Hazard Identification, Risk Assessment &
Determining Control (HIRAC)
BS OHSAS 18001:2007
HIRAC
What is risk?
What is Hazard?
What is Ill Health?
Harm or
ill health
Situation
Source
Act
Likelihood of
occurrence
of hazardous
event
Severity of
injury / ill
health
Risk
ill
health
Adverse
physical
Adverse
mental
condition
HIRAC
Why HIRAC ?
Legal Factor
Act / Rule
Contract Condition
Human Factor
Save Life
Minimize Injury
Staff moral
Financial Factor
Cost Reduction
Minimize risk of life
Penalty
Stack holder
Productivity
HIRAC
likelihood
Provide appropriate
controls
Risk level
Associated
consequences
identify OH&S hazards
PURPOSE PERFORMED AT
Head Office
Regional Office
Workshop
Projects
ALL
Activities
Sub activities
Process
Task
What is a risk assessment?
“Process of evaluating the risk arising from a hazard (s), taking into account the adequacy of any existing
controls, and deciding whether or not the risk(s) is acceptable”.
Why risk assessment required?
Assessing Risk
Risk
Assessmen
t
Requireme
nt
You
Other
Business
Factors to be considered while assessing risk:
Assessing Risk
Factors
People
Location
Process
activity
Equipment
Assessing Risk
Probability
Low
Low
Assessing Risk
Probability
Low
Medium
High
Assessing Risk
Probability
Medium
Low
Assessing Risk
Probability
Low
Medium
High
Severity
Assessing Risk
Assessing Risk
15
5 25
Assessing Risk
RISK
Assessing Risk
5 5 15 25
3 3 9 15
1 1 3 5
1 3 5
Evaluate the Risk / Risk assessment Matrix
Increasing Severity
Severity:
5 – Catastrophic
3 – Major
1 – Minor
Increasing
Probability
Probability:
5 – Certain
3 – Likely
1 – Unlikely
RISK PRIORITY CHART - Severity
Occupational Safety Hazard (Severity)
Severity of risk Description
Severity
factor
Minimal
•First aid injury
•Injury (absence less
than 48 hrs)
•Resume work immediately after FA or
within 48 hrs;
•Minor delay to resume operation.
•Cost of property damage within INR
50,000/-
1
Major/Serious
•Lost time injury
(absence more than
48 hrs),
•Temporary/permane
nt disablement
•Resume work after 48 hours
•Temporary/permanent disablement of
body organ
•Suspension of operation for few hours
•Property damage cost between INR
50000/- to INR/- 10,00,000/
3
Catastrophic
Fatalities or
Collapsing of
structure
•Loss of life; total failure of machinery
or catastrophic damages (structural
damages etc)
•Undefined Suspension of operation .
•Damage above INR 10,00,000/-
5
Occupational Health Hazard (Severity)
Severity of risk Description
Severity
factor
Minimal
•Medical aid
illness
•ill health less
than 48hrs
•Resume work
immediately after
FA
•Resume work
within 48 hrs
1
Major/Serious
•ill health
•Absence more
than 48hrs or
disabling illness
•Resume work after
48 hrs
•Disabling illness
resulting into
disablement of
body organ.
3
Catastrophic
•Death due to
Occupational
diseases
Death due to
Occupational
diseases
5
Assessing Risk
Probability ( Occupational Safety and health Hazard)
Probability of risk Description
Probability
factor
Unlikely
Never known to have happened in GIL or other
industry
1
Likely
Known to have happened more than once in GIL
projects
3
Certain Sure to happen or happens regularly at the project 5
RISK PRIORITY CHART - Probability
Assessing Risk
Risk Score
(Range)
Risk Level Action
1 to 3 Low
A risk identified as low may be considered as acceptable and further
reduction may not be necessary. However, if the risk can be resolved
quickly and efficiently, control measures should be implemented and
recorded.
5 to 9 Medium
A risk requires a planned approach to controlling the hazard and applies
temporary measure if required. Actions taken must be documented on the
risk assessment form including date for completion.
Above 9 High
A risk requires immediate action to control the hazard as detailed in the
hierarchy of control. Actions taken must be documented on the risk
assessment form including date for completion.
RISK LEVEL INDEX AND ACTION
Assessing Risk
How do you reduce risk?
5 5 15 25
3 3 9 15
1 1 3 5
1 3 5
Increasing
Probability
Increasing Severity
If you want to reduce the risk, you’ll need to:
• Reduce Probability
• Reduce Severity
• Reduce both
Controlling Risk
To decide on the risk control there is a hierarchy of risk control i.e.
1. Eliminate hazard
2. Substitution
3. Engineering control
4. Administrative controls
5. PPE
Controlling Risk Level
E.g. eliminating the need to work in a confined space.
E.g. using a hydraulic machine in wet condition instead of electrical
power driven machine to avoid shock hazards.
E.g. installing guarding on equipment or
operating machinery remotely
E.g. displaying warning signs or
providing safety training
E.g. using respiratory protection to minimize
exposure to inhalation of silica dust, fine
particles, cement dust etc.
5 5 15 25
3 3 9 15
1 1 3 5
1 3 5
Increasing
Probability
Increasing Severity
Controlling Risk level
Example - 1
Controlling Risk level
5 5 15 25
3 3 9 15
1 1 3 5
1 3 5
Increasing
Probability
Increasing Severity
Example - 2
Risks must be reduced so far as is reasonably practicable
Controlling Risk
Hazards
No plug top
No wheel guard
Damaged grinding wheel
Under age workers
Untrained workers
Unguarded tools
Wet Floor
Unprotected & improper
storing of cylinders
Non usages of PPE’s
Consequences
Electrocution
Body trap may result into
major injury
Braking of wheel causing
injury to personnel
Legal Violation results work stop / penalty
Personnel injury while
performing job
Contact of human body
results cut / crush injury
Slipping of personnel result
major injury / electrocution
Hit injury to personnel
results LTA
Personnel Injury result to
cut injury / breathing
problem
Control Measures
Control Measures
Deploy worker those
have completed 18 year
Conduct trade test
before selection /
deployment
Use of proper
grinding wheel (size)
Provide Wheel
guard as per
manufacturer
recommendation
Provide
Plug top , check
periodically
Sign Board,
Housekeeping
Use trolley, proper
cable routing, secure
in vertical position
Mandatory Use
of quality PPE’s
•Amendment of any legislation
•At least once in six months.
•New type of job
•Changing in existing process/activity
•Modification in site layout
•Current SOP / Method statement Changed
•New safety equipment / equipment deputed
•After any incident / accident investigation
•As a result of safety audit, safety inspection etc
Review of Risk Assessment
DETAIL PROCESS
• Procedure of HIRAC - GIL-ORGN-MGM-D-022
• Format of HIRAC - GIL-ORGN-MGM-F-022
• Sample HIRAC register – Batching Plant
HIRAC Documents
Hira

