Fast Track Impact Analyzer and
Accelerated Upgrade for PeopleSoft
Astute Business Solutions
Peoplesoft@beastute.com




                   http://www.beastute.com
Upgrade Business Drivers




    Upgrade
    Business Drivers


    VOLUNTARY IMPROVEMENT                                    FORCED UPGRADE

    New Functionality                                        Maintenance & Support
    •   Improved functionality                               • Stay on supported release
    •   Reduce Customizations                                • Extend investment value
    •   Develop with Ease                                    • Postpone decision on Fusion/Other ERP
    •   Standards based tools
    Expansion & Consolidation                                Technology Upgrade
    • New BU’s/Companies                                     •   New Architecture
    • More Users                                             •   Platform Improvements
    • Instance Consolidation                                 •   Streamlined Integration
                                                             •   Improved Reporting



2                                Astute Business Solutions
Upgrade Challenges



              • Drivers & Goals                                                 • Manual approach
              • Impact & Change                                                 • Eyeball method
    ASSESS
              • Architecture                                                    • Error and Bias

                            • Budget/ Resources                                 • Variance Factor
                            • Dependencies                                      • Budget Overflows
             PLAN           • Contingencies                                     • Loose Estimates


                                        • Tech. Upgrade                         • Prolonged Dev
                                        • Func. Upgrade                         • Multiple Tests
                      DEPLOY            • Test and Deploy                       • Unable to de-Customize


                                                                                • Patches/Fixes
                                                       • Maintain
                                                       • Enhance                • Optimization and Tuning
                                  SUPPORT              • Support                • Unable to de-Customize




3                                                 Astute Business Solutions
Fast Track is a pre-upgrade assessment tool and service that
     quickly details the upgrade effort

                                                                     Benefits
    Traditional        Fast Track
                                                                 •   Speed – Critical Impact Analysis in
                                                                     less time over manual efforts
                                                                 •   Reliability – Auto-discovery,
                                                                     algorithm-based analysis
    Subject to error    In-depth analysis                        •   Accuracy – No other product
       and bias                                                      simulates a Tools Upgrade prior to
                                                                     the actual start of the upgrade to
                       Intelligent reporting                         give you an accurate picture of your
                                                                     customizations
        Manual
     assessments                                                 •   Predictability – Can run Fast Track
                                                                     before the upgrade to accurately
                       Automated discovery                           plan and budget
                                                                 •   Visibility - It does what PeopleSoft
                                                                     Tools do AND A LOT MORE over
                                                                     the traditional approach




4                                    Astute Business Solutions
Typical PeopleSoft upgrade process misses details needed upfront to accurately estimate project effort

                                      Initial Pass: The Big Picture


                     Copy of       7    Perform Application
                                        Setup steps
                                                                                 New
                                                                                 Release
                                                                                            8    Back-up
                     Production
                                                                                 System
                     database
                                   9    Copy & Transform
                                        Application data
                                                                                 database

                                        Using DataStage jobs                                                    PRIMED TARGET

                                                                                            10   Final
                                                                                                 Setup steps



    1    Database
         compare             2    Copy
                                  PeopleTools
                                                         4      Compare custom project              Compare Reports and
                                                                                                    other tools don’t provide
         -to identify
         customizations
                                  tables
                                                         5      Apply customizations                in-depth Impact Analysis
                                                                                                    vs. 9.0 which is critical in
                                                         6      Copy PeopleTools tables
                                                                Using DataStage jobs
                                                                                                    estimating complexity
                                                                                                    and effort of the upgrade.


      Demo
    (current
    release)                                             3      Update PeopleTools
                                                                to new version

                                        TOOLS TARGET



5                                                    Astute Business Solutions
Traditional Assessments are not scientific and accurate
    – Fast Track is!                                                                          * Intuitive Categories
                         Category New Custom                        Delivered Custom                       Total
    Object Type                   High        Medium     Low            High       Medium    Low
    Fields                                                           15                   10                          25
    TranslateValues                                    5                                   3                           8
    Records                                75        134           100          40        68         55             472
    SQL                                    10         23            75           5        25         15              153
    RecordPeopleCode                      173       205            492          67        95        163            1195
    ApplicationPackagePeopleCde                                                                                        0
    Pages                                 183        216           457        37        273         267            1433
    PagePeopleCode                         15         84           148        12         45          32             336
    Components                             65        218           385        27         61         163             919
    ComponentPeopleCode                    46         75           419        25         73         294             932
    ComponentRecordPeopleCode              12         65           148                                              225
    ComponentRecFldPeopleCode              10         54           127                                               191
    Menus                                                           54                               35               89
    PortalRegistryStructures                                       583                              336             919
    PermissionLists                                  174                                 19                         193
    ComponentInterfaces                    35         62            121         9        21           15            263
    ApplicationEnginePeopleCode            75        193           249         16        24          69             626
    ProcessDefinitions                             1580                                 375                        1955
    ServerDefinitions                                                 2                               2                4
    MessageNodes                                                                                                       0
    Messages                                                        125                              43             168
    MessageChannels                                    2                                                               2
    SubscriptionPeopleCode                                          54                                                54
    URLDefinitions                                                   5                                                 5
    Images                                            18                                                              18
    StyleSheets                                       14                                                              14
    Relationships                                                                                                      0


                                                                  * Based on your metadata – i.e. real time info


6                                               Astute Business Solutions
Compare Report does not provide Impact Analysis –
                                                                 Drilldown to line of code
    Fast Track does.




