SlideShare une entreprise Scribd logo
1  sur  38
ASHRAE 90.1-2010
Envelope Highlights
January 7th, 2013
YOUR CONTACTS
• Henry Leung, P.Eng., MBA, LEED AP
Senior Design Engineer

• Amir Tehrani, P.Eng., LEED AP
Contract Manager, Partner
AGENDA
1. ASHRAE 90.1 Overview
2. Compliance Paths
3. Cost
4. Envelope
5. Mechanical
6. Electrical
OVERVIEW
To provide minimum
requirements for the energyefficient design of buildings
except low-rise residential
buildings
30% Energy savings compared to
ASHRAE 90.1-2004
National Energy Code
for Canada 2011
i.e. Canadian
ASHRAE 90.1
Compliance Approaches
Building System

Compliance Options
Prescriptive
Option

Envelope

HVAC

Mandatory
Provisions

SWH

(required for most
compliance options)

Power

Trade Off
Option

Energy Cost
Budget

Lighting
Other

Simplified

Energy Code
Compliance
LEED
• LEED Canada NC 2009 - Valid until at least 2015
1. ASHRAE 90.1-2007
2. MNECB 1997
• LEED v4
1. ASHRAE 90.1-2010
2. maybe NECB 2011
COST
ENVELOPE
SECTION 5

ABOVE-GRADE WALL INSULATION

Four types of walls are defined
 Mass walls
– heat capacity determined from Table A3.1B or
A3.1C
– R-value is for continuous insulation or when
uninterrupted by framing other than metal
clips no closer than 24 in. o.c. horizontally and
16 in. o.c. vertically
 Metal building wall R-value
– for insulation compressed between metal wall
panels and the steel structure
 Steel-framed wall R-value
– for uncompressed insulation installed in the
cavity between steel studs
 Wood-framed and other R-value
– for uncompressed insulation installed in the
cavity between wood studs; also acceptable to
be continuous insulation uninterrupted by studs
ENVELOPE
Section 5
Envelope Alteration Exceptions

Allowed if they don’t increase energy usage of building
 Installation of storm windows
 Replacement of glazing in
existing sash and frame

 Replacement of roof
membranes
 Replacement of existing doors

 Replacement of existing
 Alterations to envelope cavities
fenestration, provided area of
provided they are insulated to full
replacement is no more than
depth with a nominal R-3.0 per in.
25% of total fenestration area
 Roof and floor alterations where
no new cavities are created
Envelope
Envelope
SECTION 5 – 5.5.4.2.3

SKYLIGHT FENESTRATION AREA

Skylights are required in enclosed spaces that are
• ≥ 5,000 ft2 and
• Ceiling heights > 15 ft and
• Space types
– Office
- Convention Center
– Transportation
– Lobby
- Automotive Service
– Workshop
– Atrium
- Manufacturing
– Concourse
- Non-refrigerated Warehouse
– Corridor
- Retail
– Storage
- Distribution/Sorting Area
– Gymnasium/Exercise Center
SECTION 5 – 5.5.4.2.3

SKYLIGHT FENESTRATION AREA
Total skylight area is either:
• Minimum of 3% of roof area with a skylight VLT at least 0.40 OR
• Such that the daylight area under skylights is a minimum of half the floor area
and provides a minimum skylight effective aperture of at least 1%
Exceptions
• Climate zones 6-8
• Spaces with LPDs < 0.5 W/ft2
• Shaded spaces
• Daylight area under rooftop monitors is > 50% of floor area
• Documented that 90% of skylight area is shaded on June 21 (Northern
Hemisphere)/December 21 (Southern Hemisphere) at noon by permanent
features
• Required daylight area under skylights may be reduced by amount of:
• primary sidelighted area with sidelighting effective aperture > 0.15
• secondary sidelighted area with sidelighting effective aperture > 0.30
with general lighting controlled by continuous daylight dimming
SECTION 5 – 5.5.4.5

FENESTRATION ORIENTATION
Vertical fenestration area to meet this requirement:

Area South ≥ Area West and Area South ≥ Area East

N
No!

Yes!

