SlideShare a Scribd company logo
1 of 33
Download to read offline
Search for Non-Standard Model Physics
Using the Transverse Muon Polarization
         in Stopped K+ Decay
                   The E06 TREK Experiment


                         Sébastien Bianchin
                  TRIUMF / University of British Columbia
                  on behalf of the TREK-E06 Collaboration




         PANIC 2011 (July 24th – 29th, 2001)
   Massachusetts Institute of Technology, MA, USA
             Thursday, July 28th 2011


    S. Bianchin                   PANIC 2011 (July 24th – 29th 2011)   1
The TREK Program at J-PARC


Outline
 TREK Program TREK = Time Reversal Experiment with Kaons
    Search for Time Reversal Symmetry Violation
    Test of Lepton Universality
    Search for Heavy Neutrinos   Lower intensity

 Hadron Facility at J-PARC
 TREK Apparatus – R&D
 Status & Schedule


           S. Bianchin        PANIC 2011 (July 24th – 29th 2011)   2
Stopped K+ Experiments @ K1.1BR

P36 (LFU)
 “Measurement of RK = (K+ →e+) / (K+ →m)
 and search for heavy sterile neutrinos”
 Stage-1 (PAC11-Jan’11); 30 kW         (~2013)
 (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm)


E06 (TREK)
 “Measurement of T-violating transverse muon
 polarization (PT) in K+→0mdecay”
 Stage-1, 270 kW        (~2014)

        S. Bianchin       PANIC 2011 (July 24th – 29th 2011)   3
Stopped K+ Experiments @ K1.1BR

P36 (LFU)
 “Measurement of RK = (K+ →e+) / (K+ →m)
 and search for heavy sterile neutrinos”
 Stage-1 (PAC11-Jan’11); 30 kW         (~2013)
 (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm)


E06 (TREK)
 “Measurement of T-violating transverse muon
 polarization (PT) in K+→0mdecay”
 Stage-1, 270 kW        (~2014)

        S. Bianchin       PANIC 2011 (July 24th – 29th 2011)   3
Transverse m+ Polarization in the Km3 Decay

K+→mdecay



   PT is T-odd, and spurious effects from final state interaction
     are small: PT (FSI) < 10-5
                Non-zero PT is a signature of T violation

- Standard Model (SM) contribution to PT : PT (SM) < 10-7
                PT in the range 10-3 – 10-5 is a sensitive probe of
                CP violation beyond the SM.
There are theoretical models of new physics which allow
  a sizable PT value without conflicting with other
experimental constraints.

       The TREK experiment aims for a sensitivity of 10-4
            S. Bianchin           PANIC 2011 (July 24th – 29th 2011)   4
Expected Sensitivity
            We are aiming for a sensitivity of PT ~ 10-4
     PTstat ~ 0.05 PTstat (E246) ~ 10-4 : 1.4 x 107 sec runtime

    1) Beam intensity x 30
    2) Detector acceptance x 10
    3) Larger analyzing power


PTsyst ~   0.1 PTsyst (E246)
            ~ 10-4


1) Precise calibration of misalignments
2) Correction of systematic effects
3) Precise fwd-bwd cancellation

             S. Bianchin              PANIC 2011 (July 24th – 29th 2011)   5
New Physics: Model Predictions for PT




          Model                      K+  0m+                       K+  m+

■   Standard Model                        < 10-7                       < 10-7
■   Final State Interactions              < 10-5                       < 10-3
Multi-Higgs                            ≤ 10-3              ≤ 10-3
                                 PT (K+  0m+) ≈ + 3 PT (K+  m+)
SUSY with squark mixing            ≤ 10-3           ≤ 10-3
                                 PT (K+  0m+) ≈ − 3 PT (K+  m+)

SUSY with R-parity breaking          ≤ 4 x10-4                     ≤ 3 x10-4
Leptoquark model                         ≤ 10-2                        ≤ 5 x10-3
■   Left-Right symmetric model                0                        < 7x10-3

        S. Bianchin              PANIC 2011 (July 24th – 29th 2011)                6
J-PARC Facility
                                                     (KEK/JAEA)


                                                         North




S. Bianchin   PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                        Linac                                  (KEK/JAEA)


                                                                   North
                3 GeV
                Synchrotron




CY2007 Beams

  S. Bianchin           PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                         Linac                                  (KEK/JAEA)


                                                                    North
                 3 GeV
                 Synchrotron



                     Materials and Life
                      Experimental
                          Facility




 CY2007 Beams                                                 Hadron Exp.
JFY2008 Beams                                                   Facility
   S. Bianchin           PANIC 2011 (July 24th – 29th 2011)
J-PARC Facility
                         Linac                                  (KEK/JAEA)


