Overview

•   Purpose & Effect
•   FAR Requirements
•   EPLS Checks
•   EPLS Documentation
•   Search Warnings
•   Recent UCI Findings
•   FAPIIS
•   Summary
Purpose & Effect
• EPLS purpose – protects government
• Government-wide effect
  – https://www.epls.gov
  – Contractors debarred, suspended, or proposed for
    debarment are excluded from receiving contracts
  – Agencies shall not
     • Solicit offers from
     • Award contracts to
     • Consent to subcontracts with these contractors
  – Agency head may determine there is a compelling
    reason for such action
FAR Requirements
• FAR 9.402 Suspension & Debarment Policy
  – Agencies shall solicit offers from, award contracts to, and
    consent to subcontracts with responsible contractors
    only
  – Debarment and suspension are discretionary actions that
    are an appropriate means to effectuate this policy
  – The serious nature of debarment and suspension
    requires that these sanctions be imposed only in the
    public interest for the Government’s protection and not
    for purposes of punishment
FAR Requirements (cont)
• FAR 9.405 EPLS, Effect of Listing
  – Contractors debarred, suspended, or proposed for
    debarment are excluded from receiving contracts, and
    agencies shall not solicit offers from, award contracts to,
    or consent to subcontracts with these contractors, unless
    the agency head determines that there is a compelling
    reason for such action
  – Contractors debarred, suspended, or proposed for
    debarment are also excluded from conducting business
    with the government as agents or representatives of
    other contractors
FAR Requirements (cont)
• FAR 9.405(d) Contracting Officers Shall –
  – After the opening of bids or receipt of proposals, the CO
    shall review the EPLS
     • Bids shall be entered on the abstract, then rejected
     • Proposals, quotations, or offers shall not be evaluated – no
       discussions
  – Immediately prior to award, the CO shall again review
    the EPLS
FAR Requirements (cont)
• FAR 9.405 Effects of Listing on Contract Award
  – Contracting Activities Shall Not –
     • Award new contracts
     • Place orders exceeding the guaranteed minimum under IDIQ
       contracts
     • Place orders under optional use FSS contracts, BPAs, or BOAs
     • Add new work, exercise options, or otherwise extend the
       duration of current contracts or orders
FAR Requirements (cont)
• Effect of Listing – Compelling Reason to Continue
  – Written Determination: When an agency determines that
    a compelling reason exists for it to continue business
    with a contractor that is debarred, suspended, or
    proposed for debarment, it must provide written notice of
    the determination to the GSA, Office of Procurement
    Policy. 10 U.S.C. 2392(b); DFARS 209.405
     • Examples: (i) only one source for service/supply; (ii) urgency;
       (iii) agency agreement; (iv) national defense requires continued
       dealings
  – Request must address (i) efforts to develop alternate
    sources and (ii) impact. AFFARS 5309.405
FAR Requirements (cont)
• Continuation of Current Contracts
  – Notwithstanding the debarment, suspension, or
    proposed debarment of a contractor, agencies may
    continue contracts or subcontracts in existence at the
    time the contractor was debarred, suspended, or
    proposed for debarment unless the agency head directs
    otherwise. FAR 9.405-1
  – Termination of existing contracts requires T4D, T4C, or
    cancellation
  – Continue to administer the contract
     • Consider appropriate contractual remedies (including past
       performance)
Two Checks Required

• FAR 9.405(d)
• Upon receipt of proposal(s)
  – Could be accomplished in one check if award is made
    immediately

• Immediately prior to award
  – Upon finalization of file & signature by CO
  – Will address “immediately” later in the training




  Checks required for Competitive and Sole Source
Recommended EPLS Check
• Prior to release of solicitation
   – If not performed (and documented) as part of source list
     development, CO could accomplish & document prior to
     release
   – Equally applicable in sole source and competitive
     situations
What is . . .
• Immediately prior to award?
  – Within 24 hours of contracting officer signature
  – The closer to signature the better!!!

