IPMA International Project
Excellence Award
2012
10 year
 Project Excellence
      Award history
Facts about the Award

            International since 2002
            Promotes Excellence in
             Project Management
            Based on IPMA Project
              Excellence Model
            Already 78 finalists from
             14 countries worldwide
               Totally 218 Award
               Assessors from 28
                   countries
Award Products
                   Award Products       2002   2003   2004   2005   2006   2007   2008   2009   2010   2011

Project Excellence Award
            Project Excellence Model
       Award Process (Int. + Nat.)
              Award Categories
Award Trainings and
Workshops
      Award Assessor Trainings
             Trainings for corporates
               PE Award Workshops
IPMA World Congress
      Panel discussion for finalists
                     Gala Ceremony
Finalists
 Winners Club with Award finalists
                    Finalists network
Documents
                 Benchmark reports
     Finalists' Project case studies
Award Finalists 2002–2011
                New applicant for 2011

                Former applicant
Award Finalists 2002-2011 per country
Award Winners
                                  IPMA Project Excellence Awards
Winner 2011 GE Oil & Gas - Contractual Services, Italy
Qatar Modular Replacement
Winner 2010                          Winner 2009                    Winner 2008
CNOOC Huizhou Refinery, China        Siemens, China                 Foster Wheeler Italiana SpA,
CNOOC Huizhou Refinery Project       Beijing T3 Airport Expansion   Italy
                                     Project                        Lomellina 2 Project
Siemens, Germany
Velaro RUS                           Petrom, Romania
                                     Well Modernisation Program

Winner 2007                          Winners 2006                   Winner 2005
Jiangsu Sopo (Group) Co. Ltd.,       Chinese Academy of Space       NTPC Ltd. India
China                                Technology                     Simhadri Power Project
Technological Revamping Project      Shenzou 6-Manned Spaceship
of 150,000 t/a Acetic Acid
                                     T-Systems International,
                                     Germany
                                     Project: TDN REWE IP-VPN 2

Winner 2004                          Winner 2003                    Winner 2002
T-Systems Spain                      UBS AG                         Fluor Daniel B.V.
Open Administration of Cataluña      IT Wrap Program                ROG AOP-II Project
 Siemens

    6
   T-Systems
                    Award Figures
     2
Returning Clients    1-time Clients
 India
   NTPC                               Finalists:             78
    5
                                       Companies:             56
   Gail LTD

     2
                                       Continents:             3

 Italy
   GE Oil & Gas
                           +           Award categories:       3
    3                      45
   Technimont

    4                                  Award Assessors:       218
   Techint
                                       IPMA Award Officers:    16
     2
                                       Award Jury members:     24
 Poland
   Transsystems                       Award Trainers:         15

     2                                 Award Trainings:        34
 Romania
   SIVECO

Contenu connexe

En vedette

First Impressions Community Exchange Questionnaire
First Impressions Community Exchange QuestionnaireFirst Impressions Community Exchange Questionnaire
First Impressions Community Exchange Questionnaireled4lgus
 
Assignment 11 draft 7 part 3
Assignment 11 draft 7 part 3Assignment 11 draft 7 part 3
Assignment 11 draft 7 part 3rfasil22
 
Evaluation part 1
Evaluation part 1Evaluation part 1
Evaluation part 1rfasil22
 
Assignment 11 draft 7 part 6
Assignment 11 draft 7 part 6Assignment 11 draft 7 part 6
Assignment 11 draft 7 part 6rfasil22
 
Led primer
Led primerLed primer
Led primerled4lgus
 
Creative Connections
Creative ConnectionsCreative Connections
Creative ConnectionsMiles Berry
 
How we taught ourselves service design
How we taught ourselves service designHow we taught ourselves service design
How we taught ourselves service designOptimal Usability
 
Evaluation part 2
Evaluation part 2Evaluation part 2
Evaluation part 2rfasil22
 
Evaluation part 4
Evaluation part 4Evaluation part 4
Evaluation part 4rfasil22
 
Assignment 11 draft 6 part 2
Assignment 11 draft 6 part 2Assignment 11 draft 6 part 2
Assignment 11 draft 6 part 2rfasil22
 
