SAFE HARBOR STATEMENT
• Certain statements in this presentation constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of
1995 and Canadian securities legislation. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which
may cause the actual results, performance or achievements of the Company, or other future events, including forecast production, earnings and cash
flows, to be materially different from any future results, performances or achievements or other events expressly or implicitly predicted by such
forward-looking statements.
• Such risks, uncertainties and other factors include, but are not limited to, factors associated with fluctuations in the market price of precious metals,
mining industry risks, recent operating losses, uncertainty of title to properties, risk associated with foreign operations, environmental risks and
hazards, proposed legislation affecting the mining industry, litigation, governmental regulation of the mining industry, properties without known
mineable reserves, uncertainty as to calculations of reserves, mineral deposits and grades, requirement of additional financing, uninsured risks, risk of
hedging strategies, competition, dependence on key management personnel, potential volatility of market price of the Company’s common shares,
dilution and certain anti-takeover effects. Such information contained herein represents management’s best judgment as of the date hereof based on
information currently available. The Company does not intend to update this information and disclaims any legal liability to the contrary.
• Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially
affected by the inability to obtain required environmental and other regulatory approval, environmental or operating permits. The estimate may also
be materially affected by global economic conditions such as the price of gold and silver, the price of oil and other commodities utilized in the
production of gold and silver. Unknown geologic or hydrologic conditions or other unknown factors may materially affect the resource estimates. Net
smelter returns and metallurgical recoveries at Sinchao have not been considered.
• This document uses the terms "measured resources", 'indicated resources' and 'inferred resources'. Investors are cautioned not to assume that any
part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, 'inferred resources' have a great amount of
uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever
be upgraded to a higher category. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally
mineable.
• Mr. Les Tarnai, P.Eng., General Manager of Engineering, Invicta Mining Corp., is a Qualified Person as defined by National Instrument 43-101 with the
ability and authority to verify the authenticity and validity of the data herein. Victor Jaramillo, P. Geo., of Discover Geological Consultants Inc. is an
Independent Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimates. Guy Lokhorst, P. Eng., of The
Lokhorst Group, is an Independent Qualified Person as defined by NI 43-101 and is responsible for the review of the mining methodology, including the
probable reserves and life of mine, for the Invicta Feasibility Study. Deepak Malhotra, PhD., MS in Metallurgical Engineering and PhD. in Mineral
Economics, Independent Qualified Person as defined by NI 43-101, of Resource Development Inc., reviewed the metallurgy for the Invicta project and
developed the finalized process flow diagram for the Invicta Feasibility Study. Leslie F. Tarnai, P. Eng., General Manager of Engineering for Invicta
Mining Corp., is a Qualified Person as defined by NI 43-101 and is responsible for the Invicta Feasibility Study.
2
OVERVIEW
• Near Term Gold Production
• Invicta Project is 100% Owned
• Project team with over 200 years development/operations experience
• EIA received subject to conditions precedent, long lead time items bought
• Commissioning expected 12 months after start of construction
• Projected production 160,000 Au Eq Oz per Year @ $US 275/Oz LOM
Cash Cost
• World Class Assets in Pipeline
• Sinchao Gold/Copper project with initial inferred resource of 237 M
tonnes containing 3.73M oz Au, 2.45B lb Cu and 92M oz Ag with average
grades of .47% Cu, .49g/t Au and 12.1g/t Ag., using prices of $1.50/lb Cu,
$600/oz Au and $8/oz Ag.
3
MANAGEMENT
• John F. Huguet, CEO
8 years as President and 4 years as Managing Director of Atkinson Holdings and Commonwealth Construction.
During his 33 years the company constructed and placed into operation 86 major mining projects, including the
