Ishikawa-Diagram
Structure
 Kaoru Ishikawa
 basic concept
 aim
 theoretical conversion
 practical example
 exercise
• born in Tokio 1915
• graduated University of Tokyo in 1939 with an
  Engineering degree in applied chemistry
• worked as a naval technical officer until 1941
• worked for Nissan Liquid Fuel Company
                                                           Kaoru Ishikawa
• associate professor at the University of Tokyo in 1947   (1915 - 1989)
• famous person in Qualitymanagement
• not only product quality
• but also e.g. quality of Management and assistant
• developed several quality-tools
• One of these tools is the Ishikawa-Diagram
  (also called Fishbone- or cause and effect diagram)
basic concept
The Idea:




think about possible causes and reasons leading to
an effect or a problem




find solution for preventing those problems
basic concept
• one problem/effect
• 7 causes lead to the problem/effect
• the causes are divided into main- and sidecauses
 The 7 causes are:
 1. Methods
 2. Machinery
 3. Management
 4. Materials
 5. Manpower
 6. Environment
 7. Measurement
basic concept
individual problem/effect needs individual factors
basic concept
individual problem/effect needs individual factors
 not all 7 factors are needed in the diagram
basic concept
individual problem/effect needs individual factors
  not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine

Branch of administration: Management, Environment
basic concept
individual problem/effect needs individual factors
  not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine

Branch of administration: Management, Environment



e.g. Methods, Machinery, Management, Materials, Manpower
basic concept
individual problem/effect needs individual factors
  not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine

Branch of administration: Management, Environment



e.g. Methods, Machinery, Management, Materials, Manpower
   5 M‘s
basic concept
individual problem/effect needs individual factors
  not all 7 factors are needed in the diagram
grade of influence
Branch of production: Manpower, Methods, Material und Machine

Branch of administration: Management, Environment



e.g. Methods, Machinery, Management, Materials, Manpower
   5 M‘s


4P (Place, Procedures, People, Policies )
4S (Surroundings, Suppliers, Systems, Skills)
basic concept
aim
• find the causes, main- and sidecauses
• clarity
• interdependence of the causes
• improve them for having the wanted effect
  or eliminate them for solving the problem
theoretical conversion
1. sketch the diagram and inscript the needed causes
theoretical conversion
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out
theoretical conversion
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out


3. check the completeness
theoretical conversion
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out


3. check the completeness


4. weight the the main- & sidecauses in terms of meaning & influence
theoretical conversion
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out


3. check the completeness


4. weight the the main- & sidecauses in terms of meaning & influence


5. check the selected causes for rightness
theoretical conversion
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out


3. check the completeness


4. weight the the main- & sidecauses in terms of meaning & influence


5. check the selected causes for rightness


6. The team discusses about the solution
theoretical conversion
6. The team discusses about the solution




• causes that can be improved or eliminated easily will be finished
  first of all (no need to be weighted)


• The weighted causes are in a list of priority and will be finished in
  turn
theoretical conversion
It‘s important
theoretical conversion
It‘s important




that the team has skilled workers involved in discussion
theoretical conversion
It‘s important




that the team has skilled workers involved in discussion




e.g. supplier, clients etc
practical example


        rise in productivity
practical example
1. sketch the diagram and inscript the needed causes
practical example
1. sketch the diagram and inscript the needed causes
practical example
1. sketch the diagram and inscript the needed causes




                                                 rise in productivity
practical example
1. sketch the diagram and inscript the needed causes

     Enviroment




                                                 rise in productivity
practical example
1. sketch the diagram and inscript the needed causes

     Enviroment          Manpower




                                                 rise in productivity
practical example
1. sketch the diagram and inscript the needed causes

     Enviroment          Manpower




                                                 rise in productivity




 Machine
practical example
1. sketch the diagram and inscript the needed causes

     Enviroment            Manpower




                                                 rise in productivity




 Machine       Materials
practical example
1. sketch the diagram and inscript the needed causes

     Enviroment            Manpower




                                                 rise in productivity




 Machine       Materials       Methods
practical example
2. work the main- and sidecauses out

     Enviroment           Manpower




                                        rise in productivity




 Machine      Materials       Methods
practical example
2. work the main- and sidecauses out

     Enviroment              Manpower
               Temperature

       Noise


                                           rise in productivity




 Machine         Materials       Methods
practical example
2. work the main- and sidecauses out

     Enviroment              Manpower
               Temperature               Motivation




                                               w
       Noise                 Education




                                                ag
                                                   e
                                                       rise in productivity




