ENVIRONMENTAL IMPACT
     ASSESSMENT

                     Prepared by
               Prof. B. Mohanty
 Department of Civil Engineering
         SALITER, Ahmedabad
Introduction…
Defined as the systematic identification and
evaluation of potential impacts of proposed
projects, plans or actions on physical,
chemical, biological, cultural and socio-
economic components of environment.
 EIA planning tool, helps planner in predicting
  future impacts of different developments.

 EIA must be conducted for projects like
  highways, airports, canals, dams, power plants
  etc. which disturb environment.

 Applicable for developmental activities which
  involves plans, programmes and policies.
Need of EIA
 When a project undertaken it disturb
  environmental equilibrium.

 To maintain quality of environment it is essential
  to study impacts of project on environment.

 This also suggest remedial measures for
  development of projects.
An ideal EIA system…

 Apply to all projects that have a significant
  environmental effects.
 Compare alternatives of proposed effect,
  management techniques, mitigation measures.
 Preparation of EIS (Environmental Impact
  Statement).
 Include broad public participation and
  administrative review procedure.
 Be timed to provide information for decision
  making.

 Be enforceable.

 Include monitoring and feedback procedures.
Goals of EIA

   Resources conservation
   Waste minimization
   Recovery of by product
   Efficient use of equipments
   Sustainable development
Methodology of EIA
 Organizing the job

 Performing the assessment

 Writing the EIS

 Review of EIS
Organizing the job
 Interdisciplinary team is constituted to conduct
  analysis of impacts on environment.

 Consists of a group of geologists, agronomists,
  chemists, ecologists, hydrologists, engineers, etc.

 Decide whether project is required or not.
Performing the assessment

   Site visit
   Identification and evaluation
   Discussion of alternatives
   Preparation of checklist
   Measurement of environmental impact due to
    project
Preparation of EIS
 EIS is conclusion of EIA
 It is a written statement to ensure that policies and
  goals of NEPA (National Environment Policy Act)
  included in ongoing project.
 It contains following items:

1. Description of site
2. Description of proposed project, purpose of action,
   goals and objectives.
3. Environmental impact of proposed project
4. Alternatives of activity
5. Relationship of proposed activity to the existing
    land use plans
6. Relationship between local short term uses and
    long term productivity of resources involved
7. Indentifying measures that can be taken in order
    to minimize adverse effects
8. Incorporating the modifications in proposed
    project
Review of EIS
 After completion of EIA report, public must be
  informed and consulted on proposed project.

 Anyone likely to be affected by the project is
  entitled to have access to the executive summary
  of the EIA.
 The affected person may include:
Bonafide local residents
Local associations
Environmental groups active in area
Other person located at project sites
 They have to give suggestion
 One month given for public inspection
 After final review decision is taken either
  approve or reject of proposed project.
EIA in India
 Formal legislation for EIA. It has been enacted
  by making an amendment in the Environment
  Protection Act 1986.

 Limited involvement of public and government
  agencies in the initial phases.

 No provision in place to cover landscape and
  visual impacts in the Indian EIA regulations.
 Earlier scoping was done by consultant or
  proponent with an inclination towards meeting
  pollution control requirements, rather than
  addressing the full range of potential
  environmental.

 Most reports in English and not in the local
  language. In some case, executive summary is
  translated into local language.
Limitations of EIA
1. Should undertaken at policy and planning level
   rather than the project level.
2. Possible alternatives is often small
3. There is no criteria to decide what types of
   projects undergo EIA. Because many projects
   do not require in depth EIA.
4. Lack of comprehensive environmental
   information, base limitations of time,
   manpower, financial resources.
5. More research and development of improved
   methodologies required to overcome limitations
   relating in data.
6. EIA report too academic, bureaucratic and
   lengthy. Difficult to understand for common
   people.
7. In actual, EIA ends immediately after project
   clearance, no follow up taken.
Critical issues in EIA guidelines
 Can local environment cope with additional
  waste and pollution that the project will
  produce?
 Will project location conflict with nearby land
  use?
 Can project operates safely without serious risk
  of accidents or long term health hazards?
 Is there sufficient infrastructure to support the
  project?
 How much resources will project consume and
  are adequate supplies of these resources
  available?