Intuitive grouping by Component



7                                    Astute Business Solutions
Compare Reports don’t compare custom PeopleCode changes!




                                                               Compare on the fly



8                               Astute Business Solutions
Drill down to the line of custom code




9                                    Astute Business Solutions
View Customizations by Module – Accelerate Business Process Decisions
     Count of Change Detail                 Change Detail
     Module1                  Object Type   Target Changed      Target Dropped    Target UnChange Grand Total
     Asset Management                                      73                 277                 8       358
     Billing                                               33                 183                 6       222
     Bills and Routings                                    45                 395                16       456
     Commitment Control                                    19                  54                 2        75
     Contracts                                              3                  46                 1        50
     Cost Management                                        5                 123                 3       131
     Deduction Management                                  53                   4                          57
     Engineering                                           40                  32                 3        75
     General Financial                                      3                  20                          23
     General Ledger                                         4                 103                 3       110
     Inventory                                            253                 442                20       715
     None                                                 968                2540                89      3597
     Order Management                                     937                1466                76      2479
     Payables                                              44                 160                 7       211
     Production Management                                 50                  38                 5        93
     Production Planning                                    5                 150                 1       156
     Projects                                               2                  49                 1        52
     Purchasing                                            64                 123                 7       194
     Quality                                               46                 133                 8       187
     Receivables                                           68                 444                25       537
     Travel and Expenses                                   89                  21                10       120
     Grand Total                                         2804                6803               291      9898




10                                             Astute Business Solutions
Don’t Guess – Use detailed estimates by complexity ratings and change type

                          Custom                                   Custom Total Custom New              Custom New Total Grand Total
     Row Labels           High          Low     Medium Very High                 Low           Medium
     Asset Management              54     425.6       4                    483.6           3.5       33               36.5      520.1
       Target Changed              12      71.5       4                     87.5                                                 87.5
       Target Dropped              42     350.1                            392.1           3.5       33               36.5      428.6
       Target UnChange                        4                                4                                                     4
     Billing                       24       262                              286            29       29                 58        344
       Target Changed               6       154                              160                                                  160
       Target Dropped              18     104.5                            122.5            29       29                 58      180.5
       Target UnChange                      3.5                              3.5                                                  3.5
     Bills and Routings            6       88.4       2                     96.4          30.5      136             166.5       262.9
       Target Changed              6       42.6       2                     50.6                                                 50.6
       Target Dropped                      37.8                             37.8          30.5      136             166.5       204.3
       Target UnChange                        8                                8                                                     8
     Commitment Control            6       57.4      12                     75.4           2.5       19               21.5       96.9
       Target Changed              6       39.5      12                     57.5                                                 57.5
       Target Dropped                      16.9                             16.9           2.5       19               21.5       38.4
       Target UnChange                        1                                1                                                     1
     Contracts                                2                                2          4.25       19             23.25       25.25
       Target Changed                       1.5                              1.5                                                  1.5
       Target Dropped                                                                     4.25       19             23.25       23.25
       Target UnChange                     0.5                               0.5                                                  0.5




11                                                   Astute Business Solutions
SQR Analysis – Sample Report




12                                  Astute Business Solutions
Query Analysis – Sample Report




13                                    Astute Business Solutions
Component Analysis – Sample Report




14                                Astute Business Solutions
Dashboard – New Complexity Estimates




15                                Astute Business Solutions
PeopleCode Impact Analysis - Change Detail Sample Report




16                                 Astute Business Solutions
Fast Track – Differentiated Capabilities


     Solution Area Fast Track Differentiator                                      Competitor Approach
     PeopleSoft         • Automated, Fast, Comprehensive,                         • Manual analysis, some scripts,
     Upgrade            • Consistent, Predictable, Accurate Results               some SQL, ―eyeball‖ approach
     Assessment         • Uses meta data and tags to analyze code and             • Labor and cost intensive
                        determine complexity and effort                           • Subject to Error and Bias

     Upgrade Proposal   • Detailed statistical and analytical reports produce a   • Swag numbers
     Development        comprehensive fixed price proposal for Upgrade based      • Based primarily on past experience
                        on actual client information and impact to target         and consultants ability to analyze
                        release                                                   system

     Fit-Gap and        • Semi-automated ability to compare changes by            • Rely on traditional fit-gap phase to
     Business Process   process among releases                                    review functionality and prepare
     Analysis           • Faster than traditional process and accelerates fit-    analysis and recommendation
                        gap and design                                            • Labor intensive
                        • Built-in Proprietary meta-data about PeopleSoft         • Manual review of release notes and
                        Upgrade changes                                           documentation




17                                                  Astute Business Solutions
Accelerate Decision Making
                         •   Prepare DB, COP, Size and Backup
                         •   Apply UPG Planning Files, Edit Scripts
      PREPARE            •   Run Planning Scripts, Update Stats, Run Audits
                         •   Prepare for process changes, Make functional decisions



                         •   Report row counts, check DB integrity, purge queues, backup DB
       CURRENT
                         •   Rename records and fields, modify compare options, run compare   FastTrack   Traditional
       COMPARE           •   Identify customizations, document customizations, restore Demo   Approach    Approach
                                                                                                  –           –
                                                                                                Single
                         •   Modify scripts, load system tables, export and copy projects
     PEOPLETOOLS         •   Migrate records to new tablespaces, convert Tools objects           Step
     CHANGES             •   Load Tools data, create views, convert data types                 Process
                         •   READY FOR APPLICATION COMPARE



                         •   Review Customization Reports
                                                                                               2-4         6-12
     COMPARE
     AND DECIDE
                         •   Understand Impact of Customizations (online only)                WEEKS       WEEKS
                         •   Make Keep/Drop Decisions




     Fast Track Impact Analysis – Cost   Savings of up to 25% of total upgrade costs


18                                                        Astute Business Solutions
FastTrack Behind the Scenes




19                     Astute Business Solutions
FastTrack Deliverables


                                  Discovery Phase
                                   •   Complete listing of online and batch custom code
                                   •   Complexity Ratings by Object Type
 Fast Track
 Deliverables                     Analysis Phase
 Complete, Intelligent             •   Impact and Statistical Analysis
 and Timely                        •   Code Parsing for Online and Batch
 Information                       •   Side-by-Side Code Compare


                                  Reporting Phase
                                   •   Fixed Price Proposal
                                   •   Detailed Effort Estimates
                                   •   Dashboard Reports




20                       Astute Business Solutions
Fast Track Value Throughout Upgrade Project

 PREPARATION              TOOLS            PROJECT            RETROFIT              TESTING               TRAINING
   & FIT-GAP             UPGRADE           COMPARE


               FastTrack deliverables provide value throughout the upgrade project lifecycle


     Customization Discovery                                                        Reduced cycle times
     and Map to Target


     Intelligent Planning and Estimation
                                                                                    9.0 Test Scripts Repository
     With Pre-Upgrade Analysis


                           Simulated to
                           accelerate Compare                                       Fewer Test Moves


                                            Keep Drop decisions made easy
                                            through Impact Analysis


                                                               Blueprint for development
                                                               Through Impact Analysis


                                                                                                        Navigation Map
                                                                                                        Source to Target




21                                                     Astute Business Solutions
Fast Track Upgrade


     The Accelerated Upgrade service includes:

         •   Fit-Gap Analysis and Report
         •   Upgrade Planning and Preparation
         •   PeopleSoft Installation and Configuration
         •   Application and Tools Upgrades
         •   All patches and fixes required for Upgrade
         •   2 or More Test Moves with Unit, System, Integration Tests, Support for UAT
         •   Migration and Retrofit of all existing customizations
         •   Go-Live Planning and Readiness Check
         •   30-Day Post Go-Live Support
         •   60-Day Warranty of Service
         •   Detailed project documentation




22                                      Astute Business Solutions
Fast Track Upgrade Methodology



               Design Project                                 Audit and         Install New
                                      Review and
     PREPARE     Org, Plan,
                Milestones
                                     Finalize Scope
                                                               Prepare
                                                             Environment
                                                                               Release and
                                                                              Upgrade Tools



                 Configure               Define             Tools Upgrade      Compare
     ANALYZE   Upgrade Tools
                and Scripts
                                     Customizations
                                     and Estimates
                                                               and Env
                                                            Configuration
                                                                              Reports and
                                                                                Select



                                       Conversion,           Unit, System
                Application                                                   2 Test Moves
     DEVELOP     Upgrade
                                        Migration,          and Integration
                                                                 Test             UAT
                                         Retrofit



               Go Live Prep           Prepare final          Final Move to
                                                                              Cut-Over and
     GO LIVE    and Plan
                 Review
                                        Copy of
                                       Production
                                                            Production and
                                                                  Test
                                                                                Support




23                              Astute Business Solutions
Pricing Models


                ASSESSMENT                                            ACCELERATED UPGRADE


     •   Fixed Price                                              •   Fixed Price
         •   3-6Week Engagement                                        •   Comprehensive Service
         •   Discovery and Analysis                                    •   2 or More Test Moves to Production
         •   Pre-defined Deliverables                                  •   Warranty and Post Go-Live Support
         •   Pre-defined Resource Model and Plan                       •   Unit, System and Integration Test
                                                                       •   Starting at $250,000


     •   Time and Materials                                       •   Time and Materials
         •   3-6Week Engagement                                        •   Fit-Gap Analysis
         •   Discovery and Analysis                                    •   New Module Implementation
         •   Pre-defined Deliverables                                  •   New Enhancements/Processes
         •   Pre-defined Resource Model and Plan




24                                                 Astute Business Solutions
Proposed GOA Approach and Deliverables




               Conduct Fast Track Assessment
     STEP 1    •   Produce Impact Analysis Outputs




               Compare Impact Analysis with IBM Results
     STEP 2    •   Identify Delta between the two and propose plan for
                   detailed business process review of those areas


               Fast Track Business Process Review
     STEP 3    •   Build on Step 1 results and do a drill-down on key areas
                   where deltas are significant




25                   Astute Business Solutions
Fast Track Upgrade Services


     ASSESSMENTS
       • Fast Track Upgrade Impact Analysis
       • Fast Track Business Process Analysis
       • Fast Track Architecture Assessment for Upgrade



     UPGRADES
       • 90-day and 120-day (4 and 6 month) Accelerated Upgrades
       • Technical Upgrades, PeopleTools Upgrades, Service Packs
       • Custom Upgrades – Tailored Combination of Fit-Gap, Process Reengineering,
         Technical Upgrade, New Module /Feature Implementation, De-customization etc.



     ACCELERATORS
       •   V9.0 Upgrade Repository – Test Scripts, Solution, Tips
       •   V9.0 Upgrade Security Retrofit Utility
       •   V9.0 Delta Training
       •   UPK For Upgrade – Training, Documentation, Testing




26                            Astute Business Solutions
Fast Track Upgrade


     The Accelerated Upgrade service includes:

         •   Fit-Gap Analysis and Report
         •   Upgrade Planning and Preparation
         •   PeopleSoft Installation and Configuration
         •   Application and Tools Upgrades
         •   All patches and fixes required for Upgrade
         •   2 or More Test Moves with Unit, System, Integration Tests, Support for UAT
         •   Migration and Retrofit of all existing customizations
         •   Go-Live Planning and Readiness Check
         •   30-Day Post Go-Live Support
         •   60-Day Warranty of Service
         •   Detailed project documentation




27                                      Astute Business Solutions
Sample Delivery Model
                        Account Management                     Steering Committee                        Executive

                                            PROJECT & PROGRAM MANAGEMENT


                              PSFT                                     PSFT                                     Upgrade
                          Function Leads                          Technical Leads                                Leads

                        Financials & BI,                   Reports, Interfaces,                            Change Assistant,
                      HR, CRM, EP, S/CM                 Conversions, Enhancements                      DB, Scripting, Performance



               KNOWLEDGE TRANSFER, COMMUNICATION FLOWS, STATUS/ESCALATION, QUALITY CONTROL




                           Upgrade                    Upgrade                         Infrastructure                    End User
                          Developers                 Developers                       Delivery Team                     Support


                                                                                               DBA-Client
                                                    Services – Training UPK,                                            PC Support-Client
          Technical—PeopleTools                                                                OS-Client
                                                Testing/QA, Performance Tuning,
     Third-party Applications Integration                                                    Network-Client              Help Desk-Client
                                                   Maintenance and Support
                                                                                             Security-Client



                         QUALITY/ ASSURANCE/ SERVICE LEVEL REPORTING/ UTILIZATION MANAGEMENT



28                                                        Astute Business Solutions
Thank You


http://www.beastute.com

Contenu connexe

Tendances

Oracle Fusion HCM Payroll Process Flow.pdf
Oracle Fusion HCM Payroll Process Flow.pdfOracle Fusion HCM Payroll Process Flow.pdf
Oracle Fusion HCM Payroll Process Flow.pdfFeras Ahmad
 
Node mailer example how to send email using nodemailer with gmail & mailtrap
Node mailer example how to send email using nodemailer with gmail & mailtrapNode mailer example how to send email using nodemailer with gmail & mailtrap
Node mailer example how to send email using nodemailer with gmail & mailtrapKaty Slemon
 
Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112magik570
 
ADP- Chapter 3 Implementing Inter-Servlet Communication
ADP- Chapter 3 Implementing Inter-Servlet CommunicationADP- Chapter 3 Implementing Inter-Servlet Communication
ADP- Chapter 3 Implementing Inter-Servlet CommunicationRiza Nurman
 