Granduc Copper Mine (Asarco), Gibraltar (Placer Development) and La Coipa (Placer Dome).
• David Rae, President
Ten years in senior positions with Falconbridge/Xstrata, including Senior Vice President Europe & Africa, and
worldwide head of sales for all Nickel Group products. Previously he managed the Sudbury Smelter and the Timmins
Copper Operations. Prior to joining Andean American, Mr. Rae has been advising in a consulting capacity to
companies such as Kinross, Vale Inco and Iamgold on operational, productivity and strategic challenges.
• Bruce Ramsden, CFO
Vice President and CFO with noted resource companies since 1996. Received the 2006 Mining Journal Development
Funding Award for his work with Tiomin Resources Inc.
• Miguel Huaman, VP Operations
From 2004 to 2009, Mr. Huaman was the President of Minera Huallanca, where he managed the 1000tpd Pucarrajo
Zn-Pb-Ag mine and the 850tpd Contonga Zn-Pb-Ag-Cu mine, both underground operations. From 2002 to 2004, he
was General Manager of Cedimin SAC, a subsidiary of the BRGM–France and Buenaventura Mining Company Peru.
Mr. Huaman is an Engineering Graduate of the Universidad Nacional Mayor de San Marcos and a Geologist Engineer
with a Postgraduate degree in Exploration and Valuation of Mineral Resources from the University of Nancy, France.
Mr. Huaman is a former President of the Geological Society of Peru
4
THE INVICTA PROJECT
• Underground Operation: 3,000 tpd Year 1, up to 5,000 tpd Year 3+
• Initial 5 Year Mine Life, target 12 Years after resource definition
drilling
• Exciting exploration potential
• Located in Peru, close to other operating mines
• Excellent metallurgy and flow sheet: high recoveries, low grinding
costs, flexible process
• Power supply via line extension of state power grid
• Very strong community support and a talented labor pool
• Water rights obtained, wells drilled and tested
5
LOCATION
Cajamarca
Lima
Sinchao Metals
(TSX.V:SMZ)
Invicta
6
PERU Mines and exploration
projects near Invicta
7
Exploration projects
Production projects
8
Flor de Loto,
past producing
Au/Ag mine
Measured
Indicated
Inferred
20,000m drill program to be completed during construction
to extend mine life to 10 years
9
10
RESERVES/RESOURCES
Category Tonnes Density Gold Silver Copper Lead Zinc Gold
g/t g/t % % % Oz
Measured 868,000 2.77 2.71 31.26 0.69 0.73 0.61 75,724
Indicated 9,866,735 2.73 1.99 14.74 0.4 0.28 0.27 632,336
Inferred 14,224,661 2.75 0.67 11.2 0.36 0.24 0.15 306,913
Mineable Reserves - First 5 years
Tonnes 7,807,157
Metal Au Ag Cu Pb Zn
Grade (g/t or %) 2.14 18.76 0.52% 0.38% 0.30%
Contained metal (Oz or lb) 538,946 4,724,589 89,476,265 65,386,501 51,620,922
3D MODEL OF OREBODY
N S
Adit
3400
W E
Adit
3400
Work to Date:
-28,877 m of drilling
-1200 m of Adit
11
SUBLEVEL STOPING
• Bulk Underground Mining
Method
• At Invicta:
• 40m x 15m x 20 m panels
• Longhole blasting
• Development on-reef
12
3D VIEW – TAILINGS/PLANT/MINE
Concentrate Plant
Tailing
Main Road from Choques to Plant
Mine
13
3400
1100
2300
M.a.s.l.
INFRASTRUCTURE
• POWER (Cost $6M US)
• Government backed 29km extension of the 220kv national grid
• Detailed engineering has been completed by CESEL
• 27 towers to be erected mostly on our land packaged (purchased land)
• Power cost for the project is 6c/kwh
• WATER (Cost $1M US)
• Sourced from well drilled next to the Huaura River close to Paran at the 1100m elevation
• Project requires flow of 20l/s, the well has been engineered and tested by CESEL and performs at
50l/s. Water is pumped to a storage pond at the 2400 elevation
• Excess water goes to the communities
• ROADS (Cost $2M US)
• A n existing 10m wide concentrate haul road runs13km from the project
• We are building a 13,8km long, 10m wide connection from 1100 masl to plant at 2300 masl
• Second road from plant to the mine site at 3400 masl, 4km long, 3m wide access road
14
(internal)
Recoveries July 2010
Au 91%
Ag 82%
Cu 75%
Pb 80%
Zn 80%
(Dry tailings)
15
FEASIBILITY STUDY
• Average Annual Production of 97,931 Oz Gold and 160,8571 Oz Gold Equivalent over 5 Year
Initial Mine Life
• LOM Cash Cost Per Oz Gold1
• On a co-product basis: $451.38 US;
• On a gold-equivalent basis: $274.80 US;
• On a by-product basis: ($126.91) US
• Estimated CapEx $68M: $49M project costs, $9M in refundable IGV taxes, $7M in contingency
funds, $3M Startup Facility
• Operating costs of $28.31 US/tonne;
• 1 Year Payback
• The project surpasses the environmental standards of Peru: the project is a contained process
with zero liquid effluents
1. The following price deck was used: Gold $900/oz, Silver $12.50/oz, Copper $2.50/lb, Lead $0.70/lb, Zinc $0.75/lb.