                                                                    North
                 3 GeV
                 Synchrotron
Neutrino Beams
(to Kamioka)

                     Materials and Life
                      Experimental
                          Facility




       CY2007 Beams                                           Hadron Exp.
      JFY2008 Beams                                             Facility
      JFY2009 Beams
         S. Bianchin     PANIC 2011 (July 24th – 29th 2011)
J-PARC Hadron Hall


                                                                      Beam
                                                                      Dump
                               K1.8

                                                                KL
                      K1.8BR

                                                         K1.1
                                                         S-type
 30~50 GeV            Production
primary beam                            K1.1BR
                      target (T1)
                                        C-type



        S. Bianchin              PANIC 2011 (July 24th – 29th 2011)          8
K1.1BR = K0.8 Beam Line Installation




Proton beam




              S. Bianchin   PANIC 2011 (July 24th – 29th 2011)   9
K1.1BR = K0.8 Beam Line Installation
 K1.1BR completed in summer 2010 using the supplementary budget of FY09
 Commissioned in Oct. 2010 by the TREK collaboration
   - ESS Length of 2.0m to be increased to 2.5m
   - Length Q8-FF of 3.3m to be reduced to 1.5m (remove iron shielding wall)

                                                             Q1, Q2
                                                                  D2
                                           T1       D1
                                                                         Q3, Q4
                                                       IFX,
Proton beam                                            IFY         SX1
                                                                              ESS
                                                                                  Q5, Q6
                                                                        SX2

                   K1.1-BR                              SX1               MS            D3
                                                                                        HFOC
                                                                                        Q7 Q8



                                                                                    •   FF
              S. Bianchin          PANIC 2011 (July 24th – 29th 2011)
The TREK Experimental Apparatus
   K+→m               Use an upgraded E246 detector

                            Active Polarimeter
                               ( Japan )

                               New Fibre Target
                                ( Canada )




                                     C0,C1 GEM
                                      ( USA )



                                                                     CsI(Tl) readout ( Russia )

PT is measured as the azimuthal asymmetry Ae+ of the m+ decay positrons
           S. Bianchin          PANIC 2011 (July 24th – 29th 2011)                       10
The Stopped Beam Method K+→m




                         Side view of the TREK setup

  Experimental method                                         bwd -         fwd - 

0 (2) detection EM Calorimeter
                                                                               Decay Plane
m+ tracking Target + 5 Chambers
       e+ detection Active Muon Polarimeter
           S. Bianchin                        PANIC 2011 (July 24th – 29th 2011)                11
The Stopped Beam Method K+→m




                         Electromagnetic calorimeter

0 detection                                                 bwd -        fwd - 

768 CsI(Tl) crystals (250mm in length ea.)
12 “muon holes” @ 90º to allow m+ to enter 12 spectrometer gaps
75% of 4 str

           S. Bianchin                       PANIC 2011 (July 24th – 29th 2011)               11
The Stopped Beam Method K+→m




                       Tracking system

Charged particle tracking                       bwd -        fwd - 

  5 Chambers :
    1 cylindrical GEM chamber (C0)
    1 planar GEM chamber (C1)                                + Active Target !
    3 planar MWPCs (C2, C3, C4)
         S. Bianchin            PANIC 2011 (July 24th – 29th 2011)               11
The Stopped Beam Method K+→m




                                  e+




                        Active muon polarimeter

m+ polarization measurement                              bwd -        fwd - 

  Active Muon Polarimeter
    Muon stopper : 33 plates (Al, Mg or other light metal alloy)
    Plate thickness : ~ 2mm
    Plate gap ~ 8mm
          S. Bianchin                    PANIC 2011 (July 24th – 29th 2011)               11
The Stopped Beam Method K+→m
Double ratio experiment
AT = (Afwd - Abwd ) / 2
                     Ncw - Nccw
Afwd(bwd)   =
                     Ncw + Nccw
PT = AT / {<cosT>}
              : analyzing power
    <cosT> : attenuation factor
Im = PT / KF : physics parameter
       KF     : kinematic factor


                                                   bwd -        fwd - 




                S. Bianchin        PANIC 2011 (July 24th – 29th 2011)               11
The Stopped Beam Method K+→m
 Double ratio experiment
 AT = (Afwd - Abwd ) / 2
                      Ncw - Nccw
 Afwd(bwd)   =
                      Ncw + Nccw
 PT = AT / {<cosT>}
               : analyzing power
     <cosT> : attenuation factor
 Im = PT / KF : physics parameter
        KF     : kinematic factor


Current limit from KEK--E246                           bwd -        fwd - 

    PT = - 0.0017 ± 0.0023(stat) ± 0.0011(syst) |PT | < 0.005 (90% CL)