More Related Content

What's hot

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-trainingIshah Khaliq
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
Hazard Identification _ Risk Assessment.ppt
Hazard Identification _ Risk Assessment.pptHazard Identification _ Risk Assessment.ppt
Hazard Identification _ Risk Assessment.pptjxuaaaka
 
Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
Basic safety orientation training
Basic safety orientation trainingBasic safety orientation training
Basic safety orientation trainingTony Bertram
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1debandleigh
 
Hazard Recognition Training Generic
Hazard Recognition Training   GenericHazard Recognition Training   Generic
Hazard Recognition Training Genericaljingst
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Trainingedale07
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Fitri Ifony
 

What's hot (20)

Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
HIRA Manual
HIRA ManualHIRA Manual
HIRA Manual
 
Safety Culture : An Overview
Safety Culture : An OverviewSafety Culture : An Overview
Safety Culture : An Overview
 
Hazard Identification _ Risk Assessment.ppt
Hazard Identification _ Risk Assessment.pptHazard Identification _ Risk Assessment.ppt
Hazard Identification _ Risk Assessment.ppt
 
Basic safety
Basic safetyBasic safety
Basic safety
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Basic safety orientation training
Basic safety orientation trainingBasic safety orientation training
Basic safety orientation training
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1General Safety Presentationupdated 04842993 1
General Safety Presentationupdated 04842993 1
 
Introduction to HSE
Introduction to HSEIntroduction to HSE
Introduction to HSE
 
Safety leadership
Safety leadershipSafety leadership
Safety leadership
 
Hazard Recognition Training Generic
Hazard Recognition Training   GenericHazard Recognition Training   Generic
Hazard Recognition Training Generic
 
Health And Safety Induction Training
Health And Safety Induction TrainingHealth And Safety Induction Training
Health And Safety Induction Training
 