 Machine         Materials        Methods
practical example
  2. work the main- and sidecauses out

           Enviroment              Manpower
                     Temperature               Motivation




                                                     w
             Noise                 Education




                                                      ag
                                                         e
                                                             rise in productivity
    Hardware

Software


   Machine             Materials        Methods
practical example
  2. work the main- and sidecauses out

           Enviroment              Manpower
                     Temperature               Motivation




                                                     w
             Noise                 Education




                                                      ag
                                                         e
                                                             rise in productivity
    Hardware

Software             Procurement


   Machine             Materials        Methods
practical example
  2. work the main- and sidecauses out

           Enviroment              Manpower
                     Temperature               Motivation




                                                     w
             Noise                 Education




                                                      ag
                                                         e
                                                                    rise in productivity
    Hardware                           Standardisation

                     Procurement                       Lean Management
Software




                                                             CI
                                                                P
   Machine             Materials        Methods
practical example
  3. check the completeness

           Enviroment              Manpower
                     Temperature               Motivation




                                                     w
             Noise                 Education




                                                      ag
                                                         e
                                                                    rise in productivity
    Hardware                           Standardisation

                     Procurement                       Lean Management
Software




                                                             CI
                                                                P
   Machine             Materials        Methods
practical example
4. weight the the main- & sidecauses in terms of meaning & influence

  • Lean Management
  • Standardisation
  • Motivation
  • Education
  •…
practical example
5. check the selected causes for rightness

  • Lean Management
  • Standardisation
  • Motivation
  • Education
  •…
practical example
6. The team discusses about the solution


causes that can be improved or eliminated easily:
• Hardware
• Software
• Temperature
• Noise
practical example
6. The team discusses about the solution


weighted causes
• Lean Management
• Standardisation
• Motivation
• Education
exercise

     excessive drop of paper



            Henner Graubitz
           October 23rd 2006
exercise
1. sketch the diagram and inscript the needed causes


2. work the main- and sidecauses out


3. check the completeness


4. weight the the main- & sidecauses in terms of meaning & influence


5. check the selected causes for rightness


6.   The team discusses about the solution
exercise
solution

     Manpower                Machine



     create faulty     faulty feeder of
     documents         papers
                                          excessive drop of
                                          paper
                     misprints aren‘t
                     used as paper for
  too heavy          notices
  paper

     Materials           Methods
Advantage:
• different opinions by teamwork


• easy to apply


• little effort to practise


• better understanding for causes and
effects
Advantage:                              Disadvantage:
• different opinions by teamwork        • No clarity in very complex problems

• easy to apply                         • Interactions and chronological
                                        dependence can’t be displayed
• little effort to practise


• better understanding for causes and
effects

Contenu connexe

Tendances

8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving ProcessAnand Subramaniam
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMDr.Raja R
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingTimothy Wooi
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and processCharles Cotter, PhD
 
Kaizen theory
Kaizen theory Kaizen theory
Kaizen theory MOHD ARISH
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvementNaeem Hassan
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysisSimmy Sharma
 
Structured problem solving methodology,Tools and Techniques
Structured problem solving methodology,Tools and TechniquesStructured problem solving methodology,Tools and Techniques
Structured problem solving methodology,Tools and TechniquesWinning Minds Solutions
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 

Tendances (20)

8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & ManufacturingQuality in Manufacturing for Production & Manufacturing
Quality in Manufacturing for Production & Manufacturing
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
Root cause analysis - tools and process
Root cause analysis - tools and processRoot cause analysis - tools and process
Root cause analysis - tools and process
 
Zero defect
Zero defectZero defect
Zero defect
 
Tqm unit 2
Tqm unit 2Tqm unit 2
Tqm unit 2
 
Kaizen theory
Kaizen theory Kaizen theory
Kaizen theory
 
ZERO DEFECTS
ZERO DEFECTSZERO DEFECTS
ZERO DEFECTS
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Quality circles
Quality circlesQuality circles
Quality circles
 
8D Problem Solving Poster
8D Problem Solving Poster8D Problem Solving Poster
8D Problem Solving Poster
 
Root cause analysis training
Root cause analysis trainingRoot cause analysis training
Root cause analysis training
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
 
Root cause analysis
Root cause analysisRoot cause analysis
Root cause analysis
 
Structured problem solving methodology,Tools and Techniques
Structured problem solving methodology,Tools and TechniquesStructured problem solving methodology,Tools and Techniques
Structured problem solving methodology,Tools and Techniques
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Lean ppt
Lean pptLean ppt
Lean ppt
 

En vedette

Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagramsiva kumar
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagramkerviy
 