    Im= - 0.0053 ± 0.0071(stat) ± 0.0036(syst) |Im| < 0.016 (90% CL)

                                            M.Abe et al., Phys. Rev. D 73, 072005 (2006)

                 S. Bianchin           PANIC 2011 (July 24th – 29th 2011)               11
TREK/E06 Tracking Upgrade
                                                           GEM technology --
                                                           In collaboration with
                                                           Jefferson Lab,
                                                           Hampton U. and MIT


                                                             70 µm holes

                                                             140 µm spacing




 Planar GEMs (C1)
  between CsI and C2
 Cylindrical GEM (C0)
 as replacement for old C1
           S. Bianchin       PANIC 2011 (July 24th – 29th 2011)               12
The C0 Cylindrical GEM for TREK

                                   300 mm
160 mm

         140 mm




         • Vertex tracking near target,  < 0.1 mm
         • Very high rate capability > 1 kHz/mm2
         • Radiation-hardness >> 107 particles/mm2

                   S. Bianchin    PANIC 2011 (July 24th – 29th 2011)   13
R&D(1) – APD Readout for CsI(Tl)
                                      • Improve the timing characteristics of
                                         CsI(Tl) by replacing PIN diode with APD
                                      • Pulse shaping and pile-up analysis
                             C1 GEM
                                        One-module energy                       One-module timing




                                            new requirement         too slow
• Both 1 and 9 module tests have been performed using an e+ beam at Tohoku
  Univ. to check the energy resolution and high-rate performance of APD readout
               S. Bianchin                 PANIC 2011 (July 24th – 29th 2011)                  14
R&D(2) – Active Muon Polarimeter

                             Top View



                                          e+


μ+

                                  μ+

   Full angular acceptance for positrons – 10x higher than in E-246
   Determination of decay vertex – background-free measurement
   Measurement of e+ angle and approx. energy – higher analyzing power
   Improved field alignment – suppressed systematic error

 Full-size prototype tested at TRIUMF in Nov. 2009
              S. Bianchin          PANIC 2011 (July 24th – 29th 2011)     15
R&D(3) – Active Scintillating Fiber Target
                      Light Guide:
                      Kuraray Y11 WLS Fibre (1400 mm)




   3x3 mm2
   356 fibres




                   Readout:
                   SiPMT (Hamamatsu MMPC)
                   1x1 mm2 / 400 px
                   Gain 7.5x105
     S. Bianchin         PANIC 2011 (July 24th – 29th 2011)   16
Upgrade Timeline
 Target:
        Finer segmentation of TGT scintillating fibres
         Readout: MPPC (SiPMT) Hamamatsu

 Particle ID:
        Aerogel Cherenkov surrounding target, TOF                      LFU
 Charged particle tracking:                                            30 kW
        Add new element C1 between CsI(Tl) and C2                      ~2013
        Add cylindrical GEM (C0) (remove aerogel)
                                                                        TREK
   0   (1&2 photon) detection:
                                                                        270 kW
     New, faster readout of CsI(Tl): APD, MAPD
     Wave form analysis using FADCs
                                                                        >100 kW
                                                                        ~2014
 Muon polarimeter :
     Active polarimeter with increased acceptance
     New muon holding field magnet with a parallel field

              S. Bianchin          PANIC 2011 (July 24th – 29th 2011)      17
Summary
 TREK at J-PARC is gaining momentum
 “K1.1BR” secondary beamline has been commissioned
 Measurement of the T-violating transverse muon
  polarization in Kμ3 decay (~2014)
  - Large potential for the discovery of New Physics
  - Upgrade of existing experimental setup of KEK E-246




          S. Bianchin      PANIC 2011 (July 24th – 29th 2011)   18
The TREK Collaboration
                                                                     http://trek.kek.jp
CANADA                                                  RUSSIA
University of Saskatchewan                              Russian Academy of Sciences (RAS)
Department of Physics and Engineering                   Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
                                                        JAPAN
                                                        Osaka University
Laboratoire de Physique Nucleaire
                                                        Department of Physics
University of Manitoba
                                                        National Defense Academy
Department of Physics
                                                        Department of Applied Physics
                                                        Tohoku University
USA                                                     Research Center for Electron Photon Science
                                                        High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
                                                        Institute of Particle and Nuclear Studies
University of South Carolina
                                                        Institute of Material Structure Science
Department of Physics and Astronomy
                                                        Accelerator Laboratory
Iowa State University
                                                        Kyoto University,
College of Liberal Arts & Sciences
                                                        Department of Physics
Hampton University
                                                        Tokyo Institute of Technology (TiTech)
Department of Physics
                                                        Department of Physics
Jefferson Laboratory

                                                        VIETNAM
                                                        University of Natural Sciences


