RELIABILITY TESTING
[object Object]
RELIABILITY LIFE TESTING
TEST TIME CALCULATIONS
BURN IN TESTING
ACCEPTANCE TESTING
ACCELERATED LIFE TESTING
EXPERIMENTAL DESIGN,[object Object]
Reliability Qualification Test 	To measure product reliability Safety Test To find hazards ,catastrophicoccurrences ,loss of life or economic loss by generating faulty actions. Reliability Growth Testing  Consists of reliability testing of prototypes thro’ which the causes for failure is found and those failures are eliminated by design modification
Some other test types are Maintainability demonstration. System integration testing. Operation test and evaluation. Note: Reliability testing and safety testing use to generate failures to find failure modes and then eliminate them by other design.
Test parameters should be defined for product  testing: Condition of the test Resources used Apparatus or equipment Test equipment, tooling, and supplies Time and duration Personnel selection Test conditions Test materials Analysis of test data Reporting of test data
RELIABILITY LIFE TESTING Life testing is the most important activity in reliability program which is in need of largest fund and manpower. It is used to design a product and subsequent product. It also provide information for entire lifeabout maintenance plan corrective actions on design and process for a tested product.
FACTORS TO BE CONSIDERED Objective of the test Type of test to be performed Operating and environmental conditions. Number units to be tested(sample size) Duration of test Unequivocal definition of failure.
TEST STAGES Infant stage ability to fulfill the need Development stage performance, reliability, cost and modes of behavior Evolution stage compare to improve economy, maintenance and use of std.parts Performance stage  requirements of performance and reliability User stage withstand handling, transportation etc..
TEST METHODS Marginal testing Non destructive testing. Destructive testing. Accelerated testing. Burn-in and screen testing. Acceptance and qualification testing. Sequential testing. Experimental design
MARGINAL TESTING It is prescribed by designer. Probability of failure is a imminent one due to degradation. Example: Electrical equipments are tested. 			Isolating faulty parts.
Non-destructive testing NDT involves comparing a known input to a measured output and comparing to a known model - does not require the sacrifice of the physical system, as would be the case with disassembly, dissection, or failure testing. Such methods are known as Non-Destructive Testing techniques.  such techniques are valued for saving time and money. On the other hand, NDT methods do not always reveal hidden defects, and skill is usually needed in interpreting the results.
Liquid Penentrant Magnetic Particle  Eddy Current  Ultrasonic Radiography Neutron  Radiography X-ray
Destructive testing In destructive testing, tests are carried out to the specimen's failure, in order to understand a specimen's structural performance or material behavior under different loads. These tests are generally much easier to carry out, yield more information, and are easier to interpret than nondestructive testing. Destructive testing is most suitable, and economic, for objects which will be mass produced, as the cost of destroying a small number of specimens is negligible. It is usually not economic to do destructive testing where only one or very few items are to be produced (for example, in the case of a building).
Types of destructive testing Stress tests Crash tests Hardness tests Metallographic tests
The testing component is subjected to abnormal stresses. 	If the component survives it is safe to use at normal stresses. 	This is for static situations(structures and 	buildings). Example: beam or a truss can withstand lighter 	        load than test load. Testing is done in time ordered manner(time ordered observations). Example:	life of electric bulb ,life of ball 				bearings(weakest will fail simultaneously)
Progressively censored samples The items that can withstand the given tests are censored throughout the life to find the life of the item. Two types Censoring time is predetermined(type I). Censoring starts after survival drop to predetermined levels(type II).
Accelerated life testing Accelerated tests are becoming increasingly popular in today’s industry due to the need for obtaining life data quickly.   Life testing of products under higher stress levels without introducing additional failure modes can provide significant savings of both time and money.   Correct analysis of data gathered via such accelerated life testing will yield parameters and other information for the product’s life under use stress conditions(reference conditions). It is the test of an item goes for production stage when it is in the research and development stage for adequate life and no gross weakness existence. Accelerated test conditions are typically produced by testing items at higher levels than normal Example: temperature, voltage , pressure , vibration etc…
PRACTICAL CONSIDERATIONS Engineer should know how to design. Variables must be varied by which we can redesign and test and the factors not to changed. Materials used for the tests must be kept minimum. Model selected should describe stress dependence and life distributions. Failure must be clearly defined.
ACCELERATED TESTING MODELS Arrhenius and Eyring model (life on temperature) Larsen-miller relationship (rupture test of metals using temperature and stress as variables) Prot model (endurance limit of metals) Power law (capacitors and electronic components based on voltage as variable) Palmgren equation (life of bearings) Lieblein and zelen models( fiitingpalmgren equation based on assumption) Kaufman and meador model (dielectric breakdown of insulating fluids based on inverse power law)
Test time calculation For constant failure rate(CFR) model 		mean time to failure, MTTF =T/r 		where, 				T-cumulative test time. 				r-total no of failures.
Length of test For type ll testing, length of the test depends on 	no. of units being tested 	no. of failures to be observed 	time to failure distribution. Expected test time to generate r failures is  r x MTTF Under CFR model if n units are placed on test until r failures are observed the expected test time is given by E(test time)=MTTF x TTRr,n 	where , TTRr,n  is the test time factor for r failures with n units at risk. If failure units are replaced and r units are there on test then expected test time to observe r failure is E(test time)=MTTF (r/n)
For type II testing the length of test  E(r)=n( 1-e-t*/MTTF) 		t*-length of time 		p= 1-e-t*/MTTF E(r)=np