 What kind of human resources will it require or
  replace and what will be its social impacts?

 What damage will it cause to national/regional
  assets such as natural resources, tourist areas or
  historic or cultural sites etc?
Introduction
 Main aim to quantify environmental
  performance and position of an
  industry/organization.
 It is done for improving performance and
  position.
 Act as tool for achieving sustainable
  development.
 According to USEPA, EA is a systematic,
  documented, periodic and objective review by a
  regulated entity of facility operations and
  practices related to meeting environmental
  requirements.

 Govt. of India march 13, 1992 made mandatory
  for all industries to provide annual
  environmental audit reports of their operations.
 EA provide answers to the following questions:

What are we doing ? Are we compliance with
 govt. regulations, guidelines, code of practice,
 permit conditions ?

Can we do it better ? Are there non regulated
 areas where operations can be improved to
 minimize the impact on environment ?
Components of EA
I. Assessment :

 Provides expert judgment/opinion on hazards,
  associated risks and management and control
  measures.

 It provides basis for recommendations to
  improve the organization’s management
  systems and environmental performance.
II. Verification :

It determines and document performance by
 evaluating the application of and adherence to
 policies and procedures.

It certifies validity of data and reports, evaluates
 the effectiveness of management systems.
Basic steps in audit process

 Pre-audit activities

 Audit process

 Post audit activities
Types of EA
   Compliance audit
   Environmental management audit
   Due diligence audit
   Supplier audits
   Programmes audit
   Single issues audits
   Risk definition or hazard identification
Benefits of auditing
 Ensuring compliance, not only with
  laws, regulations but also with company policies
  and requirements of environment.
 Enabling environmental problems and risks to
  be anticipated and responses planned.
 Demonstrate organization impact on
  environment.
 Increase management and employee awareness
  of environmental issues.
 More efficient resources use and financial
  savings.
 Promotes “Good Practice”.
 Providing better private and public image and
  security to top management.
ASSIGNMENT NO. - 3
1. Discuss various air pollution controlling equipments with
   their advantages and disadvantages.
2. Enlist different air pollutants with their sources and
   effects.
3. Explain the effects of air pollutants on human, plants and
   materials.
4. What are the different effects of noise pollution on
   human, animals and plants and to control the noise
   pollution?
5. Write a note on EIA.
6. Briefly explain environmental audit?

Contenu connexe

Tendances

Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIGAURAV. H .TANDON
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentJini Rajendran
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)SANDEEP PATRE
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSayyid Ina
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Palash Mehar
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentPrithvi Ghag
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentationsujit roy
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsKushal Patel
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009Jenson Samraj
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessmentashwinpand90
 

Tendances (20)

Environmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit IIIEnvironmental Impact Assessment and Environmental Audit- Unit III
Environmental Impact Assessment and Environmental Audit- Unit III
 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment (eia)
Environmental impact assessment (eia)Environmental impact assessment (eia)
Environmental impact assessment (eia)
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
 
EIA Process
EIA ProcessEIA Process
EIA Process
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Eia screening
Eia screeningEia screening
Eia screening
 
Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment Introduction to Strategic Environmental Assessment
Introduction to Strategic Environmental Assessment
 
Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)
Environmental Impact Assessment (EIA)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009EIA amendments - 2006 and 2009
EIA amendments - 2006 and 2009
 
Seminar on Environmental Impact Assessment
Seminar on Environmental Impact AssessmentSeminar on Environmental Impact Assessment
Seminar on Environmental Impact Assessment
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Environmental Audit
Environmental AuditEnvironmental Audit
Environmental Audit
 

En vedette

PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017Yu-Hsun (lymanblue) Lin
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plantvandana bharti
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact AssessmentBahadur Prasad
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Arvind Kumar
 
Environmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegJohn Gunter
 
Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)tesdev
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Ethical Sector
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIASakthivel R
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Mr.Allah Dad Khan
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessmentPrabha Panth
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment conceptIntan Ayuna
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEffah Effervescence
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Arvind Kumar
 
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...Arvind Kumar
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기NAVER Engineering
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorchMayur Bhangale
 

En vedette (20)

PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017PyTorch Tutorial for NTU Machine Learing Course 2017
PyTorch Tutorial for NTU Machine Learing Course 2017
 
Imelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact AssessmentImelda Winters Presentation Environmental Impact Assessment
Imelda Winters Presentation Environmental Impact Assessment
 
EIA thermal power plant
EIA thermal power plantEIA thermal power plant
EIA thermal power plant
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...Environmental impact assessment and life cycle assessment and their role in s...
Environmental impact assessment and life cycle assessment and their role in s...
 
Environmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of WinnipegEnvironmental Impact Assessment - University of Winnipeg
Environmental Impact Assessment - University of Winnipeg
 
Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)Planning and environmental impact assessment (EIA)
Planning and environmental impact assessment (EIA)
 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
 
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIAENVIRONMENTAL IMPACT ASSESSMENT - EIA
ENVIRONMENTAL IMPACT ASSESSMENT - EIA
 
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
Environmental impact assessment (eia) By Mr Allah Dad Khan Visiting Professor...
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
13 environmental impact assessment
13 environmental impact assessment13 environmental impact assessment
13 environmental impact assessment
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
Environmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact AssessmentEnvironmental Audit and Environmental Impact Assessment
Environmental Audit and Environmental Impact Assessment
 
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
Environmental impact assessment methodology by Dr. I.M. Mishra Professor, Dep...
 
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...Summarization of Environmental Impact  Assessment Methodology by Dr. I.M. Mis...
Summarization of Environmental Impact Assessment Methodology by Dr. I.M. Mis...
 
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
1시간만에 GAN(Generative Adversarial Network) 완전 정복하기
 
Deep Learning with PyTorch
Deep Learning with PyTorchDeep Learning with PyTorch
Deep Learning with PyTorch
 

Similaire à Environmental impact assessment m5

Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfssusereef268
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentArunAngadi5
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentIntan Ayuna
 
What are the aspects and impacts of Environmental Impact Assessment_.pdf
What are the aspects and impacts of Environmental Impact Assessment_.pdfWhat are the aspects and impacts of Environmental Impact Assessment_.pdf
What are the aspects and impacts of Environmental Impact Assessment_.pdfJagriti Agarwal
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.Royallity Vishwanath
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfJagriti Agarwal
 
UNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptUNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptkrpnath1
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfHajiraThabasum
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfPranshuSharma18498
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentPramoda Raj
 
Environmental management
Environmental managementEnvironmental management
Environmental managementManoj Mota
 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxMarskyUbia
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 

Similaire à Environmental impact assessment m5 (20)

Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
 
environmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdfenvironmentalimpactassessmenteia-210826024951.pdf
environmentalimpactassessmenteia-210826024951.pdf
 
Environment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessmentEnvironment impact assessment in environment impact assessment
Environment impact assessment in environment impact assessment
 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
 
EIA PPT.pptx
EIA PPT.pptxEIA PPT.pptx
EIA PPT.pptx
 
EIA PPT.pdf
EIA PPT.pdfEIA PPT.pdf
EIA PPT.pdf
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
What are the aspects and impacts of Environmental Impact Assessment_.pdf
What are the aspects and impacts of Environmental Impact Assessment_.pdfWhat are the aspects and impacts of Environmental Impact Assessment_.pdf
What are the aspects and impacts of Environmental Impact Assessment_.pdf
 
What is eia
What is eiaWhat is eia
What is eia
 
Report on Environment impact assessment.
Report on Environment impact assessment.Report on Environment impact assessment.
Report on Environment impact assessment.
 