               S. Bianchin                PANIC 2011 (July 24th – 29th 2011)                    19
The TREK Collaboration
                                                                     http://trek.kek.jp
CANADA                                                  RUSSIA
University of Saskatchewan                              Russian Academy of Sciences (RAS)
Department of Physics and Engineering                   Institute for Nuclear Research (INR)
University of British Columbia
Department of Physics and Astronomy
TRIUMF
Universite de Montreal
                                                        JAPAN
                                                        Osaka University
Laboratoire de Physique Nucleaire
                                                        Department of Physics
University of Manitoba
                                                        National Defense Academy
Department of Physics
                                                        Department of Applied Physics
                                                        Tohoku University
USA                                                     Research Center for Electron Photon Science
                                                        High Energy Accel. Research Org. (KEK)
Massachusetts Inst. of Technology (MIT)
                                                        Institute of Particle and Nuclear Studies
University of South Carolina
                                                        Institute of Material Structure Science
Department of Physics and Astronomy
                                                        Accelerator Laboratory
Iowa State University
                                                        Kyoto University,
College of Liberal Arts & Sciences
                                                        Department of Physics
Hampton University
                                                        Tokyo Institute of Technology (TiTech)
Department of Physics
                                                        Department of Physics
Jefferson Laboratory

                                                        VIETNAM
New collaborators are welcome!                          University of Natural Sciences


               S. Bianchin                PANIC 2011 (July 24th – 29th 2011)                    19
Thank You



S. Bianchin      PANIC 2011 (July 24th – 29th 2011)   20
J-PARC March11 Earthquake Damage




   S. Bianchin   PANIC 2011 (July 24th – 29th 2011)
S. Bianchin   PANIC 2011 (July 24th – 29th 2011)

More Related Content

Viewers also liked

Viewers also liked (7)

Alexandria power point_3rd_grade-2
Alexandria power point_3rd_grade-2Alexandria power point_3rd_grade-2
Alexandria power point_3rd_grade-2
 
Blpa 2011 grant presentation
Blpa 2011 grant presentationBlpa 2011 grant presentation
Blpa 2011 grant presentation
 
Cap bianchin
Cap bianchinCap bianchin
Cap bianchin
 
Avellaneda como incorporar redes_sociales_a_los_sitios_we
Avellaneda como incorporar redes_sociales_a_los_sitios_weAvellaneda como incorporar redes_sociales_a_los_sitios_we
Avellaneda como incorporar redes_sociales_a_los_sitios_we
 
Presentación criik
Presentación criikPresentación criik
Presentación criik
 
L & A part 7
L & A part 7L & A part 7
L & A part 7
 
The street
The streetThe street
The street
 

Similar to PANIC2011_Final

Bianchin panic2011 2
Bianchin panic2011 2Bianchin panic2011 2
Bianchin panic2011 2sbianchin
 
Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011sbianchin
 
Formation of Helium Lines in Prominences
Formation of Helium Lines in ProminencesFormation of Helium Lines in Prominences
Formation of Helium Lines in ProminencesUniversity of Glasgow
 
The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)Sebastien Bianchin
 
ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1Carlo Fanara
 
Graphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronicsGraphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronicsGiuseppe Iannaccone
 
3 ej fccrf legnaro 2014-10-06
3   ej fccrf legnaro 2014-10-063   ej fccrf legnaro 2014-10-06
3 ej fccrf legnaro 2014-10-06thinfilmsworkshop
 
Electronic Structures and UV/Visible Absorption Spectra of Organic Compunds
Electronic Structures and UV/Visible Absorption Spectra of Organic CompundsElectronic Structures and UV/Visible Absorption Spectra of Organic Compunds
Electronic Structures and UV/Visible Absorption Spectra of Organic CompundsFa-Gung Fan
 
Microseismic monitoring at the CCS fields - what we learnt from Nagaoka
Microseismic monitoring at the CCS fields - what we learnt from NagaokaMicroseismic monitoring at the CCS fields - what we learnt from Nagaoka
Microseismic monitoring at the CCS fields - what we learnt from NagaokaGlobal CCS Institute
 
AVS 2007: selective biomolecular ion soft landing
AVS 2007: selective biomolecular ion soft landingAVS 2007: selective biomolecular ion soft landing
AVS 2007: selective biomolecular ion soft landingohadjar
 
End_of_studies_project_Stefano_Coltellacci_Aerospace_Engineering
End_of_studies_project_Stefano_Coltellacci_Aerospace_EngineeringEnd_of_studies_project_Stefano_Coltellacci_Aerospace_Engineering
End_of_studies_project_Stefano_Coltellacci_Aerospace_EngineeringStefano Coltellacci
 