Safety committee training
Safety committee trainingSafety committee training
Safety committee training
 
Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014Hse presentation general rev.00 may 2014
Hse presentation general rev.00 may 2014
 

Similar to Hira

PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...
PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...
PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...PECB
 
BCGT - HSSE INDUCTION.pptx
BCGT - HSSE INDUCTION.pptxBCGT - HSSE INDUCTION.pptx
BCGT - HSSE INDUCTION.pptxMackoyMarasigan
 
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Muizz Anibire
 
Hazard Identification & Risk assessment...pptx
Hazard Identification & Risk assessment...pptxHazard Identification & Risk assessment...pptx
Hazard Identification & Risk assessment...pptxanilkumar522435
 
Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1Alejandro Perez
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&SAhmed-Refat Refat
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessmentsearchgeeksg
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessmentsearchgeeksg
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptAsifHussain654789
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptShahbazAhmad736457
 
B Part 4 Risk Assessment & Study Example By J Mc Cann
B  Part 4 Risk Assessment &  Study Example By J Mc CannB  Part 4 Risk Assessment &  Study Example By J Mc Cann
B Part 4 Risk Assessment & Study Example By J Mc CannJames McCann
 
CRITICAL HAZARD MANAGEMENT SYSTEM.pptx
CRITICAL HAZARD MANAGEMENT SYSTEM.pptxCRITICAL HAZARD MANAGEMENT SYSTEM.pptx
CRITICAL HAZARD MANAGEMENT SYSTEM.pptxVENKAT241
 
Risk analysis & minimisation
Risk analysis & minimisationRisk analysis & minimisation
Risk analysis & minimisationWeini Winslow
 
Using FMEA as a Risk Management Tool for Events Sustainability
Using FMEA as a Risk Management Tool for Events SustainabilityUsing FMEA as a Risk Management Tool for Events Sustainability
Using FMEA as a Risk Management Tool for Events SustainabilityPECB
 

Similar to Hira (20)

Safety presentation
Safety presentationSafety presentation
Safety presentation
 
PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...
PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...
PECB Webinar: Hazard Identification, Risk Assessment and Determining Controls...
 
BCGT - HSSE INDUCTION.pptx
BCGT - HSSE INDUCTION.pptxBCGT - HSSE INDUCTION.pptx
BCGT - HSSE INDUCTION.pptx
 
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
Construction Safety Training_Session 10_Risk Assessment, Hierarchy of Control...
 
Hazard Identification & Risk assessment...pptx
Hazard Identification & Risk assessment...pptxHazard Identification & Risk assessment...pptx
Hazard Identification & Risk assessment...pptx
 
Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1Military + Civilian Best Practices: Risk Management ver 1.1
Military + Civilian Best Practices: Risk Management ver 1.1
 
Risk Management in Pilotage - By Mr. Marantis Stylianos
Risk Management in Pilotage - By Mr. Marantis StylianosRisk Management in Pilotage - By Mr. Marantis Stylianos
Risk Management in Pilotage - By Mr. Marantis Stylianos
 
OHS
OHSOHS
OHS
 
Risk Management Process in OH&S
Risk Management Process in OH&SRisk Management Process in OH&S
Risk Management Process in OH&S
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessment
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.ppt
 
pilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.pptpilot-Risk_Assessment_at_Workplace.ppt
pilot-Risk_Assessment_at_Workplace.ppt
 
B Part 4 Risk Assessment & Study Example By J Mc Cann
B  Part 4 Risk Assessment &  Study Example By J Mc CannB  Part 4 Risk Assessment &  Study Example By J Mc Cann
B Part 4 Risk Assessment & Study Example By J Mc Cann
 
2010; Risk Management Workshop Rev.1.1
2010; Risk Management Workshop Rev.1.12010; Risk Management Workshop Rev.1.1
2010; Risk Management Workshop Rev.1.1
 
Safety Management System
Safety Management SystemSafety Management System
Safety Management System
 
CRITICAL HAZARD MANAGEMENT SYSTEM.pptx
CRITICAL HAZARD MANAGEMENT SYSTEM.pptxCRITICAL HAZARD MANAGEMENT SYSTEM.pptx
CRITICAL HAZARD MANAGEMENT SYSTEM.pptx
 
PERUMIN 31: Bow-tie Risk Analysis
PERUMIN 31: Bow-tie Risk AnalysisPERUMIN 31: Bow-tie Risk Analysis
PERUMIN 31: Bow-tie Risk Analysis
 