What is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdfWhat is environmental impact assessment and its type_.pdf
What is environmental impact assessment and its type_.pdf
 
UNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).pptUNIT – I ptpg final (2).ppt
UNIT – I ptpg final (2).ppt
 
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdfBeige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
Beige and Brown Aesthetic Group Project Presentation_20230920_011228_0000.pdf
 
What is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdfWhat is an Environmental Clearance Certificate and How to Obtain It.pdf
What is an Environmental Clearance Certificate and How to Obtain It.pdf
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
 
Environmental management
Environmental managementEnvironmental management
Environmental management
 
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docxENVIRONMENTAL IMPACT ASSESSMENT final na.docx
ENVIRONMENTAL IMPACT ASSESSMENT final na.docx
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 

Plus de Bibhabasu Mohanty

Plus de Bibhabasu Mohanty (20)

Transport of pollution in atmosphere. m2 pptx
Transport of pollution in atmosphere. m2 pptxTransport of pollution in atmosphere. m2 pptx
Transport of pollution in atmosphere. m2 pptx
 
Air pollution control m4
Air pollution control m4Air pollution control m4
Air pollution control m4
 
Effects of air pollution m3
Effects of air pollution m3 Effects of air pollution m3
Effects of air pollution m3
 
Air quality sampling and monitoring m5
Air quality sampling and monitoring m5Air quality sampling and monitoring m5
Air quality sampling and monitoring m5
 
Introduction & transport of air pollution. m1 pptx
Introduction & transport of air pollution. m1 pptxIntroduction & transport of air pollution. m1 pptx
Introduction & transport of air pollution. m1 pptx
 
Noise pollution
Noise pollutionNoise pollution
Noise pollution
 
Flood management m4
Flood management m4Flood management m4
Flood management m4
 
Air pollution
Air pollutionAir pollution
Air pollution
 
Water resources planning and development m5
Water resources planning and development m5Water resources planning and development m5
Water resources planning and development m5
 
Drought management and water harvesting m5
Drought management and water harvesting m5Drought management and water harvesting m5
Drought management and water harvesting m5
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Irrigation engineering m1
Irrigation engineering m1Irrigation engineering m1
Irrigation engineering m1
 
Reservoir
ReservoirReservoir
Reservoir
 
Hydroelectric power
Hydroelectric power Hydroelectric power
Hydroelectric power
 
Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Water requirements
Water requirementsWater requirements
Water requirements
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Microbes
MicrobesMicrobes
Microbes
 

Dernier

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Dernier (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