Ishikawa dijagram
Ishikawa dijagramIshikawa dijagram
Ishikawa dijagramsanela1982
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagramDeepak Jha
 
Diagramme d'ishikawa Ansari Abdelali
Diagramme d'ishikawa Ansari AbdelaliDiagramme d'ishikawa Ansari Abdelali
Diagramme d'ishikawa Ansari AbdelaliAbido Ansari
 
Exposicion ishikawa alejandra carboni y rey mendoza (2)
Exposicion ishikawa alejandra carboni y rey mendoza (2)Exposicion ishikawa alejandra carboni y rey mendoza (2)
Exposicion ishikawa alejandra carboni y rey mendoza (2)Jesus Mendoza
 
Six thinking hats creative teams
Six thinking hats creative teamsSix thinking hats creative teams
Six thinking hats creative teamsmzai2003
 
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...MEASURE Evaluation
 
Socratic questioning - Elt 738
Socratic questioning - Elt 738Socratic questioning - Elt 738
Socratic questioning - Elt 738Ecem Ekinci
 
Checking for Understanding Using the Socratic Method
Checking for Understanding Using the Socratic MethodChecking for Understanding Using the Socratic Method
Checking for Understanding Using the Socratic MethodSARCTutor
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...J. García - Verdugo
 

En vedette (20)

Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagram
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagram
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagram
 
Ishikawa dijagram
Ishikawa dijagramIshikawa dijagram
Ishikawa dijagram
 
Fish bone examples ppt
Fish bone examples pptFish bone examples ppt
Fish bone examples ppt
 
Qualite ishikawa
Qualite ishikawaQualite ishikawa
Qualite ishikawa
 
Ishikawa diagram
Ishikawa diagramIshikawa diagram
Ishikawa diagram
 
Diagramme d'ishikawa Ansari Abdelali
Diagramme d'ishikawa Ansari AbdelaliDiagramme d'ishikawa Ansari Abdelali
Diagramme d'ishikawa Ansari Abdelali
 
Exposicion ishikawa alejandra carboni y rey mendoza (2)
Exposicion ishikawa alejandra carboni y rey mendoza (2)Exposicion ishikawa alejandra carboni y rey mendoza (2)
Exposicion ishikawa alejandra carboni y rey mendoza (2)
 
Histogram
HistogramHistogram
Histogram
 
Six thinking hats creative teams
Six thinking hats creative teamsSix thinking hats creative teams
Six thinking hats creative teams
 
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...
Mapping for Informed Decision Making and Strengthening Project M&E: Lessons a...
 
Socratic questioning - Elt 738
Socratic questioning - Elt 738Socratic questioning - Elt 738
Socratic questioning - Elt 738
 
Juan manuel mapa conceptual
Juan manuel mapa conceptualJuan manuel mapa conceptual
Juan manuel mapa conceptual
 
What is a histogram
What is a histogramWhat is a histogram
What is a histogram
 
Checking for Understanding Using the Socratic Method
Checking for Understanding Using the Socratic MethodChecking for Understanding Using the Socratic Method
Checking for Understanding Using the Socratic Method
 
Socratic method
Socratic methodSocratic method
Socratic method
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Quality Function De...
 
Calidad
CalidadCalidad
Calidad
 
Kaoru ishikawa
Kaoru ishikawaKaoru ishikawa
Kaoru ishikawa
 

Similaire à Ishikawa diagram

Doe Taguchi Basic Manual1
Doe Taguchi Basic Manual1Doe Taguchi Basic Manual1
Doe Taguchi Basic Manual1nazeer pasha
 
Marijana.Popovic
Marijana.PopovicMarijana.Popovic
Marijana.Popovicmmmmp
 
Estimation Agile Projects
Estimation Agile ProjectsEstimation Agile Projects
Estimation Agile ProjectsRam Srivastava
 
Pm Intro (Blk)
Pm Intro (Blk)Pm Intro (Blk)
Pm Intro (Blk)cramini
 
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...Midwest Energy Efficiency Alliance
 
02 spc訓練教材
02 spc訓練教材02 spc訓練教材
02 spc訓練教材營松 林
 
Pbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationPbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationMichaelMcNamara
 
Pbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationPbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationMichaelMcNamara
 
Pbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationPbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationMichaelMcNamara
 
Pbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationPbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationMichaelMcNamara
 
William j miller proc eng resume
William j miller proc  eng resumeWilliam j miller proc  eng resume
William j miller proc eng resumewilliam235
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture IntroductionAnkit Patel
 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HRSelf-employed
 