Exceptions:
• Buildings shaded by other buildings within 20 ft to the south which is at least
½ as tall as the proposed building
• Buildings with shade on 75% of the west and east
• Alterations and additions that don’t increase vertical fenestration area
HVAC
1. Economizers required for > 4 ton RTU
2. Energy Recovery > 5000 CFM units
SECTION 6 – 6.4.1.1

MINIMUM EQUIPMENT EFFICIENCY

HVAC Equipment Covered












Air conditioners and condensing units
Heat pumps (air, water, and ground source)
Water-chilling packages (chillers)
Packaged terminal and room air conditioners and heat pumps
Furnaces, duct furnaces and unit heaters
Boilers
Heat rejection equipment (cooling towers)
Heat transfer equipment (heat exchangers)
Variable refrigerant flow (VRF) air conditioners
VRF air-to-air and applied heat pumps
Air conditioners serving computer rooms
SECTION 6 – 6.4.3.9 (6.3.2Q)
DEMAND CONTROL VENTILATION

DCV must be provided for each zone with a area > 500 ft² and the design occupancy > 40
people/1000 ft² where the HVAC system has:
 An air-side economizer,
 Automatic modulating control of the OSA dampers, or
 A design outdoor airflow > 3,000 cfm

Demand control ventilation (DCV): a ventilation system capability that provides for the automatic reduction
of outdoor air intake below design rates when the actual occupancy of spaces served by the system is less
than design occupancy.
LIGHTING
• Lighting alteration requirements take effect at 10%
replacement
• Include exterior areas
• Include renovations even when it is just
lamp/ballast replacement
SECTION 8 – 8.4.2

AUTOMATIC RECEPTACLE CONTROL

≥ 50% of all 125 volt 15- and 20-amp receptacles (including those in

modular partitions) must be controlled by an automatic control device in these
space types
 Private offices
 Open offices
 Computer classrooms
Exceptions
 Receptacles designated for equipment requiring 24 hr operation
 Spaces with security or safety concerns
Automatic control devices must function on:
 Time-of-day controller provided to control ≤ 25,000 ft2 and not more than one floor
 Occupant sensor to turn off receptacles within 30 minutes of occupant leaving the
space
 Signal from another control or alarm that indicates the area is unoccupied
SECTION 9 - 9.4.1

MANDATORY AUTOMATIC SHUTOFF

Automatic lighting shutoff control device required
EXCEPT:

 Lighting for 24-hour operation
 Patient care spaces
 Areas with safety or security concerns

Compliance options:
Control lights on a scheduled basis (automatic time switch)
 Time-of-day controller
 Controls ≤ 25,000 ft2 and not more than one floor

Occupant sensor
 Turn lights off within 30 minutes of occupant leaving the space

Signal from another control or alarm that indicates the area is
unoccupied
SECTION 9 – 9.4.1.2

MANDATORY: INDIVIDUAL SPACE CONTROL

 At least one for each room or space enclosed by ceiling-height partitions
– To have at least one control step between 30% and 70% (inclusive) of full
lighting power in addition to all off

• Exceptions:
– Lighting in corridors, electrical/mechanical rooms, public lobbies,
restrooms, stairways, and storage rooms
– Spaces with only 1 luminaire with rated input power < 100W
– Space types with lighting power allowance of < 0.6 W/ft2
– in spaces ≤ 10,000 ft2, each control serves 2,500 ft2 maximum and in spaces >
10,000 ft2, serves 10,000 ft2 maximum
 Readily accessible to occupants
 Override of any time-of-day control for
no more than 2 hours
 Remote location is allowed to
accommodate areas where safety
or security is a concern
SECTION 9 – 9.4.1.2

MANDATORY INDIVIDUAL SPACE CONTROLS

Occupancy sensors are required in:
 Classrooms and lecture halls
 Conference, meeting, and training rooms
 Employee lunch/break rooms
 Storage and supply rooms between 50 ft2 and
1000 ft2
 Rooms used for document copying and printing
 Office spaces < 250 ft2
 Restrooms
 Dressing, locker, and fitting rooms
Exceptions:
– Spaces with multi-scene control systems
– Shop and lab classrooms
– Areas with safety or security concern
– Lighting required for 24 hour operation
SECTION 9 – 9.4.1.3

