SlideShare une entreprise Scribd logo
1  sur  23
COMMITTEE 
ON 
UBS 
CORE GROUP 
CORE GROUP 
ON 
UBS 
ON 
UBS 
• Professionals/ Experts 
•OEMs-Bus, ITS 
•Asso. of bus body 
builders 
•SIAM 
•ASRTU 
•CIRT & ARAI 
• Operators (BMTC, DTC 
etc)
 Comfortable & Safe for Passenger 
 Accessible for PWD’s 
 Better Driving Conditions 
 Standardization of common specifications 
• Regular and BRTS services 
 Technological advancements 
 ITS enabled 
 Value for money
Type Floor Ht. Length Width Total 
Capacity 
Standard 650 mm 12 m 2.6 m 70 
Midi 400/650mm 9 m 2.5 m 40 
Mini 900 mm 6 m 2.2 m 22 
Standard BRTS 900 mm (max) 12 m 2.6 m 70 
Arti-BRTS 900 mm (max) 18 m 2.6 m 110 
Bi-Articulated In Process 
High end In Process
 Pneumatic controlled wider doors 
 Wider gangway ≥ 700mm 
 Higher acceleration ≥ 0.8m/s/s 
 Engine location & fuel: optional 
 ROH ≤ 50% of Wheel base 
 Approach & departure angle: 8.5˚ & 9˚ 
 Life cycle: 10 years & 750,000 kms
Gangway ROH
 Transmission system 
 Standards for driver’s area 
• Noise 
• Vibration and 
• Heat
 Mandatory door closure for movement of 
bus 
 Disc brakes 
 Design Type approval: Roll over test
To be evolved for 
650/900mm floor ht ???
 Multiplex wiring 
 Vehicle Health Monitoring system 
 Driver Console 
 PIS inside and outside integrated with 
audio announcement system 
 Camera (inside & rear)
1. Floor inside the bus should be uniform inside 
the vehicle without any steps inside vehicle 
2. Floor Height of the Vehicle 
a) 400, 650 and 900 mm if meets criteria above 1.
DIAGRAM FOR ILLUSTRATION ONLY 
Drive & Non driver side door for median & side station @ 400/650/900 mm ht 
to match BRTS platform height 
Partition between doors for both Driver and Non driver side Tractor Gate 
Extra optional front Non Driver side gate with steps 
Not to Scale
3. Station Location 
a) Median Station with platform height to match bus floor 
height for BRTS operation 
b) Side Station with platform height to match bus floor height 
for BRTS operation 
3. System may have all Median stations or all Side Stations 
or combinations of Median and Side station with 
platform height 400 /650 / 900 mm to meet the floor 
height of the vehicle. 
4. Vehicle door locations and floor height selection will 
be based on the design of BRTS element design – 
station location, platform height and the local 
conditions. 
15
Door with steps for end 
terminals & open operation 
Can also act as emergency 
door 
Single Wide door in center for 
faster dispersal- for operating only 
in the BRT corridor 
Step-less align with bus stop 
platform 
 easy access for wheel chair user
 Uniform floor height across the length 
 Step less movement inside the bus 
 Easy & fast dispersal of passenger across the length of 
the bus- lesser dwell time
 Seats facing each other with common area for circulation 
 More space for movement while boarding/alighting 
 Plastic molded seats- easy washable with less maintenance
 Exclusive area for Wheel Chair User near the door
 Precise longitudinal and lateral placement of the bus door 
with the station doors is needed for faster, safer and 
convenient boarding & alighting of the passengers 
• Low Frequency 125KHz RFID Reader at Doors 
• LF TAG on the Bus Side Glass near driver 
• RF 2.4 GHz wireless Transmitter on the bus driver for Open/Close 
• RF 2.4 GHz 4 Door Receiver at the station for door control and communication to 
door operator
RFID Tag 
Precise & safe docking with 
the bus stop platform
 Limited Bus Manufacturers 
 Capacity for maintenance 
 Unaffordable AMC 
 No standards on fuel efficiency of buses 
 ARAI approval is limited to ‘chassis’ only 
 No standards to check on performance of AC 
buses 
 Standardization Station layout wrt door 
locations
27. urban bus specifications

Contenu connexe

Tendances

Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
kiranightly
 
Anand Vihar Integrated Circulation Plan
Anand Vihar Integrated Circulation PlanAnand Vihar Integrated Circulation Plan
Anand Vihar Integrated Circulation Plan
uttipecDRAFT
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
Hassan Raza
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
Avtansh Ghai
 

Tendances (20)

Inter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case StudyInter state bus terminal - Library Study & Case Study
Inter state bus terminal - Library Study & Case Study
 
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal HubData Collection-Standards- Bus Terminal- Multi-Modal Hub
Data Collection-Standards- Bus Terminal- Multi-Modal Hub
 
