SlideShare une entreprise Scribd logo
1  sur  7
Stakeholders & PESTLE

Political

Economic

Sociological

Project
Technical

Environmental
Legal

22nd

October 2013

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Stakeholder Analysis

INFLUENCE AND POWER
LOW

MEDIUM

HIGH

INTEREST

HIGH

MEDIUM

LOW

22nd

October 2013

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Stakeholder Analysis

INFLUENCE AND POWER
LOW

MEDIUM

HIGH

INTEREST

HIGH
Key
players

Active
consultation

MEDIUM

LOW
Keep
informed

22nd

October 2013

Maintain
interest

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Stakeholder Analysis – Examples

Green – Supporter
Orange – Neutral
Red - Blocker

22nd

October 2013

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Stakeholder Identification – Things to consider…..
Day to Day
contacts

Union

Management

External

Customers
Impacted
Areas

Commercial
contacts

Suppliers

Project
Team

Operational
contacts

Internal

Function
Representatives

Management

Controls
Programme
Management
22nd

October 2013

Finance
Risk

Internal
Politics

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Assess….The Commitment Curve

7

Level of Commitment

Where we need
them in 4
Where we
months
need them
in 2
?
months
Where they are
now

?

Internalisation
“It’s just the way we do things around here”

6

5

Commitment
“I want to help make the implementation work”

Acceptance

“The programme is going to happen”

?

4

“I want to know more about the programme”
3
2

1

Contact

Engagement

Understanding

“I know broadly why the Programme exists, & how it will impact me

Awareness

“I’ve heard about the programme”
Time

22nd

October 2013

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event
Action…..Stakeholder Status
Examples that would give rise to Red, Amber or Green flags
• There are issues or concerns present for which no resolution is currently identified OR

• The Stakeholder has refused to sign off material OR
• The Stakeholder has the power to delay the project and is deemed likely to do so OR
• The Stakeholder is communicating negative messages about the project.

• The Stakeholder is not at the required point on the commitment curve but is not likely to delay progress
as a result OR

• The Stakeholder has raised issues or concerns which are being managed, have not been resolved, and
are not irresolvable OR
• The Stakeholder has not signed off or seen material on schedule but there is no reason to believe they
will raise issues OR
• There has been insufficient contact for the Gatekeeper to be able to make a reliable status assessment
i.e. the position is unknown.
• The Stakeholder has seen all relevant material for the current stage of the programme & has approved
any material which requires their sign off OR

• They have not raised any issues which have not been addressed to their satisfaction relative to the
current stage OR
• The Stakeholder is at the required point on the commitment curve for this stage of the programme.
22nd

October 2013

© Siemens AG 2008
Exploring Stakeholder Management Skills – APM Event

Contenu connexe

Tendances

What is the Risk in Steering Committee?
What is the Risk in Steering Committee?What is the Risk in Steering Committee?
What is the Risk in Steering Committee?Christine Aykac
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5pankajsh10
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiNelson Mandela Anyomi
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder ManagementSanjay Rajpoot
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018Malcolm Peart
 
The PMO & project stakeholder management
The PMO & project stakeholder managementThe PMO & project stakeholder management
The PMO & project stakeholder managementLouise Worsley
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a projectZilicus
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder managementrafia bari
 
The people factor in contracts and procurement, Barry Trebes, 16th June 2016
The people factor in contracts and procurement, Barry Trebes, 16th June 2016The people factor in contracts and procurement, Barry Trebes, 16th June 2016
The people factor in contracts and procurement, Barry Trebes, 16th June 2016Association for Project Management
 
management advisory sevices by KBtuzon
management advisory sevices by KBtuzonmanagement advisory sevices by KBtuzon
management advisory sevices by KBtuzonKathleen Tuzon
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2Marco Booij
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Saddan Juhari
 

Tendances (20)

What is the Risk in Steering Committee?
What is the Risk in Steering Committee?What is the Risk in Steering Committee?
What is the Risk in Steering Committee?
 
Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5Project Stakeholder Management - PMBOK 5
Project Stakeholder Management - PMBOK 5
 
Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...Managing difficult stakeholders - how to...
Managing difficult stakeholders - how to...
 