PARKING GARAGE LIGHTING CONTROL
Parking garage lighting to be automatically controlled, including daylighting
• Must reduce lighting power by minimum of 30% when no activity detected for no
more than 30 minutes within a lighting zone ≤ 3,600 ft2
• Daylight transition zone lighting
– Controlled separately to automatically turn on lighting during daylight hours
and off at sunset
• Automatically reduce power in response to daylight for luminaires within 20 ft of
any perimeter wall that has
– a net opening to wall ratio of ≥ 40% and
– no exterior obstructions within 20 ft
Exceptions
• Daylight transition zones and ramps without parking are exempt from 30%
reduction and daylight control
• Applications using HID of 150W or less or induction lamps are exempt from 30%
reduction
THANK YOU
Henry Leung, P.Eng., MBA, LEED AP
hleung@bccomfort.com
604-412-0206

Contenu connexe

Tendances

Vrviii new presentation revised4
Vrviii new presentation revised4Vrviii new presentation revised4
Vrviii new presentation revised4Mahmoud Ezz
 
Variable refrigerant flow systems
Variable refrigerant flow systemsVariable refrigerant flow systems
Variable refrigerant flow systemsVAHAB ABDUL
 
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161 Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161 erdinc klima
 
TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017James Huffstutler
 
EE Reports VRF Guide
EE Reports VRF GuideEE Reports VRF Guide
EE Reports VRF GuideFrank Maricic
 
Session 03 - History of Automation and Process Introduction
Session 03 - History of Automation and Process IntroductionSession 03 - History of Automation and Process Introduction
Session 03 - History of Automation and Process IntroductionVidyaIA
 
Eta lyra series reflow oven
Eta lyra series reflow ovenEta lyra series reflow oven
Eta lyra series reflow ovenCarrie Zhang
 
Webasto marine catalog 2016
Webasto marine catalog 2016Webasto marine catalog 2016
Webasto marine catalog 2016Gabriele Brivio
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF John Chavez
 
Oil & Gas_Process Control Market FCDE 2015
Oil & Gas_Process Control Market FCDE 2015Oil & Gas_Process Control Market FCDE 2015
Oil & Gas_Process Control Market FCDE 2015Blessing Chioma Udongwo
 
Compressor technology options supporting r744 system design for diverse end u...
Compressor technology options supporting r744 system design for diverse end u...Compressor technology options supporting r744 system design for diverse end u...
Compressor technology options supporting r744 system design for diverse end u...Venu Kandi
 
GridPoint\’s Energy Management System Intelligent Controllers
GridPoint\’s Energy Management System Intelligent ControllersGridPoint\’s Energy Management System Intelligent Controllers
GridPoint\’s Energy Management System Intelligent ControllersMichele_Zambrano333
 
Session 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial AutomationSession 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial AutomationVidyaIA
 
Verasys technical introduction
Verasys technical introductionVerasys technical introduction
Verasys technical introductionRobert Stone
 
Carier vvt an alternative for vav system published by morgan pope
Carier vvt    an alternative for vav system published  by morgan popeCarier vvt    an alternative for vav system published  by morgan pope
Carier vvt an alternative for vav system published by morgan popealone160162
 
Compresor tornillo 75 a 100 HP
Compresor tornillo 75 a 100 HPCompresor tornillo 75 a 100 HP
Compresor tornillo 75 a 100 HPAlmacenes JJ S.A.
 

Tendances (20)

Booklet
BookletBooklet
Booklet
 
Vrviii new presentation revised4
Vrviii new presentation revised4Vrviii new presentation revised4
Vrviii new presentation revised4
 
The Consultants Role
The Consultants RoleThe Consultants Role
The Consultants Role
 
Variable refrigerant flow systems
Variable refrigerant flow systemsVariable refrigerant flow systems
Variable refrigerant flow systems
 
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161 Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
Rittal - İklimlendirme ve Soğutma Ürünleri 144 161
 
TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017TCS Basys Controls Overview 2017
TCS Basys Controls Overview 2017
 
EE Reports VRF Guide
EE Reports VRF GuideEE Reports VRF Guide
EE Reports VRF Guide
 
Session 03 - History of Automation and Process Introduction
Session 03 - History of Automation and Process IntroductionSession 03 - History of Automation and Process Introduction
Session 03 - History of Automation and Process Introduction
 
Eta lyra series reflow oven
Eta lyra series reflow ovenEta lyra series reflow oven
Eta lyra series reflow oven
 
Webasto marine catalog 2016
Webasto marine catalog 2016Webasto marine catalog 2016
Webasto marine catalog 2016
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Oil & Gas_Process Control Market FCDE 2015
Oil & Gas_Process Control Market FCDE 2015Oil & Gas_Process Control Market FCDE 2015
Oil & Gas_Process Control Market FCDE 2015
 
G y un50_00
G y un50_00G y un50_00
G y un50_00
 
Compressor technology options supporting r744 system design for diverse end u...
Compressor technology options supporting r744 system design for diverse end u...Compressor technology options supporting r744 system design for diverse end u...
Compressor technology options supporting r744 system design for diverse end u...
 