16
FEASIBILITY STUDY
After Tax Free Cash Flow and NPV Sensitivity Analysis on a Project Basis1
Gold Price
Total Free
Cash Flow
5 YR AVG Free
Cash Flow NPV 8% NPV 10%
$900 $264,691,245 $52,938,249 $215,191,049 $203,542,333
$1,000 $295,525,040 $59,105,008 $249,917,929 $227,112,434
$1,100 $326,366,991 $65,273,398 $265,057,808 $250,688,663
$1,200 $357,185,186 $71,437,037 $289,974,787 $274,246,114
Project Revenue Distribution2
Au Ag Cu Pb Zn
Revenue % 65.5% 5.9% 20.3% 4.5% 3.8%
1. Prices: $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn
2. Prices: $900 Au, $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn
17
FINANCING
Capital Costs $MM USD
Project Costs $49
IGV (Refundable Tax) $9
Contingency $7
Start-up Facility $3
Total Capital Cost $68
Source of Funds
Senior Secured Project Debt Facility $68
Subordinated Debt $15
Total Capital Cost and Cost Overrun Facility $83
• $15M already invested in the project by Andean American Gold
• Senior Secured Project Debt Facility underwritten by international banks Barclays Capital and West LB
• Subordinated Debt Facility provides the required Cost Overrun and Working Capital Facility for the project,
arranged by Trafigura Beheer B.V., our Strategic Partner
18
RELATIONSHIP WITH TRAFIGURA
• 2nd largest non-ferrous trading company in the world
• Sales of $47.3 Billion in 2009, 1,900 employees in 44 countries
• Over $1 Billion in AUM invested through proprietary Galena Asset Management
• Highlights of Agreements:
• Trafigura to provide $15M USD Sub Debt Facility for Cost Overruns and Working Capital
• Trafigura acquires the rights to buy all base metal concentrates from Invicta Project
• Trafigura acquires an Option, whereby:
IF
The Project Debt Lenders do not fund Invicta Project Capex by March 31st
THEN
Trafigura may purchase an additional 16% interest in AAG, name two additional directors to the
Board, and underwrite the Invicta Project Debt via one of their credit facilities
19
CAPITAL STRUCTURE
Capital Structure
Cash Balance (as of Nov 17th) $16,000,000
Basic Shares Outstanding 121,666,287
Options 8,840,588
Warrants (Price between $0.35 - $1.25, exp. starting 20/9/11) 4,705,918
Major Shareholders (approximate as of Nov 17th)
Insiders 11%
Richmond Capital LLP 8.5%
Praetorian Capital Management LLC 8%
Trafigura Beheer B.V. 6.5%
Sprott Asset Management LP 4.5%
20
MILESTONES
Q1 2011 Estimated start of construction
Q2 2011 Complete Independent Engineers Technical Report
Q2 2011 Debt Financing Draw Down
Q4 2011 Revised, extended mine plan including results from
planned definition drilling
Q4 2011 Invicta district scale exploration
Q1 2012 Commissioning 12 months after start of construction
schedule
21
CATALYSTS – LAST 12 MONTHS
• Operations
• Appointment of Mill Manager and Chief Metallurgist
• Environmental Impact Assessment Approval
• Appointment of Miguel Huaman as VP Operations – Previously manager of 2
underground mines in Peru
• Appointment of Mr. Juan Ortiz to the Board of Directors – Corporate Project Manager of
the Mining Division of Trafigura Group
• Strategic
• Appointment of Barclays Capital and WestLB as Debt Arrangers
• $3M Private Placement with Trafigura Beheer B.V. and initiation of Strategic Relationship
• Completion of Optimized Feasibility Study Audit
• Appointment of David Rae as President
• Appointment of Mr. Bruce Ramsden as CFO
22
COMPANY COMPARISONS
COMPANY MCAP Est. Annual
Prod. OzAu
Est. By-
Product Cash
Cost / Oz
Est. Annual
Free Cash Flow
($1,100 Au)
Multiple of Est.
Annual Free
Cash Flow
Timmins Gold $260,000,000 90,000 $412 $44,100,000 5.9
Brigus Gold $218,000,000 90,000 $600 $25,000,000 8.7
Luna Gold Corp $230,000,000 75,000 $450 $39,000,000 5.90
Gold Resource Corp $950,000,000 100,000 $200 $60,000,000 15.8
Minefinders $715,000,000 85,000 $450 $35,000,000 20.4
Alamos gold $2,000,000,000 165,000 $338 $83,000,000 24
Average $729,000,000 100,833 $408 $47,683,333 15.28
Andean American $97,000,000 97,000 ($126) $65,000,000 1.50
Company comparisons are for illustrative purposes only based on publicly available information. Andean American Gold is not responsible for the validity of this
information. The Company's projects are not currently in production and all estimates are based on data from the Invicta Project Feasibility Study of July, 2010.
Please refer to Safe Harbour Statement on Slide #2
23
CONCLUSION
• Near Term Production
• Bottom Quartile Cash Cost
• Projected Production of 160,000 Gold Equivalent Oz Per Year
• Strong Strategic Partners
• Strong Exploration Upside
• Production-Ready Management Team
• Undervalued
24