Stakeholder Management
Stakeholder ManagementStakeholder Management
Stakeholder Management
 
APM Presents - Benefits Management
APM Presents - Benefits ManagementAPM Presents - Benefits Management
APM Presents - Benefits Management
 
Project stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela AnyomiProject stakeholder management by Nelson Mandela Anyomi
Project stakeholder management by Nelson Mandela Anyomi
 
10. Stakeholder Management
10. Stakeholder Management10. Stakeholder Management
10. Stakeholder Management
 
Project management stakeholder feb 2018
Project management  stakeholder feb 2018Project management  stakeholder feb 2018
Project management stakeholder feb 2018
 
Chap012
Chap012Chap012
Chap012
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
The PMO & project stakeholder management
The PMO & project stakeholder managementThe PMO & project stakeholder management
The PMO & project stakeholder management
 
Chap010
Chap010Chap010
Chap010
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a project
 
Chap002
Chap002Chap002
Chap002
 
Stakeholder management
Stakeholder managementStakeholder management
Stakeholder management
 
The people factor in contracts and procurement, Barry Trebes, 16th June 2016
The people factor in contracts and procurement, Barry Trebes, 16th June 2016The people factor in contracts and procurement, Barry Trebes, 16th June 2016
The people factor in contracts and procurement, Barry Trebes, 16th June 2016
 
management advisory sevices by KBtuzon
management advisory sevices by KBtuzonmanagement advisory sevices by KBtuzon
management advisory sevices by KBtuzon
 
Pmbok5 changes v2
Pmbok5 changes v2Pmbok5 changes v2
Pmbok5 changes v2
 
Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]Chapter 1 -_intro_to_project_stakeholder_management[1]
Chapter 1 -_intro_to_project_stakeholder_management[1]
 
Stakeholder management qb
Stakeholder management qbStakeholder management qb
Stakeholder management qb
 

Similaire à Stakeholders PESTLE Analysis

Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Skillogic Solutions
 
Simple approach to managing preparedness projects
Simple approach to managing preparedness projectsSimple approach to managing preparedness projects
Simple approach to managing preparedness projectsAnita Y. Mathis
 
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...Sagar Garg
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
Project Reviews - The Basics
Project Reviews - The BasicsProject Reviews - The Basics
Project Reviews - The BasicsDarrinNoel
 
Agile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementAgile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementNajmul Hussain
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdfMrUmairKhan1
 
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...BAFS
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangePeter Quintana
 
Procurement of Complex Tunneling Projects
Procurement of Complex Tunneling ProjectsProcurement of Complex Tunneling Projects
Procurement of Complex Tunneling ProjectsSteve Tennant
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for allSurgyy Design
 
Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...
 Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen... Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...
Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...Lviv Startup Club
 
Андрій Мудрий «Risk managemnt: Welcome to Risk World»
Андрій Мудрий «Risk managemnt: Welcome to Risk World»Андрій Мудрий «Risk managemnt: Welcome to Risk World»
Андрій Мудрий «Risk managemnt: Welcome to Risk World»Lviv Startup Club
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio BalanceRon Montgomery
 
Implementing PM Systems
Implementing PM SystemsImplementing PM Systems
Implementing PM SystemsDaren Maynard
 
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conferenceDelivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conferenceAssociation for Project Management
 

Similaire à Stakeholders PESTLE Analysis (20)

Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
Simple approach to managing preparedness projects
Simple approach to managing preparedness projectsSimple approach to managing preparedness projects
Simple approach to managing preparedness projects
 
1. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV0110151. Martin Samphire - introduction GOV011015
1. Martin Samphire - introduction GOV011015
 
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...
Stakeholders of Projects, Project life Cycle, Product vs Production, Feasibil...
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
Project Reviews - The Basics
Project Reviews - The BasicsProject Reviews - The Basics
Project Reviews - The Basics
 
Agile-Risk-Management in Project Management
Agile-Risk-Management in Project ManagementAgile-Risk-Management in Project Management
Agile-Risk-Management in Project Management
 
Good governance of the project portfolio
Good governance of the project portfolioGood governance of the project portfolio
Good governance of the project portfolio
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdf
 
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
BAFS 2015 Genève : Rainer Wendt - More business in the driver's seat : BA wor...
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
 
Procurement of Complex Tunneling Projects
Procurement of Complex Tunneling ProjectsProcurement of Complex Tunneling Projects
Procurement of Complex Tunneling Projects
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
Risk Management
Risk Management Risk Management
Risk Management
 
Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...
 Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen... Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...
Андрій Мудрий “Risk managemnt: Welcome to Risk World” Lviv Project Managemen...
 