Contenu connexe

Tendances (20)

Quality inspection presentation
Quality inspection presentationQuality inspection presentation
Quality inspection presentation
 
Validity and Reliability
Validity and ReliabilityValidity and Reliability
Validity and Reliability
 
Characteristics of a good test
Characteristics of a good testCharacteristics of a good test
Characteristics of a good test
 
Life Testing[1]
Life Testing[1]Life Testing[1]
Life Testing[1]
 
Verification & Validation
Verification & ValidationVerification & Validation
Verification & Validation
 
Accelerated life testing
Accelerated life testingAccelerated life testing
Accelerated life testing
 
Reliability engineering ppt-Internship
Reliability engineering ppt-InternshipReliability engineering ppt-Internship
Reliability engineering ppt-Internship
 
Control charts for attributes
Control charts for attributesControl charts for attributes
Control charts for attributes
 
Reliability
ReliabilityReliability
Reliability
 
Work study
Work studyWork study
Work study
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance sampling
 
Types of testing
Types of testingTypes of testing
Types of testing
 
Test Reliability and Validity
Test Reliability and ValidityTest Reliability and Validity
Test Reliability and Validity
 
Statistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdfStatistical Quality Control Lecture Notes.pdf
Statistical Quality Control Lecture Notes.pdf
 
Models of aggregate planning
Models of aggregate planningModels of aggregate planning
Models of aggregate planning
 
Control chart for variables
Control chart for variablesControl chart for variables
Control chart for variables
 
Acceptance Sampling[1]
Acceptance Sampling[1]Acceptance Sampling[1]
Acceptance Sampling[1]
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliability
 
02 History Quality
02 History Quality02 History Quality
02 History Quality
 
Reliabilty
ReliabiltyReliabilty
Reliabilty
 

En vedette

Reliability for testing and assessment
Reliability for testing and assessmentReliability for testing and assessment
Reliability for testing and assessmentErlwinmer Mangmang
 
Presentation Validity & Reliability
Presentation Validity & ReliabilityPresentation Validity & Reliability
Presentation Validity & Reliabilitysongoten77
 
Poster: Test-Retest Reliability and Equivalence of PRO Measures
Poster: Test-Retest Reliability and Equivalence of PRO MeasuresPoster: Test-Retest Reliability and Equivalence of PRO Measures
Poster: Test-Retest Reliability and Equivalence of PRO MeasuresCRF Health
 