2018.06.12 isabel guillamon uam
2018.06.12 isabel guillamon uam2018.06.12 isabel guillamon uam
2018.06.12 isabel guillamon uamNanoFrontMag-cm
 
Phononics and phononic crystals
Phononics and phononic crystalsPhononics and phononic crystals
Phononics and phononic crystalsvinzilla
 
Teknik menjawab Fizik SPM 2... more detail
Teknik menjawab Fizik SPM 2... more detailTeknik menjawab Fizik SPM 2... more detail
Teknik menjawab Fizik SPM 2... more detailCikgu Pejal
 
Particle Matter in Po Valley (Source Apportionment)
Particle Matter in Po Valley (Source Apportionment)Particle Matter in Po Valley (Source Apportionment)
Particle Matter in Po Valley (Source Apportionment)Federico Karagulian
 

Similar to PANIC2011_Final (20)

Bianchin panic2011 2
Bianchin panic2011 2Bianchin panic2011 2
Bianchin panic2011 2
 
Bianchin_PANIC2011
Bianchin_PANIC2011Bianchin_PANIC2011
Bianchin_PANIC2011
 
EXO_DBD07
EXO_DBD07EXO_DBD07
EXO_DBD07
 
Formation of Helium Lines in Prominences
Formation of Helium Lines in ProminencesFormation of Helium Lines in Prominences
Formation of Helium Lines in Prominences
 
The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)The TREK Experiment at J-PARC (Kaon 2016 Talk)
The TREK Experiment at J-PARC (Kaon 2016 Talk)
 
Spintronics
SpintronicsSpintronics
Spintronics
 
J-PARC
J-PARCJ-PARC
J-PARC
 
ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1ListOfTechProjsWITHSphinxV1
ListOfTechProjsWITHSphinxV1
 
Graphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronicsGraphene transistors and two-dimensional electronics
Graphene transistors and two-dimensional electronics
 
ppt
pptppt
ppt
 
3 ej fccrf legnaro 2014-10-06
3   ej fccrf legnaro 2014-10-063   ej fccrf legnaro 2014-10-06
3 ej fccrf legnaro 2014-10-06
 
Electronic Structures and UV/Visible Absorption Spectra of Organic Compunds
Electronic Structures and UV/Visible Absorption Spectra of Organic CompundsElectronic Structures and UV/Visible Absorption Spectra of Organic Compunds
Electronic Structures and UV/Visible Absorption Spectra of Organic Compunds
 
Microseismic monitoring at the CCS fields - what we learnt from Nagaoka
Microseismic monitoring at the CCS fields - what we learnt from NagaokaMicroseismic monitoring at the CCS fields - what we learnt from Nagaoka
Microseismic monitoring at the CCS fields - what we learnt from Nagaoka
 
AVS 2007: selective biomolecular ion soft landing
AVS 2007: selective biomolecular ion soft landingAVS 2007: selective biomolecular ion soft landing
AVS 2007: selective biomolecular ion soft landing
 
End_of_studies_project_Stefano_Coltellacci_Aerospace_Engineering
End_of_studies_project_Stefano_Coltellacci_Aerospace_EngineeringEnd_of_studies_project_Stefano_Coltellacci_Aerospace_Engineering
End_of_studies_project_Stefano_Coltellacci_Aerospace_Engineering
 
Jan2010 Triumf1
Jan2010 Triumf1Jan2010 Triumf1
Jan2010 Triumf1
 
2018.06.12 isabel guillamon uam
2018.06.12 isabel guillamon uam2018.06.12 isabel guillamon uam
2018.06.12 isabel guillamon uam
 
Phononics and phononic crystals
Phononics and phononic crystalsPhononics and phononic crystals
Phononics and phononic crystals
 
Teknik menjawab Fizik SPM 2... more detail
Teknik menjawab Fizik SPM 2... more detailTeknik menjawab Fizik SPM 2... more detail
Teknik menjawab Fizik SPM 2... more detail
 
Particle Matter in Po Valley (Source Apportionment)
Particle Matter in Po Valley (Source Apportionment)Particle Matter in Po Valley (Source Apportionment)
Particle Matter in Po Valley (Source Apportionment)
 

More from Sebastien Bianchin

Sebastien Bianchin - PhD Thesis
Sebastien Bianchin  -  PhD ThesisSebastien Bianchin  -  PhD Thesis
Sebastien Bianchin - PhD ThesisSebastien Bianchin
 
Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)Sebastien Bianchin
 
Measurement of the neutrino velocity with the OPERA detector in the CNGS beam
Measurement of the neutrino velocity with the OPERA detector in the CNGS beamMeasurement of the neutrino velocity with the OPERA detector in the CNGS beam
Measurement of the neutrino velocity with the OPERA detector in the CNGS beamSebastien Bianchin
 

