Burj Al
Arab
 United Arab Emirates – Dubai
 Private Island (280 m Offshore)
The World's Tallest Usable
Full Hotel Building. If You
Counted Mixed Use
Buildings The Jin Mao
Tower In China Would Be
The Tallest Which Is Only
Half Hotel.
In English "Burj Al Arab"
Means The Arabian Tower
Burj Al Arab Was One Of
The Most Expensive
Buildings Ever Built. It Is
One Of The World's Only
Two "7 Star" Hotels.
Burj Al Arab Is Shaped Like
A Sail.
Burj Al Arab is 321m Tall
It is the second tallest hotel of
the world
Burj Al Arab is 321m Tall
It is the second tallest hotel of
the world
The building was started in 1994
and was officially launched on
December 1, 1999
Burj Al Arab is 321m Tall
It is the second tallest hotel of
the world
The building was started in 1994
and was officially launched on
December 1, 1999
The hotel cost US$650 million to
build
Structure:
Stunning design:
• The Burj Al Arab is shaped like a billowing
spinnaker sail
• It characterizes itself as the world's only
"7-star" property
• Floors: 60 Rooms: 202
Features:
• Underwater restaurant
• The hotel’s atrium is the world's tallest,
measuring 180 m high. (lobby-upper floor)
• Helicopter & RR
transfers.
• The Burj Al Arab is a futuristic architectural
marvel towering over the Gulf.
• The hotel is significantly taller than it
appears to the eye (332 m)
• Worlds highest tennis court.
Internet access, office area, laptop,
private telephone and facsimile,
photocopier and data port
It was built in the shape
of an Arabian boat.
The Burj Al Arab is built on anThe Burj Al Arab is built on an
Artificial island 280 m out fromArtificial island 280 m out from
Jumeirah beach,Jumeirah beach,
It is connected to the mainland by aIt is connected to the mainland by a
private curving bridgeprivate curving bridge
It took less than three years
to construct the building.
The building contains over
70,000 m3
of concrete and
9,000 tons of steel.
The screen is made of 1mm thick glass fiberThe screen is made of 1mm thick glass fiber
fabric with a Teflon coat to stop the dirtfabric with a Teflon coat to stop the dirt
sticking. The screen is the largest of it's typesticking. The screen is the largest of it's type
and covers an area of one and a half footballand covers an area of one and a half football
pitch.pitch.
The Burj Al Arab holds only 28 double-
storey floors which accommodate 202
bedroom suites.
The smallest suite occupies an area of 169 mThe smallest suite occupies an area of 169 m22
and the largest covers 780 mand the largest covers 780 m22
Al Muntaha Restaurant (right side)
is located 200 metres above the Persian
Gulf. It is supported by a full Cantilever
that extends 27 metres from the mast.
 Status: built
 Construction Dates:
   Began: 1994  
 Finished: 1999
 Floor Count: 60
 Elevator Count: 18
 Units / Rooms: 202
 Number of piles: 230
 Length of piles: 45m
 Diameter of piles 1.5m
 Depth of lowest basement
under sea is 7m below sea level.
Engineers created a surface layerEngineers created a surface layer
of large rocks, which is circled with aof large rocks, which is circled with a
concrete honeycomb pattern,concrete honeycomb pattern,
It protects the foundation from erosion. It tookIt protects the foundation from erosion. It took
3 Years to build the island.3 Years to build the island.
Heights
 Height of atrium: 182m
 Height of helipad from sea: 212M
 Height of top of accommodation from island:
190m
 Height of top of mast from island :321m
 The diagonal trusses on the side of the building
are as long as a football pitch and weigh as
much as 20 double-decker busses. They were
built 15 KM from the site and brought by road
to Dubai on huge 80 wheel lorries which had
to be specially imported from South Africa. The
highest truss took a day to lift into place.
If one man was to build the building himself it
would take about 8,000 years to finish.
 carbon
 fiber  
 concrete
 fabric  
 glass
 gold  
 steel
It took 3 years to complete the island from
total 5 years construction period
Construction of Burj Al Arab began in
1994, and was completed in 1999 It was
built n the shape of the Arab dhow, a
type of Arabian vessel. Two ‘wings’
spread in a V shape to form a ‘mast’,
with the space in between them making
the worlds largest atrium. It needed to
be a building that would become
synonymous with the name of the
country.
 Temporary tube piles driven into sea bed
 Temporary sheet piles and tie rods driven into sea bed to
support boundary rocks (see figure 1)
 Permanent boundary rock bunds deposited either side of
sheet piles
 Hydraulic fill layers deposited between bunds to
displace sea water and form island (see figure 2 with fill
layers partially complete)
 Permanent concrete armor units placed around island
to protect it from the waves
 2m diameter 43m deep piles driven through island
and sea bed below to stabilize structure (see figure 3)
 Island interior excavated and temporary sheet pile coffer dam
inserted
 2m thick concrete plug slab laid at base of island
 Reinforced concrete retaining wall built
 Basement floors created (see figure 4)
Lateral loads are transferred
from steel frame to central spine.
Spine unifies the steel and
concrete structures.
Whole loads are first
passed
from reinforced concrete
in
multistory frame to main
steel exoskeleton, and
then
to the foundation.
Braces the exterior steel frame
• Resists Lateral Loads
• Resists Overturning
• Braces steel frame diagonally
• Resists Lateral Loads
• Reduce Moment and
Deflection
The structure is made of a steel exoskeleton
wrapped around an reinforced concrete tower.
The space between the wings is enclosed by a
Teflon-coated fiberglass sail, curving across the
front of the building and creating an atrium
inside. The sail is made of a material called
Dyneon, spanning over 161,000 square feet,
consists of two layers, and is divided into
twelve panels and installed vertically. The
fabric is coated with DuPont Teflon to protect
it from harsh desert heat, wind, and dirt. The
fabricators estimate that it will hold up for up
to 50 years.
 Joint Venture between
 Al Habtoor Engineering
 Murray and Roberts
 Fletcher Construction
 The companies all joined to gather because by utilizing the separate talents
of each partner; the bulk of the risk could be redistributed to the firms that
were best equipped to handle each particular issue. The risks that needed to
be considered were:
1. labor supply
2. concrete work
3. structural steel supply
4. Erection
5. high rise management experience
6. Purchasing
7. cost control
8. management staffing
 The Burj Al
Arab is lit
by 150
color
changing.
highlighted
by 90 Data
Flash
strobes
• The tower
changes
from white
to multicolor
as the
evening
progresses
The
Changing
Colors of
the
Building’s
Exterior
Architecture critics:
This extraordinary
investment
stretches the limits
of the ambitious
urban imagination
largely due to the
power of
excessive wealth.
You need to add what it will cost you
to dine in this restaurant
This is an aerial view from the plane
Look at the Hotel Burj Al Arab
Burj-al-arab

