2. Presentation Agenda
•BiogenGreenfinch
•Basics of anaerobic digestion
•Applications of anaerobic digestion technology
•Where to start & what needs to be addressed;
objectives
feedstock
biogas utilisation
digestate utilisation
planning
permitting
plant design & technology provider
3. BiogenGreenfinch
• Bringing together the expertise of BIOGEN – UK’s leading AD operator
with Greenfinch – UK’s leading AD technology provider
• British, family business with 30+ years of experience within the AD
industry
• Team of 47 people based at either Milton Ernest and Ludlow
• Capability and capacity to deliver a fully integrated AD solution to the
agricultural, food, waste and water industries and to local authorities
• Responsible for the development of 14 plants to date throughout the
UK
7. Biogas
CH4
CO2
Biomass Biofertiliser
AD
(N, P, K, C) (N, P, K,C)
8. Application of AD
Manure Energy Crops
Sewage Biodegradable
Sludge Waste
Reduce Improve Diversion Renewable
Odour Nutrient from Energy
Management Landfill Production
17. Feedstock
•Type & quantity of feedstock?
On farm wastes & products
slurry- how long are animal housed?
what are the animals bedded on?
energy crops- do you have sufficient ground to grow in addition to animal feed?
what is the cost of crop production?
Imported feedstocks
ABP?
availability & seasonality?
feedstock guarantee & contract?
cost or gate fee?
18. Biogas Utilisation
•CHP
Electricity- used on site or exported to the grid?
Price per MWh?
Heat- is their a use on site or could it be exported?
Price per MWh?
Tri-generation- production of cooling using surplus heat
Connection to the national grid- contact DNO.
•Upgrade to biomethane
connection to gas grid - contract for biomethane, price per MWh
use as a vehicle fuel
19. Digestate Utilisation
•Where will the digestate be utilised?
Is there enough land locally?
How much will the haulage cost?
When will the digestate be applied?
What storage is required?
Is a permit required for its application to land?
What cost is offset through less requirement for imported fertilisers?
21. Plant Design & Technology Providers
•Plant design
Tank design
shape, material
Mixing system
mechanical, gas, liquid recirculation
Heating
external / internal
Digester feeding & discharge
pump, auger, gravity
Gas collection
•Budget costs
•Tendering process
22. Planning
•Will you get planning permission?
AONB, Greenbelt?
•Where should you apply to for planning permission?
County Planning Authority
Local Planning Authority
•What should be considered?
Odour,
noise,
vehicle movements,
proximity to dwellings,
aesthetic appearance, etc
25. Plant operation & maintenance
•Operate with current labour units
•Employ additional labour units
•Contract our specialist maintenance
•Contract out plant operation & maintenance
26. Conclusion
•Is the project viable & does it meet your objectives?
•Plan carefully
•Do not under estimate the project planning time