Renewable Energy Certificate (REC) mechanism is a market based instrument to promote
renewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimed
at addressing the mismatch between availability of RE resources in state and the requirement of
the obligated entities to meet the renewable purchase obligation (RPO).
Revenue for a RE generator under REC scheme includes revenue from the sale of electricity
component of RE generation and the revenue from the sale of environmental attributes in the
form of RECs.
Revenue
Sale of Electricity
Sale of REC Certificate
Financials REC
Per MW Optimistic Conservative Radically Pessimistic
Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores
Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units
Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit
Tariff Escallation 5% 3% 3%
Max possible tariff Rs 8 Rs 7 Rs 6
Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unitPrice of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unit
Price of REC after 5 years RS 6/unit Rs 4.0/unit Zero
Exim financing 50% of Cost No No
Interest rate (Exim) 10% NA NA
Interest rate (domestic) 12.50% 13% 14%
Tenor for Exim 15 years NA NA
Tenor for domestic 12 years 12 years 12 years
Accelerated depreciation Yes YES Yes
Equity IRR 90% 40% 16%
Accreditation
30 days
42 days
Execution PlanExecution Plan
Reg for
project
0 1 2 3 4 5 6
MOU
Accreditation
Registration
Open Access
Comissioning
42 days
Setting up of the project
42 days
Issuance
Documentation with Electricity Dept
Process of Accreditation
ELIGIBLE
Entity
STATE AGENCY
SLDC - RVPN
1
2
3a
3b
Verification prior
to accreditation
Intimation to
accreditation
Application to
accreditation
Confirmation to
accreditation
NLDC – Central agency
3a
3c
Intimation to
accreditation
Confirmation to
accreditation
AccreditationAccreditation
0 7 14 21 28 35 42
Submission
Re Submit
Processiong
5 days
7 days
30 Days
Certificate
Check
Sec A Owner Details
Sec B Operator Details
Sec C RE Generating Station Details
Format 1.1
AccreditationAccreditationAccreditationAccreditation
Sec C RE Generating Station Details
Sec D Connectivity Details with Concerned Licensee (STU/Discom)
Sec E Metering Details
Sec F Statutory Clearance Details
Sec H Details of Fee & Charges
Sec G General Details
Section I : Declaration
Format 1.2 CERTIFICATE OF ACCREDIATION
Sec A
Sec B
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec F
Sec H
Sec G
Sec B
Sec A
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec F
Sec H
Sec G
Sec C
Sec A
Sec B
Sec D
AccreditationAccreditationAccreditationAccreditation
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec F
Sec H
Sec G
Sec D
Sec A
Sec B
Sec C
AccreditationAccreditationAccreditationAccreditation
Sec D
Section I : Declaration
Format 1.2
Sec E
Sec F
Sec H
Sec G
Sec A
Sec B
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Sec E
Section I : Declaration
Format 1.2
Sec D
Sec F
Sec H
Sec G
Sec A
Sec B
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Sec F
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec H
Sec G
Sec A
Sec B
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Sec G
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec F
Sec H
Sec A
Sec B
Sec C
Sec D
AccreditationAccreditationAccreditationAccreditation
Sec H
Section I : Declaration
Format 1.2
Sec D
Sec E
Sec F
Sec G
Process of Registration
ELIGIBLE
Entity
STATE AGENCY
SLDC - RVPN
1
2
3a
3c
3b
Verification for
registration
Intimation of
Registration
Intimation of
Registration
Application for
Registration
Confirmation to
Registration
POWER
EXCHANGE
3d
Intimation of
Registration
NLDC –
Central agency
RegistrationRegistration
0 7 14 21 28 35 42
Check
Submission
2
incomplete
Processing
Fees Submit
Certificate
Check 2
7 work day
15 days
15 days
RegistrationRegistration
Sec A Owner Details
Sec B RE Generating Station Details
Sec C Copy of Certificate of Accreditation from State Agency
Format 2.1 Application for Registration of RE Generating as Eligible Entity
RegistrationRegistration
Sec C Copy of Certificate of Accreditation from State Agency
Sec D Commissioning Schedule
Sec E Details of Fee & Charges
Sec F Declaration
Section I : Declaration
Format 2.2 CERTIFICATE OF REGISTRATION
RegistrationRegistration
Sec A
Format 2.1
Sec B
Sec C
RegistrationRegistration
Section I : Declaration
Format 2.2
Sec C
Sec D
Sec E
Sec F
Sec B
Format 2.1
Sec A
Sec C
RegistrationRegistration
Section I : Declaration
Format 2.2
Sec C
Sec D
Sec E
Sec F