Risk analysis & minimisation
Risk analysis & minimisationRisk analysis & minimisation
Risk analysis & minimisation
 
Using FMEA as a Risk Management Tool for Events Sustainability
Using FMEA as a Risk Management Tool for Events SustainabilityUsing FMEA as a Risk Management Tool for Events Sustainability
Using FMEA as a Risk Management Tool for Events Sustainability
 

More from Ashish Kumar Yadav

Dobra Chanthi HMV Suspension Bridge Project
Dobra Chanthi HMV Suspension Bridge ProjectDobra Chanthi HMV Suspension Bridge Project
Dobra Chanthi HMV Suspension Bridge ProjectAshish Kumar Yadav
 
Dobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge ProjectDobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge ProjectAshish Kumar Yadav
 
Corporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects LtdCorporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects LtdAshish Kumar Yadav
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga BridgeAshish Kumar Yadav
 
Safety month celebration at Munger Ganga Bridge, North End
Safety month celebration at Munger Ganga Bridge, North EndSafety month celebration at Munger Ganga Bridge, North End
Safety month celebration at Munger Ganga Bridge, North EndAshish Kumar Yadav
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerAshish Kumar Yadav
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web GirderAshish Kumar Yadav
 
Presentation for safety month celebration 2012
Presentation for safety month celebration 2012Presentation for safety month celebration 2012
Presentation for safety month celebration 2012Ashish Kumar Yadav
 

More from Ashish Kumar Yadav (11)

Dobra Chanthi HMV Suspension Bridge Project
Dobra Chanthi HMV Suspension Bridge ProjectDobra Chanthi HMV Suspension Bridge Project
Dobra Chanthi HMV Suspension Bridge Project
 
Dobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge ProjectDobra Chanthi Suspension bridge Project
Dobra Chanthi Suspension bridge Project
 
Corporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects LtdCorporate presentation of P & R Infraprojects Ltd
Corporate presentation of P & R Infraprojects Ltd
 
P & R Brochure
P & R BrochureP & R Brochure
P & R Brochure
 
P&r group ppt
P&r group pptP&r group ppt
P&r group ppt
 
Munger ganga bridge
Munger ganga bridgeMunger ganga bridge
Munger ganga bridge
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
 
Safety month celebration at Munger Ganga Bridge, North End
Safety month celebration at Munger Ganga Bridge, North EndSafety month celebration at Munger Ganga Bridge, North End
Safety month celebration at Munger Ganga Bridge, North End
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web Girder
 
Presentation for safety month celebration 2012
Presentation for safety month celebration 2012Presentation for safety month celebration 2012
Presentation for safety month celebration 2012
 

Recently uploaded

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 

Recently uploaded (20)