More from Sebastien Bianchin (6)

C16 presentation
C16 presentationC16 presentation
C16 presentation
 
Sebastien Bianchin - PhD Thesis
Sebastien Bianchin  -  PhD ThesisSebastien Bianchin  -  PhD Thesis
Sebastien Bianchin - PhD Thesis
 
Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)Run Meeting J-PARC (June 12th 2015)
Run Meeting J-PARC (June 12th 2015)
 
Proceeding - PANIC
Proceeding - PANICProceeding - PANIC
Proceeding - PANIC
 
Measurement of the neutrino velocity with the OPERA detector in the CNGS beam
Measurement of the neutrino velocity with the OPERA detector in the CNGS beamMeasurement of the neutrino velocity with the OPERA detector in the CNGS beam
Measurement of the neutrino velocity with the OPERA detector in the CNGS beam
 
PhD Thesis
PhD ThesisPhD Thesis
PhD Thesis
 

Recently uploaded

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 

Recently uploaded (20)

A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 

PANIC2011_Final

  • 1. Search for Non-Standard Model Physics Using the Transverse Muon Polarization in Stopped K+ Decay The E06 TREK Experiment Sébastien Bianchin TRIUMF / University of British Columbia on behalf of the TREK-E06 Collaboration PANIC 2011 (July 24th – 29th, 2001) Massachusetts Institute of Technology, MA, USA Thursday, July 28th 2011 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 1
  • 2. The TREK Program at J-PARC Outline  TREK Program TREK = Time Reversal Experiment with Kaons  Search for Time Reversal Symmetry Violation  Test of Lepton Universality  Search for Heavy Neutrinos Lower intensity  Hadron Facility at J-PARC  TREK Apparatus – R&D  Status & Schedule S. Bianchin PANIC 2011 (July 24th – 29th 2011) 2
  • 3. Stopped K+ Experiments @ K1.1BR P36 (LFU) “Measurement of RK = (K+ →e+) / (K+ →m) and search for heavy sterile neutrinos” Stage-1 (PAC11-Jan’11); 30 kW (~2013) (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm) E06 (TREK) “Measurement of T-violating transverse muon polarization (PT) in K+→0mdecay” Stage-1, 270 kW (~2014) S. Bianchin PANIC 2011 (July 24th – 29th 2011) 3
  • 4. Stopped K+ Experiments @ K1.1BR P36 (LFU) “Measurement of RK = (K+ →e+) / (K+ →m) and search for heavy sterile neutrinos” Stage-1 (PAC11-Jan’11); 30 kW (~2013) (S. Shimizu, Parallel 5C – Meson Decays, July 28th @ 4pm) E06 (TREK) “Measurement of T-violating transverse muon polarization (PT) in K+→0mdecay” Stage-1, 270 kW (~2014) S. Bianchin PANIC 2011 (July 24th – 29th 2011) 3
  • 5. Transverse m+ Polarization in the Km3 Decay K+→mdecay  PT is T-odd, and spurious effects from final state interaction are small: PT (FSI) < 10-5 Non-zero PT is a signature of T violation  - Standard Model (SM) contribution to PT : PT (SM) < 10-7 PT in the range 10-3 – 10-5 is a sensitive probe of CP violation beyond the SM. There are theoretical models of new physics which allow a sizable PT value without conflicting with other experimental constraints. The TREK experiment aims for a sensitivity of 10-4 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 4
  • 6. Expected Sensitivity We are aiming for a sensitivity of PT ~ 10-4  PTstat ~ 0.05 PTstat (E246) ~ 10-4 : 1.4 x 107 sec runtime 1) Beam intensity x 30 2) Detector acceptance x 10 3) Larger analyzing power PTsyst ~ 0.1 PTsyst (E246) ~ 10-4 1) Precise calibration of misalignments 2) Correction of systematic effects 3) Precise fwd-bwd cancellation S. Bianchin PANIC 2011 (July 24th – 29th 2011) 5
  • 7. New Physics: Model Predictions for PT Model K+  0m+ K+  m+ ■ Standard Model < 10-7 < 10-7 ■ Final State Interactions < 10-5 < 10-3 Multi-Higgs ≤ 10-3 ≤ 10-3 PT (K+  0m+) ≈ + 3 PT (K+  m+) SUSY with squark mixing ≤ 10-3 ≤ 10-3 PT (K+  0m+) ≈ − 3 PT (K+  m+) SUSY with R-parity breaking ≤ 4 x10-4 ≤ 3 x10-4 Leptoquark model ≤ 10-2 ≤ 5 x10-3 ■ Left-Right symmetric model 0 < 7x10-3 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 6