Evaluation part 1
Evaluation part 1Evaluation part 1
Evaluation part 1rfasil22
 
Assignment 11 draft 7 part 5
Assignment 11 draft 7 part 5Assignment 11 draft 7 part 5
Assignment 11 draft 7 part 5rfasil22
 
Assignment 11 draft 4 part 4
Assignment 11 draft 4 part 4Assignment 11 draft 4 part 4
Assignment 11 draft 4 part 4rfasil22
 
Evaluation part 3
Evaluation part 3Evaluation part 3
Evaluation part 3rfasil22
 
Evaluation part 4
Evaluation part 4Evaluation part 4
Evaluation part 4rfasil22
 

En vedette (17)

First Impressions Community Exchange Questionnaire
First Impressions Community Exchange QuestionnaireFirst Impressions Community Exchange Questionnaire
First Impressions Community Exchange Questionnaire
 
Assignment 11 draft 7 part 3
Assignment 11 draft 7 part 3Assignment 11 draft 7 part 3
Assignment 11 draft 7 part 3
 
Evaluation part 1
Evaluation part 1Evaluation part 1
Evaluation part 1
 
Assignment 11 draft 7 part 6
Assignment 11 draft 7 part 6Assignment 11 draft 7 part 6
Assignment 11 draft 7 part 6
 
Led primer
Led primerLed primer
Led primer
 
radhe
radheradhe
radhe
 
Creative Connections
Creative ConnectionsCreative Connections
Creative Connections
 
How we taught ourselves service design
How we taught ourselves service designHow we taught ourselves service design
How we taught ourselves service design
 
Evaluation part 2
Evaluation part 2Evaluation part 2
Evaluation part 2
 
Evaluation part 4
Evaluation part 4Evaluation part 4
Evaluation part 4
 
Assignment 11 draft 6 part 2
Assignment 11 draft 6 part 2Assignment 11 draft 6 part 2
Assignment 11 draft 6 part 2
 
Evaluation part 1
Evaluation part 1Evaluation part 1
Evaluation part 1
 
CIA-BPI ppt presentation
CIA-BPI ppt presentationCIA-BPI ppt presentation
CIA-BPI ppt presentation
 
Assignment 11 draft 7 part 5
Assignment 11 draft 7 part 5Assignment 11 draft 7 part 5
Assignment 11 draft 7 part 5
 
Assignment 11 draft 4 part 4
Assignment 11 draft 4 part 4Assignment 11 draft 4 part 4
Assignment 11 draft 4 part 4
 
Evaluation part 3
Evaluation part 3Evaluation part 3
Evaluation part 3
 
Evaluation part 4
Evaluation part 4Evaluation part 4
Evaluation part 4
 

Similaire à IPMA International Project Excellence Award Winners

Aw Award Marketing Presentation 2012
Aw Award Marketing Presentation 2012Aw Award Marketing Presentation 2012
Aw Award Marketing Presentation 2012My own
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelecSirris
 
Technip company profile
Technip company profileTechnip company profile
Technip company profilePrince Patni
 
Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON Kevin YU
 
Corporate profile 20150520-English
Corporate profile 20150520-EnglishCorporate profile 20150520-English
Corporate profile 20150520-EnglishDavid Zhang
 
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...Royal Mail
 
Rajat Kumar Arya Key Highlights.pdf
Rajat Kumar Arya Key Highlights.pdfRajat Kumar Arya Key Highlights.pdf
Rajat Kumar Arya Key Highlights.pdfRajat Arya
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technipignitetribes
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan
 
Umicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore
 
Track g test strategy - delta
Track g   test strategy - deltaTrack g   test strategy - delta
Track g test strategy - deltachiportal
 
Bogdan Mircea Tomescu Presentation
Bogdan Mircea Tomescu PresentationBogdan Mircea Tomescu Presentation
Bogdan Mircea Tomescu PresentationMircea Tomescu
 