GridPoint\’s Energy Management System Intelligent Controllers
GridPoint\’s Energy Management System Intelligent ControllersGridPoint\’s Energy Management System Intelligent Controllers
GridPoint\’s Energy Management System Intelligent Controllers
 
Session 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial AutomationSession 02 - Introduction to Industrial Automation
Session 02 - Introduction to Industrial Automation
 
Verasys technical introduction
Verasys technical introductionVerasys technical introduction
Verasys technical introduction
 
Carier vvt an alternative for vav system published by morgan pope
Carier vvt    an alternative for vav system published  by morgan popeCarier vvt    an alternative for vav system published  by morgan pope
Carier vvt an alternative for vav system published by morgan pope
 
Compresor tornillo 75 a 100 HP
Compresor tornillo 75 a 100 HPCompresor tornillo 75 a 100 HP
Compresor tornillo 75 a 100 HP
 
Dekon vrf system brief introduction
Dekon vrf system brief introductionDekon vrf system brief introduction
Dekon vrf system brief introduction
 

En vedette

US DOE 90.1 2010 HVAC & SWH-presentations_中英對照
US DOE 90.1 2010 HVAC & SWH-presentations_中英對照US DOE 90.1 2010 HVAC & SWH-presentations_中英對照
US DOE 90.1 2010 HVAC & SWH-presentations_中英對照erik chiang
 
5156 p1-p psp-pengawasan mutu
5156 p1-p psp-pengawasan mutu5156 p1-p psp-pengawasan mutu
5156 p1-p psp-pengawasan mutuWinarto Winartoap
 
Ashrae 62.1 2010 最小外氣量需求計算
Ashrae 62.1 2010 最小外氣量需求計算Ashrae 62.1 2010 最小外氣量需求計算
Ashrae 62.1 2010 最小外氣量需求計算erik chiang
 
Permenkes 9 2015 perubahan penggolongan psikotropika
Permenkes 9 2015 perubahan penggolongan psikotropikaPermenkes 9 2015 perubahan penggolongan psikotropika
Permenkes 9 2015 perubahan penggolongan psikotropikaUlfah Hanum
 
ASHRAE Standard 62.1 2010 Table 6.1
ASHRAE Standard 62.1 2010 Table 6.1ASHRAE Standard 62.1 2010 Table 6.1
ASHRAE Standard 62.1 2010 Table 6.1erik chiang
 
Rancangan Formularium 2
Rancangan Formularium 2Rancangan Formularium 2
Rancangan Formularium 2Sisca Yoliza
 
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015weni chris
 
Rancangan Formularium 1
Rancangan Formularium 1Rancangan Formularium 1
Rancangan Formularium 1Sisca Yoliza
 
5c handbook-welding
5c handbook-welding5c handbook-welding
5c handbook-weldingkomang gede
 
Contoh form pengusulan obat formularium
Contoh form pengusulan obat formulariumContoh form pengusulan obat formularium
Contoh form pengusulan obat formulariumKaraengRewaMatt
 
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotika
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotikaPermenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotika
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotikaUlfah Hanum
 
Contoh surat permohonan obat
Contoh surat permohonan obatContoh surat permohonan obat
Contoh surat permohonan obatEdi Purwanto
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulashvactrg1
 
Spo penyimp narkotika
Spo penyimp narkotikaSpo penyimp narkotika
Spo penyimp narkotikaWawan Wan
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load CalculationOrange Slides
 

En vedette (20)

Building Leakage Test Results
Building Leakage Test ResultsBuilding Leakage Test Results
Building Leakage Test Results
 
US DOE 90.1 2010 HVAC & SWH-presentations_中英對照
US DOE 90.1 2010 HVAC & SWH-presentations_中英對照US DOE 90.1 2010 HVAC & SWH-presentations_中英對照
US DOE 90.1 2010 HVAC & SWH-presentations_中英對照
 
5156 p1-p psp-pengawasan mutu
5156 p1-p psp-pengawasan mutu5156 p1-p psp-pengawasan mutu
5156 p1-p psp-pengawasan mutu
 