Contenu connexe

Tendances

TNR Gold Investor Presentation March 2014
TNR Gold Investor Presentation March 2014TNR Gold Investor Presentation March 2014
TNR Gold Investor Presentation March 2014Kirill Klip
 
Berkwood Resources Investor Presentation - February 2016
Berkwood Resources Investor Presentation - February 2016Berkwood Resources Investor Presentation - February 2016
Berkwood Resources Investor Presentation - February 2016Berkwood Resources Ltd.
 
Energold Q1 2016 Corporate Presentation
Energold Q1 2016 Corporate PresentationEnergold Q1 2016 Corporate Presentation
Energold Q1 2016 Corporate PresentationAdnet Communications
 
Corporate presentation may 15 website
Corporate presentation may 15 websiteCorporate presentation may 15 website
Corporate presentation may 15 websiteNorthAmericanNickel
 
Corporate Presentation April 2015
Corporate Presentation April 2015Corporate Presentation April 2015
Corporate Presentation April 2015NorthAmericanNickel
 
TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016Kirill Klip
 
North Arrow Minerals Corporate Overview - May24, 2017
North Arrow Minerals Corporate Overview - May24, 2017North Arrow Minerals Corporate Overview - May24, 2017
North Arrow Minerals Corporate Overview - May24, 2017narminerals
 
Medinah presentation
Medinah presentationMedinah presentation
Medinah presentationpayal parak
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALVictor Cantore
 
Exploration Presentation 2017 - Ascendant Resources Inc.
Exploration Presentation 2017 - Ascendant Resources Inc.Exploration Presentation 2017 - Ascendant Resources Inc.
Exploration Presentation 2017 - Ascendant Resources Inc.Ascendant Resources Inc.
 
Som ir 14july2021
Som ir 14july2021Som ir 14july2021
Som ir 14july2021AdnetNew
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.Kirill Klip
 
TNR Gold Presentation June 2016
TNR Gold Presentation June 2016TNR Gold Presentation June 2016
TNR Gold Presentation June 2016Kirill Klip
 
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015Kirill Klip
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfaldridgeminerals
 
06.01.2015 pinecrest corporate presentation - final
06.01.2015   pinecrest corporate presentation - final06.01.2015   pinecrest corporate presentation - final
06.01.2015 pinecrest corporate presentation - finalAdnet Communications
 

Tendances (20)

TNR Gold Investor Presentation March 2014
TNR Gold Investor Presentation March 2014TNR Gold Investor Presentation March 2014
TNR Gold Investor Presentation March 2014
 
Berkwood Resources Investor Presentation - February 2016
Berkwood Resources Investor Presentation - February 2016Berkwood Resources Investor Presentation - February 2016
Berkwood Resources Investor Presentation - February 2016
 
Energold Q1 2016 Corporate Presentation
Energold Q1 2016 Corporate PresentationEnergold Q1 2016 Corporate Presentation
Energold Q1 2016 Corporate Presentation
 
Corporate presentation may 15 website
Corporate presentation may 15 websiteCorporate presentation may 15 website
Corporate presentation may 15 website
 
Corporate Presentation April 2015
Corporate Presentation April 2015Corporate Presentation April 2015
Corporate Presentation April 2015
 
EDW Fact Sheet
EDW Fact SheetEDW Fact Sheet
EDW Fact Sheet
 
TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016TNR Gold Shotgun Project, Alaska. June 2016
TNR Gold Shotgun Project, Alaska. June 2016
 
North Arrow Minerals Corporate Overview - May24, 2017
North Arrow Minerals Corporate Overview - May24, 2017North Arrow Minerals Corporate Overview - May24, 2017
North Arrow Minerals Corporate Overview - May24, 2017
 
Medinah presentation
Medinah presentationMedinah presentation
Medinah presentation
 
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINALNemaska Lithium Corporate Presentation Jan 04 2016 FINAL
Nemaska Lithium Corporate Presentation Jan 04 2016 FINAL
 
Presentation
PresentationPresentation
Presentation
 
Exploration Presentation 2017 - Ascendant Resources Inc.
Exploration Presentation 2017 - Ascendant Resources Inc.Exploration Presentation 2017 - Ascendant Resources Inc.
Exploration Presentation 2017 - Ascendant Resources Inc.
 