• Why is this important?
  – 1100 – Buyer completes file by running EPLS check and
    placing it in the file; provides file to CO for signature
  – 1400 – Agency inputs contractor suspension into EPLS
  – 1700 – CO signs action based upon earlier EPLS check;
    awards to debarred/ suspended contractor




                                                            11
Actions Requiring EPLS
                                       Check
• FAR 9.405-1 provides overarching guidance
• Check for new contracts, orders, UCAs,
  definitization of UCAs, etc.
• Modifications: Check for actions that add new
  work in the broad sense
  – Includes “changes” clause work, exercise an option, or
    extend duration of contract or order
• May not be required for admin mods or
  incremental funding IF work required and
  performance/delivery period unchanged


                                                             12
Actions Requiring EPLS
                                     Check (cont)
• Check EPLS before consenting to subcontracts
• Ktrs shall not enter into subcontract
  > $30K w/company that has been debarred,
  suspended, or proposed for debarment
  – Compliance checked during Contractor Purchasing
    System Reviews
  – Additional documentation in prime contract file should
    not be necessary




                                                             13
Actions Requiring EPLS
                                     Check (cont)
• Gov’t extending the period of performance
  – Must check EPLS
  – Doesn’t matter why period of performance extended


• Orders under a requirements contract
  – EPLS checked at initial award
  – Subsequent checks not required
  – Contract requirement is for all of the government’s
    requirements for a period of time
EPLS Documentation
• What is acceptable documentation of EPLS
  review?
  – Screen prints from EPLS are acceptable
  – Should include all of the query results
     • If results are voluminous, refine your search
  – “Conservative (thorough) CO” may also include a brief
    memo
  – Signature on screen prints not required




                                                            15
Search Warnings
• Exact Name
• CAGE Code/DUNS Number
• Multiple field advanced search




                                               16
17
18
Exact Name Warning
• Partial Name search recommended
• Exact Name search NOT recommended
  – Will return results only if query is identical to name of
    record in EPLS
  – Including any punctuation, prefixes, or suffixes


                APM ≠ APM, LLC
             APM LLC ≠ APM, LLC
           John Doe Jr ≠ John Doe, Jr.


                                                                19
CAGE/DUNS Warning
• Search by CAGE Code or DUNS may not be
  sufficient
  – EPLS does not have CAGE Code or DUNS identifiers
    for all firms

• Partial Name search also should be performed if
  no results are obtained from a DUNS or CAGE
  search
  – Partial name must be spelled correctly




                                                       20
Advanced Search Warning
• More than one advanced search criterion may be
  selected

• Not all need to be selected to perform search
• Many searches will not return any results if more
  than two criteria are selected
  – Each criterion will reduce the number of returned
    search results




                                                        21
Recent UCI Findings
• Lack of one or both EPLS checks
• Not checking EPLS for Delivery Orders/Task
  Orders
• Lack of documentation
Effect of FAPIIS
• Federal Awardee Performance and Integrity
  Information System (FAPIIS)
• NDAA, Section 872 requires development of a
  ‘database’ on potential awardees for data to
  support award decisions
• Decision made to leverage the capabilities of
  CPARS, CCR, and PPIRS to satisfy the 872
  requirements
Effect of FAPIIS (cont)
• FAPIIS – Sources of Information
  – EPLS
  – Past Performance Information Retrieval System (PPIRS)
    and Contractor Performance Assessment Reporting
    System (CPARS)
  – COs will provide information on non-responsibility
    determinations and T4Ds
  – Suspension/Debarment Official will provide summaries of
    Administrative Agreements
  – Contractors (>$10M contracts/grants) required to provide
    information relating to criminal, civil, and administrative
    proceedings
Phases

• Initial Operational Capability (IOC) Deployed March
  22, 2010
  – FAPIIS input module of CPARS – ability to collect all of
    the contracting / grants officer required postings (e.g.,
    T4D, Non-Responsibility Determinations)
  – CCR – collect the criminal / civil / administrative
    proceeding information
  – FAPIIS search module of PPIRS – ability to access
    above items, PPIRS, and EPLS
Phases (cont)

• Subsequent Phases
  – Required – Ability to collect administrative agreement
    information from suspension / debarment officials
    (pending requirements definition for identification of
    individuals) – planned for Fall 2010 release
  – OFPP considering lowering the threshold at which
    vendors have to provide criminal/civil/administrative
    proceeding information to the simplified acquisition
    threshold
  – OFPP considering expanding the criminal/civil/
    administrative proceeding information to cover state
    contracts/grants in addition to federal contracts/grants
Regulation Changes

• FAR Case 2008-027 final rule, effective April 22,
  2010, was published March 23, 2010
  – Established the FAPIIS database
  – Contracting officers report non-responsibility
    determinations to FAPIIS
  – Contracting officers place new provision/clause
    52.209-7/8 (Information Regarding Responsibility Matters)
    in new contracts above $500K
  – Vendors report data regarding criminal/civil/ administrative
    proceedings to CCR that will be shared with FAPIIS
  – Contracting officers must review FAPIIS for any new
    contract award above the simplified acquisition threshold
    as part of his/her responsibility determination (FAR
    9.104-6)
Regulation Changes (cont)