Similaire à Ishikawa diagram (20)

Ishikawa diagram
Ishikawa diagram Ishikawa diagram
Ishikawa diagram
 
Doe Taguchi Basic Manual1
Doe Taguchi Basic Manual1Doe Taguchi Basic Manual1
Doe Taguchi Basic Manual1
 
Marijana.Popovic
Marijana.PopovicMarijana.Popovic
Marijana.Popovic
 
Estimation Agile Projects
Estimation Agile ProjectsEstimation Agile Projects
Estimation Agile Projects
 
Pm Intro (Blk)
Pm Intro (Blk)Pm Intro (Blk)
Pm Intro (Blk)
 
Chapter10
Chapter10Chapter10
Chapter10
 
Chapter10
Chapter10Chapter10
Chapter10
 
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...
Strategic Energy Management in the Midwest - A Process Efficiency Case Study ...
 
Rapid Product Innovation
Rapid Product InnovationRapid Product Innovation
Rapid Product Innovation
 
02 spc訓練教材
02 spc訓練教材02 spc訓練教材
02 spc訓練教材
 
Lean Mangement
Lean MangementLean Mangement
Lean Mangement
 
Pbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationPbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentation
 
Pbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationPbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentation
 
Pbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentationPbi marcus evans sept2011presentation
Pbi marcus evans sept2011presentation
 
Pbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentationPbi Marcus Evans Sept2011presentation
Pbi Marcus Evans Sept2011presentation
 
William j miller proc eng resume
William j miller proc  eng resumeWilliam j miller proc  eng resume
William j miller proc eng resume
 
Tv Operations And Ob Creation Srg
Tv Operations And Ob Creation SrgTv Operations And Ob Creation Srg
Tv Operations And Ob Creation Srg
 
Research on BPA
Research on BPAResearch on BPA
Research on BPA
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture Introduction
 
Employee productivity and Role of HR
Employee productivity and Role of HREmployee productivity and Role of HR
Employee productivity and Role of HR
 

Plus de Roy Antony Arnold G (20)

6 sigma
6 sigma6 sigma
6 sigma
 
Run chart
Run chartRun chart
Run chart
 
Reliability growth models for quality management
Reliability growth models for quality managementReliability growth models for quality management
Reliability growth models for quality management
 
6 sigma
6 sigma6 sigma
6 sigma
 
Quality management models
Quality management modelsQuality management models
Quality management models
 
Pareto diagram
Pareto diagramPareto diagram
Pareto diagram
 
Histogram
HistogramHistogram
Histogram
 
Customer satisfaction
Customer satisfactionCustomer satisfaction
Customer satisfaction
 
Control chart
Control chartControl chart
Control chart
 
Complexity metrics and models
Complexity metrics and modelsComplexity metrics and models
Complexity metrics and models
 
Check lists
Check listsCheck lists
Check lists
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
Structure chart
Structure chartStructure chart
Structure chart
 
Seven new tools
Seven new toolsSeven new tools
Seven new tools
 
Scatter diagram
Scatter diagramScatter diagram
Scatter diagram
 
Qms
QmsQms
Qms
 
Relations diagram
Relations diagramRelations diagram
Relations diagram
 
Rayleigh model
Rayleigh modelRayleigh model
Rayleigh model
 
Defect removal effectiveness
Defect removal effectivenessDefect removal effectiveness
Defect removal effectiveness
 
Customer satisfaction
Customer satisfactionCustomer satisfaction
Customer satisfaction
 