Contenu connexe

Tendances

Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyChyi Ong
 
High rise building case study
High rise building case study High rise building case study
High rise building case study VISHAKA BOTHRA
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadiumluisaam
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Dimple Poddar
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.Shabarinath R
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY Rifquthsb1
 
World trade center new york
World trade center new yorkWorld trade center new york
World trade center new yorkElinda Fariz
 
Burj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsBurj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsLaura Domínguez
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Jeesmon Babu
 

Tendances (20)

Al Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, KuwaitAl Hamra Firdous Tower, Kuwait
Al Hamra Firdous Tower, Kuwait
 
Capital gate abu dhabi
Capital gate abu dhabiCapital gate abu dhabi
Capital gate abu dhabi
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
Emirates towers
Emirates towersEmirates towers
Emirates towers
 
432 park avenue
432 park avenue432 park avenue
432 park avenue
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
Form Active system
Form Active systemForm Active system
Form Active system
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
Beijing National Stadium
Beijing National StadiumBeijing National Stadium
Beijing National Stadium
 
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
Long span structures case study (LINK IN DESCRIPTION FOR DOWNLOAD)
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Ferrari world, abu dhabi
Ferrari world, abu dhabiFerrari world, abu dhabi
Ferrari world, abu dhabi
 
World trade center new york
World trade center new yorkWorld trade center new york
World trade center new york
 