Life Time Testing
Life Time TestingLife Time Testing
Life Time TestingTestCampRO
 
Ifu accelerated life test april 2010 - ian soukup
Ifu accelerated life test   april 2010 - ian soukupIfu accelerated life test   april 2010 - ian soukup
Ifu accelerated life test april 2010 - ian soukupcahouser
 
Reliability in selection measures
Reliability in selection measuresReliability in selection measures
Reliability in selection measuresOre Omotayo
 
Reliability And Validity
Reliability And ValidityReliability And Validity
Reliability And ValidityJames Penny
 
Overview of highly accelerated life test (halt)
Overview of highly accelerated life test (halt)Overview of highly accelerated life test (halt)
Overview of highly accelerated life test (halt)ASQ Reliability Division
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminologyMuhammad Luqman Ikram
 
Predicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsPredicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsASQ Reliability Division
 
Language Change Part 2: Labov Studies
Language Change Part 2: Labov StudiesLanguage Change Part 2: Labov Studies
Language Change Part 2: Labov Studiessuasenglish
 
Unit Testing Concepts and Best Practices
Unit Testing Concepts and Best PracticesUnit Testing Concepts and Best Practices
Unit Testing Concepts and Best PracticesDerek Smith
 
Narrative structure analysis labov's approach
Narrative structure analysis  labov's approachNarrative structure analysis  labov's approach
Narrative structure analysis labov's approachIsmail abdulla
 
Reliability
ReliabilityReliability
ReliabilityRoi Xcel
 

En vedette (20)

Reliability for testing and assessment
Reliability for testing and assessmentReliability for testing and assessment
Reliability for testing and assessment
 
Presentation Validity & Reliability
Presentation Validity & ReliabilityPresentation Validity & Reliability
Presentation Validity & Reliability
 
Poster: Test-Retest Reliability and Equivalence of PRO Measures
Poster: Test-Retest Reliability and Equivalence of PRO MeasuresPoster: Test-Retest Reliability and Equivalence of PRO Measures
Poster: Test-Retest Reliability and Equivalence of PRO Measures
 
Quality Assurance Process
Quality Assurance ProcessQuality Assurance Process
Quality Assurance Process
 
Life Time Testing
Life Time TestingLife Time Testing
Life Time Testing
 
Ifu accelerated life test april 2010 - ian soukup
Ifu accelerated life test   april 2010 - ian soukupIfu accelerated life test   april 2010 - ian soukup
Ifu accelerated life test april 2010 - ian soukup
 
Reliability in selection measures
Reliability in selection measuresReliability in selection measures
Reliability in selection measures
 
Reliability And Validity
Reliability And ValidityReliability And Validity
Reliability And Validity
 
Overview of highly accelerated life test (halt)
Overview of highly accelerated life test (halt)Overview of highly accelerated life test (halt)
Overview of highly accelerated life test (halt)
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
 
speech comunity
speech comunityspeech comunity
speech comunity
 
Predicting product life using reliability analysis methods
Predicting product life using reliability analysis methodsPredicting product life using reliability analysis methods
Predicting product life using reliability analysis methods
 
Principles of assesment
Principles of assesmentPrinciples of assesment
Principles of assesment
 
AHS Slides_Robert Lustig
AHS Slides_Robert LustigAHS Slides_Robert Lustig
AHS Slides_Robert Lustig
 
Speech communities
Speech communitiesSpeech communities
Speech communities
 
Speech Communities
Speech CommunitiesSpeech Communities
Speech Communities
 
Language Change Part 2: Labov Studies
Language Change Part 2: Labov StudiesLanguage Change Part 2: Labov Studies
Language Change Part 2: Labov Studies
 
Unit Testing Concepts and Best Practices
Unit Testing Concepts and Best PracticesUnit Testing Concepts and Best Practices
Unit Testing Concepts and Best Practices
 