Ishikawa diagram

  • 2. Structure Kaoru Ishikawa basic concept aim theoretical conversion practical example exercise
  • 3. • born in Tokio 1915 • graduated University of Tokyo in 1939 with an Engineering degree in applied chemistry • worked as a naval technical officer until 1941 • worked for Nissan Liquid Fuel Company Kaoru Ishikawa • associate professor at the University of Tokyo in 1947 (1915 - 1989) • famous person in Qualitymanagement • not only product quality • but also e.g. quality of Management and assistant • developed several quality-tools • One of these tools is the Ishikawa-Diagram (also called Fishbone- or cause and effect diagram)
  • 4. basic concept The Idea: think about possible causes and reasons leading to an effect or a problem find solution for preventing those problems
  • 5. basic concept • one problem/effect • 7 causes lead to the problem/effect • the causes are divided into main- and sidecauses The 7 causes are: 1. Methods 2. Machinery 3. Management 4. Materials 5. Manpower 6. Environment 7. Measurement
  • 6. basic concept individual problem/effect needs individual factors
  • 7. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram
  • 8. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment
  • 9. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower
  • 10. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower 5 M‘s
  • 11. basic concept individual problem/effect needs individual factors not all 7 factors are needed in the diagram grade of influence Branch of production: Manpower, Methods, Material und Machine Branch of administration: Management, Environment e.g. Methods, Machinery, Management, Materials, Manpower 5 M‘s 4P (Place, Procedures, People, Policies ) 4S (Surroundings, Suppliers, Systems, Skills)
  • 13. aim • find the causes, main- and sidecauses • clarity • interdependence of the causes • improve them for having the wanted effect or eliminate them for solving the problem
  • 14. theoretical conversion 1. sketch the diagram and inscript the needed causes
  • 15. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out
  • 16. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness
  • 17. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence
  • 18. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness
  • 19. theoretical conversion 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness 6. The team discusses about the solution
  • 20. theoretical conversion 6. The team discusses about the solution • causes that can be improved or eliminated easily will be finished first of all (no need to be weighted) • The weighted causes are in a list of priority and will be finished in turn
  • 22. theoretical conversion It‘s important that the team has skilled workers involved in discussion
  • 23. theoretical conversion It‘s important that the team has skilled workers involved in discussion e.g. supplier, clients etc
  • 24. practical example rise in productivity
  • 25. practical example 1. sketch the diagram and inscript the needed causes
  • 26. practical example 1. sketch the diagram and inscript the needed causes
  • 27. practical example 1. sketch the diagram and inscript the needed causes rise in productivity
  • 28. practical example 1. sketch the diagram and inscript the needed causes Enviroment rise in productivity
  • 29. practical example 1. sketch the diagram and inscript the needed causes Enviroment Manpower rise in productivity
  • 30. practical example 1. sketch the diagram and inscript the needed causes Enviroment Manpower rise in productivity Machine
  • 31. practical example 1. sketch the diagram and inscript the needed causes Enviroment Manpower rise in productivity Machine Materials
  • 32. practical example 1. sketch the diagram and inscript the needed causes Enviroment Manpower rise in productivity Machine Materials Methods
  • 33. practical example 2. work the main- and sidecauses out Enviroment Manpower rise in productivity Machine Materials Methods
  • 34. practical example 2. work the main- and sidecauses out Enviroment Manpower Temperature Noise rise in productivity Machine Materials Methods
  • 35. practical example 2. work the main- and sidecauses out Enviroment Manpower Temperature Motivation w Noise Education ag e rise in productivity Machine Materials Methods
  • 36. practical example 2. work the main- and sidecauses out Enviroment Manpower Temperature Motivation w Noise Education ag e rise in productivity Hardware Software Machine Materials Methods
  • 37. practical example 2. work the main- and sidecauses out Enviroment Manpower Temperature Motivation w Noise Education ag e rise in productivity Hardware Software Procurement Machine Materials Methods
  • 38. practical example 2. work the main- and sidecauses out Enviroment Manpower Temperature Motivation w Noise Education ag e rise in productivity Hardware Standardisation Procurement Lean Management Software CI P Machine Materials Methods
  • 39. practical example 3. check the completeness Enviroment Manpower Temperature Motivation w Noise Education ag e rise in productivity Hardware Standardisation Procurement Lean Management Software CI P Machine Materials Methods
  • 40. practical example 4. weight the the main- & sidecauses in terms of meaning & influence • Lean Management • Standardisation • Motivation • Education •…
  • 41. practical example 5. check the selected causes for rightness • Lean Management • Standardisation • Motivation • Education •…
  • 42. practical example 6. The team discusses about the solution causes that can be improved or eliminated easily: • Hardware • Software • Temperature • Noise
  • 43. practical example 6. The team discusses about the solution weighted causes • Lean Management • Standardisation • Motivation • Education
  • 44. exercise excessive drop of paper Henner Graubitz October 23rd 2006
  • 45. exercise 1. sketch the diagram and inscript the needed causes 2. work the main- and sidecauses out 3. check the completeness 4. weight the the main- & sidecauses in terms of meaning & influence 5. check the selected causes for rightness 6. The team discusses about the solution
  • 46. exercise solution Manpower Machine create faulty faulty feeder of documents papers excessive drop of paper misprints aren‘t used as paper for too heavy notices paper Materials Methods
  • 47. Advantage: • different opinions by teamwork • easy to apply • little effort to practise • better understanding for causes and effects
  • 48. Advantage: Disadvantage: • different opinions by teamwork • No clarity in very complex problems • easy to apply • Interactions and chronological dependence can’t be displayed • little effort to practise • better understanding for causes and effects