  • 8. J-PARC Facility (KEK/JAEA) North S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 9. J-PARC Facility Linac (KEK/JAEA) North 3 GeV Synchrotron CY2007 Beams S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 10. J-PARC Facility Linac (KEK/JAEA) North 3 GeV Synchrotron Materials and Life Experimental Facility CY2007 Beams Hadron Exp. JFY2008 Beams Facility S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 11. J-PARC Facility Linac (KEK/JAEA) North 3 GeV Synchrotron Neutrino Beams (to Kamioka) Materials and Life Experimental Facility CY2007 Beams Hadron Exp. JFY2008 Beams Facility JFY2009 Beams S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 12. J-PARC Hadron Hall Beam Dump K1.8 KL K1.8BR K1.1 S-type 30~50 GeV Production primary beam K1.1BR target (T1) C-type S. Bianchin PANIC 2011 (July 24th – 29th 2011) 8
  • 13. K1.1BR = K0.8 Beam Line Installation Proton beam S. Bianchin PANIC 2011 (July 24th – 29th 2011) 9
  • 14. K1.1BR = K0.8 Beam Line Installation  K1.1BR completed in summer 2010 using the supplementary budget of FY09  Commissioned in Oct. 2010 by the TREK collaboration - ESS Length of 2.0m to be increased to 2.5m - Length Q8-FF of 3.3m to be reduced to 1.5m (remove iron shielding wall) Q1, Q2 D2 T1 D1 Q3, Q4 IFX, Proton beam IFY SX1 ESS Q5, Q6 SX2 K1.1-BR SX1 MS D3 HFOC Q7 Q8 • FF S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 15. The TREK Experimental Apparatus K+→m Use an upgraded E246 detector Active Polarimeter ( Japan ) New Fibre Target ( Canada ) C0,C1 GEM ( USA ) CsI(Tl) readout ( Russia ) PT is measured as the azimuthal asymmetry Ae+ of the m+ decay positrons S. Bianchin PANIC 2011 (July 24th – 29th 2011) 10
  • 16. The Stopped Beam Method K+→m Side view of the TREK setup Experimental method bwd -  fwd -  0 (2) detection EM Calorimeter Decay Plane m+ tracking Target + 5 Chambers e+ detection Active Muon Polarimeter S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 17. The Stopped Beam Method K+→m Electromagnetic calorimeter 0 detection bwd -  fwd -  768 CsI(Tl) crystals (250mm in length ea.) 12 “muon holes” @ 90º to allow m+ to enter 12 spectrometer gaps 75% of 4 str S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 18. The Stopped Beam Method K+→m Tracking system Charged particle tracking bwd -  fwd -  5 Chambers : 1 cylindrical GEM chamber (C0) 1 planar GEM chamber (C1) + Active Target ! 3 planar MWPCs (C2, C3, C4) S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 19. The Stopped Beam Method K+→m e+ Active muon polarimeter m+ polarization measurement bwd -  fwd -  Active Muon Polarimeter Muon stopper : 33 plates (Al, Mg or other light metal alloy) Plate thickness : ~ 2mm Plate gap ~ 8mm S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 20. The Stopped Beam Method K+→m Double ratio experiment AT = (Afwd - Abwd ) / 2 Ncw - Nccw Afwd(bwd) = Ncw + Nccw PT = AT / {<cosT>}  : analyzing power <cosT> : attenuation factor Im = PT / KF : physics parameter KF : kinematic factor bwd -  fwd -  S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 21. The Stopped Beam Method K+→m Double ratio experiment AT = (Afwd - Abwd ) / 2 Ncw - Nccw Afwd(bwd) = Ncw + Nccw PT = AT / {<cosT>}  : analyzing power <cosT> : attenuation factor Im = PT / KF : physics parameter KF : kinematic factor Current limit from KEK--E246 bwd -  fwd -  PT = - 0.0017 ± 0.0023(stat) ± 0.0011(syst) |PT | < 0.005 (90% CL) Im= - 0.0053 ± 0.0071(stat) ± 0.0036(syst) |Im| < 0.016 (90% CL) M.Abe et al., Phys. Rev. D 73, 072005 (2006) S. Bianchin PANIC 2011 (July 24th – 29th 2011) 11
  • 22. TREK/E06 Tracking Upgrade GEM technology -- In collaboration with Jefferson Lab, Hampton U. and MIT 70 µm holes 140 µm spacing  Planar GEMs (C1) between CsI and C2  Cylindrical GEM (C0) as replacement for old C1 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 12
  • 23. The C0 Cylindrical GEM for TREK 300 mm 160 mm 140 mm • Vertex tracking near target,  < 0.1 mm • Very high rate capability > 1 kHz/mm2 • Radiation-hardness >> 107 particles/mm2 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 13
  • 24. R&D(1) – APD Readout for CsI(Tl) • Improve the timing characteristics of CsI(Tl) by replacing PIN diode with APD • Pulse shaping and pile-up analysis C1 GEM One-module energy One-module timing new requirement too slow • Both 1 and 9 module tests have been performed using an e+ beam at Tohoku Univ. to check the energy resolution and high-rate performance of APD readout S. Bianchin PANIC 2011 (July 24th – 29th 2011) 14