Chapter 02 sap script forms
Chapter 02 sap script formsChapter 02 sap script forms
Chapter 02 sap script formsKranthi Kumar
 
Workflow Part1 1
Workflow Part1 1Workflow Part1 1
Workflow Part1 1evil66_in
 
UDA-Componentes RUP. Accordion
UDA-Componentes RUP. AccordionUDA-Componentes RUP. Accordion
UDA-Componentes RUP. AccordionAnder Martinez
 
RESUME2015_Updated
RESUME2015_UpdatedRESUME2015_Updated
RESUME2015_UpdatedAmit Prayag
 
Ebs 12.2 con9021_pdf_9021_0001
Ebs 12.2 con9021_pdf_9021_0001Ebs 12.2 con9021_pdf_9021_0001
Ebs 12.2 con9021_pdf_9021_0001jucaab
 
Project Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsProject Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsSIVAKUMAR_G
 
How to integrate java application with temenos t24
How to integrate java application with temenos t24How to integrate java application with temenos t24
How to integrate java application with temenos t24Mahmoud Elkholy PMI-ACP
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
CV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISCV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISJYOSTHNA
 
PeopleSoft Integration broker Performance Tunning
PeopleSoft Integration broker Performance TunningPeopleSoft Integration broker Performance Tunning
PeopleSoft Integration broker Performance TunningInSync Conference
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infosapdocs. info
 
Resume-pradeep SQL DBA
Resume-pradeep SQL DBAResume-pradeep SQL DBA
Resume-pradeep SQL DBAPradeep GP
 

Tendances (20)

Oracle Fusion HCM Payroll Process Flow.pdf
Oracle Fusion HCM Payroll Process Flow.pdfOracle Fusion HCM Payroll Process Flow.pdf
Oracle Fusion HCM Payroll Process Flow.pdf
 
Node mailer example how to send email using nodemailer with gmail & mailtrap
Node mailer example how to send email using nodemailer with gmail & mailtrapNode mailer example how to send email using nodemailer with gmail & mailtrap
Node mailer example how to send email using nodemailer with gmail & mailtrap
 
Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112Md050 application extensions_functional_design_080112
Md050 application extensions_functional_design_080112
 
ADP- Chapter 3 Implementing Inter-Servlet Communication
ADP- Chapter 3 Implementing Inter-Servlet CommunicationADP- Chapter 3 Implementing Inter-Servlet Communication
ADP- Chapter 3 Implementing Inter-Servlet Communication
 
Marzouk jsp
Marzouk jspMarzouk jsp
Marzouk jsp
 
Chapter 02 sap script forms
Chapter 02 sap script formsChapter 02 sap script forms
Chapter 02 sap script forms
 
Workflow Part1 1
Workflow Part1 1Workflow Part1 1
Workflow Part1 1
 
UDA-Componentes RUP. Accordion
UDA-Componentes RUP. AccordionUDA-Componentes RUP. Accordion
UDA-Componentes RUP. Accordion
 
RESUME2015_Updated
RESUME2015_UpdatedRESUME2015_Updated
RESUME2015_Updated
 
Ebs 12.2 con9021_pdf_9021_0001
Ebs 12.2 con9021_pdf_9021_0001Ebs 12.2 con9021_pdf_9021_0001
Ebs 12.2 con9021_pdf_9021_0001
 
Project Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementationsProject Management challenges in oracle EBS/ERP implementations
Project Management challenges in oracle EBS/ERP implementations
 
How to integrate java application with temenos t24
How to integrate java application with temenos t24How to integrate java application with temenos t24
How to integrate java application with temenos t24
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
CV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASISCV_Jyosthna_SAP BASIS
CV_Jyosthna_SAP BASIS
 
Sap abap
Sap abapSap abap
Sap abap
 
PeopleSoft Integration broker Performance Tunning
PeopleSoft Integration broker Performance TunningPeopleSoft Integration broker Performance Tunning
PeopleSoft Integration broker Performance Tunning
 
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.infoSAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
SAP ECC 6.0 PM Configuration Manual - www.sapdocs.info
 
Resume-pradeep SQL DBA
Resume-pradeep SQL DBAResume-pradeep SQL DBA
Resume-pradeep SQL DBA
 
Sap dms document management system
Sap dms   document management systemSap dms   document management system
Sap dms document management system
 
Spring boot jpa
Spring boot jpaSpring boot jpa
Spring boot jpa
 

En vedette

PeopleTools 8.52 - Five reasons to upgrade
PeopleTools 8.52 - Five reasons to upgrade PeopleTools 8.52 - Five reasons to upgrade
PeopleTools 8.52 - Five reasons to upgrade hbiroglu
 
Key Findings from the Applicant Survey
Key Findings from the Applicant SurveyKey Findings from the Applicant Survey
Key Findings from the Applicant SurveyHuron Consulting Group
 
Upgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessUpgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessCedar Consulting
 
OHRP Regulatory Interpretations That You Need To Know But Have Never Been Told
OHRP Regulatory Interpretations That You Need To Know But Have Never Been ToldOHRP Regulatory Interpretations That You Need To Know But Have Never Been Told
OHRP Regulatory Interpretations That You Need To Know But Have Never Been ToldHuron Consulting Group
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessHuron Consulting Group
 
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1Smart ERP Solutions, Inc.
 
PeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondPeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondFastestBeastute
 
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...NERUG
 
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...NERUG
 
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningPeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningArvind Rajan
 
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...Arvind Rajan
 
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyond
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyondPeoplesoft Update Manager (PUM) Presentation – During the upgrade and beyond
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyondgravitonconsulting
 
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobilePeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobileNERUG
 
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check Arvind Rajan
 

En vedette (17)

PeopleTools 8.52 - Five reasons to upgrade
PeopleTools 8.52 - Five reasons to upgrade PeopleTools 8.52 - Five reasons to upgrade
PeopleTools 8.52 - Five reasons to upgrade
 
Key Findings from the Applicant Survey
Key Findings from the Applicant SurveyKey Findings from the Applicant Survey
Key Findings from the Applicant Survey
 
Hays PeopleSoft upgrade
Hays PeopleSoft upgradeHays PeopleSoft upgrade
Hays PeopleSoft upgrade
 
Upgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For SuccessUpgrading to 9.2 - Setting Yourself Up For Success
Upgrading to 9.2 - Setting Yourself Up For Success
 
OHRP Regulatory Interpretations That You Need To Know But Have Never Been Told
OHRP Regulatory Interpretations That You Need To Know But Have Never Been ToldOHRP Regulatory Interpretations That You Need To Know But Have Never Been Told
OHRP Regulatory Interpretations That You Need To Know But Have Never Been Told
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = Success
 
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
 
PeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and BeyondPeopleSoft Update Manager During the Upgrade and Beyond
PeopleSoft Update Manager During the Upgrade and Beyond
 
PeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A RoadmapPeopleSoft 9.2 Upgrade - A Roadmap
PeopleSoft 9.2 Upgrade - A Roadmap
 
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
 
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
Upgrading PeopleSoft Financials from 8.9 to 9.2 – Advice You Need to Know fro...
 