• FAR Case 2008-016 is anticipated for final rule in
  Q3FY10 and expands the data in FAPIIS by
  requiring contracting officers report:
  – Terminations for Default (partial or complete)
  – Terminations for Cause (partial or complete)
  – Defective Pricing determinations

• OMB has also issued proposed guidance
  (February 18, 2010) to amend CFR Title 2 to
  require grants officers report:
  – Terminations for Material Failure to Comply
  – Recipient Not Qualified determinations
FAPIIS Bottom Line
• Ultimately checking FAPIIS will fulfill the
  requirement to check EPLS

• Robustness not there yet

• Continue to check EPLS
Summary
• Check EPLS twice!
• Document the file!
  – Partial Name search is preferred method
  – Goal is NOT to obtain a results page without any
    listing
  – Goal is to conduct broad enough search to capture
    contractor if they are listed on EPLS
  – Additional search tips can be found in the EPLS User
    Manual
  – https://www.epls.gov/EPLS%20Public%20Users
    %20Manual.pdf



                                                           30
Overview
• NDAA, Section 872 requires development of a ‘database’ on
  potential awardees for data to support award decisions
   – Government contracting / grants officials report
       •   Terminations for Default (contracts)
       •   Terminations for Cause (commercial contracts)
       •   Terminations for Material Failure to Comply (grants)
       •   Defective Pricing determinations (contracts)
       •   Non-responsibility determinations (contracts)
       •   Recipient Not-Qualified determinations (grants)
   – Government suspension / debarment officials report
       • Administrative Agreements (in lieu of actual debarment / suspension,
         action does not prohibit other awards)
   – Vendor has the opportunity to provide comments on posted items
   – Collect information about criminal / civil / and administrative
     proceedings on vendors for which there has been a finding of fault
   – Information available for 5 years from the date of action



                                                                                37
Data Elements
•   Data elements to enable searches and reports (required unless otherwise
    identified):
     –   Record Type (T4D, Non-responsibility, Admin Agreement, etc.) *
     –   Date of record/action (when the T4D was signed) *
     –   Date / Time Stamp of Posting (New Module will generate) *
     –   DUNS number *
     –   CAGE code (Optional)
     –   Vendor name and address (could pull from CCR or D&B based on DUNS) *
     –   Doing Business As (DBA) (Optional)
     –   Product Service Code (Mandatory for Contracts only)
     –   NAICS (Mandatory for Contracts only)
     –   Catalog of Federal Domestic Assistance (CFDA) (Mandatory for grants actions)
     –   Solicitation / Funding Opportunity (announcement) number (Mandatory for non-
         responsibility, not-qualified determinations; Optional otherwise)
     –   Contract or Grant Award ID Number (Mandatory for terminations; Optional otherwise)
     –   Contract or Grant Referenced Award ID Number (Optional) – e.g. GWAC, FSS, IDV, etc.
     –   Government reporting agency and office codes *
     –   Government reporting official name *, address *, phone *, email *




                                        * Mandatory Field
Data Elements (cont)
• Ability to upload actual record as a .PDF along with
  above data (5MB size limit)*
• Government reporting of suspensions and
  debarments follow same procedures as today
• Government reporting of performance assessment
  reports follow same procedures as today


                     * Mandatory Field
Getting Set Up
• If you are already using CPARS and PPIRS, accessing the
  FAPIIS modules is simply another ‘role’ that the focal points
  can authorize for users
• If you are not already using CPARS and PPIRS, a
  representative from the Senior Procurement Executive's
  staff should contact the CPARS Program Management
  Office (PMO) to discuss approaches for establishing focal
  points
   – PMO will assist each agency with this process. An access request
     form must be submitted for each focal point.
• Online training is available to assist new users
• A FAPIIS User Manual is available for new users
FAPIIS
• In spring 2009, determination is made by the ACE to
  leverage the capabilities of CPARS, CCR, and PPIRS to
  satisfy the 872 requirements
   – FAPIIS input module on CPARS collects items listed from
     contracting and grants officers and debarment/suspension
     officials
       • Collects basic identification information and provides capability to
         upload an attachment
       • Pre-populates from FPDS and CCR when possible
   – CCR collects the information regarding criminal / civil /
     administrative proceedings during vendor registration / renewal
   – FAPIIS search module on PPIRS provides central access to the
     collected items from
       •   FAPIIS input module on CPARS
       •   CCR criminal/civil/administrative proceedings data
       •   Existing debarments and suspensions in EPLS
       •   Existing past performance evaluations in PPIRS
• DoD led cross-federal agency/functional design team
  meetings to flesh out the requirements and design
Effect of FAPIIS
Proposed FAR Rule: Federal Awardee
Performance and Integrity Information System (74
Fed. Reg. 45579)

– Requires GSA to establish and maintain a data system
  containing specific information on the integrity and
  performance of covered contractors.

