PMO Point of View
2010
By Bill Boehner
Director, PMO Practice
Table of Contents

 Today’s IT Challenges           Challenges to IT


 The Role of the PMO         PMO as an Enabler


 The PMO Framework            A Holistic Approach


 Newton Consulting Can Help                         PMO Vision Implementers


 Newton Consulting Company Background                                 Who We Are




                                      2
                   Copyright © 2010 Newton Consulting, LLC.
Today’s Challenges
                     Challenges to IT




                                 3
              Copyright © 2010 Newton Consulting, LLC.
Challenges to IT

           Today’s Challenges
 IT expected to deliver more with less
 IT expected to add value to the business while cutting costs
 IT perceived as a tactical cost-center – an “order-taker,” not as
  a strategic partner to the Business
 IT and the Business pointing fingers and clashing over
  priorities, projects, and IT investments
 A lack of transparency and trust between IT and the
  Business
 Project benefits not captured or tracked
 No tracking or accountability for project success


                                    4
                 Copyright © 2010 Newton Consulting, LLC.
Challenges to IT

       Today’s Challenges (con’t)
 Key resources are overworked and under appreciated
 Use of 3rd party contractors is increasing due to
  commoditized services now available in the market
 No prioritization or process for business requests – “the
  squeaky wheel gets the grease”
 Redundant solutions for similar problems
 No holistic (cross-organization) view of the Business’
  investments into IT
 Outsiders’ question: “What does IT really do?”
 IT must respond to these challenges and plant the seed for
  the future…

                                   5
                Copyright © 2010 Newton Consulting, LLC.
Challenges to IT

      IT must position itself as a:
 Strategic partner to the Business that enables achievement
  of key business objectives
 Driver of growth & innovation – “sits at the table” with
  Business leadership
 Leader of IT Governance, establishing and maintaining an IT
  investment portfolio that aligns to the Business strategy
 Reliable unit that can keep the critical system running
 High throughput machine that can produce more with less
 Flexible operation that can deliver at Business’ speed
 An attractive and exciting place to work, enabling retention
  of high energy people

                                   6
                Copyright © 2010 Newton Consulting, LLC.
The Role of the PMO
             PMO as an Enabler




                            7
         Copyright © 2010 Newton Consulting, LLC.
PMO as an Enabler

       The PMO is an Enabler
 A Project Management Office (PMO) is an organization
  designed to:
   • Align IT initiatives with the Business strategy
   • Optimize IT investments and the project portfolio
   • Govern the flow of work through the IT delivery
     machine
   • Establish project management best practices suitable
     to the organization
   • Provide metrics and reporting to senior management



                                  8
               Copyright © 2010 Newton Consulting, LLC.
PMO as an Enabler

       The PMO is an Enabler
 A PMO should represent for an organization what air
  traffic controllers represent to pilots:
   • Should guide projects safely (minimizing risks)
   • Should guide projects as quickly as possible to their
     destination
   • Should prevent midstream collisions between projects
     and resources
   • Should be the Project Manager’s and Executive’s best
     friend




                                 9
              Copyright © 2010 Newton Consulting, LLC.
PMO as an Enabler

                        Goal of a PMO
 The goal is simple:



     Do the                                     With the              To Drive
                   The Right
      Right                                      Right               Value to the
                     Way
     Things                                    Resources              Business

 Alignment         Optimized Execution                              Measure

          A holistic approach to managing IT investments




                                            10
                         Copyright © 2010 Newton Consulting, LLC.
PMO as an Enabler

      So Why Do PMOs Fail?
 The PMO…
  • does not define its value proposition
  • does not have the buy-in from the senior management
  • is seen as a threat – most often too authoritative
  • is too low in the management reporting structure
  • does not fully understand the political environment, the
    company culture, or the organization’s tolerance for change
  • does not have a mechanism to measure and report value
  • is expected to be one-size-fits-all by the organization
  • is not sustainable on its own (i.e., executive support leaves)

                                  11
               Copyright © 2010 Newton Consulting, LLC.
PMO as an Enabler
  Avoid Failure – Think Holistically
 Analyze and Plan Before Acting
   •   Where are the current pain-points in the organization?
   •   What is the Business Strategy? What is IT’s strategy? Are they aligned?
   •   How are projects selected for funding? What criteria should be used to determine
       pipeline project priorities?
   •   Do any project management procedures, methods and/or systems exist?
   •   What are the success criteria for your PMO and how will you measure them?
   •   What services should the PMO provide (e.g. project mgt, project audits, training &
       mentoring, project recovery, project startup, QA, business analysis, etc.)?
   •   Where should the PMO report (e.g. Enterprise PMO, IT PMO, or Divisional PMO)?
       Should the PMO house the PMs or should the PMs sit within IT or the Business?
   •   What authority and accountability should the PMO have?
   •   What is change management impact of adopting a PMO / disciplined project mgt?
   •   Should the PMO manage vendor relations?
   •   Should the PMO own process improvement (CMMI, PMP, ITIL, 6-Sigma, etc.)?
   •   What type of tools will be required to operate your PMO (PPM tools, Balanced
       Scorecard, Collaboration tools, etc.)?
                                        12
                     Copyright © 2010 Newton Consulting, LLC.
The PMO Framework
          A Holistic Approach