Som ir 14july2021
Som ir 14july2021Som ir 14july2021
Som ir 14july2021
 
TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.TNR Gold Presentation January 2015.
TNR Gold Presentation January 2015.
 
TNR Gold Presentation June 2016
TNR Gold Presentation June 2016TNR Gold Presentation June 2016
TNR Gold Presentation June 2016
 
July2016
July2016July2016
July2016
 
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
TNR Gold Shotgun Gold Project, Alaska. Presentation August 2015
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdf
 
Cxb corp pres_
Cxb corp pres_Cxb corp pres_
Cxb corp pres_
 
06.01.2015 pinecrest corporate presentation - final
06.01.2015   pinecrest corporate presentation - final06.01.2015   pinecrest corporate presentation - final
06.01.2015 pinecrest corporate presentation - final
 

Similaire à Aa ggold presentation

Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American Gold
 
Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Gold
 
Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Joe Gray
 
Lion One Metals Feb 2020 Presentation
Lion One Metals Feb 2020 PresentationLion One Metals Feb 2020 Presentation
Lion One Metals Feb 2020 PresentationJoe Gray
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American Gold
 
Lion One Metals Presentation April 2020
Lion One Metals Presentation April 2020Lion One Metals Presentation April 2020
Lion One Metals Presentation April 2020Joe Gray
 
Lion One Presentation March 2020
Lion One Presentation March 2020Lion One Presentation March 2020
Lion One Presentation March 2020Joe Gray
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationAdnet Communications
 
Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Adnet Communications
 
Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Adnet Communications
 
2018 March Impact Silver Presentation
2018 March Impact Silver Presentation2018 March Impact Silver Presentation
2018 March Impact Silver PresentationAdnet Communications
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Freddy Salazar
 

Similaire à Aa ggold presentation (20)

Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10Aa ggold presentation 10 4-10
Aa ggold presentation 10 4-10
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Aa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdfAa ggold 13-10-10 pdf
Aa ggold 13-10-10 pdf
 
Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010
 
Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020Lion One Metals Presentation May 2020
Lion One Metals Presentation May 2020
 
Lion One Metals Feb 2020 Presentation
Lion One Metals Feb 2020 PresentationLion One Metals Feb 2020 Presentation
Lion One Metals Feb 2020 Presentation
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Lion One Metals Presentation April 2020
Lion One Metals Presentation April 2020Lion One Metals Presentation April 2020
Lion One Metals Presentation April 2020
 
Lion One Presentation March 2020
Lion One Presentation March 2020Lion One Presentation March 2020
Lion One Presentation March 2020
 
Aa ggold 10 20-10
Aa ggold 10 20-10Aa ggold 10 20-10
Aa ggold 10 20-10
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
IMPACT Silver Corporate Presentation
IMPACT Silver Corporate PresentationIMPACT Silver Corporate Presentation
IMPACT Silver Corporate Presentation
 
Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018Impact Silver Corporate Presentation June 2018
Impact Silver Corporate Presentation June 2018
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
IMPACT Silver Corp. Presentation
IMPACT Silver Corp. PresentationIMPACT Silver Corp. Presentation
IMPACT Silver Corp. Presentation
 
Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018Impact Silver IPT Corporate Presentation July 2018
Impact Silver IPT Corporate Presentation July 2018
 
Impact Silver Presentation
Impact Silver PresentationImpact Silver Presentation
Impact Silver Presentation
 
IMPACT Corporate Presentation
IMPACT Corporate PresentationIMPACT Corporate Presentation
IMPACT Corporate Presentation
 
2018 March Impact Silver Presentation
2018 March Impact Silver Presentation2018 March Impact Silver Presentation
2018 March Impact Silver Presentation
 
Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017Salazar Resources Corporate Presentation 2017
Salazar Resources Corporate Presentation 2017
 