Sec C
Format 2.1
Sec A
Sec B
RegistrationRegistration
Sec C
Section I : Declaration
Format 2.2
Sec D
Sec E
Sec F
Format 2.1
Sec A
Sec B
Sec C
RegistrationRegistration
Sec D
Section I : Declaration
Format 2.2
Sec C
Sec E
Sec F
Format 2.1
Sec A
Sec B
Sec C
RegistrationRegistration
Sec E
Section I : Declaration
Format 2.2
Sec C
Sec D
Sec F
Format 2.1
Sec A
Sec B
Sec C
RegistrationRegistration
Sec F
Section I : Declaration
Format 2.2
Sec C
Sec D
Sec E
Sec A
Sec B
Sec C
Format 2.1
RegistrationRegistration
Sec C
Sec D
Sec E
Sec F
Section I : Declaration
Format 2.2
Process of Open Access
Power Ex
NLDC
Urja Bhawan
RREC
Open AccessOpen Access
0 10 20 30 40 50 60
Submission
MOU
incomplete
Processing
System stren
System Study
Submission
10 day
30 days
30 days
???
Form I APPLICATION FOR SCHEDULING
Form II CONCURENCE FROM SLDC
Form III REQUEST/CONCURRENCE FROM RLDC
Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING)
Open AccessOpen Access
Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING)
Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION
Form VI ACCEPTANCE FOR SCHEDULING
Form VIII REGISTRATION FORM
Form VII DETAILS OF PAYMENT
Commissioning
Process of Issuance
2
3
Verification prior
to Issuance
Intimation to
Issuance
Issuance of
REC
Intimation of Meter Reading
5b
Regular Injection
Report
STATE AGENCY
NLDC – Central agency
SLDC - RVPN
ELIGIBLE Entity
1
4b
5a
Issuance of
REC
Application for
Issuance
Intimation of Meter Reading
Distribution
Licensee
4a
4c
SLDC - RVPN
IssuanceIssuance
0 7 14 21 28 35 42
2Check
Submit
Incomplete
Processiong
2
5 days
15 days
Certificate
Check
IssuanceIssuance
Sec A Energy Injection Report
Sec B Registration Certificate (To ascertain validity)
Format 3.1
Sec B Registration Certificate (To ascertain validity)
Sec C Details of Fee & Charges
Sec D Compliance Auditor Report (if applicable)
Format 3.2 CERTIFICATE OF ISSUANCE
IssuanceIssuance
Sec A
Format 3.1
Sec B
Sec C
Format 3.2
Sec C
Sec D
IssuanceIssuance
Sec B
Format 3.1
Sec A
Sec C
Format 3.2
Sec C
Sec D
IssuanceIssuance
Sec C
Format 3.1
Sec A
Sec B
Sec C
Format 3.2
Sec D
IssuanceIssuance
Format 3.1
Sec A
Sec B
Sec C
Sec D
Format 3.2
Sec C
IssuanceIssuance
Sec A
Sec B
Sec C
Format 3.1
Sec C
Sec D
Format 3.2
Application
Execution time
Forms
Application
Execution time
Forms
I Company Details
II Proposed Power Project
III Details of Proposed Power Project
IV Electrical DetailsIV Electrical Details
V Financial Details
VI Any Other relevant information
VIII Documents enclosed – As applicable
VII Declaration
Application
Execution time
Forms
I Company Details
II Proposed Power Project
III Details of Proposed Power Project
IV Electrical DetailsIV Electrical Details
V Financial Details
VI Any Other relevant information
VIII Documents enclosed – As applicable
VII Declaration
Services Offered
Conceptualization Execution Project MonitoringConceptualization
Monitoring
Execution Project Monitoring
Land Identification
Funding
Feasibility Study
Rebates and Incentives
Quality
Design
Procure
Install
Testing and Certification
Maintenance
Providing Engineering Excellence in every Step
Scope of Work
Business Model
Incorporating Renewable Incentives and Policy changes to get maximum out
of the Business Model
Technical
Proposals
Finance
Tie ups
Investor
Incorporating Renewable Incentives and Policy changes to get maximum out
of the Business Model
Forming JV for FI’s and facilitating tie ups with Indian Companies.
Overcoming legal hurdles to ease Investments in India
Consulting about best technology for Solar projects, based on the location
and the cost.
Pre Bid and Post Bid Consultancy for lucrative but competitive for Solar
tenders in India
Arranging Funds and Optimizing it to get maximum returns on Equity
Making strategic tie-ups for Foreign companies looking for Solar Business
Opportunity in India
Contact us:-
410, Alankar Plaza
Jaipur, Rajasthan
Ph no :- +91 141 2231469
Fax :- +91 141 3916464
Mob no :- +91 – 9829031658
Email :- agm@greenergytechnologies.in
Thank You
Contact us:-
410, Alankar Plaza
Jaipur, Rajasthan
Ph no :- +91 141 2231469
Fax :- +91 141 3916464
Mob no :- +91 – 9829031658
Email :- agm@greenergytechnologies.in
Our Business Associations
Power Ex
NLDC
Urja Bhawan
RREC
S.No Type Charges
1 Registration for the project Rs 10,000 / MW
Registration Charges Rs 50,000/ MW
Processing Charges Rs 10,000 / MW
2 Accreditation Charges
3 Registration for certificate
4 Issuance for Certificates
Compliance Auditor