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and PlanningPeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
PeopleSoft 9.2 Webinar Series - Part 1 - Upgrade Roadmap and Planning
 
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...
Accelerate and Automate PeopleSoft 9.2/9.1 Testing with PeopleSoft Test Frame...
 
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyond
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyondPeoplesoft Update Manager (PUM) Presentation – During the upgrade and beyond
Peoplesoft Update Manager (PUM) Presentation – During the upgrade and beyond
 
PeopleSoft 9.1 upgrade best practices
PeopleSoft  9.1 upgrade best practicesPeopleSoft  9.1 upgrade best practices
PeopleSoft 9.1 upgrade best practices
 
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid MobilePeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
PeopleSoft 9.2 HCM Features and Functions Including Fluid Mobile
 
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
PeopleSoft 9.2 Upgrade Readiness Assessment and Health Check
 

Similaire à Fast Track PeopleSoft Upgrade Impact Analyzer

Astute people soft northwest rug - v1
Astute   people soft northwest rug - v1Astute   people soft northwest rug - v1
Astute people soft northwest rug - v1Arvind Rajan
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsSantanu Bhattacharya
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008sissie1234
 
Zend server presentation for osi days
Zend server presentation for osi daysZend server presentation for osi days
Zend server presentation for osi daysOpenSourceIndia
 
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...XebiaLabs
 
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoft
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoftAstute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoft
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoftArvind Rajan
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeArvind Rajan
 
Amazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team SportAmazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team SportPaul Muller
 
Persistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertisePersistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertiseSebastien RATTIER
 
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...Joel Oleson
 
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...InSync2011
 
Automating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPMAutomating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPMBalakrishnan Bala B
 
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...InSync2011
 
Astute oracle i participate webinar series - v1
Astute   oracle i participate webinar series - v1Astute   oracle i participate webinar series - v1
Astute oracle i participate webinar series - v1Arvind Rajan
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Ray Glass
 

Similaire à Fast Track PeopleSoft Upgrade Impact Analyzer (20)

Astute people soft northwest rug - v1
Astute   people soft northwest rug - v1Astute   people soft northwest rug - v1
Astute people soft northwest rug - v1
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projects
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008
 
Zend server presentation for osi days
Zend server presentation for osi daysZend server presentation for osi days
Zend server presentation for osi days
 
People soft 9.1 upgrade for a leading beer distributor
People soft 9.1 upgrade for a leading beer distributorPeople soft 9.1 upgrade for a leading beer distributor
People soft 9.1 upgrade for a leading beer distributor
 
PeopleSoft 9.1 Upgrade for a Leading Beer Distributor & Retailer
PeopleSoft 9.1 Upgrade for a Leading Beer Distributor & RetailerPeopleSoft 9.1 Upgrade for a Leading Beer Distributor & Retailer
PeopleSoft 9.1 Upgrade for a Leading Beer Distributor & Retailer
 
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
 
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoft
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoftAstute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoft
Astute @ Quest Midwest Conference 2011 - At A CrossRoads with PeopleSoft
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
 
Amazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team SportAmazing Winter Keynote - IT as a Team Sport
Amazing Winter Keynote - IT as a Team Sport
 
Persistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation ExpertisePersistent Analytical Instrumentation Expertise
Persistent Analytical Instrumentation Expertise
 
PeopleSoft 9.1 Upgrade
PeopleSoft 9.1 UpgradePeopleSoft 9.1 Upgrade
PeopleSoft 9.1 Upgrade
 
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...
SharePoint 2010 Upgrade Strategies and Best Practices - MS Days Bulgaria - Jo...
 
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...
JD Edwards & Peoplesoft 3 _ Victoria Cleven _ Improving ROI and lower costs b...
 
Automating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPMAutomating user provisioning with SAP NW BPM
Automating user provisioning with SAP NW BPM
 
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...
JDE & Peoplesoft 3 | Antionette Leuthard | Peoplesoft Human Capital Managemen...
 
Astute oracle i participate webinar series - v1
Astute   oracle i participate webinar series - v1Astute   oracle i participate webinar series - v1
Astute oracle i participate webinar series - v1
 
Orsyp Introduction
Orsyp IntroductionOrsyp Introduction
Orsyp Introduction
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security
 
Utah PMA Quarterly Meeting, June, 2009
Utah PMA Quarterly Meeting, June, 2009Utah PMA Quarterly Meeting, June, 2009
Utah PMA Quarterly Meeting, June, 2009
 

Plus de Arvind Rajan

Hilton procurement optimization
Hilton procurement optimizationHilton procurement optimization
Hilton procurement optimizationArvind Rajan
 
Hilton general ledger case study
Hilton general ledger case studyHilton general ledger case study
Hilton general ledger case studyArvind Rajan
 
Hilton data spii case study
Hilton data spii case studyHilton data spii case study
Hilton data spii case studyArvind Rajan
 
Cuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyCuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyArvind Rajan
 
Cuna fas test case study
Cuna fas test case studyCuna fas test case study
Cuna fas test case studyArvind Rajan
 
Case study optimizing_the_general_ledger
Case study optimizing_the_general_ledgerCase study optimizing_the_general_ledger
Case study optimizing_the_general_ledgerArvind Rajan
 
PeopleSoft Optimization for Higher Education
PeopleSoft Optimization for Higher EducationPeopleSoft Optimization for Higher Education
PeopleSoft Optimization for Higher EducationArvind Rajan
 
FasTest - Test Automation Solutions for PeopleSoft
FasTest - Test Automation Solutions for PeopleSoftFasTest - Test Automation Solutions for PeopleSoft
FasTest - Test Automation Solutions for PeopleSoftArvind Rajan
 