Ashrae 62.1 2010 最小外氣量需求計算
Ashrae 62.1 2010 最小外氣量需求計算Ashrae 62.1 2010 最小外氣量需求計算
Ashrae 62.1 2010 最小外氣量需求計算
 
Table 6.3.2
Table 6.3.2Table 6.3.2
Table 6.3.2
 
Permenkes 9 2015 perubahan penggolongan psikotropika
Permenkes 9 2015 perubahan penggolongan psikotropikaPermenkes 9 2015 perubahan penggolongan psikotropika
Permenkes 9 2015 perubahan penggolongan psikotropika
 
Borang kosong
Borang kosongBorang kosong
Borang kosong
 
ASHRAE Standard 62.1 2010 Table 6.1
ASHRAE Standard 62.1 2010 Table 6.1ASHRAE Standard 62.1 2010 Table 6.1
ASHRAE Standard 62.1 2010 Table 6.1
 
Rancangan Formularium 2
Rancangan Formularium 2Rancangan Formularium 2
Rancangan Formularium 2
 
Patient safety (apoteker wajib baca)
Patient safety (apoteker wajib baca)Patient safety (apoteker wajib baca)
Patient safety (apoteker wajib baca)
 
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015
Kepmenkes no. 137 th 2016 ttg perubahan formularium nasional 2015
 
Rancangan Formularium 1
Rancangan Formularium 1Rancangan Formularium 1
Rancangan Formularium 1
 
5c handbook-welding
5c handbook-welding5c handbook-welding
5c handbook-welding
 
Contoh form pengusulan obat formularium
Contoh form pengusulan obat formulariumContoh form pengusulan obat formularium
Contoh form pengusulan obat formularium
 
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotika
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotikaPermenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotika
Permenkes 3 2015 peredaran, penyimpanan, pemusnahan, dan pelaporan narkotika
 
Contoh surat permohonan obat
Contoh surat permohonan obatContoh surat permohonan obat
Contoh surat permohonan obat
 
HVAC Sysems & AHU
HVAC Sysems & AHUHVAC Sysems & AHU
HVAC Sysems & AHU
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulas
 
Spo penyimp narkotika
Spo penyimp narkotikaSpo penyimp narkotika
Spo penyimp narkotika
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load Calculation
 

Similaire à BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects)- January 2013 Presentation

Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2ong93
 
Presentation emb and industrial ventilation
Presentation emb and industrial ventilationPresentation emb and industrial ventilation
Presentation emb and industrial ventilationjkborade
 
Presentation industrial ventilation roda
Presentation industrial ventilation rodaPresentation industrial ventilation roda
Presentation industrial ventilation rodaEeu SC
 
TandG_Building_Tech_Specs.pdf
TandG_Building_Tech_Specs.pdfTandG_Building_Tech_Specs.pdf
TandG_Building_Tech_Specs.pdfRobert Tannoury
 
Update on 2014 New York State and NYC Energy Codes Energy Code Requirements
Update on 2014 New York State and NYC Energy Codes Energy Code RequirementsUpdate on 2014 New York State and NYC Energy Codes Energy Code Requirements
Update on 2014 New York State and NYC Energy Codes Energy Code RequirementsCindy Foster-Warthen
 
Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehouse
 
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse Europe
 
Code Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDCode Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDScott Bowman
 
Sales Training - New Building Codes for Lighting - CA Title 24
Sales Training - New Building Codes for Lighting - CA Title 24Sales Training - New Building Codes for Lighting - CA Title 24
Sales Training - New Building Codes for Lighting - CA Title 24Jennifer Andrews
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsXiangyang Tan
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...Colt UK
 
Designing and optimising a glass curtain wall facade
Designing and optimising a glass curtain wall facadeDesigning and optimising a glass curtain wall facade
Designing and optimising a glass curtain wall facadeReshma Philip
 
ventilación mecánica
ventilación mecánicaventilación mecánica
ventilación mecánicaUSCO
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastAli Shoaee
 
HVAC - Concept & Components
HVAC - Concept & ComponentsHVAC - Concept & Components
HVAC - Concept & ComponentsUmang Patel
 
2015 Commercial Products LENNOX
2015 Commercial Products LENNOX2015 Commercial Products LENNOX
2015 Commercial Products LENNOXVictor Neugebauer
 

Similaire à BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects)- January 2013 Presentation (20)

Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
Presentation emb and industrial ventilation
Presentation emb and industrial ventilationPresentation emb and industrial ventilation
Presentation emb and industrial ventilation
 
Presentation industrial ventilation roda
Presentation industrial ventilation rodaPresentation industrial ventilation roda
Presentation industrial ventilation roda
 
TandG_Building_Tech_Specs.pdf
TandG_Building_Tech_Specs.pdfTandG_Building_Tech_Specs.pdf
TandG_Building_Tech_Specs.pdf
 
Update on 2014 New York State and NYC Energy Codes Energy Code Requirements
Update on 2014 New York State and NYC Energy Codes Energy Code RequirementsUpdate on 2014 New York State and NYC Energy Codes Energy Code Requirements
Update on 2014 New York State and NYC Energy Codes Energy Code Requirements
 
Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015
 
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
 
Code Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDCode Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEED
 
Sales Training - New Building Codes for Lighting - CA Title 24
Sales Training - New Building Codes for Lighting - CA Title 24Sales Training - New Building Codes for Lighting - CA Title 24
Sales Training - New Building Codes for Lighting - CA Title 24
 
Energy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylawsEnergy efficient for part 9 buildings and city bylaws
Energy efficient for part 9 buildings and city bylaws
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
Designing and optimising a glass curtain wall facade
Designing and optimising a glass curtain wall facadeDesigning and optimising a glass curtain wall facade
Designing and optimising a glass curtain wall facade
 
ventilación mecánica
ventilación mecánicaventilación mecánica
ventilación mecánica
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 
Presentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation systemPresentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation system
 
Presentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation systemPresentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation system
 
HVAC - Concept & Components
HVAC - Concept & ComponentsHVAC - Concept & Components
HVAC - Concept & Components
 
2015 Commercial Products LENNOX
2015 Commercial Products LENNOX2015 Commercial Products LENNOX
2015 Commercial Products LENNOX
 
Appa
AppaAppa
Appa
 
Hvac System
Hvac SystemHvac System
Hvac System
 

Dernier

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 

Dernier (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 

BC Comfort ASHRAE 90.1 2010 Envelope Highlights (Christopher Boyzk Architects)- January 2013 Presentation