More Related Content

Similar to REC mechanism

Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfCILPS1
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Rec framework in india
Rec framework in indiaRec framework in india
Rec framework in indiaranjeetsingh
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptxPankaj Kumar
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.CHARAK RAY
 
Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Amir Khan
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxSantoshkumarGupta67
 
Guidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsGuidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsAnirban Mukerji
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemeshambhupoddar1
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
Quality Assurance Procedures fro MCAP.ppt
Quality Assurance Procedures fro MCAP.pptQuality Assurance Procedures fro MCAP.ppt
Quality Assurance Procedures fro MCAP.pptknownet
 
financial concurrence-ntpc
financial concurrence-ntpcfinancial concurrence-ntpc
financial concurrence-ntpcumesh yadav
 
Project Management: Execution of a Pump Installation in an Industry - Executi...
Project Management: Execution of a Pump Installation in an Industry - Executi...Project Management: Execution of a Pump Installation in an Industry - Executi...
Project Management: Execution of a Pump Installation in an Industry - Executi...Harender Singh
 

Similar to REC mechanism (20)

Rec mechanism
Rec mechanismRec mechanism
Rec mechanism
 
Tendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdfTendernotice_1 of Washery for coal washing.pdf
Tendernotice_1 of Washery for coal washing.pdf
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Final tender chp
Final tender chpFinal tender chp
Final tender chp
 
Rec framework in india
Rec framework in indiaRec framework in india
Rec framework in india
 
BB Project on AHT .pptx
BB Project on AHT .pptxBB Project on AHT .pptx
BB Project on AHT .pptx
 
COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.COLD STORE PROJECT SCHEME.
COLD STORE PROJECT SCHEME.
 
Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)Rules and regulation of Pakistan Engineering Council (PEC)
Rules and regulation of Pakistan Engineering Council (PEC)
 
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptxTPWODL- Q1 FY24 _Board Meeting Presentation.pptx
TPWODL- Q1 FY24 _Board Meeting Presentation.pptx
 
Oracle Database is a trademark of Oracle Corporation #CloudServerforIP
Oracle Database is a trademark of Oracle Corporation #CloudServerforIPOracle Database is a trademark of Oracle Corporation #CloudServerforIP
Oracle Database is a trademark of Oracle Corporation #CloudServerforIP
 
Guidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projectsGuidelines for preparation of a RFP for e governance projects
Guidelines for preparation of a RFP for e governance projects
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
Pat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat schemePat rules and obligations of d cs under pat scheme
Pat rules and obligations of d cs under pat scheme
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
Quality Assurance Procedures fro MCAP.ppt
Quality Assurance Procedures fro MCAP.pptQuality Assurance Procedures fro MCAP.ppt
Quality Assurance Procedures fro MCAP.ppt
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
financial concurrence-ntpc
financial concurrence-ntpcfinancial concurrence-ntpc
financial concurrence-ntpc
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Project Management: Execution of a Pump Installation in an Industry - Executi...
Project Management: Execution of a Pump Installation in an Industry - Executi...Project Management: Execution of a Pump Installation in an Industry - Executi...
Project Management: Execution of a Pump Installation in an Industry - Executi...
 

Recently uploaded

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Recently uploaded (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

