A pair of heel blocks • Switch tie plate or gauge • Parts for operating points- Rods, cranks,levers etc • Locking system which includes locking box, lock bar, plunger bar etc 6
  • 7. Important Terms Used • Facing Direction: If someone stands at toe of switch and looks towards the crossing, then the direction is called “Facing Direction” • Trailing Direction: If someone stands at the crossing and looks towards the switches then the direction is called “Trailing Direction” • Facing Points of Turnouts:When a train travels from the switch to the frog, the points are known as facing points of turnouts. • Trailing Points of Turnouts:When a train travels in the direction from the crossing to the switches, the points are known as trailing points or trailing turnouts. 7
  • 8. Turnout are basically consists of two main parts Points Crossings Components of Points Stock rail: The rails of the main line track against which tongue rails snugly fit, are called stock rail Tongue rail: The tapered rails whose thicker ends known as heel are fixed to the main track and thinner ends known as toe of the switch to obtain a snug fit with the respective stock rails, are called tongue rails, switch rails or point rails Switch: A stock rail and its respective tongue rails form a switch. A set switch is known as points which divert the trains from one track to another. 8
  • 9. Heel block: The block which connects the heel of the tongue rail to the stock rail, with a ordinary fish plate and bolts, is called the heel block. Sliding plate: The metal plates which are provided for supporting and sliding the tongue rail to obtain snug fit against the stock rail is called the sliding plates. Stretcher bar: Two or three bars which are used to connect the ends of the tongue rail at the toe to ensure the movement of the tongues through the same distance, are called the stretcher bar. Point rod: The rod which moves the points by operating a point leaver, is called the point rod. Throw of switch: The distance through the tongue moves laterally at the toe of the switch for movement of trains is known as throw of switch. 9
  • 10. 10
  • 11. Components of crossings The arrangement of rails which provided to enable the flanges of wheels to cross the rail, of other track is called crossing. Crossing lead rail: The heels of tongue rail are connected to the crossing with two rails one straight rail and other curved rail. These two rails are called crossing lead rail. Point rail: The rail of the V-shaped portion of the crossing i.e. frog, which ends the nose of crossing, is called point rail. Splice rail: The rail of V-shaped portion of the crossing i.e. frog, which ends a little behind the nose of crossing is called splice rail. Wing rail: The two bent up rails of the crossing which are connected to the ends of the crossing lead rails( one straight and one curve rail) are called the wing rails. Toe of crossing: The line joining the joints of the rail of the crossing assembly with the end of crossing lead rails, is called the toe of crossing. Heels of crossing: The line which joins the ends of the point rail and splice rail of the crossing, is called the heel of the crossing. Throat: the narrowest space between the two wing rails of a crossing is called the throat of the crossing. 11
  • 12. 12
  • 13. 13
  • 14. Check Rail: It is the rail length provided on the opposite side of crossing to check the tendency of wheel to climb over the crossing Crossing angle: The angle between the gauge of the rail and splice rail, is called the crossing angle(α). The size of the crossing is designated by its crossing angle. Theoretical nose of crossing(T.N.C): The point of intersection of the gauge of the point rail and splice rail of a crossing, is called the theoretical nose of crossing. It is slightly away from the actual nose of the crossing. Actual nose of crossing(A.N.C): The ends of the point rail in the gap of the crossing is called actual nose of crossing. 14
  • 15. Working Principle of Turnout Referring to the previous figure, a turnout provides facilities for safe turning of vehicles from track to another. One turnout provides facilities for turning of vehicles from one direction only and not from both the directions of the straight path or route as in the case of roads. A turnout works with the combination of points and crossings. This consists of mainly a pair of points or switches, four lead rails(2-straight and 2-curved lead rails), two check rails and a crossing 15
  • 16. Types of Turnouts There are different types of turnouts designed to fit particular trackwork situations. And they are- Conventional :The diverging route curves away from a tangent (straight) track. Left- or right-hand designation is the direction of diversion when looking at the turnout from the switch-point end. On main lines the straight leg should be the main route, if possible. Curved :Both routes curve in the same direction, but with different radii. Left- or right-hand designation is the direction of curvature when looking at the turnout from the switch-point end. Curved turnouts can save space in some trackwork situations like yard leads. Equipment will track better on the larger radius leg, which should be the main route 16
  • 17. Conclusion In a developing country like India, the contribution of railway transport towards the economic growth is immense at other modes of transport ie roadways, airways ,inland waterways etc are not available at reasonable rates and in sizeable quantity to cope up with quantum of traffic. In order to move the traffic efficiently, it is felt that the speed of the rail transport shall be augmented. Turnout , an essential feature of the track structure for diversion of traffic from one road to another, poses at present a tricky problem in the context of achieving reasonably high speed over the turnout. Turnouts are an essential feature of trackwork but can be trouble makers if not done right Turnout points are hinged rails that move back and forth(left & right) and guide the train’s wheels throughout the turnout’s frog to either the straight leg of the turnout or through the curved leg of the turnout. 17
  • 18. Reference A text book of Railway Engineering-By S.C. Saxena and S.P. Arora www.wikipedia.com www.modelrectifier.com Transportation Engineering II: Railways-By Dr. Charisma Choudhury 18
  • 19. 19