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 

Hira

  • 1. Hazard Identification, Risk Assessment & Determining Control (HIRAC) BS OHSAS 18001:2007
  • 2. HIRAC What is risk? What is Hazard? What is Ill Health? Harm or ill health Situation Source Act Likelihood of occurrence of hazardous event Severity of injury / ill health Risk ill health Adverse physical Adverse mental condition
  • 3. HIRAC Why HIRAC ? Legal Factor Act / Rule Contract Condition Human Factor Save Life Minimize Injury Staff moral Financial Factor Cost Reduction Minimize risk of life Penalty Stack holder Productivity
  • 4. HIRAC likelihood Provide appropriate controls Risk level Associated consequences identify OH&S hazards PURPOSE PERFORMED AT Head Office Regional Office Workshop Projects ALL Activities Sub activities Process Task
  • 5. What is a risk assessment? “Process of evaluating the risk arising from a hazard (s), taking into account the adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable”. Why risk assessment required? Assessing Risk Risk Assessmen t Requireme nt You Other Business
  • 6. Factors to be considered while assessing risk: Assessing Risk Factors People Location Process activity Equipment
  • 14. Assessing Risk 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Evaluate the Risk / Risk assessment Matrix Increasing Severity Severity: 5 – Catastrophic 3 – Major 1 – Minor Increasing Probability Probability: 5 – Certain 3 – Likely 1 – Unlikely
  • 15. RISK PRIORITY CHART - Severity Occupational Safety Hazard (Severity) Severity of risk Description Severity factor Minimal •First aid injury •Injury (absence less than 48 hrs) •Resume work immediately after FA or within 48 hrs; •Minor delay to resume operation. •Cost of property damage within INR 50,000/- 1 Major/Serious •Lost time injury (absence more than 48 hrs), •Temporary/permane nt disablement •Resume work after 48 hours •Temporary/permanent disablement of body organ •Suspension of operation for few hours •Property damage cost between INR 50000/- to INR/- 10,00,000/ 3 Catastrophic Fatalities or Collapsing of structure •Loss of life; total failure of machinery or catastrophic damages (structural damages etc) •Undefined Suspension of operation . •Damage above INR 10,00,000/- 5 Occupational Health Hazard (Severity) Severity of risk Description Severity factor Minimal •Medical aid illness •ill health less than 48hrs •Resume work immediately after FA •Resume work within 48 hrs 1 Major/Serious •ill health •Absence more than 48hrs or disabling illness •Resume work after 48 hrs •Disabling illness resulting into disablement of body organ. 3 Catastrophic •Death due to Occupational diseases Death due to Occupational diseases 5 Assessing Risk
  • 16. Probability ( Occupational Safety and health Hazard) Probability of risk Description Probability factor Unlikely Never known to have happened in GIL or other industry 1 Likely Known to have happened more than once in GIL projects 3 Certain Sure to happen or happens regularly at the project 5 RISK PRIORITY CHART - Probability Assessing Risk
  • 17. Risk Score (Range) Risk Level Action 1 to 3 Low A risk identified as low may be considered as acceptable and further reduction may not be necessary. However, if the risk can be resolved quickly and efficiently, control measures should be implemented and recorded. 5 to 9 Medium A risk requires a planned approach to controlling the hazard and applies temporary measure if required. Actions taken must be documented on the risk assessment form including date for completion. Above 9 High A risk requires immediate action to control the hazard as detailed in the hierarchy of control. Actions taken must be documented on the risk assessment form including date for completion. RISK LEVEL INDEX AND ACTION Assessing Risk
  • 18. How do you reduce risk? 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Increasing Probability Increasing Severity If you want to reduce the risk, you’ll need to: • Reduce Probability • Reduce Severity • Reduce both Controlling Risk
  • 19. To decide on the risk control there is a hierarchy of risk control i.e. 1. Eliminate hazard 2. Substitution 3. Engineering control 4. Administrative controls 5. PPE Controlling Risk Level E.g. eliminating the need to work in a confined space. E.g. using a hydraulic machine in wet condition instead of electrical power driven machine to avoid shock hazards. E.g. installing guarding on equipment or operating machinery remotely E.g. displaying warning signs or providing safety training E.g. using respiratory protection to minimize exposure to inhalation of silica dust, fine particles, cement dust etc.
  • 20. 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Increasing Probability Increasing Severity Controlling Risk level Example - 1
  • 21. Controlling Risk level 5 5 15 25 3 3 9 15 1 1 3 5 1 3 5 Increasing Probability Increasing Severity Example - 2
  • 22. Risks must be reduced so far as is reasonably practicable Controlling Risk
  • 23. Hazards No plug top No wheel guard Damaged grinding wheel Under age workers Untrained workers Unguarded tools Wet Floor Unprotected & improper storing of cylinders Non usages of PPE’s
  • 24. Consequences Electrocution Body trap may result into major injury Braking of wheel causing injury to personnel Legal Violation results work stop / penalty Personnel injury while performing job Contact of human body results cut / crush injury Slipping of personnel result major injury / electrocution Hit injury to personnel results LTA Personnel Injury result to cut injury / breathing problem
  • 26. Control Measures Deploy worker those have completed 18 year Conduct trade test before selection / deployment Use of proper grinding wheel (size) Provide Wheel guard as per manufacturer recommendation Provide Plug top , check periodically Sign Board, Housekeeping Use trolley, proper cable routing, secure in vertical position Mandatory Use of quality PPE’s
  • 27. •Amendment of any legislation •At least once in six months. •New type of job •Changing in existing process/activity •Modification in site layout •Current SOP / Method statement Changed •New safety equipment / equipment deputed •After any incident / accident investigation •As a result of safety audit, safety inspection etc Review of Risk Assessment
  • 28. DETAIL PROCESS • Procedure of HIRAC - GIL-ORGN-MGM-D-022 • Format of HIRAC - GIL-ORGN-MGM-F-022 • Sample HIRAC register – Batching Plant HIRAC Documents