REC mechanism

  • 2. REC Mechanism Renewable Energy Certificate (REC) mechanism is a market based instrument to promote renewable energy and facilitate compliance of renewable purchase obligations (RPO). It is aimed at addressing the mismatch between availability of RE resources in state and the requirement of the obligated entities to meet the renewable purchase obligation (RPO). Revenue for a RE generator under REC scheme includes revenue from the sale of electricity component of RE generation and the revenue from the sale of environmental attributes in the form of RECs. Revenue Sale of Electricity Sale of REC Certificate
  • 3. Financials REC Per MW Optimistic Conservative Radically Pessimistic Cost of Project Rs 9.5 crores Rs 10 crores Rs 10.5 crores Expected Generation 17.5 lac units 16.5 Lac units 16 Lac units Power Tariff Sale Rs 4 per unit Rs 2.7 per unit Rs 2.7 per unit Tariff Escallation 5% 3% 3% Max possible tariff Rs 8 Rs 7 Rs 6 Price of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unitPrice of REC for 5 years Rs 11.5/unit Rs 9.3 /unit Rs 9.3 / unit Price of REC after 5 years RS 6/unit Rs 4.0/unit Zero Exim financing 50% of Cost No No Interest rate (Exim) 10% NA NA Interest rate (domestic) 12.50% 13% 14% Tenor for Exim 15 years NA NA Tenor for domestic 12 years 12 years 12 years Accelerated depreciation Yes YES Yes Equity IRR 90% 40% 16%
  • 4. Accreditation 30 days 42 days Execution PlanExecution Plan Reg for project 0 1 2 3 4 5 6 MOU Accreditation Registration Open Access Comissioning 42 days Setting up of the project 42 days Issuance Documentation with Electricity Dept
  • 5. Process of Accreditation ELIGIBLE Entity STATE AGENCY SLDC - RVPN 1 2 3a 3b Verification prior to accreditation Intimation to accreditation Application to accreditation Confirmation to accreditation NLDC – Central agency 3a 3c Intimation to accreditation Confirmation to accreditation
  • 6. AccreditationAccreditation 0 7 14 21 28 35 42 Submission Re Submit Processiong 5 days 7 days 30 Days Certificate Check
  • 7. Sec A Owner Details Sec B Operator Details Sec C RE Generating Station Details Format 1.1 AccreditationAccreditationAccreditationAccreditation Sec C RE Generating Station Details Sec D Connectivity Details with Concerned Licensee (STU/Discom) Sec E Metering Details Sec F Statutory Clearance Details Sec H Details of Fee & Charges Sec G General Details Section I : Declaration Format 1.2 CERTIFICATE OF ACCREDIATION
  • 8. Sec A Sec B Sec C Sec D AccreditationAccreditationAccreditationAccreditation Section I : Declaration Format 1.2 Sec D Sec E Sec F Sec H Sec G
  • 9. Sec B Sec A Sec C Sec D AccreditationAccreditationAccreditationAccreditation Section I : Declaration Format 1.2 Sec D Sec E Sec F Sec H Sec G
  • 10. Sec C Sec A Sec B Sec D AccreditationAccreditationAccreditationAccreditation Section I : Declaration Format 1.2 Sec D Sec E Sec F Sec H Sec G
  • 11. Sec D Sec A Sec B Sec C AccreditationAccreditationAccreditationAccreditation Sec D Section I : Declaration Format 1.2 Sec E Sec F Sec H Sec G
  • 12. Sec A Sec B Sec C Sec D AccreditationAccreditationAccreditationAccreditation Sec E Section I : Declaration Format 1.2 Sec D Sec F Sec H Sec G
  • 13. Sec A Sec B Sec C Sec D AccreditationAccreditationAccreditationAccreditation Sec F Section I : Declaration Format 1.2 Sec D Sec E Sec H Sec G
  • 14. Sec A Sec B Sec C Sec D AccreditationAccreditationAccreditationAccreditation Sec G Section I : Declaration Format 1.2 Sec D Sec E Sec F Sec H
  • 15. Sec A Sec B Sec C Sec D AccreditationAccreditationAccreditationAccreditation Sec H Section I : Declaration Format 1.2 Sec D Sec E Sec F Sec G
  • 16. Process of Registration ELIGIBLE Entity STATE AGENCY SLDC - RVPN 1 2 3a 3c 3b Verification for registration Intimation of Registration Intimation of Registration Application for Registration Confirmation to Registration POWER EXCHANGE 3d Intimation of Registration NLDC – Central agency
  • 17. RegistrationRegistration 0 7 14 21 28 35 42 Check Submission 2 incomplete Processing Fees Submit Certificate Check 2 7 work day 15 days 15 days
  • 18. RegistrationRegistration Sec A Owner Details Sec B RE Generating Station Details Sec C Copy of Certificate of Accreditation from State Agency Format 2.1 Application for Registration of RE Generating as Eligible Entity RegistrationRegistration Sec C Copy of Certificate of Accreditation from State Agency Sec D Commissioning Schedule Sec E Details of Fee & Charges Sec F Declaration Section I : Declaration Format 2.2 CERTIFICATE OF REGISTRATION
  • 19. RegistrationRegistration Sec A Format 2.1 Sec B Sec C RegistrationRegistration Section I : Declaration Format 2.2 Sec C Sec D Sec E Sec F