TWA Flight Center - NY
TWA Flight Center - NYTWA Flight Center - NY
TWA Flight Center - NY
 
Burj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The ArabsBurj Al Arab, Tower Of The Arabs
Burj Al Arab, Tower Of The Arabs
 
Bhurj khalifa _Net Case Study
Bhurj khalifa _Net Case StudyBhurj khalifa _Net Case Study
Bhurj khalifa _Net Case Study
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
Sears tower
Sears towerSears tower
Sears tower
 

En vedette

Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentationKat0412
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arabpeterhuy
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiHamed Zarei
 
Burj Al Arab - Dubai
Burj Al Arab - DubaiBurj Al Arab - Dubai
Burj Al Arab - DubaiJohn *
 
Burj al arab technology homework
Burj al arab technology homeworkBurj al arab technology homework
Burj al arab technology homeworknataliarodriguez611
 
My presentation on Dubhai ICON burj al arab
My presentation on Dubhai ICON  burj al arabMy presentation on Dubhai ICON  burj al arab
My presentation on Dubhai ICON burj al arabVenu M
 
Burj-Al-Arab
Burj-Al-ArabBurj-Al-Arab
Burj-Al-Arabharry3114
 
Getting started with Enterprise Application Integration (EAI) using Enterpris...
Getting started with Enterprise Application Integration (EAI) using Enterpris...Getting started with Enterprise Application Integration (EAI) using Enterpris...
Getting started with Enterprise Application Integration (EAI) using Enterpris...Tamim Khan
 
Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)sumitvikram
 
Foundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj KhalifaFoundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj Khalifaastoria104
 
ملخص بحث برج خليفة باللغة العربية
ملخص بحث برج خليفة باللغة العربيةملخص بحث برج خليفة باللغة العربية
ملخص بحث برج خليفة باللغة العربيةSafa Aboelssaad
 
Hotel Burj Al Arab (برج العرب)
Hotel Burj Al Arab (برج العرب)Hotel Burj Al Arab (برج العرب)
Hotel Burj Al Arab (برج العرب)Maria Laura Andereggen
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of constructionJoji Mathew
 

En vedette (19)

Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentation
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Burj Al arab
Burj Al arabBurj Al arab
Burj Al arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubai
 
Burj Al Arab - Dubai
Burj Al Arab - DubaiBurj Al Arab - Dubai
Burj Al Arab - Dubai
 
Burj al arab technology homework
Burj al arab technology homeworkBurj al arab technology homework
Burj al arab technology homework
 
My presentation on Dubhai ICON burj al arab
My presentation on Dubhai ICON  burj al arabMy presentation on Dubhai ICON  burj al arab
My presentation on Dubhai ICON burj al arab
 
Burj-Al-Arab
Burj-Al-ArabBurj-Al-Arab
Burj-Al-Arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj ul arab
Burj ul arabBurj ul arab
Burj ul arab
 
Getting started with Enterprise Application Integration (EAI) using Enterpris...
Getting started with Enterprise Application Integration (EAI) using Enterpris...Getting started with Enterprise Application Integration (EAI) using Enterpris...
Getting started with Enterprise Application Integration (EAI) using Enterpris...
 
Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)Foundation design of burj khalifa (deep foundation<piles>)
Foundation design of burj khalifa (deep foundation<piles>)
 
Foundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj KhalifaFoundation Deisgn of Burj Khalifa
Foundation Deisgn of Burj Khalifa
 
ملخص بحث برج خليفة باللغة العربية
ملخص بحث برج خليفة باللغة العربيةملخص بحث برج خليفة باللغة العربية
ملخص بحث برج خليفة باللغة العربية
 
Hotel Burj Al Arab (برج العرب)
Hotel Burj Al Arab (برج العرب)Hotel Burj Al Arab (برج العرب)
Hotel Burj Al Arab (برج العرب)
 
Burj khalifa-mode of construction
Burj khalifa-mode of constructionBurj khalifa-mode of construction
Burj khalifa-mode of construction
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 

Similaire à Burj-al-arab

Burj al-arab
Burj al-arabBurj al-arab
Burj al-arabmilyas143
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1jayashree
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Rohit Arora
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptxGhaziMoe
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemABDURRAB ANSARI
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) sathish sak
 