Narrative structure analysis labov's approach
Narrative structure analysis  labov's approachNarrative structure analysis  labov's approach
Narrative structure analysis labov's approach
 
Reliability
ReliabilityReliability
Reliability
 

Similaire à Reliability Testing

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...IRJET Journal
 
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?sigmatest1
 
Introduction to Non destructive testing.pptx
Introduction to Non destructive testing.pptxIntroduction to Non destructive testing.pptx
Introduction to Non destructive testing.pptxJyothireddy Inturi
 
Electrical testing javid iqbal sodagar
Electrical testing javid iqbal sodagarElectrical testing javid iqbal sodagar
Electrical testing javid iqbal sodagarjavid iqbal sodagar
 
MTU ABET Final
MTU ABET FinalMTU ABET Final
MTU ABET FinalDan Burg
 
Chakresh Tiwari Philips report
Chakresh Tiwari Philips reportChakresh Tiwari Philips report
Chakresh Tiwari Philips reportpranav kapoor
 
Application of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptxApplication of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptxSahilBagnikar1
 
Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerMark Turner CRP
 
35 Insp, Ndt, Stat Reqmts Fope
35 Insp, Ndt, Stat Reqmts Fope35 Insp, Ndt, Stat Reqmts Fope
35 Insp, Ndt, Stat Reqmts Fopejubin
 
Failure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber ComponentsFailure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber ComponentsKartik Srinivas
 
Paper id 26201474
Paper id 26201474Paper id 26201474
Paper id 26201474IJRAT
 
Standard Test Method for Tensile Properties of Plastics
Standard Test Method for Tensile Properties of PlasticsStandard Test Method for Tensile Properties of Plastics
Standard Test Method for Tensile Properties of PlasticsTuongBinhMinh1
 
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...IJERA Editor
 
1 Introduction to Nondestructive Testing (1).pptx
1 Introduction to Nondestructive Testing (1).pptx1 Introduction to Nondestructive Testing (1).pptx
1 Introduction to Nondestructive Testing (1).pptxSivasankar459126
 
Testing for analysis and quality assurance
Testing for analysis and quality assuranceTesting for analysis and quality assurance
Testing for analysis and quality assuranceSylvin Technologies, Inc
 

Similaire à Reliability Testing (20)

A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
 
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?
WHAT IS NDT OR NON DESTRUCTIVE LAB TESTING ?
 
Introduction to Non destructive testing.pptx
Introduction to Non destructive testing.pptxIntroduction to Non destructive testing.pptx
Introduction to Non destructive testing.pptx
 
NDT and DT
NDT and DTNDT and DT
NDT and DT
 
Electrical testing javid iqbal sodagar
Electrical testing javid iqbal sodagarElectrical testing javid iqbal sodagar
Electrical testing javid iqbal sodagar
 
MTU ABET Final
MTU ABET FinalMTU ABET Final
MTU ABET Final
 
Chakresh Tiwari Philips report
Chakresh Tiwari Philips reportChakresh Tiwari Philips report
Chakresh Tiwari Philips report
 
Application of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptxApplication of CAE: DURABILITY ANALYSIS.pptx
Application of CAE: DURABILITY ANALYSIS.pptx
 
Applied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M TurnerApplied Reliability Symposium 2009 M Turner
Applied Reliability Symposium 2009 M Turner
 
35 Insp, Ndt, Stat Reqmts Fope
35 Insp, Ndt, Stat Reqmts Fope35 Insp, Ndt, Stat Reqmts Fope
35 Insp, Ndt, Stat Reqmts Fope
 
LCsimulator
LCsimulatorLCsimulator
LCsimulator
 
Failure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber ComponentsFailure Analysis of Polymer and Rubber Components
Failure Analysis of Polymer and Rubber Components
 
ASTM E8-E8M
ASTM E8-E8MASTM E8-E8M
ASTM E8-E8M
 
CONCEPTS OF NDT
CONCEPTS OF NDTCONCEPTS OF NDT
CONCEPTS OF NDT
 
2007 Introduction MEOST
2007 Introduction MEOST2007 Introduction MEOST
2007 Introduction MEOST
 
Paper id 26201474
Paper id 26201474Paper id 26201474
Paper id 26201474
 
Standard Test Method for Tensile Properties of Plastics
Standard Test Method for Tensile Properties of PlasticsStandard Test Method for Tensile Properties of Plastics
Standard Test Method for Tensile Properties of Plastics
 
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...
Study of Microstructure Degradation of Boiler Tubes Due To Creep for Remainin...
 