– Requires awarding officials to review the data system
  and consider other past performance information when
  making any past performance evaluation or
  responsibility determination

Contenu connexe

Similaire à Epls slides

Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentRaffa Learning Community
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)Giselle Duran
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...MECConference
 
NCMA Government Property
NCMA Government PropertyNCMA Government Property
NCMA Government PropertyPeggy Burchardt
 
Outsourcing fundamentals 9 21
Outsourcing fundamentals 9 21Outsourcing fundamentals 9 21
Outsourcing fundamentals 9 21ideatoipo
 
Outsourcing Fundamentals 9 21 2015
Outsourcing Fundamentals 9 21 2015Outsourcing Fundamentals 9 21 2015
Outsourcing Fundamentals 9 21 2015Paul Petach
 
Debriefing and Bid Protests
Debriefing and Bid ProtestsDebriefing and Bid Protests
Debriefing and Bid ProtestsTan Wilson, PMP
 
A Winning Game Plan for Contracting with the Federal Government
A Winning Game Plan for Contracting with the Federal GovernmentA Winning Game Plan for Contracting with the Federal Government
A Winning Game Plan for Contracting with the Federal GovernmentJim Cowan
 
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...BakerTillyConsulting
 
2014-09-25 The OMB Super Circular New Rules
2014-09-25 The OMB Super Circular New Rules2014-09-25 The OMB Super Circular New Rules
2014-09-25 The OMB Super Circular New RulesRaffa Learning Community
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGCCordell Parvin
 
045 what are indefinite contracts
045   what are indefinite contracts045   what are indefinite contracts
045 what are indefinite contractsTim Griggs
 
contract-management-training4.ppt
contract-management-training4.pptcontract-management-training4.ppt
contract-management-training4.pptajaynain10
 
Role Of The Broker Aug 9
Role Of The Broker Aug 9Role Of The Broker Aug 9
Role Of The Broker Aug 9cbroker
 

Similaire à Epls slides (20)

2017 SLA Conference - Government Contracting - King
2017 SLA Conference - Government Contracting - King2017 SLA Conference - Government Contracting - King
2017 SLA Conference - Government Contracting - King
 
Rfp slides (2)
Rfp slides (2)Rfp slides (2)
Rfp slides (2)
 
Government Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory EnvironmentGovernment Contracting & The DCAA Regulatory Environment
Government Contracting & The DCAA Regulatory Environment
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
Air Strategic Permitting and Compliance; Srivastav, Piyush; NAQS-Environmenta...
 
NCMA Government Property
NCMA Government PropertyNCMA Government Property
NCMA Government Property
 
Outsourcing fundamentals 9 21
Outsourcing fundamentals 9 21Outsourcing fundamentals 9 21
Outsourcing fundamentals 9 21
 
Outsourcing Fundamentals 9 21 2015
Outsourcing Fundamentals 9 21 2015Outsourcing Fundamentals 9 21 2015
Outsourcing Fundamentals 9 21 2015
 
ci newsletter
ci newsletterci newsletter
ci newsletter
 
Debriefing and Bid Protests
Debriefing and Bid ProtestsDebriefing and Bid Protests
Debriefing and Bid Protests
 
Preparing for the CPSR - A Practical Guide
Preparing for the CPSR - A Practical GuidePreparing for the CPSR - A Practical Guide
Preparing for the CPSR - A Practical Guide
 
A Winning Game Plan for Contracting with the Federal Government
A Winning Game Plan for Contracting with the Federal GovernmentA Winning Game Plan for Contracting with the Federal Government
A Winning Game Plan for Contracting with the Federal Government
 
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...
Baker Tilly Presents: Government Contractor Mergers & Acquisitions: Making th...
 