Petronas twin towers, taipei 101, burj al-arab
Petronas twin towers, taipei 101, burj al-arabPetronas twin towers, taipei 101, burj al-arab
Petronas twin towers, taipei 101, burj al-arabRajat Nainwal
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifashobhita4
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa shiv404
 

Similaire à Burj-al-arab (20)

Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, Dubai
 
Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj al arab-uae
Burj al arab-uaeBurj al arab-uae
Burj al arab-uae
 
PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, Dubai
 
Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.Burj khalifa , its engineering as well as architectural features and facts.
Burj khalifa , its engineering as well as architectural features and facts.
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
burjjjj new
burjjjj newburjjjj new
burjjjj new
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB)
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Petronas twin towers, taipei 101, burj al-arab
Petronas twin towers, taipei 101, burj al-arabPetronas twin towers, taipei 101, burj al-arab
Petronas twin towers, taipei 101, burj al-arab
 
Burje-khalifa
Burje-khalifaBurje-khalifa
Burje-khalifa
 
Bruj khalifa
Bruj khalifaBruj khalifa
Bruj khalifa
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa
 

Dernier

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 

Dernier (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Burj-al-arab

  • 1.
  • 3.
  • 4.  United Arab Emirates – Dubai  Private Island (280 m Offshore)
  • 5. The World's Tallest Usable Full Hotel Building. If You Counted Mixed Use Buildings The Jin Mao Tower In China Would Be The Tallest Which Is Only Half Hotel. In English "Burj Al Arab" Means The Arabian Tower Burj Al Arab Was One Of The Most Expensive Buildings Ever Built. It Is One Of The World's Only Two "7 Star" Hotels. Burj Al Arab Is Shaped Like A Sail.
  • 6. Burj Al Arab is 321m Tall It is the second tallest hotel of the world
  • 7. Burj Al Arab is 321m Tall It is the second tallest hotel of the world The building was started in 1994 and was officially launched on December 1, 1999
  • 8. Burj Al Arab is 321m Tall It is the second tallest hotel of the world The building was started in 1994 and was officially launched on December 1, 1999 The hotel cost US$650 million to build
  • 9. Structure: Stunning design: • The Burj Al Arab is shaped like a billowing spinnaker sail • It characterizes itself as the world's only "7-star" property • Floors: 60 Rooms: 202
  • 10. Features: • Underwater restaurant • The hotel’s atrium is the world's tallest, measuring 180 m high. (lobby-upper floor) • Helicopter & RR transfers.
  • 11. • The Burj Al Arab is a futuristic architectural marvel towering over the Gulf. • The hotel is significantly taller than it appears to the eye (332 m) • Worlds highest tennis court.
  • 12. Internet access, office area, laptop, private telephone and facsimile, photocopier and data port
  • 13. It was built in the shape of an Arabian boat.
  • 14. The Burj Al Arab is built on anThe Burj Al Arab is built on an Artificial island 280 m out fromArtificial island 280 m out from Jumeirah beach,Jumeirah beach, It is connected to the mainland by aIt is connected to the mainland by a private curving bridgeprivate curving bridge
  • 15. It took less than three years to construct the building. The building contains over 70,000 m3 of concrete and 9,000 tons of steel.
  • 16. The screen is made of 1mm thick glass fiberThe screen is made of 1mm thick glass fiber fabric with a Teflon coat to stop the dirtfabric with a Teflon coat to stop the dirt sticking. The screen is the largest of it's typesticking. The screen is the largest of it's type and covers an area of one and a half footballand covers an area of one and a half football pitch.pitch.
  • 17. The Burj Al Arab holds only 28 double- storey floors which accommodate 202 bedroom suites.
  • 18. The smallest suite occupies an area of 169 mThe smallest suite occupies an area of 169 m22 and the largest covers 780 mand the largest covers 780 m22
  • 19. Al Muntaha Restaurant (right side) is located 200 metres above the Persian Gulf. It is supported by a full Cantilever that extends 27 metres from the mast.
  • 20.  Status: built  Construction Dates:    Began: 1994    Finished: 1999  Floor Count: 60  Elevator Count: 18  Units / Rooms: 202