  • 2. YOUR CONTACTS • Henry Leung, P.Eng., MBA, LEED AP Senior Design Engineer • Amir Tehrani, P.Eng., LEED AP Contract Manager, Partner
  • 3. AGENDA 1. ASHRAE 90.1 Overview 2. Compliance Paths 3. Cost 4. Envelope 5. Mechanical 6. Electrical
  • 4. OVERVIEW To provide minimum requirements for the energyefficient design of buildings except low-rise residential buildings 30% Energy savings compared to ASHRAE 90.1-2004
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. National Energy Code for Canada 2011 i.e. Canadian ASHRAE 90.1
  • 11.
  • 12. Compliance Approaches Building System Compliance Options Prescriptive Option Envelope HVAC Mandatory Provisions SWH (required for most compliance options) Power Trade Off Option Energy Cost Budget Lighting Other Simplified Energy Code Compliance
  • 13.
  • 14.
  • 15.
  • 16. LEED • LEED Canada NC 2009 - Valid until at least 2015 1. ASHRAE 90.1-2007 2. MNECB 1997 • LEED v4 1. ASHRAE 90.1-2010 2. maybe NECB 2011
  • 17. COST
  • 18.
  • 20. SECTION 5 ABOVE-GRADE WALL INSULATION Four types of walls are defined  Mass walls – heat capacity determined from Table A3.1B or A3.1C – R-value is for continuous insulation or when uninterrupted by framing other than metal clips no closer than 24 in. o.c. horizontally and 16 in. o.c. vertically  Metal building wall R-value – for insulation compressed between metal wall panels and the steel structure  Steel-framed wall R-value – for uncompressed insulation installed in the cavity between steel studs  Wood-framed and other R-value – for uncompressed insulation installed in the cavity between wood studs; also acceptable to be continuous insulation uninterrupted by studs
  • 22. Section 5 Envelope Alteration Exceptions Allowed if they don’t increase energy usage of building  Installation of storm windows  Replacement of glazing in existing sash and frame  Replacement of roof membranes  Replacement of existing doors  Replacement of existing  Alterations to envelope cavities fenestration, provided area of provided they are insulated to full replacement is no more than depth with a nominal R-3.0 per in. 25% of total fenestration area  Roof and floor alterations where no new cavities are created
  • 25. SECTION 5 – 5.5.4.2.3 SKYLIGHT FENESTRATION AREA Skylights are required in enclosed spaces that are • ≥ 5,000 ft2 and • Ceiling heights > 15 ft and • Space types – Office - Convention Center – Transportation – Lobby - Automotive Service – Workshop – Atrium - Manufacturing – Concourse - Non-refrigerated Warehouse – Corridor - Retail – Storage - Distribution/Sorting Area – Gymnasium/Exercise Center
  • 26. SECTION 5 – 5.5.4.2.3 SKYLIGHT FENESTRATION AREA Total skylight area is either: • Minimum of 3% of roof area with a skylight VLT at least 0.40 OR • Such that the daylight area under skylights is a minimum of half the floor area and provides a minimum skylight effective aperture of at least 1% Exceptions • Climate zones 6-8 • Spaces with LPDs < 0.5 W/ft2 • Shaded spaces • Daylight area under rooftop monitors is > 50% of floor area • Documented that 90% of skylight area is shaded on June 21 (Northern Hemisphere)/December 21 (Southern Hemisphere) at noon by permanent features • Required daylight area under skylights may be reduced by amount of: • primary sidelighted area with sidelighting effective aperture > 0.15 • secondary sidelighted area with sidelighting effective aperture > 0.30 with general lighting controlled by continuous daylight dimming
  • 27. SECTION 5 – 5.5.4.5 FENESTRATION ORIENTATION Vertical fenestration area to meet this requirement: Area South ≥ Area West and Area South ≥ Area East N No! Yes! Exceptions: • Buildings shaded by other buildings within 20 ft to the south which is at least ½ as tall as the proposed building • Buildings with shade on 75% of the west and east • Alterations and additions that don’t increase vertical fenestration area
  • 28. HVAC 1. Economizers required for > 4 ton RTU 2. Energy Recovery > 5000 CFM units
  • 29. SECTION 6 – 6.4.1.1 MINIMUM EQUIPMENT EFFICIENCY HVAC Equipment Covered            Air conditioners and condensing units Heat pumps (air, water, and ground source) Water-chilling packages (chillers) Packaged terminal and room air conditioners and heat pumps Furnaces, duct furnaces and unit heaters Boilers Heat rejection equipment (cooling towers) Heat transfer equipment (heat exchangers) Variable refrigerant flow (VRF) air conditioners VRF air-to-air and applied heat pumps Air conditioners serving computer rooms
  • 30. SECTION 6 – 6.4.3.9 (6.3.2Q) DEMAND CONTROL VENTILATION DCV must be provided for each zone with a area > 500 ft² and the design occupancy > 40 people/1000 ft² where the HVAC system has:  An air-side economizer,  Automatic modulating control of the OSA dampers, or  A design outdoor airflow > 3,000 cfm Demand control ventilation (DCV): a ventilation system capability that provides for the automatic reduction of outdoor air intake below design rates when the actual occupancy of spaces served by the system is less than design occupancy.
  • 31. LIGHTING • Lighting alteration requirements take effect at 10% replacement • Include exterior areas • Include renovations even when it is just lamp/ballast replacement
  • 32.
  • 33. SECTION 8 – 8.4.2 AUTOMATIC RECEPTACLE CONTROL ≥ 50% of all 125 volt 15- and 20-amp receptacles (including those in modular partitions) must be controlled by an automatic control device in these space types  Private offices  Open offices  Computer classrooms Exceptions  Receptacles designated for equipment requiring 24 hr operation  Spaces with security or safety concerns Automatic control devices must function on:  Time-of-day controller provided to control ≤ 25,000 ft2 and not more than one floor  Occupant sensor to turn off receptacles within 30 minutes of occupant leaving the space  Signal from another control or alarm that indicates the area is unoccupied
  • 34. SECTION 9 - 9.4.1 MANDATORY AUTOMATIC SHUTOFF Automatic lighting shutoff control device required EXCEPT:  Lighting for 24-hour operation  Patient care spaces  Areas with safety or security concerns Compliance options: Control lights on a scheduled basis (automatic time switch)  Time-of-day controller  Controls ≤ 25,000 ft2 and not more than one floor Occupant sensor  Turn lights off within 30 minutes of occupant leaving the space Signal from another control or alarm that indicates the area is unoccupied
  • 35. SECTION 9 – 9.4.1.2 MANDATORY: INDIVIDUAL SPACE CONTROL  At least one for each room or space enclosed by ceiling-height partitions – To have at least one control step between 30% and 70% (inclusive) of full lighting power in addition to all off • Exceptions: – Lighting in corridors, electrical/mechanical rooms, public lobbies, restrooms, stairways, and storage rooms – Spaces with only 1 luminaire with rated input power < 100W – Space types with lighting power allowance of < 0.6 W/ft2 – in spaces ≤ 10,000 ft2, each control serves 2,500 ft2 maximum and in spaces > 10,000 ft2, serves 10,000 ft2 maximum  Readily accessible to occupants  Override of any time-of-day control for no more than 2 hours  Remote location is allowed to accommodate areas where safety or security is a concern
  • 36. SECTION 9 – 9.4.1.2 MANDATORY INDIVIDUAL SPACE CONTROLS Occupancy sensors are required in:  Classrooms and lecture halls  Conference, meeting, and training rooms  Employee lunch/break rooms  Storage and supply rooms between 50 ft2 and 1000 ft2  Rooms used for document copying and printing  Office spaces < 250 ft2  Restrooms  Dressing, locker, and fitting rooms Exceptions: – Spaces with multi-scene control systems – Shop and lab classrooms – Areas with safety or security concern – Lighting required for 24 hour operation
  • 37. SECTION 9 – 9.4.1.3 PARKING GARAGE LIGHTING CONTROL Parking garage lighting to be automatically controlled, including daylighting • Must reduce lighting power by minimum of 30% when no activity detected for no more than 30 minutes within a lighting zone ≤ 3,600 ft2 • Daylight transition zone lighting – Controlled separately to automatically turn on lighting during daylight hours and off at sunset • Automatically reduce power in response to daylight for luminaires within 20 ft of any perimeter wall that has – a net opening to wall ratio of ≥ 40% and – no exterior obstructions within 20 ft Exceptions • Daylight transition zones and ramps without parking are exempt from 30% reduction and daylight control • Applications using HID of 150W or less or induction lamps are exempt from 30% reduction
  • 38. THANK YOU Henry Leung, P.Eng., MBA, LEED AP hleung@bccomfort.com 604-412-0206