1 Introduction to Nondestructive Testing (1).pptx
1 Introduction to Nondestructive Testing (1).pptx1 Introduction to Nondestructive Testing (1).pptx
1 Introduction to Nondestructive Testing (1).pptx
 
Testing for analysis and quality assurance
Testing for analysis and quality assuranceTesting for analysis and quality assurance
Testing for analysis and quality assurance
 

Dernier

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 

Dernier (20)

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 

Reliability Testing

  • 2.
  • 8.
  • 9. Reliability Qualification Test To measure product reliability Safety Test To find hazards ,catastrophicoccurrences ,loss of life or economic loss by generating faulty actions. Reliability Growth Testing Consists of reliability testing of prototypes thro’ which the causes for failure is found and those failures are eliminated by design modification
  • 10. Some other test types are Maintainability demonstration. System integration testing. Operation test and evaluation. Note: Reliability testing and safety testing use to generate failures to find failure modes and then eliminate them by other design.
  • 11. Test parameters should be defined for product testing: Condition of the test Resources used Apparatus or equipment Test equipment, tooling, and supplies Time and duration Personnel selection Test conditions Test materials Analysis of test data Reporting of test data
  • 12. RELIABILITY LIFE TESTING Life testing is the most important activity in reliability program which is in need of largest fund and manpower. It is used to design a product and subsequent product. It also provide information for entire lifeabout maintenance plan corrective actions on design and process for a tested product.
  • 13. FACTORS TO BE CONSIDERED Objective of the test Type of test to be performed Operating and environmental conditions. Number units to be tested(sample size) Duration of test Unequivocal definition of failure.
  • 14. TEST STAGES Infant stage ability to fulfill the need Development stage performance, reliability, cost and modes of behavior Evolution stage compare to improve economy, maintenance and use of std.parts Performance stage requirements of performance and reliability User stage withstand handling, transportation etc..
  • 15. TEST METHODS Marginal testing Non destructive testing. Destructive testing. Accelerated testing. Burn-in and screen testing. Acceptance and qualification testing. Sequential testing. Experimental design
  • 16. MARGINAL TESTING It is prescribed by designer. Probability of failure is a imminent one due to degradation. Example: Electrical equipments are tested. Isolating faulty parts.
  • 17. Non-destructive testing NDT involves comparing a known input to a measured output and comparing to a known model - does not require the sacrifice of the physical system, as would be the case with disassembly, dissection, or failure testing. Such methods are known as Non-Destructive Testing techniques. such techniques are valued for saving time and money. On the other hand, NDT methods do not always reveal hidden defects, and skill is usually needed in interpreting the results.
  • 18. Liquid Penentrant Magnetic Particle Eddy Current Ultrasonic Radiography Neutron Radiography X-ray
  • 19. Destructive testing In destructive testing, tests are carried out to the specimen's failure, in order to understand a specimen's structural performance or material behavior under different loads. These tests are generally much easier to carry out, yield more information, and are easier to interpret than nondestructive testing. Destructive testing is most suitable, and economic, for objects which will be mass produced, as the cost of destroying a small number of specimens is negligible. It is usually not economic to do destructive testing where only one or very few items are to be produced (for example, in the case of a building).
  • 20. Types of destructive testing Stress tests Crash tests Hardness tests Metallographic tests
  • 21. The testing component is subjected to abnormal stresses. If the component survives it is safe to use at normal stresses. This is for static situations(structures and buildings). Example: beam or a truss can withstand lighter load than test load. Testing is done in time ordered manner(time ordered observations). Example: life of electric bulb ,life of ball bearings(weakest will fail simultaneously)