                            13
         Copyright © 2010 Newton Consulting, LLC.
A Holistic Approach
                    The PMO Framework



 A holistic
  approach to                               Portfolio                       Project
  organizing and                           Management                     Management

  planning your                                                    PMO
                                                                  Frame
  PMO initiatives                                                 Work


                                            Resource                        Quality
 Tailored to                              Management                     Management
  meet the
  specific needs
  of the Business

                                          14
                       Copyright © 2010 Newton Consulting, LLC.
A Holistic Approach
              So Now What?
 Expect a challenge
   •   Resistance to change, to transparency, and being tracked
   •   Business’ reluctance to committing to ROI
   •   Labeling structured documentation as “administration”
   •   Lack of accountability and managers’ follow through
   •   Isolated groups avoiding processes
 Secure commitment across leadership ranks – Executive,
  Senior, Middle
 Appoint an experienced leader who can prevent pitfalls
 Communicate at all levels with a consistent message
 Determine where you are on the PMO Adoption Cycle
 Newton Consulting can help
                                   15
                Copyright © 2010 Newton Consulting, LLC.
Newton Consulting Can Help
       PMO Vision Implementers




                            16
         Copyright © 2010 Newton Consulting, LLC.
PMO Vision Implementers
                              Newton Consulting PMO Services
  Newton’s three PMO offerings are designed to help you answer The
   PMO Challenge and drive value to your IT and Business operations                                                          VALUE


  Our unique and flexible operating model allows us to provide Tier 1
   experienced resources at rates 25-50% lower than Tier 1 firms.

 Strategic Consulting Services               Practical Project Management Services                       PMO Services
 PMO strategy and roadmap development         PM on Demand: Flexible staffing and           PMO on Demand: Partial or full outsourcing
 Current state / future state assessments      seasoned project managers with Tier 1 PM       of PMO
 PMO and project management maturity           consulting experience
                                                                                              Build, operate, and transition a PMO
  analysis                                     Manage party vendors or systems
                                                        3rd
 PMO organizational assessments                integrators                                   Provide temporary PMO leadership
                                                                                               resources
 PMO business case development
                                               Drive cultural change around project
 “PMO in a box”                                management (demonstrating the value of        Tailor and implement tools, templates, and
 Portfolio management and project              good project management)                       techniques
  prioritization analysis
                                               Project management best practices             Optimize IT spending & resource utilization
 PPM tool analysis and recommendation
 PM / PMO training and coaching                                                              Recruit, develop, and place skilled
 Project / program audits                                                                     PM/PMO resources
 Balanced scorecards and project
  dashboards



                                                                     17
                                                  Copyright © 2010 Newton Consulting, LLC.
PMO Vision Implementers

                     Newton Consulting’s PMO Adoption Cycle
                 Where are you?
                           Stage 1                       Stage 2                           Stage 3                           Stage 4                        Stage 5
                         Unaware or                    Recognition                         Approval                        Early Stage                    Sustain and
                        Unconvinced                      of Need                          to Proceed                     Implementation                     Expand

Stage             Minimal defined PM          Minimal defined PM              Have funding approval     Initial PM / PMO initiatives         The first year’s push is
                   processes for the org        processes for the org                                       are rolled out                        complete.
Characteristics:                                                                Have both IT and BU
                  IT mgrs serving in PM       Recognize the importance         sponsorship               Preliminary feedback is              The organization has
                   capacity                     and value of Project            Recognize the tremendous   trickling in                          generally accepted the PMO
                  Limited exposure to PM /     Management                       hurdle in front of you    Some components going                Initial excitement has worn off
                   PMO best practices          Need help with “selling” the    Uncertain how to proceed   well, others are not                 Organization may become
                  Not sure if a PMO will       concept internally to mgt                                  Some early adopters are               complacent
                   deliver value                                                                            supportive, others are not.

Typical           6-18 months prior to        3-9 months prior to             0-3 months prior to               1-12 months after            13-36 months after
                   beginning a PM / PMO         beginning a PM / PMO             beginning a PM / PMO               beginning a PM / PMO          beginning a PM / PMO
Timeframe:         improvement initiative       improvement initiative           improvement initiative             improvement initiative        improvement initiative

How Newton       Newton can:                  Newton can:                      Newton can:                        Newton can:                   Newton can:
Can Help:         Educate the organization    Provide a current state         Help develop a PMO                Help course-correct where    Assist with the execution of a
                   on PM/PMO best practices     assessment                       strategy and phased                appropriate                   “Phase 2” for the PMO
                  Conduct workshops with      Develop Business Case to         roadmap                           Assist developing a          Help reinforce first yr’s initiatives
                   key IT and BU resources      socialize internally            Assist with development of         “Phase 2” push for the PM    Expand on the internal
                  Develop Business Case to    Provide case studies and         a communication plan               / PMO initiatives             marketing/communication plan
                   justify an investment        key success criteria            Provide tools, templates,         Help reinforce the first     Help establish PMO as an
                  Help organizations          Conduct workshops with           and resources to help              year’s initiatives            incubator for future leaders
                   recognize the value and      key IT and BU executives         jump-start the process            Conduct audits & reviews     Help realign the PMO’s long-term
                   need for PM / PMO best      Help define the scope of        Implement the PM / PMO            Assist with metrics &         strategy with IT & BU strategies
                   practices                    the PM / PMO initiative          initiative in partnership with     measurement
                                                                                 you.                              Drive specific components
                                                                                                                    of the PMO initiative
                                                                                  18
                                                               Copyright © 2010 Newton Consulting, LLC.
PMO Vision Implementers