Aa ggold presentation

  • 1. 1
  • 2. SAFE HARBOR STATEMENT • Certain statements in this presentation constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and Canadian securities legislation. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or other future events, including forecast production, earnings and cash flows, to be materially different from any future results, performances or achievements or other events expressly or implicitly predicted by such forward-looking statements. • Such risks, uncertainties and other factors include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, recent operating losses, uncertainty of title to properties, risk associated with foreign operations, environmental risks and hazards, proposed legislation affecting the mining industry, litigation, governmental regulation of the mining industry, properties without known mineable reserves, uncertainty as to calculations of reserves, mineral deposits and grades, requirement of additional financing, uninsured risks, risk of hedging strategies, competition, dependence on key management personnel, potential volatility of market price of the Company’s common shares, dilution and certain anti-takeover effects. Such information contained herein represents management’s best judgment as of the date hereof based on information currently available. The Company does not intend to update this information and disclaims any legal liability to the contrary. • Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by the inability to obtain required environmental and other regulatory approval, environmental or operating permits. The estimate may also be materially affected by global economic conditions such as the price of gold and silver, the price of oil and other commodities utilized in the production of gold and silver. Unknown geologic or hydrologic conditions or other unknown factors may materially affect the resource estimates. Net smelter returns and metallurgical recoveries at Sinchao have not been considered. • This document uses the terms "measured resources", 'indicated resources' and 'inferred resources'. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, 'inferred resources' have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. • Mr. Les Tarnai, P.Eng., General Manager of Engineering, Invicta Mining Corp., is a Qualified Person as defined by National Instrument 43-101 with the ability and authority to verify the authenticity and validity of the data herein. Victor Jaramillo, P. Geo., of Discover Geological Consultants Inc. is an Independent Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimates. Guy Lokhorst, P. Eng., of The Lokhorst Group, is an Independent Qualified Person as defined by NI 43-101 and is responsible for the review of the mining methodology, including the probable reserves and life of mine, for the Invicta Feasibility Study. Deepak Malhotra, PhD., MS in Metallurgical Engineering and PhD. in Mineral Economics, Independent Qualified Person as defined by NI 43-101, of Resource Development Inc., reviewed the metallurgy for the Invicta project and developed the finalized process flow diagram for the Invicta Feasibility Study. Leslie F. Tarnai, P. Eng., General Manager of Engineering for Invicta Mining Corp., is a Qualified Person as defined by NI 43-101 and is responsible for the Invicta Feasibility Study. 2
  • 3. OVERVIEW • Near Term Gold Production • Invicta Project is 100% Owned • Project team with over 200 years development/operations experience • EIA received subject to conditions precedent, long lead time items bought • Commissioning expected 12 months after start of construction • Projected production 160,000 Au Eq Oz per Year @ $US 275/Oz LOM Cash Cost • World Class Assets in Pipeline • Sinchao Gold/Copper project with initial inferred resource of 237 M tonnes containing 3.73M oz Au, 2.45B lb Cu and 92M oz Ag with average grades of .47% Cu, .49g/t Au and 12.1g/t Ag., using prices of $1.50/lb Cu, $600/oz Au and $8/oz Ag. 3