  • 22. Progressively censored samples The items that can withstand the given tests are censored throughout the life to find the life of the item. Two types Censoring time is predetermined(type I). Censoring starts after survival drop to predetermined levels(type II).
  • 23. Accelerated life testing Accelerated tests are becoming increasingly popular in today’s industry due to the need for obtaining life data quickly. Life testing of products under higher stress levels without introducing additional failure modes can provide significant savings of both time and money. Correct analysis of data gathered via such accelerated life testing will yield parameters and other information for the product’s life under use stress conditions(reference conditions). It is the test of an item goes for production stage when it is in the research and development stage for adequate life and no gross weakness existence. Accelerated test conditions are typically produced by testing items at higher levels than normal Example: temperature, voltage , pressure , vibration etc…
  • 24. PRACTICAL CONSIDERATIONS Engineer should know how to design. Variables must be varied by which we can redesign and test and the factors not to changed. Materials used for the tests must be kept minimum. Model selected should describe stress dependence and life distributions. Failure must be clearly defined.
  • 25. ACCELERATED TESTING MODELS Arrhenius and Eyring model (life on temperature) Larsen-miller relationship (rupture test of metals using temperature and stress as variables) Prot model (endurance limit of metals) Power law (capacitors and electronic components based on voltage as variable) Palmgren equation (life of bearings) Lieblein and zelen models( fiitingpalmgren equation based on assumption) Kaufman and meador model (dielectric breakdown of insulating fluids based on inverse power law)
  • 26. Test time calculation For constant failure rate(CFR) model mean time to failure, MTTF =T/r where, T-cumulative test time. r-total no of failures.
  • 27. Length of test For type ll testing, length of the test depends on no. of units being tested no. of failures to be observed time to failure distribution. Expected test time to generate r failures is r x MTTF Under CFR model if n units are placed on test until r failures are observed the expected test time is given by E(test time)=MTTF x TTRr,n where , TTRr,n is the test time factor for r failures with n units at risk. If failure units are replaced and r units are there on test then expected test time to observe r failure is E(test time)=MTTF (r/n)
  • 28. For type II testing the length of test E(r)=n( 1-e-t*/MTTF) t*-length of time p= 1-e-t*/MTTF E(r)=np
  • 29. BURN IN TEST To eliminate or reduce “infant morality” failures by accumulating initial operating hours and resulting failures prior to user acceptance. The mean residual lifetime can be found. It requires test of all items so it increases production lead time and costs.
  • 30. ACCEPTANCE TESTING The objective of the test is to demonstrate that the system design meets performance and reliability requirements under specified operating and environmental conditions. Sample size may be predetermined or unspecified. Units from the production line should be randomly selected for testing. BINOMIAL ACCEPTANCE TESTING SEQUENTIAL TESTS
  • 31. EXPERIMENTAL DESIGN Efficient collection and analysis of data. A design is selected which will iedntify the factors, their levels, the no. of replications at specified levels, randomization of experimental units and use of blocking FACTORIAL DESIGN RBD CRBD
  • 32. APPLICATIONS OF TESTING Comparative evaluation of new design and new processing techniques. Deviation of screening techniques to prohibit failures in future field use. Estimation of system failure behavior under different test conditions.
  • 33. references websites www.ndt.net/ndtaz/ndtaz.php - 1k(ndt) en.wikipedia.org/wiki/Nondestructive_testing - 54k www.arsymposium.org/southamerica/Simposio2004/Paper_Modelo.doc www.centerforquality.org/courses/onsite/ara.htm - 13k www.Pdf-search-engine.com www.google.com www.enwikipedia.com www.encyclopedia.com Books An introduction to reliability and maintainability engineering- by charlesE.ebeling Text book given as Photocopy