Central Bus Station, Vadodara
Central Bus Station, VadodaraCentral Bus Station, Vadodara
Central Bus Station, Vadodara
 
BUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDYBUS TERMINAL LIBRARY STUDY
BUS TERMINAL LIBRARY STUDY
 
Transit hub
Transit hub Transit hub
Transit hub
 
Bus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt showBus terminal+commercial complex+isbt+india ppt show
Bus terminal+commercial complex+isbt+india ppt show
 
CHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case studyCHENNAI MOFUSSIL BUS TERMINUS_a case study
CHENNAI MOFUSSIL BUS TERMINUS_a case study
 
Isbt kashmere gate 2
Isbt kashmere gate 2Isbt kashmere gate 2
Isbt kashmere gate 2
 
Planning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics ParksPlanning principles of Bus Terminals and Logistics Parks
Planning principles of Bus Terminals and Logistics Parks
 
Kashmere gate isbt
Kashmere gate isbtKashmere gate isbt
Kashmere gate isbt
 
Isbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case studyIsbt, kashmiri gate, delhi_a case study
Isbt, kashmiri gate, delhi_a case study
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Chennai mofussil bus terminal case study
Chennai mofussil bus terminal case studyChennai mofussil bus terminal case study
Chennai mofussil bus terminal case study
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
 
Anand Vihar Integrated Circulation Plan
Anand Vihar Integrated Circulation PlanAnand Vihar Integrated Circulation Plan
Anand Vihar Integrated Circulation Plan
 
Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006 Bus Terminal-Bachelor thesis project 2006
Bus Terminal-Bachelor thesis project 2006
 
bus terminal design
bus terminal designbus terminal design
bus terminal design
 
Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline Bus Karo: Bus Depot Design Guideline
Bus Karo: Bus Depot Design Guideline
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 

En vedette

Jaipur City Bus Route
Jaipur City Bus RouteJaipur City Bus Route
Jaipur City Bus Route
nandudhayal17
 

En vedette (7)

JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi Experience
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURM
 
Jaipur City Bus Route
Jaipur City Bus RouteJaipur City Bus Route
Jaipur City Bus Route
 
1.Jnnurm
1.Jnnurm1.Jnnurm
1.Jnnurm
 
Overcoming Challenges of Integrating Urban Transport System
Overcoming Challenges of Integrating Urban Transport SystemOvercoming Challenges of Integrating Urban Transport System
Overcoming Challenges of Integrating Urban Transport System
 
Jnnurm
JnnurmJnnurm
Jnnurm
 
Urban Transportation Market In India
Urban Transportation Market In IndiaUrban Transportation Market In India
Urban Transportation Market In India
 

Similaire à 27. urban bus specifications

PARI Carparking Brochure Web
PARI Carparking Brochure WebPARI Carparking Brochure Web
PARI Carparking Brochure Web
Farukh Alase
 

Similaire à 27. urban bus specifications (20)

THINK ‘SMART’,THINK WOHR AUTOMATIC CAR PARKING
THINK ‘SMART’,THINK WOHR AUTOMATIC CAR PARKINGTHINK ‘SMART’,THINK WOHR AUTOMATIC CAR PARKING
THINK ‘SMART’,THINK WOHR AUTOMATIC CAR PARKING
 
Automated parking system
Automated parking systemAutomated parking system
Automated parking system
 
automaticparking
automaticparkingautomaticparking
automaticparking
 
Automatic parking SYSTEM
Automatic parking SYSTEMAutomatic parking SYSTEM
Automatic parking SYSTEM
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Proterra TearSheet
Proterra TearSheetProterra TearSheet
Proterra TearSheet
 
Multi Storey Car Parking presentation.pdf
Multi Storey Car Parking presentation.pdfMulti Storey Car Parking presentation.pdf
Multi Storey Car Parking presentation.pdf
 
Advantages of Automated Parking Systems ..pptx
Advantages of Automated Parking Systems ..pptxAdvantages of Automated Parking Systems ..pptx
Advantages of Automated Parking Systems ..pptx
 
Auto parking-system
Auto parking-systemAuto parking-system
Auto parking-system
 
Wohr Elevator Car Parking System For India's Parking Problems
Wohr Elevator Car Parking System For India's Parking ProblemsWohr Elevator Car Parking System For India's Parking Problems
Wohr Elevator Car Parking System For India's Parking Problems
 
Smart parking 2020 vision
Smart parking 2020 vision Smart parking 2020 vision
Smart parking 2020 vision
 
MULTIPLE ADVANTAGES WITH WOHR’S MULTIPARKER
MULTIPLE ADVANTAGES WITH WOHR’S MULTIPARKERMULTIPLE ADVANTAGES WITH WOHR’S MULTIPARKER
MULTIPLE ADVANTAGES WITH WOHR’S MULTIPARKER
 
Swiss Parking Systems
Swiss Parking SystemsSwiss Parking Systems
Swiss Parking Systems
 