PMO Consulting Workshop Offerings
 Newton Consulting offers packaged workshops (2 days to 2
  weeks) based on where you are in the PMO Adoption Cycle:
    • Stage 1: Unaware or Unconvinced
        • An Introduction to the Power of a PMO (PMO Defined: Is it right for you?
          How can it help?)
    • Stages 2 & 3: Recognize need and/or have funding but
      have not started
        • The PMO Roadmap (How to define your PMO Vision: An approach to
          implementation)
        • PMO in a Box (A way to jump-start your PMO initiative)
    • Stages 4 & 5: PMO Initiatives already underway
        • PMO Current State of Assessment (Evaluation of an existing PMO and its
          maturity)

 Contact us to learn more or to discuss further how Newton
  Consulting can help you achieve your PMO vision…

                                      19
                   Copyright © 2010 Newton Consulting, LLC.
Company Background
                  Who We Are




                              20
           Copyright © 2010 Newton Consulting, LLC.
Who We Are
                            Company Background
About Us
 Newton Consulting is a unique and leading provider of IT and HR consulting
  services, providing an outstanding proposition to our clients at they move
  from vision to reality.
        With a superior team of experienced leaders and accomplished professionals, Newton
         Consulting specializes in providing these services to growing companies based in North
         America and Europe:
                   IT Strategy
                   Project Management
                   Systems Integration
                   Legacy Application Support
                   Health and Welfare Benefits Consulting
                   Recruitment Placement Outsourcing

        Newton Consulting is able to serve an expanding customer base by attracting and retaining
         the best and brightest in the consulting field with its industry changing business model.

   Whatever your IT or HR vision, Newton Consulting can implement it.

                                                         21
                                      Copyright © 2010 Newton Consulting, LLC.
Who We Are
                          Company Background
We are Vision Implementers
   We believe that all companies have vision, but most need help in shaping and
    effectively pursuing it.

                     Almost always, they know what they need to do.
                     Often, they know where they want to go.
                     Sometimes, they know how they are going to get there.


 Newton Consulting helps fill in their vision implementation gaps.
   Our goal is to provide our clients the best that consultants have to offer…
          Partnership       Leadership            Experience          Expertise
          Focus            Catalytic Energy       Commitment to the Mission’s Success…

          …without the conflicting “profit first” and “high-growth-based” business
          agendas of large consulting organizations.

                                                      22
                                   Copyright © 2010 Newton Consulting, LLC.
Who We Are
                         Company Background
Our Mission
                    To implement the business and technology vision
 To                 of our clients through premier, values-driven
                     consulting solutions.


Our Vision
 To be the global standard of a customer-focused, values-driven
  consulting company.
   We will accomplish this by:
     being true to our core values
     developing and establishing long-term, partnering relationships with businesses that
       are (or aspire to be) leaders in their marketplace and community
     attracting and retaining the best talent in the consulting industry
     maintaining an employee-friendly, shared ownership operating model


                                                      23
                                   Copyright © 2010 Newton Consulting, LLC.
Who We Are
                             Company Background
We are Growing

            Employees           65 Total                                                             8.5M
35                                                       9,000,000                  Revenue
30          Subcontractors                               8,000,000
                                                         7,000,000
25
                                                         6,000,000
20                                                       5,000,000
                        28
15                                                       4,000,000
                                                                                           2.5M
                7                                        3,000,000
10
                                                         2,000,000
5     1                                                                             700K
                                                         1,000,000            0
0                                                                0
     2003      2005      2006   2009                                         2003   2005      2006   2009


                     We believe this growth is a result of our customer-centric
                      business approach and validates our unique operating model.



                                                     24
                                  Copyright © 2010 Newton Consulting, LLC.
Who We Are
                    Company Background
The Newton Difference: Not Your Typical Consulting Company

           • Customer Focused                          • We implement your vision, not our own.


           • Values Driven                             • Our core values drive everything we do.

                                                       • Our model attracts and retains the top
           • Unique Operating Model                      talent in the consulting industry.



                      RESULT: Our clients receive Tier 1 quality
  Client              at value cost – the right solution to your
                      mid-sized company’s dilemma.

                                                25
                             Copyright © 2010 Newton Consulting, LLC.
Company Background
                                                                             Who We Are



Recognized in Our Industry

                Best Service Provider
 Pittsburgh Technology Council’s Tech 50 Finalist 2009 and Category Winner 2008.
 Recognized as one of the leading and highest achieving companies in
  southwestern Pennsylvania.

 Proud to serve our
  region, the nation,
  and a growing
  international client
  base!



                                                 26
                              Copyright © 2010 Newton Consulting, LLC.
Who We Are
Our Services
Bringing Together
 People, Process
 and Technology
                                                                            IT
                                                                 Information Technology
 Customer-focused
  services revolve
  around our client       PRACTICE   SERVICE
                                                     DIVISION          CLIENT
                            AREA       LINE




                                                                            HR
                                                                     Human Resources

 Whatever your IT or HR
  vision, Newton Consulting
  can implement it.