Notes de l'éditeur

  1. Based on a study commissioned by Office of Housing and Construction Standards. Joint venture between Stantec and BTY (QS). Not significant cost&lt;1% increase in cost.Makes sense, because many of the items asked for in the code are already in effect. E.g. RTUs/boilers sold are already quite high efficiency. Walls are regularly well insulated. Low-E glazing is becoming more standard. However, I think this study is optimistic.
  2. Table gives a layout of the insulation values before and after the new code. All Walls are overall assembly. i.e. to achieve R15, you will need R20+ insulation between studsMass: Concrete Wall, e.g. Tilt up concreteSteel-Framed: Wall with cavity (with insulation)Wood-framed: same, but with wood.VBBL requires slightly more stringent values.
  3. Table gives a layout of the insulation values before and after the new code. All Walls are overall assembly. i.e. to achieve R15, you will need R20+ insulation between studsMass: Concrete Wall, e.g. Tilt up concreteSteel-Framed: Wall with cavity (with insulation)Wood-framed: same, but with wood.VBBL requires slightly more stringent values.
  4. Table gives a layout of the insulation values before and after the new code. All Walls are overall assembly. i.e. to achieve R15, you will need R20+ insulation between studsMass: Concrete Wall, e.g. Tilt up concreteSteel-Framed: Wall with cavity (with insulation)Wood-framed: same, but with wood.VBBL requires slightly more stringent values.
  5. Required pretty much for any building.
  6. Economizer have been standard practice by BCC, but make sure your mech contractor is including this.
  7. Tables 6.8.1A – 6.8.1Ki.e. Replacement equipment may be larger and be more expensive than what was originally installed.e.g. water source heat pumps at UBC SPPHNew heat pump chassis was significantly larger than old 20 year units.
  8. Previously 50% threshold for replacement.
  9. 25% reduction in some cases, but more like 10% in most cases.
  10. Intent:Eliminate after hours lighting wasteAreas with safety – always an issue
  11. All Building Permits issued after December 20th, 2013 will require compliance to ASHRAE 90.1-2010.