Smart parking
Smart parkingSmart parking
Smart parking
 
PARI Carparking Brochure Web
PARI Carparking Brochure WebPARI Carparking Brochure Web
PARI Carparking Brochure Web
 
Automatic Metro
Automatic MetroAutomatic Metro
Automatic Metro
 
Sam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City DesignSam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City Design
 
Topic - Lift, Escalator, Walkway & automated Pedestrian overpass
Topic - Lift, Escalator, Walkway & automated Pedestrian overpassTopic - Lift, Escalator, Walkway & automated Pedestrian overpass
Topic - Lift, Escalator, Walkway & automated Pedestrian overpass
 
Automatic People and Passenger Counters
Automatic People and Passenger CountersAutomatic People and Passenger Counters
Automatic People and Passenger Counters
 
Fata Skyparks Presentation Linked In
Fata Skyparks Presentation Linked InFata Skyparks Presentation Linked In
Fata Skyparks Presentation Linked In
 

27. urban bus specifications

  • 1.
  • 2. COMMITTEE ON UBS CORE GROUP CORE GROUP ON UBS ON UBS • Professionals/ Experts •OEMs-Bus, ITS •Asso. of bus body builders •SIAM •ASRTU •CIRT & ARAI • Operators (BMTC, DTC etc)
  • 3.  Comfortable & Safe for Passenger  Accessible for PWD’s  Better Driving Conditions  Standardization of common specifications • Regular and BRTS services  Technological advancements  ITS enabled  Value for money
  • 4. Type Floor Ht. Length Width Total Capacity Standard 650 mm 12 m 2.6 m 70 Midi 400/650mm 9 m 2.5 m 40 Mini 900 mm 6 m 2.2 m 22 Standard BRTS 900 mm (max) 12 m 2.6 m 70 Arti-BRTS 900 mm (max) 18 m 2.6 m 110 Bi-Articulated In Process High end In Process
  • 5.  Pneumatic controlled wider doors  Wider gangway ≥ 700mm  Higher acceleration ≥ 0.8m/s/s  Engine location & fuel: optional  ROH ≤ 50% of Wheel base  Approach & departure angle: 8.5˚ & 9˚  Life cycle: 10 years & 750,000 kms
  • 7.
  • 8.  Transmission system  Standards for driver’s area • Noise • Vibration and • Heat
  • 9.  Mandatory door closure for movement of bus  Disc brakes  Design Type approval: Roll over test
  • 10. To be evolved for 650/900mm floor ht ???
  • 11.  Multiplex wiring  Vehicle Health Monitoring system  Driver Console  PIS inside and outside integrated with audio announcement system  Camera (inside & rear)
  • 12. 1. Floor inside the bus should be uniform inside the vehicle without any steps inside vehicle 2. Floor Height of the Vehicle a) 400, 650 and 900 mm if meets criteria above 1.
  • 13.
  • 14. DIAGRAM FOR ILLUSTRATION ONLY Drive & Non driver side door for median & side station @ 400/650/900 mm ht to match BRTS platform height Partition between doors for both Driver and Non driver side Tractor Gate Extra optional front Non Driver side gate with steps Not to Scale
  • 15. 3. Station Location a) Median Station with platform height to match bus floor height for BRTS operation b) Side Station with platform height to match bus floor height for BRTS operation 3. System may have all Median stations or all Side Stations or combinations of Median and Side station with platform height 400 /650 / 900 mm to meet the floor height of the vehicle. 4. Vehicle door locations and floor height selection will be based on the design of BRTS element design – station location, platform height and the local conditions. 15
  • 16. Door with steps for end terminals & open operation Can also act as emergency door Single Wide door in center for faster dispersal- for operating only in the BRT corridor Step-less align with bus stop platform  easy access for wheel chair user
  • 17.  Uniform floor height across the length  Step less movement inside the bus  Easy & fast dispersal of passenger across the length of the bus- lesser dwell time
  • 18.  Seats facing each other with common area for circulation  More space for movement while boarding/alighting  Plastic molded seats- easy washable with less maintenance
  • 19.  Exclusive area for Wheel Chair User near the door
  • 20.  Precise longitudinal and lateral placement of the bus door with the station doors is needed for faster, safer and convenient boarding & alighting of the passengers • Low Frequency 125KHz RFID Reader at Doors • LF TAG on the Bus Side Glass near driver • RF 2.4 GHz wireless Transmitter on the bus driver for Open/Close • RF 2.4 GHz 4 Door Receiver at the station for door control and communication to door operator
  • 21. RFID Tag Precise & safe docking with the bus stop platform
  • 22.  Limited Bus Manufacturers  Capacity for maintenance  Unaffordable AMC  No standards on fuel efficiency of buses  ARAI approval is limited to ‘chassis’ only  No standards to check on performance of AC buses  Standardization Station layout wrt door locations