                                                    27
                                 Copyright © 2010 Newton Consulting, LLC.
Who We Are

                       Our “Ex” Factor
Experience
 600+ years of combined experience integrating and managing
  information technology

Expertise
 Project Leadership
 Implementation
 Support

Excellence
 100% client referrals



                                             28
                          Copyright © 2010 Newton Consulting, LLC.
Who We Are
                     Our Value Proposition

                                                                  We Solve Your Mid-Sized
Cost




                       “Big 5”                                    Company’s Dilemma
                        Firms
                                                                    We offer Tier 1 quality consulting
                                                                     services at rates that are
                               Newton                                consistently 25-50% lower than
                                                                     Tier 1 firms – with no loss in
                              Consulting
                                                                     quality

                                                                    This value proposition is tailored
                     Staff                                           for, and craved by, mid-market
       Offshore
                  Augmentation                                       companies.




                                        Quality

                                                29
                             Copyright © 2010 Newton Consulting, LLC.
Who We Are
                             Our Difference
We are Business Experts Who Know Technology
 We staff Tier 1 experienced consultants who choose to work for Newton Consulting
  because of our unique shared ownership model, mission, and values.

 Our Right Resourcing model gives you the right staff at the right time.

 Savings are often measured in hundreds of thousands of dollars, a result of:

         Lower Rates
         Shorter Timelines
         Higher Productivity
         On-Time Delivery




                                                  30
                               Copyright © 2010 Newton Consulting, LLC.
Who We Are
                             Our Commitment

We want to understand your vision, adopt it
 as our own, and make it a reality.
            – Rick Newton, President & Founder, Newton Consulting



Newton is the most customer-focused vendor I’ve ever worked with.
                                         – GlaxoSmithKline Consumer Healthcare IT Management Team



Our Commitment  Our Values Satisfaction Guaranteed
 If you are not 100% satisfied with the work performed by Newton Consulting, we will do
  everything in our power to remedy the situation.




                                                    31
                                 Copyright © 2010 Newton Consulting, LLC.
Who We Are
                Our Service to You

We are…
  Difference Makers
  Problem Solvers
  Team Players
  Servant Leaders


                Vision Implementers




                                          32
                       Copyright © 2010 Newton Consulting, LLC.
Newton Consulting, LLC
2068 East Finley Drive
Claysville, PA 15323

p: 800.883.1198
p: 724.663.5827             Bill Boehner
f: 724.663.4209             Director, PMO Practice
                            p: 412-334-0196
info@newtonconsulting.com   f: 724.663.5440
www.newtonconsulting.com    bill.boehner@newtonconsulting.com

Contenu connexe

Tendances

PMO Presentation
PMO PresentationPMO Presentation
PMO PresentationTURKI , PMP
 
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...Hussain Bandukwala
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014PM Solutions
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOAnthony Natoli
 
PMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPM Solutions
 
Journey to Maturity Building a PMO
Journey to Maturity Building a PMOJourney to Maturity Building a PMO
Journey to Maturity Building a PMOJames Brown
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
Senior Leadership Plan Running a PMO
Senior Leadership Plan Running a PMOSenior Leadership Plan Running a PMO
Senior Leadership Plan Running a PMOJack Brown
 
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...Wellingtone
 
PMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPM Solutions
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposalHugh Shults
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOLaura Barnard, PMP
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter TemplateDemand Metric
 

Tendances (20)

PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...
How First-time Project Management Office (PMO) Leaders Can Set Up PMOs – Ev...
 
The PMO in practice
The PMO in practiceThe PMO in practice
The PMO in practice
 
The Next Generation PMO - VIC
The Next Generation PMO - VICThe Next Generation PMO - VIC
The Next Generation PMO - VIC
 
The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014The State of the Project Management Office (PMO) 2014
The State of the Project Management Office (PMO) 2014
 
PMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMOPMO Handbook - How to Plan, Build, and Run a PMO
PMO Handbook - How to Plan, Build, and Run a PMO
 
PMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBookPMO of the Year Award 2011 eBook
PMO of the Year Award 2011 eBook
 
What is a PMO
What is a PMOWhat is a PMO
What is a PMO
 
Journey to Maturity Building a PMO
Journey to Maturity Building a PMOJourney to Maturity Building a PMO
Journey to Maturity Building a PMO
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
Senior Leadership Plan Running a PMO
Senior Leadership Plan Running a PMOSenior Leadership Plan Running a PMO
Senior Leadership Plan Running a PMO
 
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...
FuturePMO 2017 - Justin Byrd, Fujitsu - Future-proofing your PMO; Building an...
 