  • 25. R&D(2) – Active Muon Polarimeter Top View e+ μ+ μ+  Full angular acceptance for positrons – 10x higher than in E-246  Determination of decay vertex – background-free measurement  Measurement of e+ angle and approx. energy – higher analyzing power  Improved field alignment – suppressed systematic error  Full-size prototype tested at TRIUMF in Nov. 2009 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 15
  • 26. R&D(3) – Active Scintillating Fiber Target Light Guide: Kuraray Y11 WLS Fibre (1400 mm) 3x3 mm2 356 fibres Readout: SiPMT (Hamamatsu MMPC) 1x1 mm2 / 400 px Gain 7.5x105 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 16
  • 27. Upgrade Timeline  Target:  Finer segmentation of TGT scintillating fibres Readout: MPPC (SiPMT) Hamamatsu  Particle ID:  Aerogel Cherenkov surrounding target, TOF LFU  Charged particle tracking: 30 kW  Add new element C1 between CsI(Tl) and C2 ~2013  Add cylindrical GEM (C0) (remove aerogel) TREK  0 (1&2 photon) detection: 270 kW  New, faster readout of CsI(Tl): APD, MAPD  Wave form analysis using FADCs >100 kW ~2014  Muon polarimeter :  Active polarimeter with increased acceptance  New muon holding field magnet with a parallel field S. Bianchin PANIC 2011 (July 24th – 29th 2011) 17
  • 28. Summary  TREK at J-PARC is gaining momentum  “K1.1BR” secondary beamline has been commissioned  Measurement of the T-violating transverse muon polarization in Kμ3 decay (~2014) - Large potential for the discovery of New Physics - Upgrade of existing experimental setup of KEK E-246 S. Bianchin PANIC 2011 (July 24th – 29th 2011) 18
  • 29. The TREK Collaboration http://trek.kek.jp CANADA RUSSIA University of Saskatchewan Russian Academy of Sciences (RAS) Department of Physics and Engineering Institute for Nuclear Research (INR) University of British Columbia Department of Physics and Astronomy TRIUMF Universite de Montreal JAPAN Osaka University Laboratoire de Physique Nucleaire Department of Physics University of Manitoba National Defense Academy Department of Physics Department of Applied Physics Tohoku University USA Research Center for Electron Photon Science High Energy Accel. Research Org. (KEK) Massachusetts Inst. of Technology (MIT) Institute of Particle and Nuclear Studies University of South Carolina Institute of Material Structure Science Department of Physics and Astronomy Accelerator Laboratory Iowa State University Kyoto University, College of Liberal Arts & Sciences Department of Physics Hampton University Tokyo Institute of Technology (TiTech) Department of Physics Department of Physics Jefferson Laboratory VIETNAM University of Natural Sciences S. Bianchin PANIC 2011 (July 24th – 29th 2011) 19
  • 30. The TREK Collaboration http://trek.kek.jp CANADA RUSSIA University of Saskatchewan Russian Academy of Sciences (RAS) Department of Physics and Engineering Institute for Nuclear Research (INR) University of British Columbia Department of Physics and Astronomy TRIUMF Universite de Montreal JAPAN Osaka University Laboratoire de Physique Nucleaire Department of Physics University of Manitoba National Defense Academy Department of Physics Department of Applied Physics Tohoku University USA Research Center for Electron Photon Science High Energy Accel. Research Org. (KEK) Massachusetts Inst. of Technology (MIT) Institute of Particle and Nuclear Studies University of South Carolina Institute of Material Structure Science Department of Physics and Astronomy Accelerator Laboratory Iowa State University Kyoto University, College of Liberal Arts & Sciences Department of Physics Hampton University Tokyo Institute of Technology (TiTech) Department of Physics Department of Physics Jefferson Laboratory VIETNAM New collaborators are welcome! University of Natural Sciences S. Bianchin PANIC 2011 (July 24th – 29th 2011) 19
  • 31. Thank You S. Bianchin PANIC 2011 (July 24th – 29th 2011) 20
  • 32. J-PARC March11 Earthquake Damage S. Bianchin PANIC 2011 (July 24th – 29th 2011)
  • 33. S. Bianchin PANIC 2011 (July 24th – 29th 2011)