The Automation Revolution - RAD
The Automation Revolution - RADThe Automation Revolution - RAD
The Automation Revolution - RADqualisystems
 
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...Dürr
 
Introduction to Tridiagonal Solutions
Introduction to Tridiagonal SolutionsIntroduction to Tridiagonal Solutions
Introduction to Tridiagonal Solutionsvv.ranade
 
FIWARE Global Summit - PERNOUD E-TOOLING: a SME Application
FIWARE Global Summit - PERNOUD E-TOOLING: a SME ApplicationFIWARE Global Summit - PERNOUD E-TOOLING: a SME Application
FIWARE Global Summit - PERNOUD E-TOOLING: a SME ApplicationFIWARE
 
DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1Jiewen Li
 

Similaire à IPMA International Project Excellence Award Winners (20)

Aw Award Marketing Presentation 2012
Aw Award Marketing Presentation 2012Aw Award Marketing Presentation 2012
Aw Award Marketing Presentation 2012
 
20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec20200923 inside metal am webinar_laborelec
20200923 inside metal am webinar_laborelec
 
Technip company profile
Technip company profileTechnip company profile
Technip company profile
 
3 uhdenora281014-final
3 uhdenora281014-final3 uhdenora281014-final
3 uhdenora281014-final
 
Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON Hydrogen Peroxide Plant Project -EXPERSON
Hydrogen Peroxide Plant Project -EXPERSON
 
Corporate profile 20150520-English
Corporate profile 20150520-EnglishCorporate profile 20150520-English
Corporate profile 20150520-English
 
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...Auditac  tg 6 how to benefit from eurovent cert database and retrieve past eq...
Auditac tg 6 how to benefit from eurovent cert database and retrieve past eq...
 
Rajat Kumar Arya Key Highlights.pdf
Rajat Kumar Arya Key Highlights.pdfRajat Kumar Arya Key Highlights.pdf
Rajat Kumar Arya Key Highlights.pdf
 
Process Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by TechnipProcess Related, Mechanical and Piping Workshop by Technip
Process Related, Mechanical and Piping Workshop by Technip
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
 
Umicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and InnovationUmicore Capital Markets Day 2015 : Technology and Innovation
Umicore Capital Markets Day 2015 : Technology and Innovation
 
Track g test strategy - delta
Track g   test strategy - deltaTrack g   test strategy - delta
Track g test strategy - delta
 
Bogdan Mircea Tomescu Presentation
Bogdan Mircea Tomescu PresentationBogdan Mircea Tomescu Presentation
Bogdan Mircea Tomescu Presentation
 
The Automation Revolution - RAD
The Automation Revolution - RADThe Automation Revolution - RAD
The Automation Revolution - RAD
 
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...
ANALYSTS‘ TRIP: Paint and Final Assembly Systems, Application Technology, Cle...
 
Introduction to Tridiagonal Solutions
Introduction to Tridiagonal SolutionsIntroduction to Tridiagonal Solutions
Introduction to Tridiagonal Solutions
 
FIWARE Global Summit - PERNOUD E-TOOLING: a SME Application
FIWARE Global Summit - PERNOUD E-TOOLING: a SME ApplicationFIWARE Global Summit - PERNOUD E-TOOLING: a SME Application
FIWARE Global Summit - PERNOUD E-TOOLING: a SME Application
 
DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1DEKE Precision Tooling_Molding 2020.6 v1.1
DEKE Precision Tooling_Molding 2020.6 v1.1
 
CATIA.pptx
CATIA.pptxCATIA.pptx
CATIA.pptx
 
Acciona Energia Madrid Information Day
Acciona Energia Madrid Information DayAcciona Energia Madrid Information Day
Acciona Energia Madrid Information Day
 

Plus de My own

eBook_ Digitizing and Automating Work Packaging (3).pdf
eBook_ Digitizing and Automating Work Packaging (3).pdfeBook_ Digitizing and Automating Work Packaging (3).pdf
eBook_ Digitizing and Automating Work Packaging (3).pdfMy own
 