Astute PeopleSoft 9.2 Sandbox In The Cloud
Astute PeopleSoft 9.2 Sandbox In The CloudAstute PeopleSoft 9.2 Sandbox In The Cloud
Astute PeopleSoft 9.2 Sandbox In The CloudArvind Rajan
 
Astute Case Study - Application Management Services for Global Media Company
Astute Case Study - Application Management Services for Global Media Company Astute Case Study - Application Management Services for Global Media Company
Astute Case Study - Application Management Services for Global Media Company Arvind Rajan
 
Astute Case Study - PeopleSoft Financials Integration for Hospitality Company
Astute Case Study - PeopleSoft Financials Integration for Hospitality CompanyAstute Case Study - PeopleSoft Financials Integration for Hospitality Company
Astute Case Study - PeopleSoft Financials Integration for Hospitality CompanyArvind Rajan
 
Astute Case Study - Implementation for Middle-East University
Astute Case Study - Implementation for Middle-East University Astute Case Study - Implementation for Middle-East University
Astute Case Study - Implementation for Middle-East University Arvind Rajan
 
Session 104590 the foundation of people soft enterprise talent management v1
Session 104590   the foundation of people soft enterprise talent management v1Session 104590   the foundation of people soft enterprise talent management v1
Session 104590 the foundation of people soft enterprise talent management v1Arvind Rajan
 
Session 104620 hitchhikers guide to people soft organization relationships-v2
Session 104620   hitchhikers guide to people soft organization relationships-v2Session 104620   hitchhikers guide to people soft organization relationships-v2
Session 104620 hitchhikers guide to people soft organization relationships-v2Arvind Rajan
 

Plus de Arvind Rajan (16)

Windham
WindhamWindham
Windham
 
Kaiser permanente
Kaiser permanenteKaiser permanente
Kaiser permanente
 
Hilton procurement optimization
Hilton procurement optimizationHilton procurement optimization
Hilton procurement optimization
 
Hilton general ledger case study
Hilton general ledger case studyHilton general ledger case study
Hilton general ledger case study
 
Hilton data spii case study
Hilton data spii case studyHilton data spii case study
Hilton data spii case study
 
Cuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_studyCuna mutual ins. fin controls case_study
Cuna mutual ins. fin controls case_study
 
Cuna fas test case study
Cuna fas test case studyCuna fas test case study
Cuna fas test case study
 
Case study optimizing_the_general_ledger
Case study optimizing_the_general_ledgerCase study optimizing_the_general_ledger
Case study optimizing_the_general_ledger
 
PeopleSoft Optimization for Higher Education
PeopleSoft Optimization for Higher EducationPeopleSoft Optimization for Higher Education
PeopleSoft Optimization for Higher Education
 
FasTest - Test Automation Solutions for PeopleSoft
FasTest - Test Automation Solutions for PeopleSoftFasTest - Test Automation Solutions for PeopleSoft
FasTest - Test Automation Solutions for PeopleSoft
 
Astute PeopleSoft 9.2 Sandbox In The Cloud
Astute PeopleSoft 9.2 Sandbox In The CloudAstute PeopleSoft 9.2 Sandbox In The Cloud
Astute PeopleSoft 9.2 Sandbox In The Cloud
 
Astute Case Study - Application Management Services for Global Media Company
Astute Case Study - Application Management Services for Global Media Company Astute Case Study - Application Management Services for Global Media Company
Astute Case Study - Application Management Services for Global Media Company
 
Astute Case Study - PeopleSoft Financials Integration for Hospitality Company
Astute Case Study - PeopleSoft Financials Integration for Hospitality CompanyAstute Case Study - PeopleSoft Financials Integration for Hospitality Company
Astute Case Study - PeopleSoft Financials Integration for Hospitality Company
 
Astute Case Study - Implementation for Middle-East University
Astute Case Study - Implementation for Middle-East University Astute Case Study - Implementation for Middle-East University
Astute Case Study - Implementation for Middle-East University
 
Session 104590 the foundation of people soft enterprise talent management v1
Session 104590   the foundation of people soft enterprise talent management v1Session 104590   the foundation of people soft enterprise talent management v1
Session 104590 the foundation of people soft enterprise talent management v1
 
Session 104620 hitchhikers guide to people soft organization relationships-v2
Session 104620   hitchhikers guide to people soft organization relationships-v2Session 104620   hitchhikers guide to people soft organization relationships-v2
Session 104620 hitchhikers guide to people soft organization relationships-v2
 

Dernier

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 

Dernier (20)

Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 

Fast Track PeopleSoft Upgrade Impact Analyzer

  • 1. Fast Track Impact Analyzer and Accelerated Upgrade for PeopleSoft Astute Business Solutions Peoplesoft@beastute.com http://www.beastute.com
  • 2. Upgrade Business Drivers Upgrade Business Drivers VOLUNTARY IMPROVEMENT FORCED UPGRADE New Functionality Maintenance & Support • Improved functionality • Stay on supported release • Reduce Customizations • Extend investment value • Develop with Ease • Postpone decision on Fusion/Other ERP • Standards based tools Expansion & Consolidation Technology Upgrade • New BU’s/Companies • New Architecture • More Users • Platform Improvements • Instance Consolidation • Streamlined Integration • Improved Reporting 2 Astute Business Solutions
  • 3. Upgrade Challenges • Drivers & Goals • Manual approach • Impact & Change • Eyeball method ASSESS • Architecture • Error and Bias • Budget/ Resources • Variance Factor • Dependencies • Budget Overflows PLAN • Contingencies • Loose Estimates • Tech. Upgrade • Prolonged Dev • Func. Upgrade • Multiple Tests DEPLOY • Test and Deploy • Unable to de-Customize • Patches/Fixes • Maintain • Enhance • Optimization and Tuning SUPPORT • Support • Unable to de-Customize 3 Astute Business Solutions
  • 4. Fast Track is a pre-upgrade assessment tool and service that quickly details the upgrade effort Benefits Traditional Fast Track • Speed – Critical Impact Analysis in less time over manual efforts • Reliability – Auto-discovery, algorithm-based analysis Subject to error In-depth analysis • Accuracy – No other product and bias simulates a Tools Upgrade prior to the actual start of the upgrade to Intelligent reporting give you an accurate picture of your customizations Manual assessments • Predictability – Can run Fast Track before the upgrade to accurately Automated discovery plan and budget • Visibility - It does what PeopleSoft Tools do AND A LOT MORE over the traditional approach 4 Astute Business Solutions
  • 5. Typical PeopleSoft upgrade process misses details needed upfront to accurately estimate project effort Initial Pass: The Big Picture Copy of 7 Perform Application Setup steps New Release 8 Back-up Production System database 9 Copy & Transform Application data database Using DataStage jobs PRIMED TARGET 10 Final Setup steps 1 Database compare 2 Copy PeopleTools 4 Compare custom project Compare Reports and other tools don’t provide -to identify customizations tables 5 Apply customizations in-depth Impact Analysis vs. 9.0 which is critical in 6 Copy PeopleTools tables Using DataStage jobs estimating complexity and effort of the upgrade. Demo (current release) 3 Update PeopleTools to new version TOOLS TARGET 5 Astute Business Solutions
  • 6. Traditional Assessments are not scientific and accurate – Fast Track is! * Intuitive Categories Category New Custom Delivered Custom Total Object Type High Medium Low High Medium Low Fields 15 10 25 TranslateValues 5 3 8 Records 75 134 100 40 68 55 472 SQL 10 23 75 5 25 15 153 RecordPeopleCode 173 205 492 67 95 163 1195 ApplicationPackagePeopleCde 0 Pages 183 216 457 37 273 267 1433 PagePeopleCode 15 84 148 12 45 32 336 Components 65 218 385 27 61 163 919 ComponentPeopleCode 46 75 419 25 73 294 932 ComponentRecordPeopleCode 12 65 148 225 ComponentRecFldPeopleCode 10 54 127 191 Menus 54 35 89 PortalRegistryStructures 583 336 919 PermissionLists 174 19 193 ComponentInterfaces 35 62 121 9 21 15 263 ApplicationEnginePeopleCode 75 193 249 16 24 69 626 ProcessDefinitions 1580 375 1955 ServerDefinitions 2 2 4 MessageNodes 0 Messages 125 43 168 MessageChannels 2 2 SubscriptionPeopleCode 54 54 URLDefinitions 5 5 Images 18 18 StyleSheets 14 14 Relationships 0 * Based on your metadata – i.e. real time info 6 Astute Business Solutions
  • 7. Compare Report does not provide Impact Analysis – Drilldown to line of code Fast Track does. Intuitive grouping by Component 7 Astute Business Solutions
  • 8. Compare Reports don’t compare custom PeopleCode changes! Compare on the fly 8 Astute Business Solutions
  • 9. Drill down to the line of custom code 9 Astute Business Solutions
  • 10. View Customizations by Module – Accelerate Business Process Decisions Count of Change Detail Change Detail Module1 Object Type Target Changed Target Dropped Target UnChange Grand Total Asset Management 73 277 8 358 Billing 33 183 6 222 Bills and Routings 45 395 16 456 Commitment Control 19 54 2 75 Contracts 3 46 1 50 Cost Management 5 123 3 131 Deduction Management 53 4 57 Engineering 40 32 3 75 General Financial 3 20 23 General Ledger 4 103 3 110 Inventory 253 442 20 715 None 968 2540 89 3597 Order Management 937 1466 76 2479 Payables 44 160 7 211 Production Management 50 38 5 93 Production Planning 5 150 1 156 Projects 2 49 1 52 Purchasing 64 123 7 194 Quality 46 133 8 187 Receivables 68 444 25 537 Travel and Expenses 89 21 10 120 Grand Total 2804 6803 291 9898 10 Astute Business Solutions
  • 11. Don’t Guess – Use detailed estimates by complexity ratings and change type Custom Custom Total Custom New Custom New Total Grand Total Row Labels High Low Medium Very High Low Medium Asset Management 54 425.6 4 483.6 3.5 33 36.5 520.1 Target Changed 12 71.5 4 87.5 87.5 Target Dropped 42 350.1 392.1 3.5 33 36.5 428.6 Target UnChange 4 4 4 Billing 24 262 286 29 29 58 344 Target Changed 6 154 160 160 Target Dropped 18 104.5 122.5 29 29 58 180.5 Target UnChange 3.5 3.5 3.5 Bills and Routings 6 88.4 2 96.4 30.5 136 166.5 262.9 Target Changed 6 42.6 2 50.6 50.6 Target Dropped 37.8 37.8 30.5 136 166.5 204.3 Target UnChange 8 8 8 Commitment Control 6 57.4 12 75.4 2.5 19 21.5 96.9 Target Changed 6 39.5 12 57.5 57.5 Target Dropped 16.9 16.9 2.5 19 21.5 38.4 Target UnChange 1 1 1 Contracts 2 2 4.25 19 23.25 25.25 Target Changed 1.5 1.5 1.5 Target Dropped 4.25 19 23.25 23.25 Target UnChange 0.5 0.5 0.5 11 Astute Business Solutions
  • 12. SQR Analysis – Sample Report 12 Astute Business Solutions
  • 13. Query Analysis – Sample Report 13 Astute Business Solutions
  • 14. Component Analysis – Sample Report 14 Astute Business Solutions
  • 15. Dashboard – New Complexity Estimates 15 Astute Business Solutions
  • 16. PeopleCode Impact Analysis - Change Detail Sample Report 16 Astute Business Solutions