Андрій Мудрий «Risk managemnt: Welcome to Risk World»
Андрій Мудрий «Risk managemnt: Welcome to Risk World»Андрій Мудрий «Risk managemnt: Welcome to Risk World»
Андрій Мудрий «Risk managemnt: Welcome to Risk World»
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
 
Implementing PM Systems
Implementing PM SystemsImplementing PM Systems
Implementing PM Systems
 
Better Business Cases - APMG
Better Business Cases - APMGBetter Business Cases - APMG
Better Business Cases - APMG
 
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conferenceDelivering Assurance - Audit, Mark Reilly,  APM ASSURANCE SIG conference
Delivering Assurance - Audit, Mark Reilly, APM ASSURANCE SIG conference
 

Plus de Association for Project Management

The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024Association for Project Management
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...Association for Project Management
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakAssociation for Project Management
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Association for Project Management
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Association for Project Management
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Association for Project Management
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...Association for Project Management
 
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...APM Wessex Branch: Soft Skills Training for Project Management – harder than ...
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...Association for Project Management
 

Plus de Association for Project Management (20)

The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
Scaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peakScaling New Heights: Project Management on the world’s 3rd highest peak
Scaling New Heights: Project Management on the world’s 3rd highest peak
 
Demystifying digital accessibility webinar
Demystifying digital accessibility webinarDemystifying digital accessibility webinar
Demystifying digital accessibility webinar
 
Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...Inspire inclusion within the project profession to attract and retain a diver...
Inspire inclusion within the project profession to attract and retain a diver...
 
Burnout_ Prevention Intervention Recovery.pdf
Burnout_ Prevention Intervention  Recovery.pdfBurnout_ Prevention Intervention  Recovery.pdf
Burnout_ Prevention Intervention Recovery.pdf
 
Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...Discussing the new Competence Framework for project managers in the built env...
Discussing the new Competence Framework for project managers in the built env...
 
Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...Successful projects and failed programmes – the cost of not designing the who...
Successful projects and failed programmes – the cost of not designing the who...
 
Risk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threatRisk in the changing world – Opportunity or threat
Risk in the changing world – Opportunity or threat
 
Time-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA LeadersTime-Honored Wisdom: African Teachings for VUCA Leaders
Time-Honored Wisdom: African Teachings for VUCA Leaders
 
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
APM Volunteer opportunities - Insights in how you can get involved, 7 Februar...
 
Including mental health support in project delivery
Including mental health support in project deliveryIncluding mental health support in project delivery
Including mental health support in project delivery
 
Sustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to knowSustainability in Project Management – what you need to know
Sustainability in Project Management – what you need to know
 
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...APM Wessex Branch: Soft Skills Training for Project Management – harder than ...
APM Wessex Branch: Soft Skills Training for Project Management – harder than ...
 

Dernier

Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 

Dernier (20)

Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 

Stakeholders PESTLE Analysis

  • 1. Stakeholders & PESTLE Political Economic Sociological Project Technical Environmental Legal 22nd October 2013 © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 2. Stakeholder Analysis INFLUENCE AND POWER LOW MEDIUM HIGH INTEREST HIGH MEDIUM LOW 22nd October 2013 © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 3. Stakeholder Analysis INFLUENCE AND POWER LOW MEDIUM HIGH INTEREST HIGH Key players Active consultation MEDIUM LOW Keep informed 22nd October 2013 Maintain interest © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 4. Stakeholder Analysis – Examples Green – Supporter Orange – Neutral Red - Blocker 22nd October 2013 © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 5. Stakeholder Identification – Things to consider….. Day to Day contacts Union Management External Customers Impacted Areas Commercial contacts Suppliers Project Team Operational contacts Internal Function Representatives Management Controls Programme Management 22nd October 2013 Finance Risk Internal Politics © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 6. Assess….The Commitment Curve 7 Level of Commitment Where we need them in 4 Where we months need them in 2 ? months Where they are now ? Internalisation “It’s just the way we do things around here” 6 5 Commitment “I want to help make the implementation work” Acceptance “The programme is going to happen” ? 4 “I want to know more about the programme” 3 2 1 Contact Engagement Understanding “I know broadly why the Programme exists, & how it will impact me Awareness “I’ve heard about the programme” Time 22nd October 2013 © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event
  • 7. Action…..Stakeholder Status Examples that would give rise to Red, Amber or Green flags • There are issues or concerns present for which no resolution is currently identified OR • The Stakeholder has refused to sign off material OR • The Stakeholder has the power to delay the project and is deemed likely to do so OR • The Stakeholder is communicating negative messages about the project. • The Stakeholder is not at the required point on the commitment curve but is not likely to delay progress as a result OR • The Stakeholder has raised issues or concerns which are being managed, have not been resolved, and are not irresolvable OR • The Stakeholder has not signed off or seen material on schedule but there is no reason to believe they will raise issues OR • There has been insufficient contact for the Gatekeeper to be able to make a reliable status assessment i.e. the position is unknown. • The Stakeholder has seen all relevant material for the current stage of the programme & has approved any material which requires their sign off OR • They have not raised any issues which have not been addressed to their satisfaction relative to the current stage OR • The Stakeholder is at the required point on the commitment curve for this stage of the programme. 22nd October 2013 © Siemens AG 2008 Exploring Stakeholder Management Skills – APM Event