  • 4. MANAGEMENT • John F. Huguet, CEO 8 years as President and 4 years as Managing Director of Atkinson Holdings and Commonwealth Construction. During his 33 years the company constructed and placed into operation 86 major mining projects, including the Granduc Copper Mine (Asarco), Gibraltar (Placer Development) and La Coipa (Placer Dome). • David Rae, President Ten years in senior positions with Falconbridge/Xstrata, including Senior Vice President Europe & Africa, and worldwide head of sales for all Nickel Group products. Previously he managed the Sudbury Smelter and the Timmins Copper Operations. Prior to joining Andean American, Mr. Rae has been advising in a consulting capacity to companies such as Kinross, Vale Inco and Iamgold on operational, productivity and strategic challenges. • Bruce Ramsden, CFO Vice President and CFO with noted resource companies since 1996. Received the 2006 Mining Journal Development Funding Award for his work with Tiomin Resources Inc. • Miguel Huaman, VP Operations From 2004 to 2009, Mr. Huaman was the President of Minera Huallanca, where he managed the 1000tpd Pucarrajo Zn-Pb-Ag mine and the 850tpd Contonga Zn-Pb-Ag-Cu mine, both underground operations. From 2002 to 2004, he was General Manager of Cedimin SAC, a subsidiary of the BRGM–France and Buenaventura Mining Company Peru. Mr. Huaman is an Engineering Graduate of the Universidad Nacional Mayor de San Marcos and a Geologist Engineer with a Postgraduate degree in Exploration and Valuation of Mineral Resources from the University of Nancy, France. Mr. Huaman is a former President of the Geological Society of Peru 4
  • 5. THE INVICTA PROJECT • Underground Operation: 3,000 tpd Year 1, up to 5,000 tpd Year 3+ • Initial 5 Year Mine Life, target 12 Years after resource definition drilling • Exciting exploration potential • Located in Peru, close to other operating mines • Excellent metallurgy and flow sheet: high recoveries, low grinding costs, flexible process • Power supply via line extension of state power grid • Very strong community support and a talented labor pool • Water rights obtained, wells drilled and tested 5
  • 7. PERU Mines and exploration projects near Invicta 7 Exploration projects Production projects
  • 8. 8 Flor de Loto, past producing Au/Ag mine
  • 9. Measured Indicated Inferred 20,000m drill program to be completed during construction to extend mine life to 10 years 9
  • 10. 10 RESERVES/RESOURCES Category Tonnes Density Gold Silver Copper Lead Zinc Gold g/t g/t % % % Oz Measured 868,000 2.77 2.71 31.26 0.69 0.73 0.61 75,724 Indicated 9,866,735 2.73 1.99 14.74 0.4 0.28 0.27 632,336 Inferred 14,224,661 2.75 0.67 11.2 0.36 0.24 0.15 306,913 Mineable Reserves - First 5 years Tonnes 7,807,157 Metal Au Ag Cu Pb Zn Grade (g/t or %) 2.14 18.76 0.52% 0.38% 0.30% Contained metal (Oz or lb) 538,946 4,724,589 89,476,265 65,386,501 51,620,922
  • 11. 3D MODEL OF OREBODY N S Adit 3400 W E Adit 3400 Work to Date: -28,877 m of drilling -1200 m of Adit 11
  • 12. SUBLEVEL STOPING • Bulk Underground Mining Method • At Invicta: • 40m x 15m x 20 m panels • Longhole blasting • Development on-reef 12
  • 13. 3D VIEW – TAILINGS/PLANT/MINE Concentrate Plant Tailing Main Road from Choques to Plant Mine 13 3400 1100 2300 M.a.s.l.
  • 14. INFRASTRUCTURE • POWER (Cost $6M US) • Government backed 29km extension of the 220kv national grid • Detailed engineering has been completed by CESEL • 27 towers to be erected mostly on our land packaged (purchased land) • Power cost for the project is 6c/kwh • WATER (Cost $1M US) • Sourced from well drilled next to the Huaura River close to Paran at the 1100m elevation • Project requires flow of 20l/s, the well has been engineered and tested by CESEL and performs at 50l/s. Water is pumped to a storage pond at the 2400 elevation • Excess water goes to the communities • ROADS (Cost $2M US) • A n existing 10m wide concentrate haul road runs13km from the project • We are building a 13,8km long, 10m wide connection from 1100 masl to plant at 2300 masl • Second road from plant to the mine site at 3400 masl, 4km long, 3m wide access road 14
  • 15. (internal) Recoveries July 2010 Au 91% Ag 82% Cu 75% Pb 80% Zn 80% (Dry tailings) 15
  • 16. FEASIBILITY STUDY • Average Annual Production of 97,931 Oz Gold and 160,8571 Oz Gold Equivalent over 5 Year Initial Mine Life • LOM Cash Cost Per Oz Gold1 • On a co-product basis: $451.38 US; • On a gold-equivalent basis: $274.80 US; • On a by-product basis: ($126.91) US • Estimated CapEx $68M: $49M project costs, $9M in refundable IGV taxes, $7M in contingency funds, $3M Startup Facility • Operating costs of $28.31 US/tonne; • 1 Year Payback • The project surpasses the environmental standards of Peru: the project is a contained process with zero liquid effluents 1. The following price deck was used: Gold $900/oz, Silver $12.50/oz, Copper $2.50/lb, Lead $0.70/lb, Zinc $0.75/lb. 16