Pmo
PmoPmo
Pmo
 
PMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBookPMO of the Year Award 2010 eBook
PMO of the Year Award 2010 eBook
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Implementation of the pmo proposal
Implementation of the pmo proposalImplementation of the pmo proposal
Implementation of the pmo proposal
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
PMO Charter Template
PMO Charter TemplatePMO Charter Template
PMO Charter Template
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 

En vedette

Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Ricardo Viana Vargas
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMOTURKI , PMP
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmocrmackenzie
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMOJack Brown
 
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017Association for Project Management
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
PMO STARTUP / IMPLEMENTATION - PMI CONGRESS PRESENTATION
PMO STARTUP / IMPLEMENTATION  - PMI CONGRESS PRESENTATIONPMO STARTUP / IMPLEMENTATION  - PMI CONGRESS PRESENTATION
PMO STARTUP / IMPLEMENTATION - PMI CONGRESS PRESENTATIONAGRAPIDIS
 
Implementing a Project Office Management
Implementing a Project Office ManagementImplementing a Project Office Management
Implementing a Project Office ManagementRicardo Viana Vargas
 
PMO Standard Org structure processes Chart & Role Descriptions_Arabic - Copy
PMO Standard Org  structure processes Chart & Role Descriptions_Arabic - CopyPMO Standard Org  structure processes Chart & Role Descriptions_Arabic - Copy
PMO Standard Org structure processes Chart & Role Descriptions_Arabic - CopyRabah Odeh ITIL 5.0-OCP-CISA-PMP-OCP..etc
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmoemre_demir
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMOrmac39
 
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016PMO and Value Conference - Ricardo Vargas, London, 25 October 2016
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016Association for Project Management
 
The PMO & project stakeholder management
The PMO & project stakeholder managementThe PMO & project stakeholder management
The PMO & project stakeholder managementLouise Worsley
 
Discover the right tools for your Project Management Office (PMO)
Discover the right tools for your Project Management Office (PMO)Discover the right tools for your Project Management Office (PMO)
Discover the right tools for your Project Management Office (PMO)Hussain Bandukwala
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMOfficers PMOAcademy
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 

En vedette (18)

Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
 
Implementing PMO
Implementing PMOImplementing PMO
Implementing PMO
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmo
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO
 
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
APM PMO Value Ring workshop, Americo Pinto, London, 01 March 2017
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
PMO STARTUP / IMPLEMENTATION - PMI CONGRESS PRESENTATION
PMO STARTUP / IMPLEMENTATION  - PMI CONGRESS PRESENTATIONPMO STARTUP / IMPLEMENTATION  - PMI CONGRESS PRESENTATION
PMO STARTUP / IMPLEMENTATION - PMI CONGRESS PRESENTATION
 
Implementing a Project Office Management
Implementing a Project Office ManagementImplementing a Project Office Management
Implementing a Project Office Management
 
PMO Standard Org structure processes Chart & Role Descriptions_Arabic - Copy
PMO Standard Org  structure processes Chart & Role Descriptions_Arabic - CopyPMO Standard Org  structure processes Chart & Role Descriptions_Arabic - Copy
PMO Standard Org structure processes Chart & Role Descriptions_Arabic - Copy
 
Building a pmo
Building a pmoBuilding a pmo
Building a pmo
 
Tips on Implementing a PMO
Tips on Implementing a PMOTips on Implementing a PMO
Tips on Implementing a PMO
 
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016PMO and Value Conference - Ricardo Vargas, London, 25 October 2016
PMO and Value Conference - Ricardo Vargas, London, 25 October 2016
 
The PMO & project stakeholder management
The PMO & project stakeholder managementThe PMO & project stakeholder management
The PMO & project stakeholder management
 
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENTPROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
PROJECT MANAGEMENT OFFICE (PMO) SETTING UP AND MANAGEMENT
 
Discover the right tools for your Project Management Office (PMO)
Discover the right tools for your Project Management Office (PMO)Discover the right tools for your Project Management Office (PMO)
Discover the right tools for your Project Management Office (PMO)
 
PMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts OverviewPMO - Strategic Model & Concepts Overview
PMO - Strategic Model & Concepts Overview
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 

Similaire à PMO Point of View (20)

T346 P Iweb
T346 P IwebT346 P Iweb
T346 P Iweb
 
T346
T346T346
T346
 
T346
T346T346
T346
 
T346
T346T346
T346
 
T346 Asm Iweb
T346 Asm IwebT346 Asm Iweb
T346 Asm Iweb
 
T346
T346T346
T346
 
T346
T346T346
T346
 
Making the Case for a Project Management Office
Making the Case for a Project Management OfficeMaking the Case for a Project Management Office
Making the Case for a Project Management Office
 
T346
T346T346
T346
 
T346 Asm Iweb
T346 Asm IwebT346 Asm Iweb
T346 Asm Iweb
 
9 deadly sins every pmo should avoid omni red paper - may 2012
9 deadly sins every pmo should avoid   omni red paper - may 20129 deadly sins every pmo should avoid   omni red paper - may 2012
9 deadly sins every pmo should avoid omni red paper - may 2012
 
The Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering ValueThe Project Management Office - Effectiveness and Delivering Value
The Project Management Office - Effectiveness and Delivering Value
 
The New Public Sector PMO
The New Public Sector PMOThe New Public Sector PMO
The New Public Sector PMO
 
T332 Asmi Web
T332 Asmi WebT332 Asmi Web
T332 Asmi Web
 
T332
T332T332
T332
 
T350 web pi
T350 web piT350 web pi
T350 web pi
 
T350 Web Pi
T350 Web PiT350 Web Pi
T350 Web Pi
 
Realizing value from IT investments - Kemper v1
Realizing value from IT investments - Kemper v1Realizing value from IT investments - Kemper v1
Realizing value from IT investments - Kemper v1
 