Procurement and Contract Management Strategy-1.docx
Procurement and Contract Management Strategy-1.docxProcurement and Contract Management Strategy-1.docx
Procurement and Contract Management Strategy-1.docxMy own
 
AWP-Education-Primer.pdf
AWP-Education-Primer.pdfAWP-Education-Primer.pdf
AWP-Education-Primer.pdfMy own
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxMy own
 
ENR Sep 2018 - Best Global Project Award - Sidra Citation -w Picture.pdf
ENR Sep 2018 - Best Global Project Award  - Sidra Citation -w Picture.pdfENR Sep 2018 - Best Global Project Award  - Sidra Citation -w Picture.pdf
ENR Sep 2018 - Best Global Project Award - Sidra Citation -w Picture.pdfMy own
 
Andrew 2008 Ipma Assessor Certificate
Andrew 2008 Ipma Assessor CertificateAndrew 2008 Ipma Assessor Certificate
Andrew 2008 Ipma Assessor CertificateMy own
 
2008 Ipma Pe Training Beijing
2008 Ipma Pe Training Beijing2008 Ipma Pe Training Beijing
2008 Ipma Pe Training BeijingMy own
 
2007 Advanced Primavera Project Management Module 6.0 Training
2007 Advanced Primavera Project Management Module 6.0 Training2007 Advanced Primavera Project Management Module 6.0 Training
2007 Advanced Primavera Project Management Module 6.0 TrainingMy own
 
Cipa 2009 Contract Master Class
Cipa 2009 Contract Master ClassCipa 2009 Contract Master Class
Cipa 2009 Contract Master ClassMy own
 
2010 Ipma Pe Training Beijing
2010 Ipma  Pe Training Beijing2010 Ipma  Pe Training Beijing
2010 Ipma Pe Training BeijingMy own
 
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng
120606 Contract Management Skill Checklist & Experience Grid Andrew NgMy own
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 
Beyond Contract Series Article One
Beyond Contract Series   Article OneBeyond Contract Series   Article One
Beyond Contract Series Article OneMy own
 
Skills & Experience Compared with Planning Fraternity
Skills & Experience Compared with Planning FraternitySkills & Experience Compared with Planning Fraternity
Skills & Experience Compared with Planning FraternityMy own
 
Ipma Proj Excel Mtg09
Ipma Proj Excel Mtg09Ipma Proj Excel Mtg09
Ipma Proj Excel Mtg09My own
 
Ipma Pe Draf Tnewassessmenttables Tm 20090515
Ipma Pe Draf Tnewassessmenttables Tm 20090515Ipma Pe Draf Tnewassessmenttables Tm 20090515
Ipma Pe Draf Tnewassessmenttables Tm 20090515My own
 

Plus de My own (16)

eBook_ Digitizing and Automating Work Packaging (3).pdf
eBook_ Digitizing and Automating Work Packaging (3).pdfeBook_ Digitizing and Automating Work Packaging (3).pdf
eBook_ Digitizing and Automating Work Packaging (3).pdf
 
Procurement and Contract Management Strategy-1.docx
Procurement and Contract Management Strategy-1.docxProcurement and Contract Management Strategy-1.docx
Procurement and Contract Management Strategy-1.docx
 
AWP-Education-Primer.pdf
AWP-Education-Primer.pdfAWP-Education-Primer.pdf
AWP-Education-Primer.pdf
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
 
ENR Sep 2018 - Best Global Project Award - Sidra Citation -w Picture.pdf
ENR Sep 2018 - Best Global Project Award  - Sidra Citation -w Picture.pdfENR Sep 2018 - Best Global Project Award  - Sidra Citation -w Picture.pdf
ENR Sep 2018 - Best Global Project Award - Sidra Citation -w Picture.pdf
 
Andrew 2008 Ipma Assessor Certificate
Andrew 2008 Ipma Assessor CertificateAndrew 2008 Ipma Assessor Certificate
Andrew 2008 Ipma Assessor Certificate
 