  • 17. FEASIBILITY STUDY After Tax Free Cash Flow and NPV Sensitivity Analysis on a Project Basis1 Gold Price Total Free Cash Flow 5 YR AVG Free Cash Flow NPV 8% NPV 10% $900 $264,691,245 $52,938,249 $215,191,049 $203,542,333 $1,000 $295,525,040 $59,105,008 $249,917,929 $227,112,434 $1,100 $326,366,991 $65,273,398 $265,057,808 $250,688,663 $1,200 $357,185,186 $71,437,037 $289,974,787 $274,246,114 Project Revenue Distribution2 Au Ag Cu Pb Zn Revenue % 65.5% 5.9% 20.3% 4.5% 3.8% 1. Prices: $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn 2. Prices: $900 Au, $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn 17
  • 18. FINANCING Capital Costs $MM USD Project Costs $49 IGV (Refundable Tax) $9 Contingency $7 Start-up Facility $3 Total Capital Cost $68 Source of Funds Senior Secured Project Debt Facility $68 Subordinated Debt $15 Total Capital Cost and Cost Overrun Facility $83 • $15M already invested in the project by Andean American Gold • Senior Secured Project Debt Facility underwritten by international banks Barclays Capital and West LB • Subordinated Debt Facility provides the required Cost Overrun and Working Capital Facility for the project, arranged by Trafigura Beheer B.V., our Strategic Partner 18
  • 19. RELATIONSHIP WITH TRAFIGURA • 2nd largest non-ferrous trading company in the world • Sales of $47.3 Billion in 2009, 1,900 employees in 44 countries • Over $1 Billion in AUM invested through proprietary Galena Asset Management • Highlights of Agreements: • Trafigura to provide $15M USD Sub Debt Facility for Cost Overruns and Working Capital • Trafigura acquires the rights to buy all base metal concentrates from Invicta Project • Trafigura acquires an Option, whereby: IF The Project Debt Lenders do not fund Invicta Project Capex by March 31st THEN Trafigura may purchase an additional 16% interest in AAG, name two additional directors to the Board, and underwrite the Invicta Project Debt via one of their credit facilities 19
  • 20. CAPITAL STRUCTURE Capital Structure Cash Balance (as of Nov 17th) $16,000,000 Basic Shares Outstanding 121,666,287 Options 8,840,588 Warrants (Price between $0.35 - $1.25, exp. starting 20/9/11) 4,705,918 Major Shareholders (approximate as of Nov 17th) Insiders 11% Richmond Capital LLP 8.5% Praetorian Capital Management LLC 8% Trafigura Beheer B.V. 6.5% Sprott Asset Management LP 4.5% 20
  • 21. MILESTONES Q1 2011 Estimated start of construction Q2 2011 Complete Independent Engineers Technical Report Q2 2011 Debt Financing Draw Down Q4 2011 Revised, extended mine plan including results from planned definition drilling Q4 2011 Invicta district scale exploration Q1 2012 Commissioning 12 months after start of construction schedule 21
  • 22. CATALYSTS – LAST 12 MONTHS • Operations • Appointment of Mill Manager and Chief Metallurgist • Environmental Impact Assessment Approval • Appointment of Miguel Huaman as VP Operations – Previously manager of 2 underground mines in Peru • Appointment of Mr. Juan Ortiz to the Board of Directors – Corporate Project Manager of the Mining Division of Trafigura Group • Strategic • Appointment of Barclays Capital and WestLB as Debt Arrangers • $3M Private Placement with Trafigura Beheer B.V. and initiation of Strategic Relationship • Completion of Optimized Feasibility Study Audit • Appointment of David Rae as President • Appointment of Mr. Bruce Ramsden as CFO 22
  • 23. COMPANY COMPARISONS COMPANY MCAP Est. Annual Prod. OzAu Est. By- Product Cash Cost / Oz Est. Annual Free Cash Flow ($1,100 Au) Multiple of Est. Annual Free Cash Flow Timmins Gold $260,000,000 90,000 $412 $44,100,000 5.9 Brigus Gold $218,000,000 90,000 $600 $25,000,000 8.7 Luna Gold Corp $230,000,000 75,000 $450 $39,000,000 5.90 Gold Resource Corp $950,000,000 100,000 $200 $60,000,000 15.8 Minefinders $715,000,000 85,000 $450 $35,000,000 20.4 Alamos gold $2,000,000,000 165,000 $338 $83,000,000 24 Average $729,000,000 100,833 $408 $47,683,333 15.28 Andean American $97,000,000 97,000 ($126) $65,000,000 1.50 Company comparisons are for illustrative purposes only based on publicly available information. Andean American Gold is not responsible for the validity of this information. The Company's projects are not currently in production and all estimates are based on data from the Invicta Project Feasibility Study of July, 2010. Please refer to Safe Harbour Statement on Slide #2 23
  • 24. CONCLUSION • Near Term Production • Bottom Quartile Cash Cost • Projected Production of 160,000 Gold Equivalent Oz Per Year • Strong Strategic Partners • Strong Exploration Upside • Production-Ready Management Team • Undervalued 24