T332
T332T332
T332
 
T332 Asmi
T332 AsmiT332 Asmi
T332 Asmi
 

PMO Point of View

  • 1. PMO Point of View 2010 By Bill Boehner Director, PMO Practice
  • 2. Table of Contents  Today’s IT Challenges Challenges to IT  The Role of the PMO PMO as an Enabler  The PMO Framework A Holistic Approach  Newton Consulting Can Help PMO Vision Implementers  Newton Consulting Company Background Who We Are 2 Copyright © 2010 Newton Consulting, LLC.
  • 3. Today’s Challenges Challenges to IT 3 Copyright © 2010 Newton Consulting, LLC.
  • 4. Challenges to IT Today’s Challenges  IT expected to deliver more with less  IT expected to add value to the business while cutting costs  IT perceived as a tactical cost-center – an “order-taker,” not as a strategic partner to the Business  IT and the Business pointing fingers and clashing over priorities, projects, and IT investments  A lack of transparency and trust between IT and the Business  Project benefits not captured or tracked  No tracking or accountability for project success 4 Copyright © 2010 Newton Consulting, LLC.
  • 5. Challenges to IT Today’s Challenges (con’t)  Key resources are overworked and under appreciated  Use of 3rd party contractors is increasing due to commoditized services now available in the market  No prioritization or process for business requests – “the squeaky wheel gets the grease”  Redundant solutions for similar problems  No holistic (cross-organization) view of the Business’ investments into IT  Outsiders’ question: “What does IT really do?”  IT must respond to these challenges and plant the seed for the future… 5 Copyright © 2010 Newton Consulting, LLC.
  • 6. Challenges to IT IT must position itself as a:  Strategic partner to the Business that enables achievement of key business objectives  Driver of growth & innovation – “sits at the table” with Business leadership  Leader of IT Governance, establishing and maintaining an IT investment portfolio that aligns to the Business strategy  Reliable unit that can keep the critical system running  High throughput machine that can produce more with less  Flexible operation that can deliver at Business’ speed  An attractive and exciting place to work, enabling retention of high energy people 6 Copyright © 2010 Newton Consulting, LLC.
  • 7. The Role of the PMO PMO as an Enabler 7 Copyright © 2010 Newton Consulting, LLC.
  • 8. PMO as an Enabler The PMO is an Enabler  A Project Management Office (PMO) is an organization designed to: • Align IT initiatives with the Business strategy • Optimize IT investments and the project portfolio • Govern the flow of work through the IT delivery machine • Establish project management best practices suitable to the organization • Provide metrics and reporting to senior management 8 Copyright © 2010 Newton Consulting, LLC.
  • 9. PMO as an Enabler The PMO is an Enabler  A PMO should represent for an organization what air traffic controllers represent to pilots: • Should guide projects safely (minimizing risks) • Should guide projects as quickly as possible to their destination • Should prevent midstream collisions between projects and resources • Should be the Project Manager’s and Executive’s best friend 9 Copyright © 2010 Newton Consulting, LLC.
  • 10. PMO as an Enabler Goal of a PMO  The goal is simple: Do the With the To Drive The Right Right Right Value to the Way Things Resources Business Alignment Optimized Execution Measure A holistic approach to managing IT investments 10 Copyright © 2010 Newton Consulting, LLC.
  • 11. PMO as an Enabler So Why Do PMOs Fail?  The PMO… • does not define its value proposition • does not have the buy-in from the senior management • is seen as a threat – most often too authoritative • is too low in the management reporting structure • does not fully understand the political environment, the company culture, or the organization’s tolerance for change • does not have a mechanism to measure and report value • is expected to be one-size-fits-all by the organization • is not sustainable on its own (i.e., executive support leaves) 11 Copyright © 2010 Newton Consulting, LLC.
  • 12. PMO as an Enabler Avoid Failure – Think Holistically  Analyze and Plan Before Acting • Where are the current pain-points in the organization? • What is the Business Strategy? What is IT’s strategy? Are they aligned? • How are projects selected for funding? What criteria should be used to determine pipeline project priorities? • Do any project management procedures, methods and/or systems exist? • What are the success criteria for your PMO and how will you measure them? • What services should the PMO provide (e.g. project mgt, project audits, training & mentoring, project recovery, project startup, QA, business analysis, etc.)? • Where should the PMO report (e.g. Enterprise PMO, IT PMO, or Divisional PMO)? Should the PMO house the PMs or should the PMs sit within IT or the Business? • What authority and accountability should the PMO have? • What is change management impact of adopting a PMO / disciplined project mgt? • Should the PMO manage vendor relations? • Should the PMO own process improvement (CMMI, PMP, ITIL, 6-Sigma, etc.)? • What type of tools will be required to operate your PMO (PPM tools, Balanced Scorecard, Collaboration tools, etc.)? 12 Copyright © 2010 Newton Consulting, LLC.
  • 13. The PMO Framework A Holistic Approach 13 Copyright © 2010 Newton Consulting, LLC.
  • 14. A Holistic Approach The PMO Framework  A holistic approach to Portfolio Project organizing and Management Management planning your PMO Frame PMO initiatives Work Resource Quality  Tailored to Management Management meet the specific needs of the Business 14 Copyright © 2010 Newton Consulting, LLC.