2014-09-25 The OMB Super Circular New Rules
2014-09-25 The OMB Super Circular New Rules2014-09-25 The OMB Super Circular New Rules
2014-09-25 The OMB Super Circular New Rules
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
Pricing-Related Current Events, Trends & Coming Attractions
Pricing-Related Current Events, Trends & Coming Attractions Pricing-Related Current Events, Trends & Coming Attractions
Pricing-Related Current Events, Trends & Coming Attractions
 
Contract closing ppt
Contract closing pptContract closing ppt
Contract closing ppt
 
045 what are indefinite contracts
045   what are indefinite contracts045   what are indefinite contracts
045 what are indefinite contracts
 
contract-management-training4.ppt
contract-management-training4.pptcontract-management-training4.ppt
contract-management-training4.ppt
 
Role Of The Broker Aug 9
Role Of The Broker Aug 9Role Of The Broker Aug 9
Role Of The Broker Aug 9
 

Epls slides

  • 1. Overview • Purpose & Effect • FAR Requirements • EPLS Checks • EPLS Documentation • Search Warnings • Recent UCI Findings • FAPIIS • Summary
  • 2. Purpose & Effect • EPLS purpose – protects government • Government-wide effect – https://www.epls.gov – Contractors debarred, suspended, or proposed for debarment are excluded from receiving contracts – Agencies shall not • Solicit offers from • Award contracts to • Consent to subcontracts with these contractors – Agency head may determine there is a compelling reason for such action
  • 3. FAR Requirements • FAR 9.402 Suspension & Debarment Policy – Agencies shall solicit offers from, award contracts to, and consent to subcontracts with responsible contractors only – Debarment and suspension are discretionary actions that are an appropriate means to effectuate this policy – The serious nature of debarment and suspension requires that these sanctions be imposed only in the public interest for the Government’s protection and not for purposes of punishment
  • 4. FAR Requirements (cont) • FAR 9.405 EPLS, Effect of Listing – Contractors debarred, suspended, or proposed for debarment are excluded from receiving contracts, and agencies shall not solicit offers from, award contracts to, or consent to subcontracts with these contractors, unless the agency head determines that there is a compelling reason for such action – Contractors debarred, suspended, or proposed for debarment are also excluded from conducting business with the government as agents or representatives of other contractors
  • 5. FAR Requirements (cont) • FAR 9.405(d) Contracting Officers Shall – – After the opening of bids or receipt of proposals, the CO shall review the EPLS • Bids shall be entered on the abstract, then rejected • Proposals, quotations, or offers shall not be evaluated – no discussions – Immediately prior to award, the CO shall again review the EPLS
  • 6. FAR Requirements (cont) • FAR 9.405 Effects of Listing on Contract Award – Contracting Activities Shall Not – • Award new contracts • Place orders exceeding the guaranteed minimum under IDIQ contracts • Place orders under optional use FSS contracts, BPAs, or BOAs • Add new work, exercise options, or otherwise extend the duration of current contracts or orders
  • 7. FAR Requirements (cont) • Effect of Listing – Compelling Reason to Continue – Written Determination: When an agency determines that a compelling reason exists for it to continue business with a contractor that is debarred, suspended, or proposed for debarment, it must provide written notice of the determination to the GSA, Office of Procurement Policy. 10 U.S.C. 2392(b); DFARS 209.405 • Examples: (i) only one source for service/supply; (ii) urgency; (iii) agency agreement; (iv) national defense requires continued dealings – Request must address (i) efforts to develop alternate sources and (ii) impact. AFFARS 5309.405
  • 8. FAR Requirements (cont) • Continuation of Current Contracts – Notwithstanding the debarment, suspension, or proposed debarment of a contractor, agencies may continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment unless the agency head directs otherwise. FAR 9.405-1 – Termination of existing contracts requires T4D, T4C, or cancellation – Continue to administer the contract • Consider appropriate contractual remedies (including past performance)
  • 9. Two Checks Required • FAR 9.405(d) • Upon receipt of proposal(s) – Could be accomplished in one check if award is made immediately • Immediately prior to award – Upon finalization of file & signature by CO – Will address “immediately” later in the training Checks required for Competitive and Sole Source
  • 10. Recommended EPLS Check • Prior to release of solicitation – If not performed (and documented) as part of source list development, CO could accomplish & document prior to release – Equally applicable in sole source and competitive situations
  • 11. What is . . . • Immediately prior to award? – Within 24 hours of contracting officer signature – The closer to signature the better!!! • Why is this important? – 1100 – Buyer completes file by running EPLS check and placing it in the file; provides file to CO for signature – 1400 – Agency inputs contractor suspension into EPLS – 1700 – CO signs action based upon earlier EPLS check; awards to debarred/ suspended contractor 11