Environmental impact assessment m5

  • 1. ENVIRONMENTAL IMPACT ASSESSMENT Prepared by Prof. B. Mohanty Department of Civil Engineering SALITER, Ahmedabad
  • 2. Introduction… Defined as the systematic identification and evaluation of potential impacts of proposed projects, plans or actions on physical, chemical, biological, cultural and socio- economic components of environment.
  • 3.  EIA planning tool, helps planner in predicting future impacts of different developments.  EIA must be conducted for projects like highways, airports, canals, dams, power plants etc. which disturb environment.  Applicable for developmental activities which involves plans, programmes and policies.
  • 4. Need of EIA  When a project undertaken it disturb environmental equilibrium.  To maintain quality of environment it is essential to study impacts of project on environment.  This also suggest remedial measures for development of projects.
  • 5. An ideal EIA system…  Apply to all projects that have a significant environmental effects.  Compare alternatives of proposed effect, management techniques, mitigation measures.  Preparation of EIS (Environmental Impact Statement).  Include broad public participation and administrative review procedure.
  • 6.  Be timed to provide information for decision making.  Be enforceable.  Include monitoring and feedback procedures.
  • 7.
  • 8. Goals of EIA  Resources conservation  Waste minimization  Recovery of by product  Efficient use of equipments  Sustainable development
  • 9. Methodology of EIA  Organizing the job  Performing the assessment  Writing the EIS  Review of EIS
  • 10.
  • 11. Organizing the job  Interdisciplinary team is constituted to conduct analysis of impacts on environment.  Consists of a group of geologists, agronomists, chemists, ecologists, hydrologists, engineers, etc.  Decide whether project is required or not.
  • 12. Performing the assessment  Site visit  Identification and evaluation  Discussion of alternatives  Preparation of checklist  Measurement of environmental impact due to project
  • 13. Preparation of EIS  EIS is conclusion of EIA  It is a written statement to ensure that policies and goals of NEPA (National Environment Policy Act) included in ongoing project.  It contains following items: 1. Description of site 2. Description of proposed project, purpose of action, goals and objectives. 3. Environmental impact of proposed project
  • 14. 4. Alternatives of activity 5. Relationship of proposed activity to the existing land use plans 6. Relationship between local short term uses and long term productivity of resources involved 7. Indentifying measures that can be taken in order to minimize adverse effects 8. Incorporating the modifications in proposed project
  • 15. Review of EIS  After completion of EIA report, public must be informed and consulted on proposed project.  Anyone likely to be affected by the project is entitled to have access to the executive summary of the EIA.
  • 16.  The affected person may include: Bonafide local residents Local associations Environmental groups active in area Other person located at project sites  They have to give suggestion  One month given for public inspection  After final review decision is taken either approve or reject of proposed project.
  • 17. EIA in India  Formal legislation for EIA. It has been enacted by making an amendment in the Environment Protection Act 1986.  Limited involvement of public and government agencies in the initial phases.  No provision in place to cover landscape and visual impacts in the Indian EIA regulations.
  • 18.  Earlier scoping was done by consultant or proponent with an inclination towards meeting pollution control requirements, rather than addressing the full range of potential environmental.  Most reports in English and not in the local language. In some case, executive summary is translated into local language.
  • 19. Limitations of EIA 1. Should undertaken at policy and planning level rather than the project level. 2. Possible alternatives is often small 3. There is no criteria to decide what types of projects undergo EIA. Because many projects do not require in depth EIA. 4. Lack of comprehensive environmental information, base limitations of time, manpower, financial resources.
  • 20. 5. More research and development of improved methodologies required to overcome limitations relating in data. 6. EIA report too academic, bureaucratic and lengthy. Difficult to understand for common people. 7. In actual, EIA ends immediately after project clearance, no follow up taken.
  • 21. Critical issues in EIA guidelines  Can local environment cope with additional waste and pollution that the project will produce?  Will project location conflict with nearby land use?  Can project operates safely without serious risk of accidents or long term health hazards?  Is there sufficient infrastructure to support the project?
  • 22.  How much resources will project consume and are adequate supplies of these resources available?  What kind of human resources will it require or replace and what will be its social impacts?  What damage will it cause to national/regional assets such as natural resources, tourist areas or historic or cultural sites etc?
  • 23.
  • 24. Introduction  Main aim to quantify environmental performance and position of an industry/organization.  It is done for improving performance and position.  Act as tool for achieving sustainable development.
  • 25.  According to USEPA, EA is a systematic, documented, periodic and objective review by a regulated entity of facility operations and practices related to meeting environmental requirements.  Govt. of India march 13, 1992 made mandatory for all industries to provide annual environmental audit reports of their operations.
  • 26.  EA provide answers to the following questions: What are we doing ? Are we compliance with govt. regulations, guidelines, code of practice, permit conditions ? Can we do it better ? Are there non regulated areas where operations can be improved to minimize the impact on environment ?
  • 27. Components of EA I. Assessment :  Provides expert judgment/opinion on hazards, associated risks and management and control measures.  It provides basis for recommendations to improve the organization’s management systems and environmental performance.
  • 28. II. Verification : It determines and document performance by evaluating the application of and adherence to policies and procedures. It certifies validity of data and reports, evaluates the effectiveness of management systems.
  • 29. Basic steps in audit process  Pre-audit activities  Audit process  Post audit activities
  • 30. Types of EA  Compliance audit  Environmental management audit  Due diligence audit  Supplier audits  Programmes audit  Single issues audits  Risk definition or hazard identification
  • 31. Benefits of auditing  Ensuring compliance, not only with laws, regulations but also with company policies and requirements of environment.  Enabling environmental problems and risks to be anticipated and responses planned.  Demonstrate organization impact on environment.
  • 32.  Increase management and employee awareness of environmental issues.  More efficient resources use and financial savings.  Promotes “Good Practice”.  Providing better private and public image and security to top management.
  • 33.
  • 34. ASSIGNMENT NO. - 3 1. Discuss various air pollution controlling equipments with their advantages and disadvantages. 2. Enlist different air pollutants with their sources and effects. 3. Explain the effects of air pollutants on human, plants and materials. 4. What are the different effects of noise pollution on human, animals and plants and to control the noise pollution? 5. Write a note on EIA. 6. Briefly explain environmental audit?