  • 15. A Holistic Approach So Now What?  Expect a challenge • Resistance to change, to transparency, and being tracked • Business’ reluctance to committing to ROI • Labeling structured documentation as “administration” • Lack of accountability and managers’ follow through • Isolated groups avoiding processes  Secure commitment across leadership ranks – Executive, Senior, Middle  Appoint an experienced leader who can prevent pitfalls  Communicate at all levels with a consistent message  Determine where you are on the PMO Adoption Cycle  Newton Consulting can help 15 Copyright © 2010 Newton Consulting, LLC.
  • 16. Newton Consulting Can Help PMO Vision Implementers 16 Copyright © 2010 Newton Consulting, LLC.
  • 17. PMO Vision Implementers Newton Consulting PMO Services  Newton’s three PMO offerings are designed to help you answer The PMO Challenge and drive value to your IT and Business operations VALUE  Our unique and flexible operating model allows us to provide Tier 1 experienced resources at rates 25-50% lower than Tier 1 firms. Strategic Consulting Services Practical Project Management Services PMO Services  PMO strategy and roadmap development  PM on Demand: Flexible staffing and  PMO on Demand: Partial or full outsourcing  Current state / future state assessments seasoned project managers with Tier 1 PM of PMO  PMO and project management maturity consulting experience  Build, operate, and transition a PMO analysis  Manage party vendors or systems 3rd  PMO organizational assessments integrators  Provide temporary PMO leadership resources  PMO business case development  Drive cultural change around project  “PMO in a box” management (demonstrating the value of  Tailor and implement tools, templates, and  Portfolio management and project good project management) techniques prioritization analysis  Project management best practices  Optimize IT spending & resource utilization  PPM tool analysis and recommendation  PM / PMO training and coaching  Recruit, develop, and place skilled  Project / program audits PM/PMO resources  Balanced scorecards and project dashboards 17 Copyright © 2010 Newton Consulting, LLC.
  • 18. PMO Vision Implementers Newton Consulting’s PMO Adoption Cycle Where are you? Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Unaware or Recognition Approval Early Stage Sustain and Unconvinced of Need to Proceed Implementation Expand Stage  Minimal defined PM  Minimal defined PM  Have funding approval  Initial PM / PMO initiatives  The first year’s push is processes for the org processes for the org are rolled out complete. Characteristics:  Have both IT and BU  IT mgrs serving in PM  Recognize the importance sponsorship  Preliminary feedback is  The organization has capacity and value of Project  Recognize the tremendous trickling in generally accepted the PMO  Limited exposure to PM / Management hurdle in front of you  Some components going  Initial excitement has worn off PMO best practices  Need help with “selling” the  Uncertain how to proceed well, others are not  Organization may become  Not sure if a PMO will concept internally to mgt  Some early adopters are complacent deliver value supportive, others are not. Typical  6-18 months prior to  3-9 months prior to  0-3 months prior to  1-12 months after  13-36 months after beginning a PM / PMO beginning a PM / PMO beginning a PM / PMO beginning a PM / PMO beginning a PM / PMO Timeframe: improvement initiative improvement initiative improvement initiative improvement initiative improvement initiative How Newton Newton can: Newton can: Newton can: Newton can: Newton can: Can Help:  Educate the organization  Provide a current state  Help develop a PMO  Help course-correct where  Assist with the execution of a on PM/PMO best practices assessment strategy and phased appropriate “Phase 2” for the PMO  Conduct workshops with  Develop Business Case to roadmap  Assist developing a  Help reinforce first yr’s initiatives key IT and BU resources socialize internally  Assist with development of “Phase 2” push for the PM  Expand on the internal  Develop Business Case to  Provide case studies and a communication plan / PMO initiatives marketing/communication plan justify an investment key success criteria  Provide tools, templates,  Help reinforce the first  Help establish PMO as an  Help organizations  Conduct workshops with and resources to help year’s initiatives incubator for future leaders recognize the value and key IT and BU executives jump-start the process  Conduct audits & reviews  Help realign the PMO’s long-term need for PM / PMO best  Help define the scope of  Implement the PM / PMO  Assist with metrics & strategy with IT & BU strategies practices the PM / PMO initiative initiative in partnership with measurement you.  Drive specific components of the PMO initiative 18 Copyright © 2010 Newton Consulting, LLC.
  • 19. PMO Vision Implementers PMO Consulting Workshop Offerings  Newton Consulting offers packaged workshops (2 days to 2 weeks) based on where you are in the PMO Adoption Cycle: • Stage 1: Unaware or Unconvinced • An Introduction to the Power of a PMO (PMO Defined: Is it right for you? How can it help?) • Stages 2 & 3: Recognize need and/or have funding but have not started • The PMO Roadmap (How to define your PMO Vision: An approach to implementation) • PMO in a Box (A way to jump-start your PMO initiative) • Stages 4 & 5: PMO Initiatives already underway • PMO Current State of Assessment (Evaluation of an existing PMO and its maturity)  Contact us to learn more or to discuss further how Newton Consulting can help you achieve your PMO vision… 19 Copyright © 2010 Newton Consulting, LLC.
  • 20. Company Background Who We Are 20 Copyright © 2010 Newton Consulting, LLC.