  • 12. Actions Requiring EPLS Check • FAR 9.405-1 provides overarching guidance • Check for new contracts, orders, UCAs, definitization of UCAs, etc. • Modifications: Check for actions that add new work in the broad sense – Includes “changes” clause work, exercise an option, or extend duration of contract or order • May not be required for admin mods or incremental funding IF work required and performance/delivery period unchanged 12
  • 13. Actions Requiring EPLS Check (cont) • Check EPLS before consenting to subcontracts • Ktrs shall not enter into subcontract > $30K w/company that has been debarred, suspended, or proposed for debarment – Compliance checked during Contractor Purchasing System Reviews – Additional documentation in prime contract file should not be necessary 13
  • 14. Actions Requiring EPLS Check (cont) • Gov’t extending the period of performance – Must check EPLS – Doesn’t matter why period of performance extended • Orders under a requirements contract – EPLS checked at initial award – Subsequent checks not required – Contract requirement is for all of the government’s requirements for a period of time
  • 15. EPLS Documentation • What is acceptable documentation of EPLS review? – Screen prints from EPLS are acceptable – Should include all of the query results • If results are voluminous, refine your search – “Conservative (thorough) CO” may also include a brief memo – Signature on screen prints not required 15
  • 16. Search Warnings • Exact Name • CAGE Code/DUNS Number • Multiple field advanced search 16
  • 17. 17
  • 18. 18
  • 19. Exact Name Warning • Partial Name search recommended • Exact Name search NOT recommended – Will return results only if query is identical to name of record in EPLS – Including any punctuation, prefixes, or suffixes APM ≠ APM, LLC APM LLC ≠ APM, LLC John Doe Jr ≠ John Doe, Jr. 19
  • 20. CAGE/DUNS Warning • Search by CAGE Code or DUNS may not be sufficient – EPLS does not have CAGE Code or DUNS identifiers for all firms • Partial Name search also should be performed if no results are obtained from a DUNS or CAGE search – Partial name must be spelled correctly 20
  • 21. Advanced Search Warning • More than one advanced search criterion may be selected • Not all need to be selected to perform search • Many searches will not return any results if more than two criteria are selected – Each criterion will reduce the number of returned search results 21
  • 22. Recent UCI Findings • Lack of one or both EPLS checks • Not checking EPLS for Delivery Orders/Task Orders • Lack of documentation
  • 23. Effect of FAPIIS • Federal Awardee Performance and Integrity Information System (FAPIIS) • NDAA, Section 872 requires development of a ‘database’ on potential awardees for data to support award decisions • Decision made to leverage the capabilities of CPARS, CCR, and PPIRS to satisfy the 872 requirements
  • 24. Effect of FAPIIS (cont) • FAPIIS – Sources of Information – EPLS – Past Performance Information Retrieval System (PPIRS) and Contractor Performance Assessment Reporting System (CPARS) – COs will provide information on non-responsibility determinations and T4Ds – Suspension/Debarment Official will provide summaries of Administrative Agreements – Contractors (>$10M contracts/grants) required to provide information relating to criminal, civil, and administrative proceedings
  • 25. Phases • Initial Operational Capability (IOC) Deployed March 22, 2010 – FAPIIS input module of CPARS – ability to collect all of the contracting / grants officer required postings (e.g., T4D, Non-Responsibility Determinations) – CCR – collect the criminal / civil / administrative proceeding information – FAPIIS search module of PPIRS – ability to access above items, PPIRS, and EPLS
  • 26. Phases (cont) • Subsequent Phases – Required – Ability to collect administrative agreement information from suspension / debarment officials (pending requirements definition for identification of individuals) – planned for Fall 2010 release – OFPP considering lowering the threshold at which vendors have to provide criminal/civil/administrative proceeding information to the simplified acquisition threshold – OFPP considering expanding the criminal/civil/ administrative proceeding information to cover state contracts/grants in addition to federal contracts/grants
  • 27. Regulation Changes • FAR Case 2008-027 final rule, effective April 22, 2010, was published March 23, 2010 – Established the FAPIIS database – Contracting officers report non-responsibility determinations to FAPIIS – Contracting officers place new provision/clause 52.209-7/8 (Information Regarding Responsibility Matters) in new contracts above $500K – Vendors report data regarding criminal/civil/ administrative proceedings to CCR that will be shared with FAPIIS – Contracting officers must review FAPIIS for any new contract award above the simplified acquisition threshold as part of his/her responsibility determination (FAR 9.104-6)