2008 Ipma Pe Training Beijing
2008 Ipma Pe Training Beijing2008 Ipma Pe Training Beijing
2008 Ipma Pe Training Beijing
 
2007 Advanced Primavera Project Management Module 6.0 Training
2007 Advanced Primavera Project Management Module 6.0 Training2007 Advanced Primavera Project Management Module 6.0 Training
2007 Advanced Primavera Project Management Module 6.0 Training
 
Cipa 2009 Contract Master Class
Cipa 2009 Contract Master ClassCipa 2009 Contract Master Class
Cipa 2009 Contract Master Class
 
2010 Ipma Pe Training Beijing
2010 Ipma  Pe Training Beijing2010 Ipma  Pe Training Beijing
2010 Ipma Pe Training Beijing
 
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng120606  Contract Management Skill Checklist & Experience Grid   Andrew Ng
120606 Contract Management Skill Checklist & Experience Grid Andrew Ng
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 
Beyond Contract Series Article One
Beyond Contract Series   Article OneBeyond Contract Series   Article One
Beyond Contract Series Article One
 
Skills & Experience Compared with Planning Fraternity
Skills & Experience Compared with Planning FraternitySkills & Experience Compared with Planning Fraternity
Skills & Experience Compared with Planning Fraternity
 
Ipma Proj Excel Mtg09
Ipma Proj Excel Mtg09Ipma Proj Excel Mtg09
Ipma Proj Excel Mtg09
 
Ipma Pe Draf Tnewassessmenttables Tm 20090515
Ipma Pe Draf Tnewassessmenttables Tm 20090515Ipma Pe Draf Tnewassessmenttables Tm 20090515
Ipma Pe Draf Tnewassessmenttables Tm 20090515
 

IPMA International Project Excellence Award Winners

  • 2. 10 year Project Excellence Award history
  • 3. Facts about the Award International since 2002 Promotes Excellence in Project Management Based on IPMA Project Excellence Model Already 78 finalists from 14 countries worldwide Totally 218 Award Assessors from 28 countries
  • 4. Award Products Award Products 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Project Excellence Award Project Excellence Model Award Process (Int. + Nat.) Award Categories Award Trainings and Workshops Award Assessor Trainings Trainings for corporates PE Award Workshops IPMA World Congress Panel discussion for finalists Gala Ceremony Finalists Winners Club with Award finalists Finalists network Documents Benchmark reports Finalists' Project case studies
  • 5. Award Finalists 2002–2011 New applicant for 2011 Former applicant
  • 7. Award Winners IPMA Project Excellence Awards Winner 2011 GE Oil & Gas - Contractual Services, Italy Qatar Modular Replacement Winner 2010 Winner 2009 Winner 2008 CNOOC Huizhou Refinery, China Siemens, China Foster Wheeler Italiana SpA, CNOOC Huizhou Refinery Project Beijing T3 Airport Expansion Italy Project Lomellina 2 Project Siemens, Germany Velaro RUS Petrom, Romania Well Modernisation Program Winner 2007 Winners 2006 Winner 2005 Jiangsu Sopo (Group) Co. Ltd., Chinese Academy of Space NTPC Ltd. India China Technology Simhadri Power Project Technological Revamping Project Shenzou 6-Manned Spaceship of 150,000 t/a Acetic Acid T-Systems International, Germany Project: TDN REWE IP-VPN 2 Winner 2004 Winner 2003 Winner 2002 T-Systems Spain UBS AG Fluor Daniel B.V. Open Administration of Cataluña IT Wrap Program ROG AOP-II Project
  • 8.  Siemens 6  T-Systems Award Figures 2 Returning Clients 1-time Clients  India  NTPC  Finalists: 78 5  Companies: 56  Gail LTD 2  Continents: 3  Italy  GE Oil & Gas +  Award categories: 3 3 45  Technimont 4  Award Assessors: 218  Techint  IPMA Award Officers: 16 2  Award Jury members: 24  Poland  Transsystems  Award Trainers: 15 2  Award Trainings: 34  Romania  SIVECO