  • 21. Who We Are Company Background About Us  Newton Consulting is a unique and leading provider of IT and HR consulting services, providing an outstanding proposition to our clients at they move from vision to reality.  With a superior team of experienced leaders and accomplished professionals, Newton Consulting specializes in providing these services to growing companies based in North America and Europe:  IT Strategy  Project Management  Systems Integration  Legacy Application Support  Health and Welfare Benefits Consulting  Recruitment Placement Outsourcing  Newton Consulting is able to serve an expanding customer base by attracting and retaining the best and brightest in the consulting field with its industry changing business model.  Whatever your IT or HR vision, Newton Consulting can implement it. 21 Copyright © 2010 Newton Consulting, LLC.
  • 22. Who We Are Company Background We are Vision Implementers  We believe that all companies have vision, but most need help in shaping and effectively pursuing it.  Almost always, they know what they need to do.  Often, they know where they want to go.  Sometimes, they know how they are going to get there.  Newton Consulting helps fill in their vision implementation gaps.  Our goal is to provide our clients the best that consultants have to offer… Partnership Leadership Experience Expertise Focus Catalytic Energy Commitment to the Mission’s Success… …without the conflicting “profit first” and “high-growth-based” business agendas of large consulting organizations. 22 Copyright © 2010 Newton Consulting, LLC.
  • 23. Who We Are Company Background Our Mission  To implement the business and technology vision  To of our clients through premier, values-driven consulting solutions. Our Vision  To be the global standard of a customer-focused, values-driven consulting company. We will accomplish this by:  being true to our core values  developing and establishing long-term, partnering relationships with businesses that are (or aspire to be) leaders in their marketplace and community  attracting and retaining the best talent in the consulting industry  maintaining an employee-friendly, shared ownership operating model 23 Copyright © 2010 Newton Consulting, LLC.
  • 24. Who We Are Company Background We are Growing Employees 65 Total 8.5M 35 9,000,000 Revenue 30 Subcontractors 8,000,000 7,000,000 25 6,000,000 20 5,000,000 28 15 4,000,000 2.5M 7 3,000,000 10 2,000,000 5 1 700K 1,000,000 0 0 0 2003 2005 2006 2009 2003 2005 2006 2009  We believe this growth is a result of our customer-centric business approach and validates our unique operating model. 24 Copyright © 2010 Newton Consulting, LLC.
  • 25. Who We Are Company Background The Newton Difference: Not Your Typical Consulting Company • Customer Focused • We implement your vision, not our own. • Values Driven • Our core values drive everything we do. • Our model attracts and retains the top • Unique Operating Model talent in the consulting industry. RESULT: Our clients receive Tier 1 quality Client at value cost – the right solution to your mid-sized company’s dilemma. 25 Copyright © 2010 Newton Consulting, LLC.
  • 26. Company Background Who We Are Recognized in Our Industry Best Service Provider  Pittsburgh Technology Council’s Tech 50 Finalist 2009 and Category Winner 2008.  Recognized as one of the leading and highest achieving companies in southwestern Pennsylvania.  Proud to serve our region, the nation, and a growing international client base! 26 Copyright © 2010 Newton Consulting, LLC.
  • 27. Who We Are Our Services Bringing Together People, Process and Technology IT Information Technology  Customer-focused services revolve around our client PRACTICE SERVICE DIVISION CLIENT AREA LINE HR Human Resources  Whatever your IT or HR vision, Newton Consulting can implement it. 27 Copyright © 2010 Newton Consulting, LLC.
  • 28. Who We Are Our “Ex” Factor Experience  600+ years of combined experience integrating and managing information technology Expertise  Project Leadership  Implementation  Support Excellence  100% client referrals 28 Copyright © 2010 Newton Consulting, LLC.
  • 29. Who We Are Our Value Proposition We Solve Your Mid-Sized Cost “Big 5” Company’s Dilemma Firms  We offer Tier 1 quality consulting services at rates that are Newton consistently 25-50% lower than Tier 1 firms – with no loss in Consulting quality  This value proposition is tailored Staff for, and craved by, mid-market Offshore Augmentation companies. Quality 29 Copyright © 2010 Newton Consulting, LLC.
  • 30. Who We Are Our Difference We are Business Experts Who Know Technology  We staff Tier 1 experienced consultants who choose to work for Newton Consulting because of our unique shared ownership model, mission, and values.  Our Right Resourcing model gives you the right staff at the right time.  Savings are often measured in hundreds of thousands of dollars, a result of: Lower Rates Shorter Timelines Higher Productivity On-Time Delivery 30 Copyright © 2010 Newton Consulting, LLC.
  • 31. Who We Are Our Commitment We want to understand your vision, adopt it as our own, and make it a reality. – Rick Newton, President & Founder, Newton Consulting Newton is the most customer-focused vendor I’ve ever worked with. – GlaxoSmithKline Consumer Healthcare IT Management Team Our Commitment  Our Values Satisfaction Guaranteed  If you are not 100% satisfied with the work performed by Newton Consulting, we will do everything in our power to remedy the situation. 31 Copyright © 2010 Newton Consulting, LLC.
  • 32. Who We Are Our Service to You We are…  Difference Makers  Problem Solvers  Team Players  Servant Leaders  Vision Implementers 32 Copyright © 2010 Newton Consulting, LLC.
  • 33. Newton Consulting, LLC 2068 East Finley Drive Claysville, PA 15323 p: 800.883.1198 p: 724.663.5827 Bill Boehner f: 724.663.4209 Director, PMO Practice p: 412-334-0196 info@newtonconsulting.com f: 724.663.5440 www.newtonconsulting.com bill.boehner@newtonconsulting.com