  • 20. Sec B Format 2.1 Sec A Sec C RegistrationRegistration Section I : Declaration Format 2.2 Sec C Sec D Sec E Sec F
  • 21. Sec C Format 2.1 Sec A Sec B RegistrationRegistration Sec C Section I : Declaration Format 2.2 Sec D Sec E Sec F
  • 22. Format 2.1 Sec A Sec B Sec C RegistrationRegistration Sec D Section I : Declaration Format 2.2 Sec C Sec E Sec F
  • 23. Format 2.1 Sec A Sec B Sec C RegistrationRegistration Sec E Section I : Declaration Format 2.2 Sec C Sec D Sec F
  • 24. Format 2.1 Sec A Sec B Sec C RegistrationRegistration Sec F Section I : Declaration Format 2.2 Sec C Sec D Sec E
  • 25. Sec A Sec B Sec C Format 2.1 RegistrationRegistration Sec C Sec D Sec E Sec F Section I : Declaration Format 2.2
  • 26. Process of Open Access Power Ex NLDC Urja Bhawan RREC
  • 27. Open AccessOpen Access 0 10 20 30 40 50 60 Submission MOU incomplete Processing System stren System Study Submission 10 day 30 days 30 days ???
  • 28. Form I APPLICATION FOR SCHEDULING Form II CONCURENCE FROM SLDC Form III REQUEST/CONCURRENCE FROM RLDC Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING) Open AccessOpen Access Form IV CONGESTION INFORMATION (ADVANCE SCHEDULING) Form V REQUEST FOR REVISION OF SCHEDULE DUE TO CONGESTION Form VI ACCEPTANCE FOR SCHEDULING Form VIII REGISTRATION FORM Form VII DETAILS OF PAYMENT
  • 30. Process of Issuance 2 3 Verification prior to Issuance Intimation to Issuance Issuance of REC Intimation of Meter Reading 5b Regular Injection Report STATE AGENCY NLDC – Central agency SLDC - RVPN ELIGIBLE Entity 1 4b 5a Issuance of REC Application for Issuance Intimation of Meter Reading Distribution Licensee 4a 4c SLDC - RVPN
  • 31. IssuanceIssuance 0 7 14 21 28 35 42 2Check Submit Incomplete Processiong 2 5 days 15 days Certificate Check
  • 32. IssuanceIssuance Sec A Energy Injection Report Sec B Registration Certificate (To ascertain validity) Format 3.1 Sec B Registration Certificate (To ascertain validity) Sec C Details of Fee & Charges Sec D Compliance Auditor Report (if applicable) Format 3.2 CERTIFICATE OF ISSUANCE
  • 33. IssuanceIssuance Sec A Format 3.1 Sec B Sec C Format 3.2 Sec C Sec D
  • 34. IssuanceIssuance Sec B Format 3.1 Sec A Sec C Format 3.2 Sec C Sec D
  • 35. IssuanceIssuance Sec C Format 3.1 Sec A Sec B Sec C Format 3.2 Sec D
  • 36. IssuanceIssuance Format 3.1 Sec A Sec B Sec C Sec D Format 3.2 Sec C
  • 37. IssuanceIssuance Sec A Sec B Sec C Format 3.1 Sec C Sec D Format 3.2
  • 39. Application Execution time Forms I Company Details II Proposed Power Project III Details of Proposed Power Project IV Electrical DetailsIV Electrical Details V Financial Details VI Any Other relevant information VIII Documents enclosed – As applicable VII Declaration
  • 40. Application Execution time Forms I Company Details II Proposed Power Project III Details of Proposed Power Project IV Electrical DetailsIV Electrical Details V Financial Details VI Any Other relevant information VIII Documents enclosed – As applicable VII Declaration
  • 41. Services Offered Conceptualization Execution Project MonitoringConceptualization Monitoring Execution Project Monitoring Land Identification Funding Feasibility Study Rebates and Incentives Quality Design Procure Install Testing and Certification Maintenance Providing Engineering Excellence in every Step
  • 42. Scope of Work Business Model Incorporating Renewable Incentives and Policy changes to get maximum out of the Business Model Technical Proposals Finance Tie ups Investor Incorporating Renewable Incentives and Policy changes to get maximum out of the Business Model Forming JV for FI’s and facilitating tie ups with Indian Companies. Overcoming legal hurdles to ease Investments in India Consulting about best technology for Solar projects, based on the location and the cost. Pre Bid and Post Bid Consultancy for lucrative but competitive for Solar tenders in India Arranging Funds and Optimizing it to get maximum returns on Equity Making strategic tie-ups for Foreign companies looking for Solar Business Opportunity in India
  • 43. Contact us:- 410, Alankar Plaza Jaipur, Rajasthan Ph no :- +91 141 2231469 Fax :- +91 141 3916464 Mob no :- +91 – 9829031658 Email :- agm@greenergytechnologies.in Thank You Contact us:- 410, Alankar Plaza Jaipur, Rajasthan Ph no :- +91 141 2231469 Fax :- +91 141 3916464 Mob no :- +91 – 9829031658 Email :- agm@greenergytechnologies.in Our Business Associations
  • 45. S.No Type Charges 1 Registration for the project Rs 10,000 / MW Registration Charges Rs 50,000/ MW Processing Charges Rs 10,000 / MW 2 Accreditation Charges 3 Registration for certificate 4 Issuance for Certificates