  • 17. Fast Track – Differentiated Capabilities Solution Area Fast Track Differentiator Competitor Approach PeopleSoft • Automated, Fast, Comprehensive, • Manual analysis, some scripts, Upgrade • Consistent, Predictable, Accurate Results some SQL, ―eyeball‖ approach Assessment • Uses meta data and tags to analyze code and • Labor and cost intensive determine complexity and effort • Subject to Error and Bias Upgrade Proposal • Detailed statistical and analytical reports produce a • Swag numbers Development comprehensive fixed price proposal for Upgrade based • Based primarily on past experience on actual client information and impact to target and consultants ability to analyze release system Fit-Gap and • Semi-automated ability to compare changes by • Rely on traditional fit-gap phase to Business Process process among releases review functionality and prepare Analysis • Faster than traditional process and accelerates fit- analysis and recommendation gap and design • Labor intensive • Built-in Proprietary meta-data about PeopleSoft • Manual review of release notes and Upgrade changes documentation 17 Astute Business Solutions
  • 18. Accelerate Decision Making • Prepare DB, COP, Size and Backup • Apply UPG Planning Files, Edit Scripts PREPARE • Run Planning Scripts, Update Stats, Run Audits • Prepare for process changes, Make functional decisions • Report row counts, check DB integrity, purge queues, backup DB CURRENT • Rename records and fields, modify compare options, run compare FastTrack Traditional COMPARE • Identify customizations, document customizations, restore Demo Approach Approach – – Single • Modify scripts, load system tables, export and copy projects PEOPLETOOLS • Migrate records to new tablespaces, convert Tools objects Step CHANGES • Load Tools data, create views, convert data types Process • READY FOR APPLICATION COMPARE • Review Customization Reports 2-4 6-12 COMPARE AND DECIDE • Understand Impact of Customizations (online only) WEEKS WEEKS • Make Keep/Drop Decisions Fast Track Impact Analysis – Cost Savings of up to 25% of total upgrade costs 18 Astute Business Solutions
  • 19. FastTrack Behind the Scenes 19 Astute Business Solutions
  • 20. FastTrack Deliverables Discovery Phase • Complete listing of online and batch custom code • Complexity Ratings by Object Type Fast Track Deliverables Analysis Phase Complete, Intelligent • Impact and Statistical Analysis and Timely • Code Parsing for Online and Batch Information • Side-by-Side Code Compare Reporting Phase • Fixed Price Proposal • Detailed Effort Estimates • Dashboard Reports 20 Astute Business Solutions
  • 21. Fast Track Value Throughout Upgrade Project PREPARATION TOOLS PROJECT RETROFIT TESTING TRAINING & FIT-GAP UPGRADE COMPARE FastTrack deliverables provide value throughout the upgrade project lifecycle Customization Discovery Reduced cycle times and Map to Target Intelligent Planning and Estimation 9.0 Test Scripts Repository With Pre-Upgrade Analysis Simulated to accelerate Compare Fewer Test Moves Keep Drop decisions made easy through Impact Analysis Blueprint for development Through Impact Analysis Navigation Map Source to Target 21 Astute Business Solutions
  • 22. Fast Track Upgrade The Accelerated Upgrade service includes: • Fit-Gap Analysis and Report • Upgrade Planning and Preparation • PeopleSoft Installation and Configuration • Application and Tools Upgrades • All patches and fixes required for Upgrade • 2 or More Test Moves with Unit, System, Integration Tests, Support for UAT • Migration and Retrofit of all existing customizations • Go-Live Planning and Readiness Check • 30-Day Post Go-Live Support • 60-Day Warranty of Service • Detailed project documentation 22 Astute Business Solutions
  • 23. Fast Track Upgrade Methodology Design Project Audit and Install New Review and PREPARE Org, Plan, Milestones Finalize Scope Prepare Environment Release and Upgrade Tools Configure Define Tools Upgrade Compare ANALYZE Upgrade Tools and Scripts Customizations and Estimates and Env Configuration Reports and Select Conversion, Unit, System Application 2 Test Moves DEVELOP Upgrade Migration, and Integration Test UAT Retrofit Go Live Prep Prepare final Final Move to Cut-Over and GO LIVE and Plan Review Copy of Production Production and Test Support 23 Astute Business Solutions
  • 24. Pricing Models ASSESSMENT ACCELERATED UPGRADE • Fixed Price • Fixed Price • 3-6Week Engagement • Comprehensive Service • Discovery and Analysis • 2 or More Test Moves to Production • Pre-defined Deliverables • Warranty and Post Go-Live Support • Pre-defined Resource Model and Plan • Unit, System and Integration Test • Starting at $250,000 • Time and Materials • Time and Materials • 3-6Week Engagement • Fit-Gap Analysis • Discovery and Analysis • New Module Implementation • Pre-defined Deliverables • New Enhancements/Processes • Pre-defined Resource Model and Plan 24 Astute Business Solutions
  • 25. Proposed GOA Approach and Deliverables Conduct Fast Track Assessment STEP 1 • Produce Impact Analysis Outputs Compare Impact Analysis with IBM Results STEP 2 • Identify Delta between the two and propose plan for detailed business process review of those areas Fast Track Business Process Review STEP 3 • Build on Step 1 results and do a drill-down on key areas where deltas are significant 25 Astute Business Solutions
  • 26. Fast Track Upgrade Services ASSESSMENTS • Fast Track Upgrade Impact Analysis • Fast Track Business Process Analysis • Fast Track Architecture Assessment for Upgrade UPGRADES • 90-day and 120-day (4 and 6 month) Accelerated Upgrades • Technical Upgrades, PeopleTools Upgrades, Service Packs • Custom Upgrades – Tailored Combination of Fit-Gap, Process Reengineering, Technical Upgrade, New Module /Feature Implementation, De-customization etc. ACCELERATORS • V9.0 Upgrade Repository – Test Scripts, Solution, Tips • V9.0 Upgrade Security Retrofit Utility • V9.0 Delta Training • UPK For Upgrade – Training, Documentation, Testing 26 Astute Business Solutions
  • 27. Fast Track Upgrade The Accelerated Upgrade service includes: • Fit-Gap Analysis and Report • Upgrade Planning and Preparation • PeopleSoft Installation and Configuration • Application and Tools Upgrades • All patches and fixes required for Upgrade • 2 or More Test Moves with Unit, System, Integration Tests, Support for UAT • Migration and Retrofit of all existing customizations • Go-Live Planning and Readiness Check • 30-Day Post Go-Live Support • 60-Day Warranty of Service • Detailed project documentation 27 Astute Business Solutions
  • 28. Sample Delivery Model Account Management Steering Committee Executive PROJECT & PROGRAM MANAGEMENT PSFT PSFT Upgrade Function Leads Technical Leads Leads Financials & BI, Reports, Interfaces, Change Assistant, HR, CRM, EP, S/CM Conversions, Enhancements DB, Scripting, Performance KNOWLEDGE TRANSFER, COMMUNICATION FLOWS, STATUS/ESCALATION, QUALITY CONTROL Upgrade Upgrade Infrastructure End User Developers Developers Delivery Team Support DBA-Client Services – Training UPK, PC Support-Client Technical—PeopleTools OS-Client Testing/QA, Performance Tuning, Third-party Applications Integration Network-Client Help Desk-Client Maintenance and Support Security-Client QUALITY/ ASSURANCE/ SERVICE LEVEL REPORTING/ UTILIZATION MANAGEMENT 28 Astute Business Solutions