  • 21.  Number of piles: 230  Length of piles: 45m  Diameter of piles 1.5m  Depth of lowest basement under sea is 7m below sea level.
  • 22. Engineers created a surface layerEngineers created a surface layer of large rocks, which is circled with aof large rocks, which is circled with a concrete honeycomb pattern,concrete honeycomb pattern, It protects the foundation from erosion. It tookIt protects the foundation from erosion. It took 3 Years to build the island.3 Years to build the island.
  • 23. Heights  Height of atrium: 182m  Height of helipad from sea: 212M  Height of top of accommodation from island: 190m  Height of top of mast from island :321m
  • 24.  The diagonal trusses on the side of the building are as long as a football pitch and weigh as much as 20 double-decker busses. They were built 15 KM from the site and brought by road to Dubai on huge 80 wheel lorries which had to be specially imported from South Africa. The highest truss took a day to lift into place. If one man was to build the building himself it would take about 8,000 years to finish.
  • 25.  carbon  fiber    concrete  fabric    glass  gold    steel
  • 26. It took 3 years to complete the island from total 5 years construction period
  • 27. Construction of Burj Al Arab began in 1994, and was completed in 1999 It was built n the shape of the Arab dhow, a type of Arabian vessel. Two ‘wings’ spread in a V shape to form a ‘mast’, with the space in between them making the worlds largest atrium. It needed to be a building that would become synonymous with the name of the country.
  • 28.  Temporary tube piles driven into sea bed  Temporary sheet piles and tie rods driven into sea bed to support boundary rocks (see figure 1)
  • 29.  Permanent boundary rock bunds deposited either side of sheet piles  Hydraulic fill layers deposited between bunds to displace sea water and form island (see figure 2 with fill layers partially complete)
  • 30.  Permanent concrete armor units placed around island to protect it from the waves  2m diameter 43m deep piles driven through island and sea bed below to stabilize structure (see figure 3)
  • 31.  Island interior excavated and temporary sheet pile coffer dam inserted  2m thick concrete plug slab laid at base of island  Reinforced concrete retaining wall built  Basement floors created (see figure 4)
  • 32.
  • 33.
  • 34. Lateral loads are transferred from steel frame to central spine. Spine unifies the steel and concrete structures.
  • 35.
  • 36. Whole loads are first passed from reinforced concrete in multistory frame to main steel exoskeleton, and then to the foundation.
  • 37. Braces the exterior steel frame • Resists Lateral Loads • Resists Overturning
  • 38. • Braces steel frame diagonally • Resists Lateral Loads • Reduce Moment and Deflection
  • 39. The structure is made of a steel exoskeleton wrapped around an reinforced concrete tower. The space between the wings is enclosed by a Teflon-coated fiberglass sail, curving across the front of the building and creating an atrium inside. The sail is made of a material called Dyneon, spanning over 161,000 square feet, consists of two layers, and is divided into twelve panels and installed vertically. The fabric is coated with DuPont Teflon to protect it from harsh desert heat, wind, and dirt. The fabricators estimate that it will hold up for up to 50 years.
  • 40.  Joint Venture between  Al Habtoor Engineering  Murray and Roberts  Fletcher Construction
  • 41.  The companies all joined to gather because by utilizing the separate talents of each partner; the bulk of the risk could be redistributed to the firms that were best equipped to handle each particular issue. The risks that needed to be considered were: 1. labor supply 2. concrete work 3. structural steel supply 4. Erection 5. high rise management experience 6. Purchasing 7. cost control 8. management staffing
  • 42.  The Burj Al Arab is lit by 150 color changing. highlighted by 90 Data Flash strobes • The tower changes from white to multicolor as the evening progresses The Changing Colors of the Building’s Exterior
  • 43. Architecture critics: This extraordinary investment stretches the limits of the ambitious urban imagination largely due to the power of excessive wealth.
  • 44. You need to add what it will cost you to dine in this restaurant
  • 45. This is an aerial view from the plane Look at the Hotel Burj Al Arab