  • 28. Regulation Changes (cont) • FAR Case 2008-016 is anticipated for final rule in Q3FY10 and expands the data in FAPIIS by requiring contracting officers report: – Terminations for Default (partial or complete) – Terminations for Cause (partial or complete) – Defective Pricing determinations • OMB has also issued proposed guidance (February 18, 2010) to amend CFR Title 2 to require grants officers report: – Terminations for Material Failure to Comply – Recipient Not Qualified determinations
  • 29. FAPIIS Bottom Line • Ultimately checking FAPIIS will fulfill the requirement to check EPLS • Robustness not there yet • Continue to check EPLS
  • 30. Summary • Check EPLS twice! • Document the file! – Partial Name search is preferred method – Goal is NOT to obtain a results page without any listing – Goal is to conduct broad enough search to capture contractor if they are listed on EPLS – Additional search tips can be found in the EPLS User Manual – https://www.epls.gov/EPLS%20Public%20Users %20Manual.pdf 30
  • 31. Overview • NDAA, Section 872 requires development of a ‘database’ on potential awardees for data to support award decisions – Government contracting / grants officials report • Terminations for Default (contracts) • Terminations for Cause (commercial contracts) • Terminations for Material Failure to Comply (grants) • Defective Pricing determinations (contracts) • Non-responsibility determinations (contracts) • Recipient Not-Qualified determinations (grants) – Government suspension / debarment officials report • Administrative Agreements (in lieu of actual debarment / suspension, action does not prohibit other awards) – Vendor has the opportunity to provide comments on posted items – Collect information about criminal / civil / and administrative proceedings on vendors for which there has been a finding of fault – Information available for 5 years from the date of action 37
  • 32. Data Elements • Data elements to enable searches and reports (required unless otherwise identified): – Record Type (T4D, Non-responsibility, Admin Agreement, etc.) * – Date of record/action (when the T4D was signed) * – Date / Time Stamp of Posting (New Module will generate) * – DUNS number * – CAGE code (Optional) – Vendor name and address (could pull from CCR or D&B based on DUNS) * – Doing Business As (DBA) (Optional) – Product Service Code (Mandatory for Contracts only) – NAICS (Mandatory for Contracts only) – Catalog of Federal Domestic Assistance (CFDA) (Mandatory for grants actions) – Solicitation / Funding Opportunity (announcement) number (Mandatory for non- responsibility, not-qualified determinations; Optional otherwise) – Contract or Grant Award ID Number (Mandatory for terminations; Optional otherwise) – Contract or Grant Referenced Award ID Number (Optional) – e.g. GWAC, FSS, IDV, etc. – Government reporting agency and office codes * – Government reporting official name *, address *, phone *, email * * Mandatory Field
  • 33. Data Elements (cont) • Ability to upload actual record as a .PDF along with above data (5MB size limit)* • Government reporting of suspensions and debarments follow same procedures as today • Government reporting of performance assessment reports follow same procedures as today * Mandatory Field
  • 34. Getting Set Up • If you are already using CPARS and PPIRS, accessing the FAPIIS modules is simply another ‘role’ that the focal points can authorize for users • If you are not already using CPARS and PPIRS, a representative from the Senior Procurement Executive's staff should contact the CPARS Program Management Office (PMO) to discuss approaches for establishing focal points – PMO will assist each agency with this process. An access request form must be submitted for each focal point. • Online training is available to assist new users • A FAPIIS User Manual is available for new users
  • 35. FAPIIS • In spring 2009, determination is made by the ACE to leverage the capabilities of CPARS, CCR, and PPIRS to satisfy the 872 requirements – FAPIIS input module on CPARS collects items listed from contracting and grants officers and debarment/suspension officials • Collects basic identification information and provides capability to upload an attachment • Pre-populates from FPDS and CCR when possible – CCR collects the information regarding criminal / civil / administrative proceedings during vendor registration / renewal – FAPIIS search module on PPIRS provides central access to the collected items from • FAPIIS input module on CPARS • CCR criminal/civil/administrative proceedings data • Existing debarments and suspensions in EPLS • Existing past performance evaluations in PPIRS • DoD led cross-federal agency/functional design team meetings to flesh out the requirements and design
  • 36. Effect of FAPIIS Proposed FAR Rule: Federal Awardee Performance and Integrity Information System (74 Fed. Reg. 45579) – Requires GSA to establish and maintain a data system containing specific information on the integrity and performance of covered contractors. – Requires awarding officials to review the data system and consider other past performance information when making any past performance evaluation or responsibility determination

Notes de l'éditeur

  1. \n
  2. \n
  3. \n
  4. \n
  5. Enter all applicable information when entering the bid into the abstract.\n
  6. Otherwise extending the duration of the contract includes extensions for any reason; whether contractor or government caused.\n
  7. \n
  8. Sometimes there is conflict between Agency and DoJ priorities/goals when considering appropriate remedies while continuing to administer the contract.\n
  9. 9.405 -- Effect of Listing (d) \nAfter the opening of bids or receipt of proposals, the contracting officer shall review the EPLS.\nBids received from any listed contractor in response to an invitation for bids shall be entered on the abstract of bids, and rejected unless the agency head or a designee determines in writing that there is a compelling reason to consider the bid.\nProposals, quotations, or offers received from any listed contractor shall not be evaluated for award or included in the competitive range, nor shall discussions be conducted with a listed offeror during a period of ineligibility, unless the agency head or a designee determines, in writing, that there is a compelling reason to do so. If the period of ineligibility expires or is terminated prior to award, the contracting officer may, but is not required to, consider such proposals, quotations, or offers.\nImmediately prior to award, the contracting officer shall again review the EPLS to ensure that no award is made to a listed contractor.\n
  10. This check is inferred (implied) by FAR FAR 9.402(a): "Agencies shall solicit offers from, award contracts to, and consent to subcontracts with responsible contractors only. Debarment and suspension are discretionary actions that, taken in accordance with this subpart, are appropriate means to effectuate this policy."\n \nThis check is recommended to prevent soliciting offers from a debarred or suspended contractor and would be required in sole source acquisitions, RFPs for delivery/task orders and competitive acquisitions where a source list has been developed through pre-RFP activities (i.e. sources sought synopsis).\n\nIt is a little more complex to determine if this third check is required for competitive acquisitions, however I make this determination by checking FBO for any registered interested parties and asking myself if anyone on the acquisition team will send a "heads up" communication to any contractor to inform them the RFP has been officially released. If either of these questions is answered yes, then an EPLS check may be accomplished.\n
  11. EPLS is a “live” system, this means that any addition, deletion or change to the listing will be immediately available to the search query. \n\nWhile, “immediately prior to award” is a phrase left to the interpretation of the CO, the above example illustrates that even as little as six hours may not be considered “immediately prior to award”.\n
  12. 9.405-1 -- Continuation of Current Contracts.\n(a) Notwithstanding the debarment, suspension, or proposed debarment of a contractor, agencies may continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, or proposed for debarment unless the agency head directs otherwise. A decision as to the type of termination action, if any, to be taken should be made only after review by agency contracting and technical personnel and by counsel to ensure the propriety of the proposed action.\n(b) For contractors debarred, suspended, or proposed for debarment, unless the agency head makes a written determination of the compelling reasons for doing so, ordering activities shall not—\n (1) Place orders exceeding the guaranteed minimum under indefinite quantity contracts; \n (2) Place orders under optional use Federal Supply Schedule contracts, blanket purchase agreements, or basic ordering agreements; or\n (3) Add new work, exercise options, or otherwise extend the duration of current contracts or orders.\n
  13. If a contractor intends to subcontract with a party that is debarred, suspended, or proposed for debarment as evidenced by the parties’ inclusion in the EPLS (see 9.404), a corporate officer or designee of the contractor is required by operation of the clause at 52.209-6, Protecting the Government’s Interests when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment, to notify the contracting officer, in writing, before entering into such subcontract." The clause is required in all solicitations/contracts expected to exceed $30K. \nThe contractor is responsible for the award of subcontracts. Clause 52.209-6 conveys this requirement. FAR 9.405-2(c) states “The contractor’s compliance with the requirements of 52.209-6 will be reviewed during Contractor Purchasing System Reviews”. Additional documentation in the prime contract file should not be necessary.\n
  14. \n
  15. \n
  16. \n
  17. Now back to basics – a few warnings related to how to search on EPLS. \n\nOnce a user selects EPLS Advanced Search this information pop-up box will appear. This information box contains warnings regarding the data results the system expects return based on the type of search. \n\nIf the checkbox is selected, EPLS will allow you to search using Exact Name, DUNS or CAGE Code without further warnings. \n
  18. If the checkbox is not marked on the information pop-up screen then the system automatically disables the search fields likely to return false negative results. \n\nIf the user chooses to acknowledge the warning and continue the search using these fields, the following screens provide additional information.\n
  19. There is no requirement in EPLS for the name to be entered into the EPLS system as the legal business name found in CCR. \n There is no control on spelling or punctuation in EPLS.\n\nExact Name – Caution: The Exact Name search will only return a match result when the name you entered in the exact name field is an exact match to a record in the EPLS. Case does not matter, but format and punctuation does.\n
  20. \n
  21. More than one advanced search criterion may be selected, but they do not all need to be selected to perform a search. In fact, many searches will not return any results if more than two criteria are selected, as each one will reduce the number of returned search results.\n\nSearches using multiple search criterion must meet all criteria selected not just any of the criteria selected. \n
  22. From UCI checklist:\n\n2.2.2.1\nDid the Contracting Officer ensure he/she did not award contracts to, or consent to subcontracts with, contractors on the List of Parties Excluded from Federal Procurement and Non-procurement programs?\n